Loading...
HomeMy WebLinkAboutContract 43389CITY SECRUARY CITY OF FORT WORTH, TEXAS CONTRACT NO- STANDARD AGREEMENT FOR PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality (the "CITY'), and US Peroxide, LLC, authorized to do business in Texas, an independent contractor ( "Consultant "), for a PROJECT generally described as: Hydrogen Sulfide Control Demonstration Program. Article I Scope of Services (1) Consultant hereby agrees to perform as an independent contractor the services set forth in the Scope of Services attached hereto as Attachment "A ". These services shall be performed in connection with Hydrogen Sulfide Control Demonstration Program, (2) Additional services, if any, will be requested in writing by the City. City shall not pay for any work performed by Consultant or its subconsultants, subcontractors and/or suppliers that has not been ordered in writing. It is specifically agreed that Consultant shall not be compensated for any alleged additional work resulting from oral orders of any person. Article it Compensation Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "B ". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A ". However the total fee paid by the City shall not exceed a total of $33,394 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly, The Consultant shall provide monthly invoices to the City. Payment for services rendered shall be due within thirty (30) days of the uncontested performance of the particular services so ordered and receipt by City of Consultant's invoice for payment of same. Acceptance by Consultant of said payment shall operate as and shall release the City from all claims or liabilities under this Agreement for anything related to, done, or furnished in connection with the services for which payment is made, including any act or omission of the City in connection with such services. City of Fart Worth, Texas S land ard Agreement for Professional Sennces PMd Official Release Dale: 0510412012 Page 1 of 6 07 -1 � -12 Pu2:36 IN OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article III Tenn Unless terminated pursuant to the terms herein, this Agreement shall be for a term of 180 days, beginning upon the date of its execution, or until the completion of the subject matter contemplated herein, whichever occurs first. Article IV Independent Contractor Consultant shall operate hereunder as an independent contractor, and not as an officer, agent, servant, or employee of the City. Consultant shall have exclusive control of and the exclusive right to control the details of its work to be performed hereunder and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, employees, contractors and subcontractors. The doctrine of respondent superior shall not apply as between City and Consultant, its officers, agents, employees, contractors, and subcontractors, and nothing herein shall be construed as creating a partnership or joint venture between City and Consultant. Article V Professional Competence and Indemnification (1) Work performed by Consultant shall comply in all aspects with all applicable local, state and federal laws and with all applicable rules and regulations promulgated by the local, state and national boards, bureaus and agencies. Approval by the City shall not constitute or be deemed to be a release of the responsibility and liability of Consultant or its officers, agents, employees, contractors and subcontractors for the accuracy and competency of its services performed hereunder. (2) In accordance with Texas Local Government Code Section 271.904, the Consultant shall indemnify, hold harmless, and defend the City against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the Consultant or Consultant's agent, consultant under contract, or another entity over which the Consultant's exercises control. City of Fort Worth. Texas Standard Agreement for Professional Services PMO Official Release Oase: 0510412012 Page 2 of 8 Article VI Insurance (1) Consultant shall not commence work under this Agreement until it has obtained all insurance required under this Article and the City has approved such insurance, nor shall Consultant allow any subcontractor to commence work on its subcontract until all similar insurance of the subcontractor has been so obtained and approval given by the City; provided, however, Consultant may elect to add any subconsultant as an additional insured under its liability policies. Commercial General Liability $1,000,000 each occurrence $1,000,000 aggregate Automobile Liability $1,000,000 each accident (or reasonably equivalent limits of coverage if written on a split limits basis). Coverage shall be on any vehicle used in the course of the Project. Worker's Compensation Coverage A; statutory limits Coverage B: $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee (2) Additional Insurance Requirements a. Except for employer's liability insurance coverage under Consultant's worker's compensation insurance policy, the City, its officers, employees and servants shall be endorsed as an additional insured on Consultant's insurance policies. b. Certificates of insurance shall be delivered to the Fort Worth Water Department, Attention: Travis Andrews, Asst. Water Director, 1608 111h Avenue, Fort Worth, TY 76102, prior to commencement of work. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non- renewal, and /or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non- payment of premium. City of Fort Worth, Texas Standard Agreament for Professional Services PTdO Official Release Date, 05/04/2012 Page 3 of 8 e. Insurers must be authorized to do business in the State of Texas and have a current AM. Best sating of A: VII or equivalent measure of financial strength and solvency. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. g. Workers' compensation insurance policy(s) covering employees employed on the Project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. h. City shall not be responsible for the direct payment of insurance premium costs for Consultant's insurance, Consultant's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self - funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. In the course of the Agreement, Consultant shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. k. Consultant's liability shall not be limited to the specified amounts of insurance required herein. Upon the request of City, Consultant shall provide complete copies of all insurance policies required by these Agreement documents. Article VII Transfer or Assignment City and Consultant each bind themselves, and their lawful successors and assigns, to this Agreement. Consultant, its lawful successors and assigns, shall not assign, sublet or transfer any interest in this Agreement without prior written consent of the City. Article Vill Termination of Contract (1) City may terminate this Agreement for its convenience on 30 days' written notice. Either the City or the Consultant for cause may terminate this Agreement if either Party fails substantially to perform through no fault of the other and does not City of Fart Worth, Texas Standard Agreement For Professional Services PMa Official Release Dale: 05/0412012 Page 4 of 8 commence correction of such nonperformance with 5 days of written notice and diligently complete the correction thereafter (2) If City chooses to terminate this Agreement under Article 8, upon receipt of notice of termination, Consultant shall discontinue services rendered up to the date of such termination and City shall compensate Consultant based upon calculations in Article 2 of this Agreement and Exhibit "B" attached hereto and incorporated herein. (3) All reports, whether partial or complete, prepared under this Agreement, including any original drawings or documents, whether furnished by the City, its officers, agents, employees, consultants, or contractors, or prepared by Consultant, shall be or become the property of the City, and shall be furnished to the City prior to or at the time such services are completed, or upon termination or expiration of this Agreement. Article IX Right to Audit (1) Consultant agrees that the City shall, until the expiration of three (3) years after final payment under this Agreement, have access to and the right to examine any directly pertinent books, documents, papers and records of Consultant involving transactions relating to this Agreement. Consultant agrees that the City shall have access during normal working hours to all necessary facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section, City shall give Consultant reasonable advance notice of intended audits. (2) Consultant further agrees to include in all its subcontracts hereunder, a provision to the effect that the subcontracting consultant agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and records of such sub - consultant, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all sub - consultant facilities, and shall he provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this article. City shall give Consultant and any sub - consultant reasonable advance notice of intended audit. (3) Consultant and sub - consultants agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Consultant for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. City of Fort Worth, Texas Standard Agreement for Professional Services FIMO Official Release Dale: 0510412012 Page 5 of 8 Article X Minority and Women Business Enterprise (M/WBE) Participation In accordance with City Ordinance No. 15530, the City has goals for the participation of minority business enterprises and woman business enterprises ( "MNVBE ") in City contracts. Consultant acknowledges the MNVBE goal established for this Agreement and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Consultant may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. Article XI Observe and Comply Consultant shall at all times observe and comply with all federal, state, and local laws and regulations and with all City ordinances and regulations which in any way affect this Agreement and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. Consultant agrees to defend, indemnify and hood harmless City and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. Article Xll Venue and Jurisdiction If any action, whether real or asserted, at law or in equity, arises on the basis of any provision of this Agreement, venue for such action shall lie in state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas — Fort Worth Division. This Agreement shall be construed in accordance with the laws of the State of Texas. Article XIII Contract Construction The Parties acknowledge that each party and, if it so chooses, its counsel have reviewed and revised this Agreement and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party must not be employed in the interpretation of this Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas Standard Agreement 'or Professional Services PMO 016et Release Dale: 051D4/2012 Page 6 at 8 Article XIV Severability The provisions of this Agreement are severable, and if any word, phrase, clause, sentence, paragraph, section or other part of this Agreement or the application thereof to any person or circumstance shall ever be held by any court of competent jurisdiction to be invalid or unconstitutional for any reason, the remainder of this Agreement and the application of such word, phrase, clause, sentence, paragraph, section, or other part of this Agreement to other persons or circumstances shall not be affected thereby and this Agreement shall be construed as if such invalid or unconstitutional portion had never been contained therein. Article XV Notices Notices to be provided hereunder shall be sufficient if forwarded to the other Party by hand- delivery or via U.S. Postal Service certified mail return receipt requested, postage prepaid, to the address of the other Party shown below: City of Fort Worth Attn: Travis Andrews, Asst. Water Director Field Operations Division 1 608 11 th Avenue Fort Worth, Texas 76102 Consultant: US Peroxide, LLC Attn: Andrew Nangano, Assistant Secretary 900 Circle 75 Parkway, Suite 1330 Atlanta, GA 36339 Article XVI Headings The headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement City 6 Fort Worth, T4,Kas 5 lands rd Agreement for P roles sianaI 5ervioas PMO 0MdaI Release Date: 05!1412012 Page 7 of 8 Article XVII Counterparts This Agreement may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but ali such counterparts shall together constitute but one and the same instrument. Executed and effective this the 21 st day of June, 2412. BY: CITY OF FORT WORTH Fernando Costa Assistant City Manager Date: APPROVAL RECOMMENDED: �y. S. Frank Crumb, P.E. Director, Water APPROVED AS TO FORM AND LEGALITY By: 9 oug as W. Black Assistant City Attorney ATTEST: Mary J. City Se ry City of Fart Worth, Texas Staiidar d Agreement foe ProlessIona I Services PMO Official Release Dale: 05/W2012 PageBof8 f 0jw j: P� lgno nn 0 4� Op* r D 'C BY: ENGINEER US Pemide. L Andrew Nanono Assistant Secretary Date: U z i o M&C No.: k M &C Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM ATTACHMENT A SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM The scope set forth herein defines the work to be performed by the CONSULTANT in completing the project. Both the CITY and CONSULTANT have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED Hydrogen Sulfide Control Demonstration Program Peroxide Regenerated Iron - Sulfide Control (PRI- SCTM), Ferrous Chloride (FeC12) & Hydrogen Peroxide (H202) City of Fort Worth - Saginaw M -292 Line A. Project Description and Objectives The City of Fort Worth (Fort Worth) is contracting with U5 Peroxide, LLC (USP) to conduct a hydrogen sulfide odor and corrosion control demonstration program using Peroxide Regenerated Iron - Sulfide Control process technology (PRI- SCTM). The PRI -SC m process is a proprietary hydrogen sulfide odor and corrosion control technology that combines the use of iron salts and hydrogen peroxide in a unique fashion, whereby iron salts (either FeC121FeC1;i/FeSO4) are added as the primary sulfide control agent in the upper reaches of the collection system, and hydrogen peroxide (H202) is added at specific points downstream to "regenerate" the spent iron (FeS). The regeneration step effectively oxidizes the sulfide to elemental sulfur and in the process "frees up" the iron for subsequent sulfide or phosphorous control further downstream. PRI -SCTM is an ideal treatment technology within interceptor systems and for integrating sulfide control into the treatment plant. In this project, an iron storage and dosing system will be installed at Blue Mound Road, and a hydrogen peroxide dose site will be installed at a location prior to the Rub -Dub car wash. US Peroxide will use a portable peroxide system to test a few locations, to determine the optimal peroxide feed location. A USP employee will man this portable site while it is running. Under the PRI -SC scenario, the iron will be fed at Blue Mound road to control sulfides throughout the length of this line. The H-202 system will have the effect of oxidizing the spent iron sulfide and regenerating the iron to ferrous. The additional regenerated iron and residual peroxide will maintain the dissolved sulfides to a level of 4.1 mg /1 or less at the car wash. The trial program will be conducted for a period of 94 days during the higher sulfide loading months (May to November). The primary project objectives and Scope of Work include: Citynf Fort W00. Texas Attachment A Pw1p Release Date: 04.09.2012 Page 1 of a ArTACHYENTA SCOPE OFSEAVICES FOR HYDROGEN SULFIDE CONTROL dEFIOHSTRAMNPROGRAM L Conduct detailed baseline H2S sampling (liquid and vapor) on Segment M -292 from Blue Mound road to the siphon (see model in Technical Approach). 2. Prove the underlying concept, the cost and operational efficacy of the PRI -SCT 11" program for controlling hydrogen sulfide odors and corrosion. The treatment targets for both liquid and vapor sulfide levels will be agreed to prior to starting the demonstration by all parties. In addition, the sampling frequency and schedule will be determined and agreed to by all parties prior to the start of the demonstration. 3. Optimize feed rates as well as optimize performance throughout M -292 line. 4. At the end of the 90 days provide a recommended treatment approach and an annualized budgetary estimate for full- service PRI -SCTM program. The demonstration study Scope of Work will be delivered as a full service project conducted over a 90 day period at a not to exceed total project cost of $33„394 as detailed below. US Peroxide recommends conducting the program during the City's higher sulfide months to demonstrate under the worst case conditions and evaluate the maximum performance benefits. This not to exceed cost estimate is based on the sulfide concentration data collected over the past 6 months. A baseline survey conducted by US Peroxide prior to the start of the demonstration will be performed in order to provide a proper baseline of current levels required for comparison to demonstration results. The project delivery scope includes the hydrogen peroxide (H202 -50 %), ferrous chloride (FeC12 — 25 %), H2O2 storage and dosing equipment system, ferrous chloride storage and dosing equipment, analytical instrumentation, and all of the labor for project management, operating and maintenance services and reporting. The actual project costs will be based on the final volume of hydrogen peroxide and ferrous chloride consumed during the program, and are structured on a not -to- exceed basis. B. Technical Approach The technical approach is based on the sulfide data collected and information provided by the City of Ft. Worth. A simplified model of the technical approach, including a schematic of approximate application points and monitoring points, is shown below. A variety of test conditions (i.e. dose response feed rates of both iron and hydrogen peroxide) will be evaluated during the course of the demonstration. As discussed above, the final test conditions, elements of the technical approach and cost estimate will be based on a baseline survey conducted at the start of the program. City of Fort Worth, Texas Attachment A PINb Release Oste: 0009.2012 Page 2 of a ATTACHMENT A SCOPE OF SERVICES FOR HYDROGER SULFIOE CONTROL DEMOXSTRATIOH PROGRAM PRI -SC Model 1 42 @A ark r:v I I -35 M-440 Saginaw M-292 Liele ® AS-355 SCM ; -2 Bpd 820 #i3 • �5 7 � #1- BlueMound Ca Wash *2- Pool 398 +92 Fl w- 2 -3mgd .83- Kubota 348 +23 Sulfides -1 -5 mg/1 *4- Cracker Barrel #5- 235 +75 7r 191 -79_2 #t7- Ca r W a sh 48- Syphon C. U5 Peroxide Delivery Scope US Peroxide will provide the demonstration as a full- service program that includes the following scope items: • Project management • Supply of 50% hydrogen peroxide • Supply of 25% ferrous chloride ■ 1 x hydrogen peroxide storage and dosing equipment system • 1 x iron storage and dosing equipment system • 2 eyewash systems • Installation, start up and ongoing maintenance of equipment • Inventory and delivery management and remote system monitoring (ChemWatchT" ) • PCM (Process Control Management) interface with Fort Worth • Dose response testing and feed rate optimization • Hydrogen sulfide sampling (liquid and vapor) labor and instrumentation • Iron sampling and analysis labor and instrumentation Sampling and analysis of sewage temperature and pH ■ Comprehensive safety training for both iron and peroxide chemicals and feed systems • Project reporting and documentation, including: Uy of Fort Worth, Texas Attachment A PYID Release Date- 04.09.2012 Page 3 018 ATTACHMEWfA SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL GElll NSTRATION PROGRAM ❑ A final report in electronic format that provides: (1) an executive summary of the demonstration, its findings, results, cost, and recommendations; (2) an analysis of any impact on Village Creek Water Reclamation Facility operations, and related system cost impacts; and (3) charts and tables containing detailed data and observations collected during the demonstration. D. US Peroxide Equipment D1. Hydrogen Peroxide Dosing System Each integrated storage and dosing system proposed for this program includes the following: in One 3,000 US gallon double contained, high density polyethylene, storage tank. The secondary containment is sized to provide 110"1, of storage capacity. Each tank comes equipped with a reverse level indicator, fill line, overflow port into the secondary containment, and pressure relief device specific to hydrogen peroxide service. Labels and placards compliant with local codes shall be supplied. A ChemWatch monitor, remote telemetry system, which provides tank level readings in gallons. The system monitors inventory, pump health, and skid diagnostics. The system communicates daily with the ChemWatch Control Center. This allows for managing delivery logistics by forecasting demand, and automatically scheduling future deliveries. The system can also remotely operate the pumps, to allow for complete US Peroxide program management. • A Process Chemical Management system (PCM) will be designed and implemented For Fort Worth to access. This is a web based system that can be accessed by USP and Fort Worth to essentially see complete details of the M -292 line in "real time ". Fort Worth will have access to adalog data, liquid sulfide data, tank levels, ongoing chemical usage rates and cost information, yearly budget information, performance data, maintenance requests, program management requests, compliance records, alarms, target/goal tracking information, monthly /quarterly reports, etc. This will be built and populated throughout the course of the demo. ■ A skid mounted chemical metering pump dosing system. The pumps are capable of local, or remote, control. All transfer piping is passivated 304L tubing for product safety and easc of use. There is an automated product degassing valve, back pressure valve, calibration cylinder, and pressure indicator. PRV's specific to peroxide service are used. An environmentally friendly, weather resistant, enclosure houses the entire skid to provide leak containment. ■ An electrical distribution panel, which provides breakers for all high -draw components, and an isolated lockable main disconnect switch. City of Fort Worth. Texas Attachment A PMO Release ❑ate: 04.09.2012 Page 4 of 8 ATTACHMENT A SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEMONSTRATPON PROGRAM ■ A combination eyewash /safety shower and a MSDS right -to -know station. D2. Iron Salt Dosing Skid Each integrated storage and dosing system proposed for this program includes the following- 0 One single waited, high density polyethylene, storage tank. The field erected secondary containment is sized to provide 110% of storage capacity. Each tank comes equipped with a reverse level indicator, fill line and overflow port into the secondary containment. Labels and placards compliant with local codes shall be supplied. ■ A ChemWatch monitor, remote telemetry system, which provides tank level readings in gallons. The system monitors inventory, pump health, and skid diagnostics. The system communicates daily with the ChemWatch Control Center. This allows for managing delivery logistics by forecasting demand, and automatically scheduling future deliveries. The system can also remotely operate the pumps, to allow for complete US Peroxide program management. • A skid mounted chemical metering pump dosing system. The pumps are capable of local, or remote, control. All transfer piping is SCH 80 (IPS XS) PVC pipe for product safety and ease of use. There is a back pressure valve, calibration cylinder, and pressure reliefs. An environmentally friendly, weather resistant, enclosure houses the entire skid to provide leak containment. An electrical distribution panel, which provides breakers for all high -draw components, and an isolated lockable main disconnect switch. • A combination eyewash/safety shower and a MSDS right- to-know station. E. US Peroxide Services Equipment services include installation, safety training, start -up and maintenance of the system during the demonstration period. US Peroxide will provide all the necessary interconnecting piping and tubing for installation. Hydrogen peroxide safety training will be provided to all designated personnel during start -up. Approximately 4 to 5 days will be required for equipment installation, start -up and establishment of initial dose rates. US Peroxide will provide safety training for anyone that works with or near the hydrogen peroxide system. The training consists of two PowerPoint presentations: one for the ferrous chloride and one for the hydrogen peroxide. The training takes about 1 hour. The training for each product includes first exposure to the chemicals, required personal protective equipment, feed system materials, and what to do if there is a spill. We will take all designated personnel to the systems and give them an equipment safety orientation. City of Fort Worth, Texas Attachment A PMC Release Dale: 04.69.2972 Page 5 of 8 ATTACHMENT A SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEYDNSTRATION PROGRAM During start -up, and at regular intervals during the demonstration, US Peroxide will provide on -site field services to adjust the H202 and iron salt Feed rates to perform dose response testing with respect to achieving targeted levels of H2S control. This includes sampling and monitoring of gaseous H2S (adalog — continuous data logging H2S monitors), liquid sulfides (grab samples), sewage pH, temperature and hydrogen peroxide residuals. US Peroxide will also sample and monitor for iron levels and speciation. US Peroxide will provide weekly project updates to the designated Ft. Worth Engineers and at the end of the demonstration, a final report will be prepared that summarizes the treatment results, conclusions and recommendations, and projects annualized program costs based on actual results and cost benefit factors. The sampling methods are as follows with Table 1 outlining the specific sampling locations with minimum sampling frequency: Liquid (grab) samples Procedure Total sulfide Std. Methods 4500 -S D. Methylene Blue (Lamotte drop count kit) Dissolved sulfide Ditto, using pre - flocculation to remove insoluble sulfides pH Combination glass electrode Temperature MIST calibrated thermometer Total iron Std. Methods 3500 -Fe D. Pherlanthroline (Hach colorimeter) Ferrous iron Ditto, but without hydroxylamine reduction step Dissolved iron Per total iron Residual H202 DPD redox test strips (e.g., EM Quant) Vapor samples (continuous datalogging) HAS, ppm App -Tek RTX OdaLog (monitor / datalogger) with remote download capabilities to tie in with our PCM systein. Table ] Description of Sampling Locations and Frequency Sameling Location Time Frame Analyses Frequency Cantrell Sartsom Manhole 398 + 92 Throughout 1-ooI & Diss. Stdfide, pH, temp., Fe, Vapor H2S 5 -10 X monthly Fran samples Demonstration Throughout Total & Di mss. SuIfidc, pH, temp., Fe, Vapor H 2 5 -10 X monthly grab samples Kubota Manhole 244 + 90 Demonf ration Throug,lrout Total & Diss. Sulfide, pH, ternp., Fe 5 -10 X monthly grab samples Cracker Barrel Manhole 289 + 05 Demonstration Vapor H2S 24 -hour data logging Fvlaris Manhole 284 + 13 Throughout Total & Diss. Su lfide, pH, temp., Fe 5 -10 X monthly grab sample s aJem� +nstration Vapor H2S Industrial Park 194 + 35.1 Throughout Demonstration Total & Diss. Sulfide, pi i, temp., Fe, Vapor H25 5 -10 X monthly grab sarsiples Rub -Dub Car Wash Manhole 181 + 51 Throughout Demonstration Total & Diss. sulfide, pH, t4,-nip,, Fe, Vapor H2S 5 -10 X monthly grab samples 24 -hour datato to KK 8 Siphon Throughout Dem«srstration Total & Dit.s. Sulfide., H, temp., Fe, Va �r H2S p 5 -10 X mnnlhly grab samples 24 -hour datalu PK in g City of Fort Worth, Texas Attachment A PMO Release Dale: 04.09.YD12 Page 6 of 6 ATTACHMENT SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM F. City of Ft. Worth Responsibilities In order to help facilitate and support the demonstration program and installation of chemical dosing facilities US Peroxide requests that the City of Ft. Worth provide the following: • Conduit run, electrical service of 110 VAC, 64 HZ, 20A, terminating in a junction box within 14 feet of each skid location. • A clear area approximately 18' x 18' to place the H2021 storage tank and 18' x 36' to place the FeCt: storage tank. A 4" bed of concrete, or coarse crushed aggregate, is preferred for the tank pad. However, other surfaces may be acceptable. • A potable water supply capable of delivering 0.4 GPM at 30 PSI, is required prior to the first fill. • A crane will be required to offload equipment systems upon arrival at each site. • Any trenching, tapping of lines, drilling through concrete, etc. requited to run chemical injection tubing to the application point. • Procurement of appropriate permits and other external items to chemical storage and dosing systems that may be required by permitting authorities. • Temporary roads/driveways as needed to support safe delivery of chemicals • Provide Village Creek Water Reclamation Facility data needed to determine any impact of demonstration treatment on plant operations. City of Fort Worth. Texas Attachment A PMO Release Date! 04.09.2012 Page 7 of 8 ATTACHMENT A SCOPE OF SERVICES FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PA02RAM Upon execution of this agreement, USl' will schedule a visit by its engineering team to conduct a detailed assessment of the FeC12 installation site at the Blue Mound Road location, and of proposed hydrogen peroxide equipment upstream of the car wash. US Peroxide will have the equipment systems on -site and installed within roughly 4 -5 weeks of receipt of a formal notice to proceed. H. Program Extension Prior to or upon completion of a successful demonstration, and with mutual agreement of all parties, the program can be extended at the same pricing terms for an additional length of time at a minimum of 30 day increments. City of Fort Worth. Texas Attachment A PtNO Release Date: 04,09.2012 Page 6 of 8 ATTACHMENT B COMPENSATION FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM ATTACHMENT B COMPENSATION FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM Compensation Project Costs and Not -to- Exceed Budget US Peroxide offers the demonstration as an all inclusive full- servicc program, including the supply of hydrogen peroxide (11202 -50 %), ferrous chloride (FeC12 - 25 %), equipment, and project and application services as described above. The program will be charged on a unit cost of hydrogen peroxidc and ferrous chloride basis (e,g. actual volume of product consumed) at a price of $4.95/gallon 50% H202 delivered and $1.50/gal 25% FeC12 delivered respectively. In addition, there will be one -tune project and equipment mobilization charge of $7,500 for the equipmcnt systems. The program will also have a $700 monthly facility fee for the duration the equipmcnt is installed. Note also that as PRI -SCTM is a patented process technology; the purchase of the program, as defined as chemicals (hydrogen peroxide and or iron salts), equipment and services at the abovc pricing from US Peroxide is inclusive of the cost for and constitutes an implied license to practice the process "Method For Reducing Hydrogen Sulfide Emissions From Wastewater ", as described in Unitcd States Patent No. 5,773,504 B2 and 7,147,783. US Peroxide Demonstration Cost Based on the Scope of Work, the 90 day project budget not to exceed amount is as follows: Hydrogen Peroxide — 50% $8,044 ( -1,625 gal x $4.95 /galj Ferrous Chloride — 25% $15,750 (- 10,500 gal x $1.501gal) One -time mobilization/installation charge $7,500 3 month facility fee $2,100 90 -day project budget estimate $33,394 Average cost per day, less mobilization: $288 To obtain a not -to- exceed project cost, estimated average liquid phase sulfide concentration is 5.0 mg/L. Sampling indicates actual level should he significantly lower, and -30% savings are anticipated with optimization and diurnal patterns. HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM ATTACHMENT 10 - COMPENSATION PAGE 1 OF 2 ATTACHMENT COMPENSATION FOR HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM The following table provides a breakdown in estimated dosing rates and cost per day: A. The CONSULTANT shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The CONSULTANT shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the CONSULTANT, based on the actual hours and costs expended by the CONSULTANT in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the CONSULTANT. C. Payment of invoices will be subject to certification by the City that such work has been performed. D. Terms of payment will be net 30 days. HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM ATTACHMENT B - COMPENSATION PAGE 2 OF 2 Saginaw M -292 Trial Segment Combined Cost Per Day Combined Blue Mound H202 Cost per Total per 90 -Day Iron gpd gpd day Segment Total Day 01 — 15- Fe Only 130 0 $195 $2,925 - Day 16 — 20 H202 130 40 $393 $1,965 - Test Day 21 — 45 Install 130 0 $195 $4,875 - H2O2 Day 46 — 60 PRI -SC 130 40 $393 $5,895 - #1 Day 61 — 75 PRI -SC 100 30 $299 $4,478 - #2 Day 76 — 90 PRI -SC 80 25 $244 $3,656 $23,794 #3 Mobilization Fee - - - $7.500 - Monthly Facility Fee 3 Months $700/ - $2,100 $33,394 month A. The CONSULTANT shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The CONSULTANT shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the CONSULTANT, based on the actual hours and costs expended by the CONSULTANT in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the CONSULTANT. C. Payment of invoices will be subject to certification by the City that such work has been performed. D. Terms of payment will be net 30 days. HYDROGEN SULFIDE CONTROL DEMONSTRATION PROGRAM ATTACHMENT B - COMPENSATION PAGE 2 OF 2