Loading...
HomeMy WebLinkAboutContract 49033-A3 CSC No.49033-A3 Mqy 2 l 2020 AMENDMENT No.3 Ciryo'ro Rr ClTySE'C8',WO � TO CITY SECRETARY CONTRACT rARWHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 49033, (the CONTRACT) which was authorized by M&C C- 28194 on the 18th day of April, 2017 in the amount of $291,579.00; and VVYWRR", the contract was subsequently revised by Amendment No. 1 in the amount of $133,294.00 authorized January 9, 2018 (M&C C-28528) and Amendment No. 2 in the amount of $70,000.00 administratively approved February 19, 2019; and WHEREAS, the CONTRACT involves engineering services for the following project: Marine Creek Drainage Basin Parallel Interceptor Phase II Improvements at Various Locations within the Marine Creek Drainage Basin; and i WHEREAS, it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 19, 2020, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $29,649.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $524,522.00 3. All other provisions of the Contract, which are not expressly x amended herein, shall remain in full force and effect. OFINUAL RECORD CITY SECRETARY 3 Page -1- FT WORTH, 7 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Hal££ Associates, Inc. Z/a> 'yc� vL 1 S% � Dana Burghdoff(May 26,2 13:06 CDT DaV�aR.tkTi ay A 2020 15:48 CDT) Dana Burghdoff, David M. Smith, P.E. Assistant City Manager Public Works Team Leader DATE: May 26, 2020 DATE: May 22, 2020 APPROVAL RECOMMENDED: Chrisfiookior Hardor Christopher Harder(May 26,2020 07:18 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Walter Norwood, P.E. WaI,t2r Alarwawi Walter Norwood(May 22,2020 16:00 CDT) - Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A hw- 1295 N/A -Al"1.w Mack(May 26,202012:56 CDT) Douglas W. Black Senior Assistant City Attorney ATTEST: t'� Mary J. Kayser '- C 'ma`s 7-17 City Secretary �� 0 F F ICIA L Eo CITY SECRETA V FT WORT S -T Page -2- mom HALFF MEN May 19,2020 32654.001 Mr.Walter Norwood City of Fort Worth Water Department 200 Texas Street Fort Worth,Texas 76102 RE: Amendment No. 3—Marine Creek Parallel Sanitary Sewer Interceptor M-365 City Project No. 100274 Dear Mr.Norwood: Halff Associates is pleased to present this Amendment No. 3 for additional services to City Project No. 100274. Amendment No. 3 includes the effort necessary to prepare two separate design and construction packages. The Level of Effort spreadsheet for Amendment 3 is attached for reference. A summary of the proposed budget for this amendment is as follows: Project Management $718 Final Design $11,740 Bid Phase $10,960 Construction Phase Services $6,231 TOTAL PROPOSED AMENDMENT NO. 3 $29,649 There is no additional SBE effort included in this amendment. The SBE utilization of the Original Contract and Amendments combined is 10.7%,which exceeds the City's original SBE goal of 10%. Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Following is project fee summary: Original Contract $291,579 Amendment No. 1 $133,294 Amendment No. 2 $70,000 Amendment No. 3 $29 649 REVISED CONTRACT AMOUNT $524,522 HALFF ASSOCIATES,INC. 4000 FOSSIL CREEK BOULEVARD TEL (817)847-1422 WWW.HALFF.COM FORT WORTH,TX 76137-2720 FAX (817)232-9784 NNE �r.N EmmCity oFort�orth Water Depa ment ■■■ HALFF May 19,2020 Page 2 Sincerely, HALFF ASSOCIATES,INC. Leah M. Hodge Project Manager a! ; ; IS § !| 1 �l �l\\ ; ! HERE S:S SHE ; HE= .s RUSSRSER . , a .. 5R . f! \ . ) " ¥ ; .. I ;S SEE, ; RM2222 22 SEWERS { /4 ) !m ■` {)}() {!{m; ! \) � f■t \)\;4{7 / } /�. | /){! ; !! !!!a!§mil;•l::t !;l•az] •.-|�\\�:!! b ! 2aaMAIM p :§f \{§ \\�\00 { Ell L, IS ! ( � \ ) ) - [ &�{u# . =e �§t LI �0.2, !/ /°\ /\ !� - / )_[| { -- - in !(; f§/ ; ,,, , &� __ _ /)§ !! )\ I r � { / ! a ) k T- .0 u } §t:m 2 ]4 ;e; § E . o IL \j�\�) \\ \ \ \ \\ / !; ! / w co §;(; !j !\ )/] \.o