HomeMy WebLinkAboutContract 48760-A2 CSC No.48760-A2
JUEI -1 2020 Harley Avenue and Bryce Avenue
CITY TH Infrastructure Construction Agreement
6TYSEC m"y CSC No. 48760
Amendment No. 2
WHEREAS, Event Facilities Fort Worth, Inc., ("Developer") and the City of Fort Worth,
("City"), entered into an Infrastructure Construction Agreement (CS No. 48760)
(Administratively approved February 28, 2017) (the "ICA") for certain improvements to
Harley Avenue and Bryce Avenue (the "Improvements") in conjunction with
construction of the Dickies Arena; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in
the amount of$300,000.00 which was authorized by M&C #C-28967 on the I Ph day of
December, 2018; and
WHEREAS, Section C. of the ICA stipulates that the Improvements may be modified a
necessary through the course of construction by written Change Orders; and
WHEREAS, additional work has been identified, specifically, the milling of street pave
sub-base, removal of ADA ramp, removal of concrete pavement, placement of new 10'
concrete pavement, placement of 6" flexible base, placement of new barrier free ramp
irrigation repairs and exploratory excavation of existing utilities within Trail Drive
("Additional Work") which was not included in the original ICA relative to the Dickies
Arena; and
WHEREAS, Developer will continue to engage the services of the General Contractor
defined in the ICA to complete the original scope of work identified under (CS No.
48760) as well as the Additional Work which has been identified and included in thi�
amendment; and
WHEREAS, Staff has reviewed the scope, fee, cost allocations and schedule for th
Additional Work and find them to be fair and reasonable.
OFFICIAL RECUR01
CITY SECRETARY �
FT. WORTK U
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
General Requirements
A. This Amendment will generally consist of the milling of street paver sub-base,
removal of ADA ramp, removal of concrete pavement, placement of new 10"
concrete pavement, placement of 6" flexible base, placement of new barrier free
ramp, irrigation repairs and exploratory excavation of existing utilities within
Trail Drive as described on Attachment A.
B. City agrees to increase the amount of the reimbursement to the Developer for the
Additional Work, in accordance with the payment terms stipulated in the ICA, by
an amount up to $172,619.43. This amount shall not be considered as part of the
"Adjusted Public Contribution Amount" as defined in the Arena Funding
Agreement (CS 48732).
C. Developer will execute a change order with General Contractor for the
construction of these additional Improvements.
D. All other terms of the original Infrastructure Construction Agreement not
specifically amended or altered herein remain in full force and effect.
ACCORDINGLY,the City and Developer have each executed this instrument by
and through their duly authorized representatives in to be effective as of the date
subscribed by the City's designated Assistant City Manager.
CITY OF FORT WORT14: DEVELOPER-
Event F ' itis fort Worth, Inc.
Dana Burghdoff(M 29,202 4:2 CDT) `-1 �7 ' 1...•st,
Dana Burghdofi Mike Oroomer
Assistant City Manager President
Date: May 29,2020 Date_ — 2r~
Recommended by:
Public Events Department Transportation & Public Works
Department
Michael Crum William Johnson
Director Director
Approved as to Form&Legality:wLalpt
%1. ... M&C: 20-0169
Mack(May 29,202010:47 CDT) Date: 4-7-2020
Douglas W.Black 1295#2020-588777
Assistant City Attorney Q a Ordinance 24 1 61-04-2020
ATTEST:
Mary J.Kayser
r �.
City Secretary
�7
Contract Comptlance Hansger;
By sier+ing I acknowkt*that I ern the person responsible
for the onitoring and administration of this contract,including
rrin all pert' c and mpurting requirements.
Chris t
OFFICUAL RECORD
CITY SECRETARY
FT. WORTH,TX
List of Attachments to this Agreement
Attachment A
[follows]
CRESTUNE RD
WASHBURH A"€v
i E�
RNRFNAMI � WNNN�SNI► - �.. a�' _ q ,.
NIRNNYI IfNANIWnNMIp NKNA ♦ R�
W.ErtNd1�Xt1 .:'�MMF)RMIIn�MtI�YI► /�� 4 �(� 00
LAFAYE A Nk'IA, - •.�lR5�ti!�lP�iikN► l �- ��� ` � f
N.�WA++JkXln\WP�hhim =
o NiWXRII
DEXlE I�XINIXh11I�LIENflie91V / ' f
f WRMin�Nl41WW �:/
- ..IMI9�NIN41p1I/ /�• ..I�
IklNk6MV �r �• ^
— — oflu#vtNutf �
l �I —
PROPOSED
BYE --
NSIH!gMklf4HhHNh1N4NNRNANI BOTANIC
limp hNiFkIN - GARDEN
-LHAR!!XINNNMNN ft Al
LINDEN AVE
i
EL CAMPO AV
Ir —
LEGEND
i
BRICK PAVER REPAIR
i REPLACEMENT J AOD 800
a
SCAM I'-4W ft-
DUNAWA�/ WILL ROGERS MEMORIAL CENTER
660 BoIMY Arwn -S,08 AW-FW Vftil%eaa 76107 BRICK PAVER REPLACEMENT EXHIBIT
1. Tak 817.735.1;11
¢ ID!!fC F-1114
L
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 04/07/20 M&C FILE NUMBER: M&C 20-0169
LOG NAME: 201CA AMEND NO2 TRAIL DRIVE
SUBJECT
Amend the Infrastructure Construction Agreement with Event Facilities Fort Worth, Inc. in the Amount of
$172,619.43, for Additional Street Surface Improvements on Trail Drive, for a Total Revised Contract
Amount of$2,272,619.43, Adopt Appropriation Ordinance and Update the FY2020-2024 CIP (COUNCIL
DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize Amendment No. 2, in the amount of$172,619.43, to City Secretary Contract No. 48760 with
Event Facilities Fort Worth, Inc., for Additional Street Surface Improvements on Trail Drive, thereby
increasing the contract amount to $2,272,619.43; and
2. Adopt the attached appropriation ordinance to adjust the receipts and appropriations in the General
Capital Projects Fund by decreasing receipts and appropriations in the Contract Street Maintenance
programmable project (City Project No. P00020) in the amount of$172,619.43 and increasing
receipts and appropriations in the Harley Street Relocation project (City Project No. C00143) by the
same amount.
DISCUSSION:
On February 28, 2017, the City entered into an Infrastructure Construction Agreement with Event Facilities
Fort Worth, Inc. (CSC 48760), pursuant to that certain Master Agreement for the construction of the Dickies
Arena, in the amount of$1,800,000.00 for infrastructure improvements related to Dickies Arena including
water, sewer, paving, drainage and lighting on roads around and adjacent to the arena.
The ICA was subsequently amended to provide an additional $300,000.00 for additional street surface
improvements on Trail Drive (M&C C-28967).
Event Facilities Fort Worth, Inc., and the City desire to amend the ICA a second time to provide an
additional $172,619.43 in funds for improvements related to the construction of certain infrastructure
improvements adjacent to and supporting the Dickies Arena project, to include additional street surfacing
work on Trail Drive.
The Trail Drive work will entail milling of street paver sub-base, removal of ADA ramp, removal of concrete
pavement, placement of new 10" concrete pavement, placement of 6" flexible base, placement of new
barrier free ramp, irrigation repairs and exploratory excavation of existing utilities. Cost for the work is
$172,619.43. Event Facilities Fort Worth, Inc. will add this scope of work to their existing contract with
Dennett Construction for the ICA work.
Funding for this project was not included in the FY2020-2024 Capital Improvement Plan due to the project
being scheduled to be completed in FY 2019. The additional funding for this project was initially
appropriated for pay-as-you-go maintenance funding for Street Maintenance. However this appropriation
will not defer any Street Maintenance funds as available residuals are being used to fund this project. The
action in this M&C will update the FY2020-2024 Capital Improvement Plan.
Fund Existing Funding Additional Funding Project Total
Harley Street Relocation [Cons- C00143 -IF
General Capital Projects—30100 $2,200,000.00 $1 22,619.43 $2,372,619.43
Grants Capital Project Other—31003 $3,213,653.50 $0.00 $3,213,653.50
2007 Critical Capital Projects— 39001 $0.00 $0.00 $0.00
Street Improvements—39403 $5,397,995.26 $0.00 $5,397,995.26
Muni Parking Captial Projects—59451 $1,493,801.56 $0.00 $1,493,801.56
Water Capital—59601 $756,294.03 $0.00 7$756,294.03
Sewer Capital Legacy—59607 1$619,057.08 1$0.00 ]$619,057.08
Storm Water Cap Proj — Bonds —59651 $2,039,136.12 11$0.00 $2,039,136.12
Stormwtr Cap Proj Legacy-5652 $3,631,179.31 $0.00 $3,631,179.31
Project Total $19,351,116.867$172,619.43 $19,523,736.29
Grand Total $19,351,116.86 $172,619.43 $19,523,736.29
The project is located in COUNCIL DISTRICT 7
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the General Capital Projects Fund for the Harley
Street Relocation project. Prior to an expenditure being incurred, the Transportation & Public Wo s
Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head: William Johnson 7801
Additional Information Contact: Monty Hall 8662