NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: RICHMOND PHASE 2
City Project No.: 100538
Improvement Type(s): Water ❑x Sewer ❑x
Original Contract Price: $1,802,649.32
Amount of Approved Change Order(s): $769.15
Revised Contract Amount: $1,803,418.47
Total Cost of Work Complete: $1,803,418.47
Josh MWda(Aug 5,019) Aug 5,2019
Contractor Date
President
Title
Venus Construction Company
Company Name
�4bG6et tSarxa,ue o Albert Samaniego(Aug5,201K Aug 5,2019
Project Inspector Date
PR-0 &HIA Ma 30 2020
FRED EHIA(May 30,202014:57 CDT) Y f
Project Manager Date
E✓elyn Robo&s
Evelyn Roberts(Jun 1,2020 07:19 CDT) Jun 1,2020
CFA Manager Date
Dana Burghdoff(Jun 1,202 8:37CDT) JUn 1,2020
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: RICHMOND PHASE 2
City Project No.: 100538
City's Attachments
Final Pay Estimate 0
Change Order(s): 0 Yes ❑ N/A
Pipe Report: N Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 125 CD Days Charged: 535
Work Start Date: 2/12/2018 Work Complete Date: 7/31/2019
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name RICHMOND PHASE 2
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100538
DOE Number 0538
Estimate Number 1 Payment Number I For Period Ending 8/2/2019
WD
City Secretary Contract Number Contract Time 12WD
Contract Date Days Charged to Date 535
Project Manager NA Contract is 100.00 Complete
Contractor VENUS CONSTRUCTION COMPANY
1426 S.MAIN P O BOX 90
MANSFIELD, TX 76063
Inspectors OWEN / SAMANIEGO
Friday,August 2,2019 Page 1 of 5
City Project Numbers 100538 DOE Number 0538
Contract Name RICHMOND PHASE 2 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/2/2019
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"PVC WATERLINE 10860 LF $27.23 $295,717.80 10860 $295,717.80
2 12"PVC WATERLINE C091 2730 LF $40.42 $110,346.60 2730 $110,346.60
3 12"CARRIER PIPE 166 LF $40.42 $6,709.72 166 $6,709.72
4 20"STEEL CASING 166 LF $570.27 $94,664.82 166 $94,664.82
5 8"GATE VALVE&BOX 35 EA $1,267.32 $44,356.20 35 $44,356.20
6 12"GATE VALVE&BOX 11 EA $2,276.13 $25,037.43 11 $25,037.43
7 8"X 8"TAPPING SLEEVE&VALVE 1 EA $4,054.46 $4,054.46 1 $4,054.46
8 CONCRETE ENCASEMENT 39 CY $254.46 $9,923.94 39 $9,923.94
9 FIRE HYDRANT ASSEMBLY 18 EA $3,797.25 $68,350.50 18 $68,350.50
10 1"SINGLE WATER SERVICE CO#1 236 EA $769.15 $181,519.40 236 $181,519.40
11 DUCTILE IRON WATER FITTINGS 7.74 TN $5,136.91 $39,759.68 7.74 $39,759.68
W/RESTRAINT
12 REMOVE AND REPLACE CONCRETE 50 SY $183.39 $9,169.50 50 $9,169.50
PAVEMENT
13 TRENCH SAFETY 13756 LF $0.16 $2,200.96 13756 $2,200.96
14 TESTING 13922 LF $0.32 $4,455.04 13922 $4,455.04
15 8"CARRIER PIPE CO#1 166 LF $40.42 $6,709.72 166 $6,709.72
--------------------------------------
Sub-Total of Previous Unit $902,975.77 $902,975.77
SEWER
Item Description of Items Unit Unit Cost Estimated Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"SDR-26 PVC PIPE 9527 LF $36.24 $345,258.48 9527 $345,258.48
2 4"SERVICE LINES 235 EA $932.29 $219,088.15 235 $219,088.15
3 4'DIAMETER MANHOLE 42 EA $3,691.56 $155,045.52 42 $155,045.52
4 4'DIAMETER DROP MANHOLE 9 EA $4,352.12 $39,169.08 9 $39,169.08
5 ADDITIONAL MANHOLE DEPTH 170.53 VF $356.65 $60,819.52 170.53 $60,819.52
6 TRENCH WATER STOP 12 EA $250.28 $3,003.36 12 $3,003.36
7 EPDXY MANHOLE LINER 124 VF $231,52 $28,708.48 124 $28,708.48
8 CONNECT TO EXISTING MANHOLE 2 EA $1,933.39 $3,866.78 2 $3,866.78
9 CONCRETE ENCASEMENT 80 CY $254.46 $20,356.80 80 $20,356.80
10 TRENCH SAFETY 9527 LF $0.29 $2,762.83 9527 $2,762.83
Friday,August 2,2019 Page 2 of 5
City Project Numbers 100538 DOE Number 0538
Contract Name RICHMOND PHASE 2 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 8/2/2019
Project Funding
11 MANHOLE VACUUM TESTING 51 EA $156.43 $7,977.93 51 $7,977.93
12 POST CCTV INSPECTION 9527 LF $1.51 $14,385.77 9527 $14,385.77
--------------------------------------
Sub-Total of Previous Unit $900,442.70 $900,442.70
Friday,August 2,2019 Page 3 of 5
City Project Numbers 100538 DOE Number 0538
Contract Name RICHMOND PHASE 2 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/2/2019
Project Funding
Contract Information Summary
Original Contract Amount $1,802,649.32
Change Orders
Change Order Number 1 $769.15
Total Contract Price $1,803,418.47
Total Cost of Work Completed $1,803,418.47
Less %Retained $0.00
Net Earned $1,803,418.47
Earned This Period $1,803,418.47
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,803,418.47
Friday,August 2,2019 Page 4 of 5
City Project Numbers 100538 DOE Number 0538
Contract Name RICHMOND PHASE 2 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/2/2019
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / SAMANIEGO Contract Date
Contractor VENUS CONSTRUCTION COMPANY Contract Time 125 WD
1426 S.MAIN P O BOX 90 Days Charged to Date 535 WD
MANSFIELD, TX 76063 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
-------------- ----------------- ----------
Total Cost of Work Completed $1,803,418.47
Less %Retained $0.00
Net Earned $1,803,418.47
Earned This Period $1,803,418.47
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,803,418.47
Friday,August 2,2019 Page 5 of 5
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Richmond Phase 2
PROJECT NUMBER: 100538
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
g° pvc 10860
12" pvc 2730
FIRE HYDRANTS: 18 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Passed
NEW SERVICES: 236 copper 4248
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8" pvc 9527
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Passed
NEW SERVICES: 4" pvc 5878
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
O Q A % zar -02 Pl CO 0 0
m A p- (ST p it O A
D �m c z qm � � `•" � u4 �
a a o -4 !"n � � '' emi
S S z y a 0 0 O m A O
mp A®� O A m Y tom. a 1 (my y
o pc'ynm zn mm —1 m
m $ 4
Y m v^ Q
-ems
a
0 n X 4+ Ih
® V F, m nl
ar d
P P.
o {
}+ cr 'F o
.77
:n, L C x u
W N
'� M': M: Q•' f9 03 O
w co
d o c R N
Z. G
a 0 n n
P
b
nv h m
" a
_ A
=r m
"R
0.
ti
p co
�C1J m m
p O
A O (NAH t{QJyiY
K V a r N
O A
w m r A
P e
9 Oo p ^9
_ a k
. n m
S e
a
A
o a my
n
O m
O �
G� a a rt
�b0 1 m
3
X`acYti`��' U C
lk
b O Wa 9 N"N 2 a
c� ro 4^ fi p a y d 5d q�{� �'•'
m day' C7 d C a ❑ A t7
HER,
E R m
mz �' Q
n:i
In r M n�>
N A
• � cb
C m m m
Q .Y
u
4
ca r N V m a c a
n
m a
m QD m ``dn a
N A {yCl
r N
o ti o 9 3. a 4
a �
•y m
6
Q
,
b In
ot�, 3
NN'j�N r
. V
IL HNNELMUS
W4 Contractors since 1967
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Josh McAda,
President Of Venus Construction Company, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Richmond Phase 2
BY �
Josh McAda esident
Subscribed and sworn before me on this date 2 of August, 2019.
VANESSA RENFROW
My Notary ID#128 014
Notary Publ c ti .+'' EVkes July 28,2M
Tarrant, TX MMI
PO Box 90 - Mansfield, TX 76063 (817) 477-2050 FAX (817) 473-9366
WWW.VENUSCONSTRUCTION.COM