Loading...
HomeMy WebLinkAboutContract 52345-AR2 R�CE1V WORTH City of Fort Worth CSC No.52345-AR2 .11�N WRTJr_-oaZN Construction Allowance Request C1N OF�0 't�on FOA# 2 Date 5/26/2020 City Sec# 52345 C1N 0 Client Project#(s) 101587 FAC#(s) 34018 0200431 5740010101587 E04080 999918010199 Project Name Concrete panel replacmenet project on Martin Street(Foard Street to Shackleford Street)and Alta Mesa Boulevard(S Description Hulen Street to Whitman Avenue) Contractorl Omega Contracting,Inc. City Inspector John Robinson Funding TPW Water Sewer Select Day Type Allocation Account Totals Original Contract Amount $1,574,312.85 $0.00 $0.00 $1,574,312.85 Extras to Date $0.00 $31,900.00 $31,900.00 Credits to Date $0.00 Current Contract Amount $1,574,312.85 $0.00 $31,900.00 $1,606,212.85 Amount of Proposed Allocation $5,121.00 $0.00 $0.00 $5,121.00 Original Allowance Available for Allocation $70,000.00 $70,000.00 Allowance Funds Previously Allocated $29,850.00 $29,850.00 Remaining Funds Available for this Allocation $40,150.00 $40,150.00 JUSTIFICATION SUMS IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: New Bid Item 37 was added for removal of 2-3"asphalt overlay on concrete panels removed in Martin Street. This bid item was not captured in the original bid item list. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Contractors �pts _ - ___ Date Date May 27,2020 o hoblhd4H May 27,2020 -Bog~ - - Date _ t .. - Date 2d& May27,2020 =d May 27,2020 Sr. Officer Date ' Assistant Director Date May 28,2020 May 28,2020 Date Date May 29,2020 ..II Jun 3,2020 Date Jun 3 2020 RECORD CITY SECRETARY FT. WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Greg Robbins � k / Name of Employee/Signature Senior Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Si oR ATTEST: Mary J. Kayser, City Secretary OFFOUAL RECORD CITY SECRETARY F_ ORT WOR_H, City of Fort Worth Construction Allowance Request Construction FOA# I � Date L5/26/2020 City Sec# F52345 Client Project#(s)l 101587 FAC#(s)1 34018 0200431 5740010101587 E04080 9999 18010199 Project Namel Concrete panel replacmenet project on Martin Street(Foard Street to Shackleford Street)and Alta Mesa Boulevard(S Hulen Street to Descriptionj Whitman Avenue) Contractor I Omega Contracting,Inc. City Inspector John Robinson ADDITIONS ITEM DESCRIPTION Dept/FAC Qty Unit Unit Cost Total 38 0241.1100 Remove Asphalt Pvmt TPW 569.00 Y 9.00 5,121.00 TPW $5,121.00 Water $0.00 Sewre $0.00 Sub Total Additions $5,121.00 Change Order Additions Page 3 of 5 FORT WORTH_, City of Fort Worth Construction Allowance Request Construction FOA# 0 Date 5/26/2020 City Sec# 52345 Client Project#(s)l 101587 FAC#(s)l 34018 0200431 5740010 101587 E04080 9999 18010199 Project Name Concrete panel replacmenet project on Martin Street(Foard Street to Shackleford Street)and Alta Mesa Boulevard(S Hulen Street to Descriptionj Whitman Avenue) Contractorl Omega Contracting,Inc. City Inspector John Robinson CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ITEM DESCRIPTION DepVFAC City Unit Unit Cost Total 35 Paving Construction Allowance TPW 0.07315714 LS $70,000.00 5,121.00 TPW $5,121.00 Water $0.00 Sewre $0.00 Sub Total Deletions $5,121.00 Change Order Deletions Page 4 of 5 MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests co# DATE AMOUNT 1 1/17/2020 $29,850.00 Total $29,850.00