Loading...
HomeMy WebLinkAboutContract 38655-A2 (2)CITY SECRETARY �� CONTRACT NO. 3 �SS�-�2 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Neel -Shaffer Inc, (ENGINEER) made and entered into City Secretary Contract No. 38655, (the CONTRACT) which was authorized by M&C C-23509 on the 12 day of May, 2009 in the amount of $133,109.47; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No 1 in the amount of $ 14,763.00 which was administratively authorized on Feb 3rd 2010; and WHEREAS, the CONTRACT involves engineering services for the following project: Contract 2B, 2008 CIP (Project 01263) Pavement, Water & Sewer replacement for: NW 23rd Street (Hanna Avenue -Belle Avenue), NW 24th Street (Belle Avenue- Dodge Avenue), Be11e Avenue (NW 22nd Street -NW 23rd Street) , Macie Avenue (NW 24th Street -Azle Avenue) ; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, .. which amends the CONTRACT: Article I of the CONTRACT engineering services specified in copy of which is attached hereto City for the additional design totals $ 24,900.00. 1. is amended to include the additional a proposal dated November 15 2011, a and incorporated herein. The cost to services to be performed by Engineer 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 172,772.42. 3. Page -1- OFFICIAL RIrCORD CITY SECRETARY FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager ENGINEER Neel -Shaffer Inc. �s P Amick, P.E. Engineer Manager 512 Main Street Suite 415 Fort Worth, Texas 76102 DATE : ,Z DATE : ` Z� � `—�� APPROVAL RECOMMEN Doug W Wiersig P.E. Director, Transportation And Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: i �� � �� Ro P. Gonzales Assistant City Secretary �� Date : 1-Gt 12 .� OFFICIAL RECORD CITY SECRETARY FT. WORTH, T�( Page -2- IOI NEED-SCHAFFER Solutions you can build upon engineers planners November 15, 2011 s�erveyors estvironMen#ai scientists and5eape Mr. Khal Jaafari, P.E. arei,i#ect$ TPW Department, City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 Reference: Amendment No. 2 - Contract 2B - 2008 CIP Neighborhood Street Project NW 23rd Street, 24th Street, Belle Avenue and Macie Avenue - City Project No. 01263 Dear Mr. Jaafari: Neel -Schaffer, Inc. is submitting this fee Amendment to the above referenced contract based on the City's request for additional design services to extend the project limits from its original scope; for monthly M/WBE reports extending beyond the original contract time limits and for modifications to plans and contract documents required due to City requesting implementation of new City adopted Standards and Specifications. A brief description and cost for the additional services follows: Extension of Project Limits for Contract 2B The City has requested design services for extending 24th Street from it's originally scoped terminus by reconstructing the asphalt roadway section between Belle Avenue to the concrete section of 24th Street adjoining Hanna Avenue, including adding adjoining sidewalk along both sides of the roadway and the addition of barrier free ramps at the southwest and southeast quadrants of the Belle Avenue / 24th Street intersection and barrier free ramps at the junction of 24th Street and Hanna Avenue. This will require removal and replacement of some existing retaining wall along the southwesterly segment of 24th Street and possibly the installation of some retaining wall along the northeasterly side of the roadway. Replacement of the existing water main in this segment with an eight inch PVC line and connecting services is also included. It will include replacement of one half of the existing concrete roadway segment of 24th Street (about eighty five feet) which joins Hanna Avenue. This will require the addition of two new sheets, relevant revisions to fourteen other sheets and renumbering of all of the sheets in the plan set along with revisions due to the quantities changes. Extension of Project Reporting Only a twelve month reporting period was allowed on the original contract which was to have had a construction advertisement date in December 2009. Monthly M/WBE reports are still being prepared and additional compensation for this task is requested. Implementation of New City Standards and Specifications Since the original contract was executed, many changes have been made to the City's standards and specifications for contract documents. Per the City's request we have implemented the new standards and specifications for this project. This resulted in a sheet total increase to the project manual and revisions to the plans to meet the new city standards. Summary of Contract Fee for Contract 2B Original Contract Amount $1335109.42 Approved Amendment No. 1 $ 14,763.00 Proposed Amendment No. 2 $ 24,900.00 Revised Contract Amount $1723772042 O:VobsV679 - Fon Worth Neighborhood StreetsWdmin\Contract�Proposed Amendment '_Wmendment 2letterdoc For your information only this Amendment includes approximately $2,900 for survey, $600 for additional reporting; $10,635 for update of plan set and contract documents to new City Standards and Specifications; $10,470 for additional design for lengthening of project and $295 for additional costs of printing of plan sheets and contract documents. Work Phase Summary (Includes this Amendment): Work Water Sewer TPW (Paving &Drainage) Phase Original 1st Revised 2° Revised Original Revised Original 1st Revised 2° Revised 51 $4.233.00 $45233.00 $7,133.00 $72.00 $72.00 $145790900 $17,990.00 $175990.00 31 $99990.63 $93990.63 $9,990.63 $341665 $341965 $235872.01 $27,340.91 $27,340.91 32 $193981.35 $19,981.35 $19,981.35 $683.30 $683.30 $47,744.03 $5401.83 $543681.83 33 $35330023 $3,330.23 1 $20,012.73 1 $113.88 1 $113.88 ff $71957.34 0 $95113664 0 $145431.14 Total $379535.21 $379535.21 1 $571117.71 1 $19210983 1 $19210.83 1 $949363.38 1 $109,126.38 1 $114,443.88 Thank you for considering this amendment request. If you have any questions, please call. Sincere_y, James P. Amidk, P.E. Engineer Manager O:Uobs\7679 -Fort Worth Neighborhood Streets\Admin\ComractU'roposed Amendment 3\Amendment 2 letter.doc