Loading...
HomeMy WebLinkAboutContract 38660-A1AMENDMENT NO. I STATE OF TEXAS § CITY SECRETARY CONTRACT NO.�ObQ - (No M&C Needed) COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and CP&Y Inc., (Engineer) made and entered into City Secretary Contract No.XC�(the Contract) which was authorized by the City Council by M&C C-23433 on the 7th day of April, 2009; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for Updates to the Fort Worth Water Department's Risk Management Plan. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 9, 2009, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $10,700.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $127,300.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. I� OFFICIAL REC��td ` CITY SECRETARY ='� WFORT,H, TY EXECUTED on this the Wo, Tarrant County, Texas. rth APPROVAL RECOMMENDED: S. Frank Crumb, PE Water Director A M chael Hartzler, P.E. CP&Y, Inc. Engineer By: Name: da y of , 2009, in Fort APPR4DVFD AS TO FORM AND LEGALITY: OFFICIAL RECOR'C !CITY �CRETARY =T. WORTH, TX APPROVED: Fernando Costa Assistant City Manager ATTEST: I&YJSMPartners for a Better Quality of Life April 9, 2009 Mr. S. Frank Crumb, PE City of Fort Worth Engineering Department 1000 Throckmorton Fort Worth, Texas 76102 TY FORETARY ✓OWiaNrp i� NOV RE: Updates to the Fort Worth Water Department's Risk Management Plan, Contract No. �, �� (� Additional Design Services CP&Y Project No.: CFW09069 Dear Mr. Crumb: The purpose of this letter is to request a Change Order for additional services related to the Update to the Fort Worth Water Department's Risk Management Plan. We respectfully submit the following items for your consideration. Correction of Emergency Operation and Response Plans The previous contract for Risk Management and Response Plan Updates did not include updates to the Emergency Operation and Response Plan (EORP), which currently has inconsistencies with the other Plans included in the contract. The additional scope and deliverables are as follows: TASK A-5. Correction of Emergency Operation and Response Plans 1. Engineer will correct the inconsistency in Emergency Operation and Response Plan (EORP) with the updated ARPP manual for the following facilities: a. South Holly WTP b. North Holly WTP c. Rolling Hills WTP d. Eagle Mountain WTP e. Village Creek WWTP 2. Work performed by the Engineer associated with this task will include the following: a. Review previous EORP and identify the inconsistency with the updated ARPP manual. b. Prepare a draft technical memorandum for each plant to present findings as well as the changes recommended for the EORP and submit draft technical memorandums to the City for review and comment. c. Revise the technical memorandums as necessary to incorporate City's comments and submit the final technical memorandums to the City. Deliverable: Draft and Final Technical Memorandums for each plant +�FFICirAil.REGURf.3 CITY �CRETARY PW:\CFW09069\1.30 Contract\RMP Amendment Ltr.docx\kn Chiang, Patel & Yerby, Inc. 15100 Trinity Blvd., Suite 200 Fort Worth, Texas 76155 817.354.0189.817.540.4220metro • 817.354.4935 fax wvvw.cpyi.com Is S. Frank Pull, PE D April 9, 2009 Page 2 Project Schedule The project schedule will not be affected by the addition of the expanded scope. The EORP will be worked on simultaneously with other elements and the project completion date will remain unchanged. Compensation Update of EORP — additional fee $10,700.00 The MWBE participation goal established for this project is 22%. MWBE participation in this additional portion of the project will be $2,350, which is 22% of the additional fee. We appreciate your review of our request. As always, we are available at your convenience to discuss your comments and respond to your questions. Sincerely, Michael S. Hartzler, PE Principal MSH/kn Enclosures PW:\CFW09069\3.30 Contract\RMP Amendment Ltr.docx\kn Partners for a Better Quality of Life � ��� ' 1&C Review Page 1 of 2 • � Official site of the City of Fort Worth, Texas FORTTH DATE: 4/7/2009 REFERENCE NO.: C-23433 LOG NAME: 60ARPP AND OCA CODE: C TYPE: NON -CONSENT PUBLIC NO HEARING: SUBJECT: Award of Engineering Contract to Chiang, Patel and Yerby in the Amount of $116,600.00 for Updates to the Fort Worth Water Department's Risk Management Plar RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Chiang, Patel and Yerby in the amount of $116,600.00 to update the Risk Management Plan for the Water Department's water production and wastewater treatment plants. DISCUSSION: Under the Environmental Protection Agency's (EPA) regulations water and wastewater facilities utilizing hazardous chemicals are required to develop a Risk Management Plan (RMP) which includes an Accidental Release Prevention Program (ARPP) and an Offsite Consequence Analysis (OCA). An update of the RMP is required every five years. The Fort Worth Water Department submitted the original RMP, ARPP and OCA in June 1999. The first updates were completed in JunE 2004, and the next updates are due June 2009. Under the proposed contract Chiang, Patel and Yerby, Inc., will update the ARPP Manuals for each facility, update the OCA for each facility, submit the updated RMP's to EPA, provide assistance in organizing information associated with tracking training requirements under the RMP and provide a workshop to present recommendations for implementation of the revised ARPP. The proposed scope of services will be completed for an amount not to exceed $116,600.00. Chiang, Patel and Yerby, Inc., is in compliance with the City's M/WBE Ordinance by committing to 2; percent M/WBE participation on this project. The City's goal on this project is 22 percent. FISCAL INFORMATI_O_N/CERTIFICATI.ON: The Financial Management Services Director certifies that funds are available, as appropriated, in th current operating budget of the Water and Sewer Fund. TO Fund/Account/Centers Submitted for City Manager's_Office by Originating. Department Head: FROM Fund/Account/Centers PE45 531200 0602501 PE45.531200 0702501 Fernando Costa (6122) S. Frank Crumb (8207) $87,450.00 $29,_150.00 http://apps.cfwnet.org/council�acket/n1c_review.asp?ID=11386&councildate=4/7/2009 04/08/2009 _.1&C Review Page 2 of 2 Additional Information Contact: ATTACHMENTS Paul Bounds (8567) http://apes.efwi�et.org/council�acket/mc_review.asp?ID=11386&councildate=4/7/2009 04/08/?009