HomeMy WebLinkAboutContract 29961-A3 A ,e rEC��V CSC No. 29961-A3 JU/V_ �� AMENDMENT No.3 2020 ciryaFro C�IySEC�AR�Y7y TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No.29961, (the CONTRACT) which was authorized by M&C C-20006 on the 23rd day of March 23, 2004 in the amount of $740,698.02; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $18,600.00 administratively authorized on March 6, 2015 and Amendment No. 2 in the amount of $129,940. 00 which was authorized by M&C C-28795 on August 14, 2018; and WHEREAS, the CONTRACT involves engineering services for the following project: Main 34, 100, D100 Drainage Area Sanitary Sewer System Evaluation Study and Improvements; and WHEREAS, it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 31, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $192,000.00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,081,238.02. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. ------ Y REMR[)� Page -1- , s _ ° FT.WORTH,'YX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER RJN Group, In G• Dana 6urghdoff(Jun5,202 5:11CDT) .cam".. Dana Burhdoff Daniel Jacks n, P.E. Assistant City Manager Vice President DATE: Jun 5,2020 DATE: APPROVAL RECOMMENDED: chns-hooher ffarder Christopher Harder(Jun 5,2020 11:33 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. JoraV Kasavich, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C:20•-0096 OK- Date: 02/18/20 — Form 1295 No. 2020-576888 D81ack(Jun 5,2020 14:19 CDT) Douglas W. Black Senior Assistant City Atto OR ATTEST: 0. Mary J. Kayser City SecretaryINN ,J LF'T. IAL RECORD Page -2- SECRETARY WORTH'] ORTH,TX r i n gr oui) www.rjn.com �'ieyuceehire9�r,,,,,w�,,,t ro,soma„a., December 31, 2019 Mr.John Kasavich, P.E., Project Manager City of Forth Worth Fort Worth Water Department 311 W. 101h Street Fort Worth,Texas 76102 Re: Fee Proposal for Contract Amendment No. 3 City of Fort Worth Project No. 02397 Main 34, 100, D100 Drainage Areas Sanitary Sewer Improvements—Part 1 Dear Mr. Kasavich, RJN Group, Inc. is submitting Contract Amendment Number 3 for additional construction phase services to the above referenced contract based on additional professional services being required to support the construction phase of this utility improvements project located in downtown Fort Worth. The following is a brief description and cost for the additional services to be provided on this project: I. Construction Inspection Services RJN Group, Inc. will provide an experienced Construction Inspector to assist the Water Department in overseeing construction of the Part 1 construction contract phase associated with this project.Additional construction supervision is required for this downtown area construction contract due to: • Confined working areas within downtown • Strict traffic and pedestrian control requirements within downtown • Shortened working hours which the Contractor must operate within downtown • Presence of various franchise and other utilities requires the contractor to work slowly to construct the new facilities and avoid conflicts with existing utilities • Extensive project coordination and communication required between the Contractor and property owners/tenants and other City departments All of these construction factors listed above will be difficult for the assigned Water Department inspector to manage on a daily basis along with his or her other assigned projects. Much more communication with property owners, tenants, and other entities is anticipated because the work will be performed in the highly visible downtown area. As such,the presence of an additional inspector provided by RJN Group, Inc. will assist in the effort to manage the construction of this contract and ensure that the construction process proceeds as expeditiously and smoothly as possible. The construction contract is referred to as Part 1.The Construction Inspector will work under the supervision of the Water Department's Construction staff.The position is expected to be part-time (approximately four(4) hours per day) throughout the duration of the construction activities on this contract. Page 1 of 5 Contract Amendment No.3—Construction Inspection Services City Project No.02397 A detailed scope of services is included in Attachment A-3 Scope of Services (see attached). II. Fee Proposal for Contract Amendment No. 3 RJN Group, Inc. proposes a total fee of$192,000 to accomplish the scope of services for Part 1. A breakdown of the fee is included in Attachment B-3. Summary of Contract Fee: Original Contract Amount: $ 740,698.02 Amendment No. 1 $ 18,600.00 Amendment No. 2 $ 129,940.00 Amendment No. 3 $ 192,000.00 Revised Contract Amount: $ 1,081,238.02 III. Project Schedule The anticipated duration of construction inspection services is 18 months which will begin upon receipt a notice to proceed from the Water Department (see Attachment C-3 Project Schedule). The Contractor shall provide a detail project construction schedule at the Pre- Construction meeting that will be used by RJN during this work phase. Please do not hesitate to contact us should you have any questions or need any additional information concerning this matter. Thank you for this opportunity. Sincerely, 441- Alo(� Chris Brooks, P.E. Senior Project Manager ATTACHMENTS CC: Tony Sholola, P.E., FWWD, Capital Projects Coordinator Daniel Jackson, P.E., Regional Manager—Vice President, RJN Group Derek Schwanke, P.E., Engineering Manager—RJN Group Page 2 of 5 Contract Amendment No.3—Construction Inspection Services City Project No.02397 Attachment A-3 SCOPE OF SERVICES Construction Inspection Services for City of Fort Worth Project No.02397 Main 34, 100, D100 Drainage Areas Sanitary Sewer Improvements-Part 1 CONSTRUCTION INSPECTION SERVICES ENGINEER will provide the following construction inspection services for the project: • Attend pre-construction meeting • Attend public meeting • Assign qualified staff to provide on-site inspection of contract work • Document work progress in daily inspection reports o Measure and record pay items placed each day • Maintain project diary each day documenting all project activity inclusive of weather conditions,work items in progress and its location, and any significant project issues • Review contractor's traffic control set-up for each work site • Meet with/attend utility meetings to facilitate coordination of contract work with existing utilities within the public right-of-way(ROW)or easements • Facilitate the resolution of any issues arising with the abutting property owners • Coordinate Material Testing with approved geotechnical firm o Receive and review all test reports • Inspect water and sanitary sewer main placements and support City Inspector by: o Ensuring construction plans are followed o Ensuring specified materials are provided o Ensuring all water and sewer pipelines testing requirements performed and satisfied o Ensuring pavement is saw cut to acceptable lines/backfill is placed at specified density/pavement is repaired in accordance with plan details • Assist City Inspector to verify that contractor is collecting required horizontal and vertical survey data for use in preparing as-built plans • Assist City Inspector to review and verify contractor pay requests each month prior to processing for payment • Assist City Inspector to review and verify the contractors progress report each month prior to City payment • Coordinate any needs for Field Changes with the City, Contractor and Staff • Assist the City to resolve any Contractor disputes relative to the work • Attend final inspection • Assist City Inspector with preparing a final punch list prior to acceptance of the project • Advise the City of the status of Contractor's progress on punch list Page 3 of 5 V / / \ N ? ? / / � � ® ƒ ta � ta _ M z � w w = w ( 7 / E ) \ ( / \ / 0 C u w = y = _ ° m 7 3 / / k 2 Gu 0 0 _ 0 0 = '0 e e 2 2 0 / _ z 2 % 7 / a s � Ln ± ± '0 I / / 0 4 z ) CD/ ( E 3 CL § G 1 \ z \ CL . j ( Ln CD t g LU k o ■ L co Ln " z § f L CL R ' m 0 ± k @Ln < c m 5 0 > \ � LLJ / 0 / u / # � CO \ if)- tDLO w � ] 0 \ ® \ k K / u 2 CD § » 0 — / 5 - % £ k § R 3 E \ u j a)> 2 / 0 / E 3 z e e = ° k 2 ® \ 0 0 c g 0 k CD \ } k k \ 0 @ _@ \ 3 Ln § c m / e ) � 0 _0 2 2 ' u 2 5 Ln u J � ®z > ai �j �\ ƒU c6 r - 0 / E t 0 / < e 6 0 E u 0 § z o E ~ ® leG \ 5 ƒ A @ u u 0 u < U u 0 O O Z Z U U 0.0 O O a1 ri aJ fa a) M o. 41 a = Ln aj ai °J +-, v) �n v c E o a, u > c o tin tin O rn CL a Q U M E i N +' aj C C 3 O u v z N 7 u 41 O O L u (n L c a E o o Ln O N N N ca O +' L,) ai av -o ui L u Q m c C aJ an Q. � Q � 7 ,,f bA n3 O L E d C 1� tin O c a� u O w U O C O u Q !I cn U) u c u O _ _ O L O L L U 41 Q Q N � i C M � O c O c�'i co u L L o fl m m c O o L u U O � u .fl .O to aJ aj C LL LL } O O C a1 u M O 75 I -a u _0 m u U a u O Ln C c N z r- U '�i O u a c rn a) a x (D aJ m O w a) ~ O N i E p d o m 0 u U o E Z u = w .� w , m u -� a) +, Q +' — v fL6 OOC m O p v d LU S- u O u c m O *' M O +*'-+ d' m O +T' u u Q a a z u Q City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, February 18, 2020 REFERENCE NO.: M&C 20-0096 LOG NAME: 60M34SSIP1-CIRCLECRJN SUBJECT: Authorize Execution of a Contract with William J. Schultz dba Circle C Construction Company, in the Amount of$5,745,825.00 for Mains 34, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1, Provide for Project Costs for a Project Total in the Amount of$6,697,010.00, Authorize Execution of Amendment No. 3 in the Amount of$192,000.00 to an Engineering Agreement with RJN Group, Inc. for Mains 34, 100, D100 Drainage Areas Sanitary Sewer System Evaluation Study and Improvements for a Revised Contract Amount of$1,081,238.02 and Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of a contract with William J. Schultz Inc., dba Circle C Construction Company, in the amount of$5,745,825.00 for the Mains 34, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1 project (City Project No. CO2397); 2. Authorize the execution of Amendment No. 3 to City Secretary Contract No. 29961, an Engineering Agreement with RJN Group, Inc. in the amount of$192,000.00 for assistance during construction of the Mains 34, 100, D100 Drainage Areas Sanitary Sewer System Improvements, Part 1 project for a revised contract amount of$1,081,238.02; 3. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Water& Sewer Commercial Paper Fund in the amount of$6,697,010.00 for the Mains 34, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1 project; and 4. Adopt the attached Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt for the Mains 34, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1 project. DISCUSSION: The Sanitary Sewer Main 34, Main 100 and D100 Drainage Areas Sanitary Sewer Improvements, Part 1 project consists of the replacement of deteriorated water or sanitary sewer mains as indicated on the following streets and alleys located in the Downtown Central Business District: Street lFrom IFTo Scope Burnett Street W. 6th Street JVV. 7th Stre ISewer Houston JVV. 7th Street W. 8th Street Sewer Commerce 234 feet South of the Northerly 834 Street 15th Street/Commerce feet Sewer Street intersection Grove Str I E. 4th Street IFE. 7th Street Sewer/Water Monroe S JW. 10th Street IFTexas Street Water E. 5th Str JGrove Street 11iones Street Sewer/Water Henderson Henderson Henderson Street West Street East of Street Crossing of right-of-way line right-of-way Sewer line W. 7th Street W 7th Street West of Westerly 20 Sewer right-of-way line Ifeet Fahey Street Fahey Street West of Westerly 80 Sewer right-of-way line Ifeet Alley between Monroe Street W 10th Street W. 13th Street Sewer and Taylor Street Alley between Houston Street W 2nd Street W. 3rd Street Sewer and Main Street Alley between Calhoun Street E. 12th Street E. 14th Street Sewer and Jones Street Construction of the project was advertised for bid on November 21, 2019 and November 28, 2019 in the Fort Worth Star-Telegram. On December 19, 2019 the following bids were received: BIDDER [AMOUNT TIME OF COMPLETION William J. Schultz Inc., dba Circle C Construction Company $5,745,825.00 400 Calendar Days In addition to the contract cost, $568,424.00 (Sewer: $452,421.00; Water: $116,003.00) is required for project management, inspection and material testing and $190,761.00 (Water: $45,964.00; Sewer: $144,797.00) is provided for project contingency. The Transportation & Public Works Department will pave all affected roadways after the completion of this project. On March 23, 2004 (M&C C-20006) the City Council authorized an engineering agreement in the amount of$740,698.02 with RJN Group, Inc. for Mains 34, 100, D100 Drainage Area Sanitary Sewer System Evaluation Study and Improvements. The agreement was subsequently revised by Amendment No. 1 in the amount of$18,600.00 administratively authorized March 6, 2015, and Amendment No. 2 in the amount of$129,940.00 authorized August 14, 2018 (M&C C-28795). Amendment No. 3 will provide inspection assistance during construction. Staff considers the proposed fee to be fair and reasonable for the scope of services proposed. This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City portfolio (currently approximately 2.3\% annually). Should the City's portfolio not support the liquidity needed to provide an interim short-term financing source, another funding source will be required, which could mean issuance of Water and Sewer revenue bonds earlier than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. The City Council approved the Water Department's Fiscal Year 2020-2024 Five Year Capital Improvement Plan on September 17, 2019. This approved plan includes this specific project, with funding identified through the CIP program to be reimbursed with future revenue bonds. In accordance with the provisions of the Financial Management Policy Statement, Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within the next three years. This debt must be issued within approximately three years to provide reimbursement for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be made whole through budgetary methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax-exempt bond proceeds. Funding for the Main 4, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1 Improvements project: Fund Existing Additional Project Appropriations Appropriations Total* W&S Capital $146,941.00 1��$146,941.00 Fund 56002 Sewer Capital Fund - Legacy $160,227.00 $0.00 $160,227.00 59607 Water & Sewer Commercial Paper Fund $0.00 $6,697,010.00 $6,697,010.00 56017 Project Fund $307,168.00 $6,697,010.00 $7,004,178.00 *Numbers rounded for presentation. This project will have no impact on the Water Department's operating budget when completed. Construction is anticipated to commence in March 2020 and be completed by August 2021. This project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. MWWBE: William J. Schultz, Inc., dba Circle C Construction Company is in compliance with the City's BIDE Ordinance by committing to zero percent MBE participation and documenting good faith effort. William J. Schultz, Inc. dba Circle C Construction Company identified several subcontracting and supplier opportunities. However, the firms contacted in the areas identified did not respond or did not submit the lowest bids. The City's MBE goal on this project is eight percent. RJN Group, Inc.: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office in accordance with the MWBE Ordinance, because the purchase of goods and services is from sources where subcontracting or supplier opportunities are negligible. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water& Sewer Commercial Paper Fund (W&S Commercial Paper) for the future growth in the Main 34, 100, D100 Drainage Areas Sanitary Sewer Improvements, Part 1 project. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO -------- ---------------- Fund Department 1Account' Project Program lActivity Budget Reference # I moun ID - ID Year (Chartfield 2) FROM _ IFund Department Account Project Program Activity Budget Reference # lArnouni ID ( j ID__I_ Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: John Kasavich (8480) ATTACHMENTS 1. 60M34SA2-Circle C 1295.pdf (CFW Internal) 2. 60M34SSIP1-Cl RCLECRJN Circle C Compliance.pdf (CFW Internal) 3. 60M34SSIPl-CIRCLECRJN Circle C SAM.pdf (CFW Internal) 4. 60M34SSIPl-CIRCLECRJN FID Table (NN 12.27.2019).docx (CFW Internal) 5. 60M34SSIPl-CIRCLECRJN FORM 1295 RJN.pdf (CFW Internal) 6. 60M34SSIPl-CIRCLECRJN RJN SAM.pdf (CFW Internal) 7. 60M34SSIP1-CIRCLECRJN Waiver.pdf (CFW Internal) 8. 60M34SSIPl-CIRCLECRJN 56017 A020 (r).docx (Public) 9. 60M34SSIPl-CIRCLECRJN Reimb Resolution (NN 12,27,2019)r2.docx (Public) 10. 60M34SSIPI-CIRCLECRJN Map.pdf (Public) 11. CIRCLECRJN Funding Availability.PNG (CFW Internal) 12. M & C Map-60M34SSIPI-CIRCLECRJN(2).pdf (Public) O o 0 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O CD CD d o h ai o o t` o t1- cYi ti � LO o 0 N Lo O M I` LO r M O N 0 IT r N LO t` LO O NM CDN '' 0-) (a � CDt O M ti 'q M N Ln O - 00 Ln Ln "t 00 00 N (3 Ln = a) a) 00 • . d7 (O N r N (fl (fl r N M LO a) a) (f} ti 'IT O d7 N a) CO bc? 01 6,) u) ff} r r (f} M (f} 60- E a) 00 r Ef} (C u)- d el} • u> 47 (fl r LO �} i • Ef} EA EA • • • LL LU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a) a) a) N N N N N N N N N N N N N N N . a7 O O O O O O O O O O O O O O O O O O O O • N N N N N N N N N N N N N N N • . • O d7 a7 • • • • �. u u D O O M IT IT LO U M O O M '4Y d' LO • M M M W co CD 00 a0 ao a0 W M 00 00 00 00 00 co 00 00 M ti ti ti ti ti ti ti ti ti ti Z o 0 0 0 0 o Z 0 0 0 0 0 0 0 0 0 0 U U U U U U U U U U U U U < U U U - -- U ti ti ti U ti t` ti ti ti ti ti ti W rn rn rn a) rn rn w rn rn rn rn rn rn rn rn a) rn 0 M M M M M M 0 M M M M M M co M M M • (n N N N N N N (n N N N N N N N . . N N N O O O O O O z O O O O O O O O O O U U U U U U U U U U U U U U U U r r O O O r O r r O O O r O O O O O r LO O O O O O r Lo O O r r O r r O M Ln r LO r r O M LO r D O O LD • O O O O O O O O O O O O O • • O O O r IT Iq r M r M r IT IT r M r d 't M r LO ti C'7 M r CO LO tI- M M r N t— M LO LO LO LO Ln LO LO LO In Ln Lf) LO LO ' ' LO LO LO O O O O O O O O O O O O O O O O O O co M M M M M M M M co M M co M co M co Co Z It It I' IT It It It It Ih d d V �Y IT I' IT d" IT c • O O O O O O O O O O O O O O O • • O O O C, CD CD O CD O O O CD CD CD CD CD O a O (D O w M (D (a (O (a (a (a � ti ti t` t` t-- ti ti (o ti ti � O O CD CD CD O O O O CD CD CD CD O O U ti i` ti ti ti ti ti f� I` ti ti ti t` (-� • r r � r r r r r r r r r r �- r � • r r r O O O O O O O O O O O O O O O CD CD CD a ca (a M (o (a (a (a (a (D (a (o (o (o (a ca LL (o (o (o N LO Ln LO LO LO LO LO Ln Lo LO LO LO Lo LO LO LO LO LO cn -- m N N N N N N N N N N N N N N N Q r r r r r r r r r r r r r r r Lfl \e /\ �\ }( ? )j \2 ;! !� / 2 / ! , / Es B }/ q /k t! � �) (} � «! � §§ � §{ {k {I ) § )A :) \q { § . k� a |f . . ' ± ;! !!