Loading...
HomeMy WebLinkAboutContract 38652-A2AMENDMENT NO. 2 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. 38ta! a -AA (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City o£ Fort Worth (City) and TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 38652, (the Contract) which was authorized by the City Council by M&C C-23367 on the 24th day of February 2009; and WHEREAS, the Contract involves engineering services for the following project. Mary's Creek Water Recycling Center Site Selection, Project No. 01239 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services speced in M&C C-24583,adopted by the City Council on the 9th day of November, 2010 and further amplified in a proposal letter dated November 03,2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total 506,228.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not City of Fort Worth, Texas Amendment to Engineering Agreement PMO Offcial Release Date: 6.18.2010 Page 1 of 2 OFFICIAL (RECORD CITY SECRETARY T. WORTH, TX exceed the sum of 801,135.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this Worth, Tarrant County, ATTEST: V �� Marty Hendrix City Secretary APPROVAL RECOMN�NDED : fj the / Uth day of November, 2010, in Fort Texas. Fon�qg (! %l A S. Frank Crumb, P.E. Director, Water Department Fernando Costa Assistant City Manager TranSystems Corporation Consultants ENGT?TWsFR By: Name Senior Vice President 500 West 7th St., suite 1100 Fort Worth, Texas, 76110 APPROVED AS TO FORM AND LEGALITY: 1 Assistant City Attorney City of Fort Worth, Texas Amendment to Engineering Agreement PMO Offcial Release Date: 6.18.2010 Page 2 of 2 Go�trac�. Authorizattiou� 11�91►0 __ Tate OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX November 03, 2010 Peter Fu, PE Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Mary's Creek Recycling Center Site Selection Contract No. 38652 and City Project No. 01239 Amendment 2 Dear Mr. Fu, TranSystems appreciates the opportunity to provide additional services with respect to the above referenced project. We have prepared this scope of services regarding Public Involvement, Real Estate consulting, Environmental studies, Engineering assistance and Architectural 3D modeling. Below is an itemized breakout of these services for your review. 1. Open House Lump Sum $29,075 a. Develop Open House Plan- Develop an open house strategy and design; coordinate with the Mary's Creek project team members to discuss the open house format, identify information station topics and staffing plan; identify graphic poster boards for each information station; develop key messages and schedule dry runs for the open house. Review drafts of poster boards before they are printed and provide revision suggestions. b. Facilitation - Manage a dry run the morning of the open house for project team members that will be staffing an information station; develop a list of questions for the internal team and assist in preparing answers as well as reviewing the questions and answers with the project team; act as a "rover" to provide assistance at stations during the open house and direct open house attendees to other stations as appropriate; facilitate meeting as needed; assist with set up and tear down of meeting room; participate in a debrief meeting with all project team participants right after the open house. c. Technical Assistance - provide assistance in the preparation of exhibits and presentations for the open house. 2. 3. d. Provide 6-7 members to attend open house to man stations and answer questions e. Meeting Summary - Conduct and attend debrief meeting. Review meeting notes, comment card comments, list of questions captured at each information station and other feedback/input gathered at open house; provide revisions and suggestions as appropriate; identify items for further discussion by the CAC. Public Outreach Lump Sum $16,214 a. Contact property owners of all three shortlisted sites. Provide owners with information on the site selection process and invite to pre council meeting. b. Benbrook presentation: At the request of the City of Benbrook and FWWD, Prepare and present a PowerPoint presentation to a Joint Meeting of various City of Benbrook committees, including City Council c. Assistance with PowerPoint presentation: Assist in preparing several graphics and other slides to comprise a PowerPoint presentation for use by the City at various meetings and presentations d. Assistance with FAQs: Assist in answering questions included in the FAQ, and participate in meetings to refine questions to be included, etc e. Meeting with TRWD: Prepared for and participate in a meeting with TRWD and FWWD regarding the MCWRC. f. ITC meeting - attend ITC meetings and assist in the preparation of PowerPoint presentations for these meetings g. Prepared a memorandum that summarizes the previous studies related to the proposed Mary's Creek facility, including the 2004 Mary's Creek WRC study, the 2007 Water Reuse Master Plan, the 2008 Eastern Parker County Regional study, and the 2009 Fort Worth — Aledo study. h. 6th CAC Meeting: Prepared for and participated in a 6tn CAC meeting in January, 2010. i. Prepare consolidated report: Work with the City's consultant (FNI) for the Wastewater Master Plan to prepare a report further considering the economic justification and timing of the MCWRC. Property Research Lump Sum $ 6000 a. Perform surveying services related to easement and property research for the 6 semi-finalist sites. b. The work includes research of Tarrant County records, and preparation of maps showing the location of recorded easements of underground utilities, etc, that were aligned through the semi-finalist sites. 4. Architectural 3D Modeling a. Prepare site layout and architectural modeling of site 4 b. Prepare site layout and architectural modeling of site 10 c. Provide alternative modeling on sites 2,4 and 10 which will illustrate different perspectives, MBR technology and architectural styling. d. No video will be performed for the project. 5. Cost Estimating a. Provide additional cost estimation regarding the capital and 0&M costs associated with the MCWRC, versus not building the plant. b. Provided the same capital and 0&M cost determinations to determine the cost difference between sites. c. Work with the City's consultant for the Wastewater Master Plan to prepare a report further considering the economic justification and timing of the MCWRC. 6. Real Estate Services a. Market Studies (2 sites) Lump Sum $ 26,370 Lump Sum $ 6,803 Hourly Estimated $29,495 i. Establish a probable land value for two selected sites. Perform an evaluation to determine the market value of the sites based on land values for areas that in southwest Fort Worth. ii. Site inspection will be performed Hi. Incorporate land uses into market analysis iv. Prepare report. b. Appraisal (1 additional site for a total of 2 sites) The appraisals will be prepared by State Certified appraisers in accordance with the Uniform Standards of Professional Appraisal Practice (USPAP). The appraisals will be suitable for use in condemnation proceedings if necessary. c. Negotiation for option to purchase (2 sites) TranSystems will provide the services of qualified right-of-way agents to secure options to purchase two sites as determined by the City. 7. Boundary Surveys (1 additional property at 100acres) Hourly Estimated $ 23,470 a. Prepare land title survey for one tract of land of approximately 100 acres each, which lie in western Fort Worth. b. The survey will be certified to substantially comply with the Texas Board of Professional Land Surveying standards. c. Existing utilities shall be located by a one call service. d. Basis of coordinates and bearings shall be based on NAD 83 (1993) Texas State Plane coordinate System, North Central Zone 4202 adjusted to reflect surface measurements. Elevations will not be established. e. No topographic information will be obtained. f. Substantial visually apparent improvements will be located within the property boundary. g. Limits of the 100 year flood plain will be taken from the National Flood Insurance Rate Map. h. Easements of which the surveyor has knowledge or has been provided will be shown on the survey. i. Deliverable will be 3 signed and sealed copies of the survey. 8. Water Quality Hourly Estimated $103,300 a. Perform field surveys to develop a site specific water quality model for Mary's Creek. Using refined model, evaluate potential discharge permitting requirements for a discharge to Mary's Creek for each potential discharge site and for flows of 5, 10, 15, 20 and 25 MGD. Field surveys are not anticipated to involve access onto private property. Arrangement for private property access will be performed as an Additional Service. b. Estimate blending ratios and detention times of reclaimed water in Mary's Creek and the Clear Fork Trinity River downstream of the confluence with Mary's Creek for a range of background and discharge flows. Evaluate the potential for impacts to raw water quality at the Holly Water Treatment Plant intake. c. In conjunction with the City, identify up to three potential discharge locations to the Clear Fork, or tributaries, upstream of Lake Benbrook. Obtain the most recent TCEQ water quality model for the Clear Fork. Use the water quality model to evaluate potential permitting requirements for discharges to the Clear Fork at each of the identified locations for flows of 5, 15, 20 and 25 MGD. Consider the influence of the City of Weatherford discharge on the results. d. Using a water balance approach, estimate blending ratios and detention times of reclaimed water in Lake Benbrook for a range of hydrologic conditions and discharge flows. Evaluate the potential for impacts to raw water quality in Lake Benbrook. e. Based on the results of subtasks a-d: i. Confirm the feasibility of permitting a wastewater effluent discharge into Mary's Creek at each of the potential discharge site locations. ii. Document any anticipated differences in permitting requirements between each potential discharge site on Mary's Creek; For each potential recycling center location, provide a recommendation for a discharge alternative to Mary's Creek and/or the Clear Fork that provides for adequate environmental buffers and protection of downstream water quaI;ty. f. Prepare a technical memorandum summarizing the results of the water quality evaluation. 9. Environmental Evaluation Hourly Estimated $ 26,420 a. Conduct an initial environmental screening of up to three potential recycling center locations. The screening level assessment will be a desk- top assessment and will not include any field visits to the potential sites. The screening evaluation will be based on: i. Readily available records including historical and current aerial photography; ii. USGS topographic quadrangle maps; Soil survey data; iv. National Wetlands Inventory maps associated with the USGS topographic maps; v. Review of the Texas Historical Commission's State Historical Site Atlas; vim Review of the Texas Commission on Environmental Quality's contaminated sites database; vii. Any other readily available data sources. b. Once a recommended site has been identified and accepted by the City, the Engineer will conduct an environmental assessment to identify whether there are any potential fatal flaws associated with environmental issues at the recommended site. The Engineer will conduct the environmental assessment in accordance with Texas Water Development Board standards. Completion of this task will depend on obtaining access to the recommended site property. c. Prepare the following deliverables: i. A technical memorandum summarizing the results of the screening - level environmental evaluation; ii. A technical memorandum summarizing the results of on -site environmental investigations of the recommended site. 10, Phase 1 Environmental Site Assessment (1 additional site) Hourly Estimated $ 4,470 The objective of a Phase I Environmental Site Assessment is to identify, through information available through public sources, interview or first hand observation, to the extent feasible recognized environmental condition in connection with the property. This intent of this action is to establish the potential for the site to have potential impact or clean up exposure from previous activities on site or from adjacent land activities, thus allow the potential This assessment will adhere to ASTM Standard Practices for Environmental Site Assessments: Phase I Environmental Site Assessment Process, E1527-05. Four (4) basic components are included in a basic ESA: a. Records Review b. Site Reconnaissance c. Interview with appropriate personnel including existing owners, local government officials d. Development of Report of findings _ information in previous ESAs may, at the discretion of the environmental professional be used to assist in the creation of an updated ESA. 11. Limited Phase II Environmental Site Assessment (2 sites) Hourly Estimated $112,200 Phase II ESA provides a more detailed review of the site including specific exploratory sampling. The intent of a Phase 2 is to confirm/determine the presence or absence of specific environmental liabilities or quantify to the extent possible through public records, interview and observations an observed or suspected environmental liability. A Limited Phase 2 will include: a. Limited ESA Phase II testing will be conducted after initial regulator data searches for Phase I is accomplished. b. Extended records research on adjacent facilities such as landfills, CERCLA (Superfund) or RCRA facilities were know contamination has potential to impact selected sites. c. The purpose of the testing is to determine the impact potential form a closed landfill on site A and exploratory on Site B. Three (3) boring sites will be performed on Site A and two (2) boring sites will be performed on Site B. Approximate length of time to bore exploratory hole is two (2) days per hole. Note: cost is directly related to depth of bore hole required. d. Sampling is to be performed by drilling and obtaining core samples to groundwater or a depth of 500 feet. At least one soil sample and one water sample will be taken per well. More samples will be taken as in - situ observations dictate. An average of three samples per boring will be collected. Sampling will be collected as coring progresses, only those showing the most potential for contamination will be selected for ultimate laboratory analysis. The number of sample per borehole is related to the depth of aquifer and potential for involvement of aquifer with contaminated materials. Borehole, depending on depth may require multiple samples and different depths. . e. Laboratory analysis will cover a spectrum of contamination normal to the site history and those chemical of concern originating from or on the site, and those originating from know adjacent site sources with potential or historical potential to impact site. This may include: Volatile Organic Compounds, MTBE, RCRA 8, RCRA 11, PCBs, Pesticides, Herbicides, Ethylene Glycol, Grease and Oils, pH, Chlorides, Sulfates, Naturally Occurring Radioactive Materials (NORM), Surfactants, Total Dissolved Solids (TDS), Turbidity, Specific conductance. Testing/analysis cost includes sampling materials and equipment. f. Sample chain of custody will be maintained and included in final report. g. Mobilization and demobilization is included in the drilling fee. h. This does not include testing soil that are suspected as being contaminated by polychlorinated biphenyls (PCBs). i. Development of Report of Findings to include an identification of unacceptable environmental conditions, if any. This Limited Phase 2 excludes: 1. Recommendation to purchase or not purchase property. 2. Identification of how purchaser's facility will impact neighboring properties. 3. Identification of impact to roads or transportation corridors. 4. Impact to native species, not related to finding of contamination. 5. Impact to environmentally sensitive areas, not related to finding of contamination. 6. Impact to endangered wildlife, not related to finding of contamination. 7. Response to public comment after production of report, or presentation to public; 8. Presentation to City Staff after submission of final report. Note: Comments submitted by CFW after review of Draft will be addressed. 12. Alternatives Evaluation and Summary Report Hourly Estimated a. Use the results of the water quality evaluation, the environmental evaluation, and the Phase 1 and 2 assessments to: i. Prepare a summary table of permitting and environmental issues for each of the potential recycling center sites. ii. Prepare opinions of probable capital and operation and maintenance costs for each site, using the recommended discharge alternatives developed in Phase D and accounting for any other known environmental or remediation costs. iii. Prepare a summary table comparing opinions of probable cost for each potential recycling center site/discharge alternative. b. Based on information developed in this and other phases, previous study efforts, and input from City staff, recommend a preferred recycling center site to pursue for land purchase. c. Prepare a summary report documenting the results of the alternative evaluation. This report is intended to be brief and will be targeted for Management, Council and public audiences. 13. Environmental Frequently Asked Q&A Hourly Estimated $ 6,250 This document will provide a list of questions and answers related to the Phase I and Phase II Environmental Assessment's findings and impacts. This task includes: a. Develop an initial report of potential questions and answers for the public relating to the Phase 1 and Phase II ESA finding and impacts. Items relating to facility design and operation are beyond scope of ESA b. Attend 3 meetings of 2 hours or less with city staff to develop, review and refine FAQA contents. c. Finalize a final report. 14. Project Management a. Prepare and submit monthly progress reports b. Prepare and submit monthly scheduling updates c. Management of project 15. Sub Consultant Management 16. Expense a. Copies b. Printing c. Mileage d. Overnight deliveries Hourly Estimated $14,628 Lump Sum $16,398 Estimated 17. On -Call Services Hourly NTE $ 75,000 Only to be authorized by the Water Department as additional services that may be needed, but are not currently included in the original contract or this amended scope of services. These services may include, but are not limited to, additional environmental testing, additional water quality modeling, architectural modeling of site adaptionIs and public involvement. Total Amendment $ 506,228 Original Contract Amendment 1 Amendment 2 Summary of Contract $ 247,407,00 $ 47,500300 506 228.00 New Total $ 801,135,00 This amendment includes an M/WBE involvement of $70,890 which comprises approximately 14% of the amendment total. The actual participation will be dependent on the extent of services exercised by the City in this amendment. TranSystems is utilizing Spooner and Associates for surveys, Wolf Eagle for environmental testing and Katz Associates for Public Relations. If you should have any questions please feel free to contact me. Raul Pena III, PE Senior Vice President Amendment 2 Mary's Creek Water Recycling Center City Project No. 001239 Trans stems Corporation Consultants Revised 11-04-2010 Total Amendment 1 M/WBE Amendment 2 M/WBE Amendments 1 & 2 Trans stems $ 44,402 $ 114,157.00 $ 158,559.00 Katz) $ 143790,00 $ 14,790 $ 14,790,00 Alan Plummer $ 185,733.00 $ 13,000 $ 185,733.00 Wolf Eagle j $ 2,950 $ 21950 $ 1013450,00 $ 435100 $ 104,400,00 5% Sub -Consultants $ 148 $ 15,098.00 $ 15,246.00 Sub Total $ 47,500 $ 431,228.00 $ 709890 $ 478,728.00 i I � On -Call services (invoiced hourly as authorized) NTE 75,000.00 75,000.00 I (additional drilling, testing, water quality modeling,etc) ! I I TOTAL Total $ 479500 $ 25950 $ 506,228.00 $ 709890 $ 553,728.00 MBE Participation { 6%1 14% Summery of Contract Original Contract I $ 2479407.00 _ L Amendment 1 $ 479500900 L — Amendment 2 $ 506 228.00 -� � Total -- — $ 801 135.00 _New 1 K:\PROPOSAUTxDOTP2029500.5TADbf\I1-03-2010 PAGE 1 Amendment 1 Maryh Creek Water Recycling Center City Projectile. oatzaa TrenSYSWN GW=6on Canaillsnb 11-a2010 IFeXG�IiF�tl �Exte Po ®, . : �El', Alan Plummer and Associates (All work covered in Amendment 21 Laval 2 (Mass) No. and Description Principal Sr. Pro) Mgr Prof Mgr Prpl Emir ER Technician Clerical 0C Total Labor Percent or B. A Plummer, McDonald, E. E. McDonald, P. Dillard, J. Q. AWolal, McDonald, B. Jordan Young J. Voight T. Capps L. Plunk A Plummer Hour Fee($$$) Laval 3(TaA) No eM De3clp5en (lire) (hrs) (ire) (lira) (his) (No) (hrs) (lira) Total Foe Phase Laval PM 76 218 32 356 513 35 13 30 11274 $169j073 100.0% A Requested or Accomplished Tasks 26 72 0 4 92 18 0 e 225 S 32,653 193Y, 1 Open House 12 24 4 34 8 2 1 85 S 12,335 7.3% 3 Assistance walr'nmlad'powerpunt _ _ _ 8 10 2 1 1 20 $ 2,833_ 1.6% 4 AsddarNawsb FAOs 1 4 0 1 0 14 It 11878 1.1% 5 Davahpprevtousropal avrmmymsmo 1 4 8 1 0 14 S 1.878 1.1% 0 AssisVa9srNlTCmeehr9s(2) 6 8 2 14 S 1.950 1.2% 7 Prepare Coma6daled Re (W FNI) 4 4 8 2 2 20 S 3,045 _ 1.8% 8 Further farm coals 2 20 t0 4 1 2 45 $ 0.803 4.0% 11 MeeQg lrI TRWD 4 4 2 2 1 0 13 f 2,133 12% 13 Levels(nask)Nsmo 0 _ 0 f 0.0% B PossiMe Tasks 0 0 0 0 0 0 0 I Meshg rom TCEQ(Nd IncludooJ7 0 $ - 0.0% 2 0 $ 0.0% 3 MasOg wsh Eedam Perker Co (Not it) 0 S 0.0% 4 Levef3 (Task? Home 0 E - Co% 5 Level(as ak)Nome 0 E - Co% C Avcompllshad Tasks 1 OVe CACMaahg i 2 2 8 $ /,180 0.7% 2 0 $ 0.0% 3 BenbaOkproseMeBar 2 2 4 3 5w 0.3% 4 LovelatrasUmame 0 3 op% 5 Lavel3 eak)Nsme 0 $ _ - 0.0% D Water Quality Evaluation 48 96 0 276 303 0 0 1s 739 IS 90,300 STA% 1 Rehr MCMWGI 8 38 140 40 2 Us S W.040 _ 17.8% 2 MOCFblandiingOTwvaluafort 8 4 18 40 2 70 $ 8.920 5,3% 3 Cher Forkrrwdeirg 4 20 /8 31 2 105 $ 14.080 8.3% 4 Benbrcok OhnJn9ODTevalua0m 8 4 24 BO 2 11e f 13.880 82% S Olsdwpeaseme5ves 4 4 18 24 2 50 $ 8.1 20 3.8% 0 Tedxycef MemoreMum 4 18 2/ BI 0 114 3 14,560 BAY. T Meehgs ws/rFat Walh (4) 12 12 8 24 58 S 8.400 50% E Environmental Evaluation 215 S 26,420 15.6% 1 screening ovalustori 1 / 8 8 4 1 26 $ 3.008 1.8% 1 4 12 12 4 1 2 Onstls Assessment 34 S ?886 23% _ 2 18 2d 40 54 8 2 1 _ 3 TerJWcelMemorends(2) 165 E 19,525 11.6% 4 Level3(T ak)Nsme _ _ 0 $ - 0.0% _ 5 Level3l7 sk)Name 0 S - 0.0% F Alternatives EvaluatIoNSUmmary Report 2 8 0 8 40 0 0 2 60 $ 7,390 4.4Y, 1 Summary TaNes and Costs _ _ 'I�dT 16 _ _ 2C E 2,360 1.4% 2 Summary Report 2 I 4 I 8 24 2_ 40 E 5,010 30% PM ADMINISTRATNE10C TASKS 0 1s 0 0 0 0 0 5 ___. _, 2.T% 1 Qve3ry Card _ I _ _+_5 5 _ S 1OW _ O1% 2 Nr4ed Mane an! 18 I is I is 10 2.1X TOTAL LABOR Total Labor Hours 78 218 32 356 513 36 13 30 1,274 Total Labor Amount $ 189,073 100.0% Labor Rates par Hour $225 $105 $155 $120 $100 300 $73 $210 Total Amounts by Labor Category f 17,100 S 42,510 $4,060 f 42,720 1 51,300 $ 3,240 j 84.1 f 8,300 $ 1694073 Labor Category Percent of Total Labor 10.1% 25.1% 2.9% 25.3% 30.3% 1.9% 0.5% 3.7% 100.0X TOTAL EXPENSES fees breakdown bolowl Total Subcansultanls f tA300 Total Reimbursables S 2,3111 Total Expanses $ 16,661 GRAND TOTAL - f185.77, 3UBCONSULTANT EXPENSES REIMBURSABLE EXPENSES Coda Description Budget (jj) Markup Fes ($SS) RA labda Arayen E 1.10 $ Kaiz and Associates All work wveretl in Amentl lieu" t L Powell in Project Asst, Proj. Project Outreach Affairs Total Labor 5 Tota TASK DESCRIPTIONPrincipal $195.00 $175.00 $125.00 $65.00 150.00 $175.00 Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Costs COMMITTEE Discuss CAC meeting strategy, agenda and how to involve members in open house. 10 $1 950 $0 $0 $0 $0 $0 10 $1,950 $1,950 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 $0 $0 $0 $0 - f '41r1 1: ,-1t, '1�It A $o o $0 0 $0 $0 $o $0 $0 $o o,t r r - r toi INFORMATIONAL MATERIALS Message Plan: Review key messages regarding why the city has proposed the Marys Creek Basin Water Recycling Center and related issues and provide comments. 4 $780 $0 $0 $0 $0 $0 4 1 $780 $780 Open House/Community Meeting Invitation: Review open house invitation and provide comments. Discuss format and language with staff. 4 $780 $0 $0 $0 $0 $0 4 $780 $780 Frequently Asked Questions: Review frequently asked questions with internal team to prepare for open house and provide comments. 4 $780 $0 $0 $0 $0 $0 4 $780 $780 $0 $0 $0 $0 $0 $0 $0 $0 COMMUNITY OUTREACH Spokesperson Workshop: Identify Fort Worth Water spokespeople who will speak to media and make community presentations. Conduct a presentation workshop (up to four hours for up to eight participants) that focuses on delivering key messages, handling challenging questions and risk communication techniques. $0 $0 $0 $0 $0 $0 $0 $0 Project Presentation: Develop a standard PowerPoint presentation that can also be given with supporting handouts or informational poster boards. The presentation will describe the proposed water recycling center and the process Fort Worth Water has followed to date to evaluate its location and treatment process. $0 $0 $0 $0 $0 $0 $0 $0 Presentations: Review open house presentations for City Council and ITC, and provide comments 4 $780 $0 $0 $0 $0 $0 4 $780 $780 $0 $0 $0 $0 $0 $0 $0 $0 Katz and Associates ( All work covered in Amendment 21 J. Charest J. Shira E, Powell Ethnic Public Expense Principal in ProjectP.Termyson Outreach DESCRIPTIONTASK $195.00 $175.00 $125.00 $65.00 150.00 $175.00 Cost Open House Plan: Develop An open house strategy and design; participate in up to three (3) telephone conferences with the Marys Creek project team members to discuss the open house format, identify information station topics and staffing plan; identify graphic poster boards for each information station; develop key messages and schedule dry runs for the open house. Review drafts of poster boards before they are printed and provide revision suggestions. This assumes Fort Worth Water does all printing and mounting for poster boards and printing of any additional informational materials such as comment cards and a FAQ, as well as arranges all meeting logistics and provides logistical support and meeting equipment and supply needs. 10 $1950 0 $0 1 2 $250 $0 1 $0 $0 12 $2,200 $23200 Facilitation services: Manage a dry run the morning of the open house for project team members that will be staffing an information station; develop a list of questions for the internal tears and assist in preparing answers as well as reviewing the questions and answers with the project team; act as a'rover to provide assistance at stations during the open house and direct open house attendees to other stations as appropriate; facilitate meeting as needed; assist with set up and tear down of meeting room; participate in a debrief meeting with all project learn participanls right alter the open house. Expenses include travel costs; Assumes Fort Worth Water will pay all costs of meeting room rental (it any), equipment rentals and 14 $2730 3 $525 $0 $0 $0 1 1 $0 17 $39255 1 $ 1,000 $43255 meeting supplies. 1 Meeting Summary: Review meeting notes, comment card comments, list of questions captured at each information station and other feedbackftnput gathered at open house; provide revisions and suggestions as appropriate; identify items for further discussion by the CAC; prepare a matrix of comments as necessary for CAC review. 6 $1170 2 $350 $0 4 $260 $0 $0 12 $1,780 $1,780 $0 $0 $0 $0 $0 $0 $0 $0 j. Task 6 $0 $0 1 $0 $0 $0 $0 $0 $0.00 $0 $0 $0 $0 $0 $0 $0 $0.00 p Task 7 $0 $0 $0 $0 $0 $0 $0 $0.00 rlr +1iQ%11 -- Task 8 $0 $0 $0 $0 $0 $0 $0 $0.00 :IG PROGRAM MANAGEMENT Administrative management, including staff coordination, budget reporting 13$375 and management, monthly activities re ort,clientcontact, 3 $585 3 $525 1 $0 1 $0 $0 9 1 $1,485 1 $12485 7T7 17 1771d7O GRAND TOTALS 59 11,505 8 1,400 5 625 4 260 #REF! 76 13,790 1,000 Wolf Eagle Task No. Items cost/ unit unit Cost Totals Amendment 1 Amendment 2 1 Site A" Phase I Environmetnal Site Assessement a. Records a uistion I $250 per site $250 b. Chain of Title Search c. Report 1 $29500 per site $25500 d. Report Review with City 2 $100 1 per hour pi $200 Subtotal $29950 $ 25950 2 Site B - Phase I Environmetnal Site Assessement a. Records a uistion 1 $250 per site $250 b. Chain of Title Search c. Report 1 $2,500 per site $23500 d. Report Review with City 2 $100 per hour pi $200 Subtotal $22950 $ 2,950 1, Site A— Limited Phase II ESA a. Drilling of three test holes 1 bore hole / 2 days) 6 $45000 per day $24,000 b. Testing of materials 3 samples/drill hole 9 $35000 per samplet $27,000 c. Extended record research landfill and report d. Report Production 1 $1,500 perreport $1,500 e. Site Management and mobilization 6 1 $800 per day $4,800 Subtotal $57,300 $ 575300 2, Site B - Limited Phase R ESA a. Drilling of three test holds 1 bore hole / 2 days) 4 $49000 1 perdar $16,000 b. Testing of materials 3samples/drill hole 6 $3,000 persample $18,000 c. Extended record research and report d. Report Production 1 $1,500 perreport $1,500 e. Site Management 4 $800 per day $35200 $ 38,700 Subtotal $38,700 3. Frequently Asked Questions and answers FAQA a. Composing a question and answer documentabout ESA findings. 16 $100 per hour $19600 b Please include at least 3 meetings with City Staff 9 $100 per hour p, $900 Subtotal $25500 $ 2,500 TOTAL $1049400 $ 21950 $ 101,450 1 Testingcost includes sampling materials and equipment. 2 Minimum number of samples collected from a well will be one soil and one water from each hole if possilble. 3 Samples will be selected as coring progresses, only the most potentially contaminated samples will be analyized. 4 Only three samples per well will be sent to the lab, but extra samples will be taken insure the best appropriate samples are available for analysis.. 5 Copies of sampling chain of custody will be included in report. 6 Question and answer document will only address ESA phase I issues and potential impacts. Iitems relating to facility design and operation are beyond scope of ESE 7 No travel is covered in these estimates. 8 Limited ESA Phase II testing will be conducted after initial regulator data searches for Phase I is accomplished. 9 Chain of title search was excluded under ESA. Added to ESA II services for enelusion in ESA. 10 Drilling time is based on maximum of 500 feet and includes mobilization and demobilization. to O O m O V1 0 0 0 0 0 0 0 0 0 0 �O t-/w 00 N 01 (O\ V•) 0�) d• q�t O O M O N O Kl 00 m N O V) r+ O d^ 0V �D �mO �O l� �10 I0 10 00 M �O ( \�D Vl �O M V) ^ to N 00 ENO 69 6R A u, F o � W4 O CD y ° y O O C V1 FBI M �O C(4 0� N tn� M � cq W) t d N N 69 &4 bl9 O O O O N Otr) 0O% O i3 O 0\ O O v1 O O O In (n d- r` 00 N 0� rt r` N O M d 00%,O,% 0\ 0� U NO 00 en �O M O� O ENO N U o rt o �=a. .. rA o C a U N bA N N C13 a)rA V1 -- N 0 cbyA cqj yrn Q N �� V � ^� N � �' •� 'a¢� 0 .� S 4w( OaAM4 www�¢wPOM4 H 00 M&C Review Page 1 of 2 Of iC al r ti. Df the City of Fort Worth exzz COUNCIL ACTION: Approved on 11/9/2010 { l T W R'f 11 DATE: 11/9/2010 REFERENCE NO., C-24583 LOG NAME, AMEND S CREEK AMEND NON� PUBLIC CODE: C TYPE: CONSENT HEARING: NO SUBJECT: Authorize the Execution of Amendment No. 2 in the Amount of $506,228.00 to City Secretary Contract No. 38652 with TranSystems Corporation Consultants for Mary's Creek Water Recycling Center Site Selection (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in the amount of $506,228.00 to City Secretary Contract No. 38652 with TranSystems Corporation Consultants for Mary's Creek Water Recycling Center Site Selection in the amount of $506,228.00, thereby increasing the amount of the contract from $294,907.00 to $801,135.00. DISCUSSION: On February 24, 2009, (M&C C-23367) the City Council authorized the City Manager to execute an Engineering Agreement in the amount of $247,407.00 with TranSystems to conduct site selection of Water Recycling Center within Mary's Creek drainage basin west of Loop 820 West. The evaluation processes resulted in three preferred sites for further detailed review and assessment. On February 9, 2010, the three finalist sites were made public during a presentation to the City COUMC 0 Infrastructure and Transportation Committee. Since then, the Water Department has conducted numerous public outreach efforts with neighborhood groups and other organizations in thi area, along with an open house on April 7, 2010, a special neighborhood meeting on June 7, 2010 and meetings with Chapel Creek and Lost Creek neighborhood associations. These outreach effort: have not only presented facts and information to the public, but also generated feedback from citizens and interested parties. Based on their comments and the evaluation of additional informatio related to neighborhood impacts, adjacent land uses, flood plain considerations, gas well drilling activities, etc., it is recommended that Transystems conduct further assessment of Site No. 10 (see attached exhibit No. 1). On October 15, 2010, Amendment No. 1 in the amount of $47,500.00 was approved administratively to conduct preliminary property appraisal, boundary survey and environmental assessment on Site No. 10. The engineering services to be performed under Amendment No. 2 consist of conducting additional meetings, public outreach, real estate research, properly market studies, site environmental evaluation, water quality sampling and modeling. Transystems will coordinate with the Texas Commission on Environmental Quality (TCEQ) and the Tarrant Regional Water District (TRWD) to assess the impacts of recycle water on the Mary's Creek and the Clear Fork of the Trinity River, Furthermore, Transystems will evaluate potential flood plain issues by coordinating with the City Transportation and Public Works Department and TRWD's on -going Mary's Creek drainage study. The net effect of this proposed amendment is as follows: Oriainal reement $247,407.00 http://apps,crwnet.org/council.packet/me review.asp?ID=139ou&counclicate=i I/9/2010 11/10/2010 �C Review Page 2 of 2 ministrative Amendment No. 1 11 $47,500.00 Proposed Amendment No. 2 ised Total Agreement Cost ll$801,135.00 TranSystems Corporation Consultants is compliance with the City's M/1A/BE Ordinance by committing to an additional 14 percent M/WBE participation on this Amendment No 2. The City's goal on this amendment is 14 percent. This project is located in COUNCIL DISTRICT 3 and MAPSCO 71 and 72. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers Oro icy Hating ®epartment Head: Additional Inforrnati®n Contact: ATTACHMENTS FROM Fund/Account/Centers P275 531200 703290123920 Fernando Costa (6122) S. Frank Crumb (8207) Peter Fu (8438) $506,228.00 http://apps.cfwnet.org/council�acket/mc review.asp?ID=13960&councildate=ll/9/2010 11/10/2010