HomeMy WebLinkAboutContract 52751-CO1 CSC No.52751-COI
RECOV,E17 Fc>aT Wgn-rH City of Fort Worth
JUN 1•' 2020 Change Order Request
CnYOF FORT WORTH Project Name: Swill"Sewer Emergency Response Contred City Sec No,: 52751 —�
CITY
,,, _, ft)3ct No.(s):l lam DOENo. N/A CityProl.No.:1 102082
Project Description: Emergency Sewer RepaidRepiacement in All Council Districts
Conlractorl William J.Sdwltz,Inc.dim Ctrde C Consbudion Co. Change Order# Date 6110/2020
City Project Mgr.J Chris Underwood City Inspector. I Paul Gleger
Phone Number. 817-392-2029+ Phone lumber 817-392-8371 —�
Dept Sewer Totals Contract Time
(Calender days)
Original Contract Amount $1,250,000.00 $1,250,000.00 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,250,000.00 $1,250,000.00 365
Amount of Proposed Change Order 170,420.0 170,420.00
Revised Contract Amount 1,420, 20.00 $1,420, 20.00 365
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding Of necessary) $170,420.00 $170,420.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 13.63%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,562,500.00
J S7'I ICATION(REASONS)FOR MANGE ORDE
One of several emergency work orders recently issued included one for the emergency replacement of a
deteriorated public sanitary sewer main located within Shady Oaks Country Club.Change Order No.1 will
provide funding to the original contract sufficient to complete this work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or Incidental to,the above Change Order.
Contrac)Or's Company Name Contractor Name Contractor Si nature Date
mmam�.scnw�,mc.and cads c cons�uotlan co. Teri Skelly • Sir d
Ins actor Date Pro ect Manager d Date
Kaldl A. 06-/ to.
DJrector Wafer De t Date onstr otion Su ervisor ater De t Date
T. 5 . Jun 11,2020 /—N/
Assistapt City Attqrqey Date As slant City Manager Date
Jun 11,2020 Jun 11,2020
Council Action If.Re uired
M&C Number 2M376 M&C Date Approved 6M2020I
95: aoao-woo I s S CREME'
,L �`�.WORTH,TX
FORT Wbn-rm City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Emergency Response Contract City Sec No.: 52751
Project No.(s): 102082 1 DOE No. N/A City Proj. No.: 102082
Project Emergency Sewer Repair/Replacement in All Council Districts
Description
Contractor William J. Schultz, Inc.dba Circle C Construction Co. Change Order:=1 Date: 6/10/2020
City Project Mgr. Chris Underwood City Inspector Paul Gieger
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1 Work Order Mobilization Sewer 1.00 EA $3,000.00 $3,000.00
71 Pre-CCTV Sewer 757.40 LF $15.00 $11,361.00
72 Post CCTV Inspection Sewer 617.40 LF $10.00 $6,174.00
73 Trench Safety Sewer 227.40 LF $10.00 $2,274.00
74 4-foot MH 0'to 6'depth Sewer 2.00 EA $6,500.00 $13,000.00
75 4-foot MH Extra Depth Sewer 7.90 VF $250.00 $1,975.00
76 4-foot Drop MH 0'to 6' Sewer 1.00 EA $7,500.00 $7,500.00
77 4-foot Drop MH Extra Depth Sewer 5.00 VF $300.00 $1,500.00
101 Concrete Collar Sewer 3.00 EA $500.00 $1,500.00
102 MH Vacuum Testing Sewer 3.00 EA $300.00 $900.00
106 Epoxy MH liner Sewer 30.90 VF $350.00 $10,815.00
107 Abandon MH Sewer 2.00 EA $1,000.00 $2,000.00
122 Sanitary Sewer Line Grouting Sewer 22.00 CY $250.00 $5,500.00
130 Block Sod Replacement Sewer 900.00 SY $15.00 $13,500.00
180 12-inch PVC Sewer Pipe, 10'to 12'Depth Sewer 227.40 LF $75.00 $17,055.00
181 42-inch Wood Box Tunnel w/12-inch Sewer Pipe Sewer 103.38 LF $700.00 $72,366.00
Sewer $170,420.00
Page 2 of 4 Additions Sub Total $170,420.00
FORT VVC3RTH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Emergency Response Contract City Sec No.: 52751
Project No.(s): 102082 DOE No. N/A City Proj. No.: 102082
Project Description Emergency Sewer Repair/Replacement in All Council Districts
Contractor William J. Schultz, Inc. dba Circle C Construction Co. Change Order: Date 6/10/2020
City Project Mgr. Chris Underwood City Inspector: Paul Gieger
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Sewer
Page 3 of 4 Deletions Sub Total
MWWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
7
S gnature
3 .t4 kis lt`ID
Name of Employee
Title A, R
ATTEST:
Mary J. Kayser ,`
City Secretary
®FFOCgAL RECORD
CITY SECRETARY
FT WORTHS TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, June 2, 2020 REFERENCE NO.: **M&C 20-0376
LOG NAME: 6018EMERCONCOIRl-CIRCLEC
SUBJECT:
Authorize Execution of a Change Order in the Amount of$170,420.00 to 2018-SS Emergency Response
Contract with William J. Schultz, Inc. dba Circle C Construction Company to Fund Emergency Work
Ordered Under the Contract;Adopt Appropriation Ordinance to Fund Change Order No. 1 and the First
Renewal in the Amount of$1,250,000.00 (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize Change Order No. 1 in the amount of$170,420.00 to 2018-SS Emergency Response
Contract with William J. Schultz, Inc. dba Circle C Construction Company (CSC No. 52751) to fund
emergency work ordered under the contract; and
2. Adopt the attached Appropriation Ordinance increasing receipts and appropriations in the Water&
Sewer Capital Projects (W&S Capital Projects) Fund in the amount of$1,670,420.00, transferred from
available funds within the Water& Sewer Fund, for the change order and continued funding of 2018-SS
Emergency Response contract(City Project No. 102082).
DISCUSSION:
On August 20, 2019, the City Council authorized a contract in the amount of$1,250,000.00, (City
Secretary Contract No. 52751, Mayor& Council 19-0047), for the 2018-SS Emergency Response project
and provided for the option of two renewals.
One of several emergency work orders recently issued included one for the emergency replacement of a
deteriorated public sanitary sewer main located within Shady Oaks Country Club. Change Order No. 1 is
necessary to add funding in the amount of$170,420.00 to the original contract sufficient to complete this
work.
The City and the Contractor desire to exercise the first renewal of the contract in the amount of
$1,250,000.00 and with the same terms and conditions at this early date due to the exhaustion of funds.
The work to be performed under this contract consists of replacing and/or relocating sewer mains,
services, and other pertinent construction required in response to emergency sanitary sewer main break
incidents.
In addition to the contract renewal amount, $250,000.00 is required for project management, real property
acquisitions, material testing, and inspection.
Appropriations for 2018-SS Emergency Response project are as depicted below:
Fund Existing Additional Project Total*
Appropriations Appropriations
W&S Capital
Projects - Fund $1,500,000.00 $1,670,420.00 $3,170,420.00
56002
I[Project Total L$1,500,000.00 I$1,670,420.00 11$3,170,420.0011
*Numbers rounded for presentation purposes.
This project will have no impact on the Water Department's operating budget when completed. This
contract will expire when the contract amount is exhausted or one year after the effective date, whichever
occurs later.
M/WBE OFFICE - William J. Schultz, Inc. dba Circle C Construction Company is in compliance with the
City's BDE Ordinance by documenting good faith effort on the first renewal. The City's goal on this project
is four percent.
M/WBE OFFICE -A waiver of the goal for MBE/SBE subcontracting requirements was requested by the
Department and approved by the OBD, in accordance with the MWBE or BDE Ordinance, because the
public or administrative emergency exists which requires the goods or services to be provided with
unusual immediacy.
This project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION /CERTIFICATION:
The Director of Finance certifies that funds are available in the current operating budget of the Water&
Sewer Fund, and upon approval of the above recommendation and adoption of the attached appropriation
ordinance, funds will be available in the current capital budget, as appropriated, in the Water& Sewer
Capital Projects (W&S Capital Projects) Fund for 2018-SS Emergency Response project. Prior to any
expenditure being incurred, the Water Department has the responsibility of verifying the availability of
funds.
FUND IDENTIFIERS (FIDs):
TO
IFun Departmenfi�Account. Project liProgram(Activity Budget , Reference# Pmoun l
ID —_ ID i _( Year ; (Chartfield 2)
FROM
JFundl Department Accoun Pro Project lA t Programctivityj Budget Reference# mount)
ID ID Year Chartfield 2
CERTIFICATIONS:
Submitted for City Manaqer's Office by: Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Chris Underwood (2629)
ATTACHMENTS
1. 6018EMERCONC01 R1-Cl RCLEC Compliance.pdf (CFW Internal)
2. 6018EMERCONCOlRl-CIRCLEC Form 1295 1of2.pdf (CFW Internal)
3. 6018EMERCONCOl R1-CIRCLEC Funds Avail.docx (CFW Internal)
4. 6018EMERCONC01 R1-CIRCLEC SAM.pdf (CFW Internal)
5. 6018EMERCONC01 R1-CIRCLEC Waiver.pdf (CFW Internal)
6. 6018EMERCONCOlRl-CIRCLEC 56002 A020.docx (Public)
7. 6019EMERCONCOl R1-CIRCLEC FID Table (NN 05.04.20).xlsx (CFW Internal)