Loading...
HomeMy WebLinkAboutContract 38618r Y SECRETAIr,t -�N a RACT Na MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding ("MOU") is made and entered into on this g ,AZf day of , 2009 ("Effective Date"), by and between the United States Postal Service ("Uncho Development L.P. ("Concho") and the City of Fort Worth, Texas ("Ci SPS" ), oI, ty"), sometimes collectively referred to herein as the "Parties". WHEREAS, USPS has previously selected Eagle Development Corporation as its developer for projects in Fort Worth, Texas; and WHEREAS, Eagle Development Corporation formed Concho as its subsidiary for a previous development project and intends to utilize Concho for development of the historic downtown postal facility located at 251 West Lancaster Avenue ("Facility"); and WHEREAS, City is interested in moving its City Hall, which is currently located at 1000 Throckmorton Street, to a new location and has indicated that the Facility may be an acceptable location; and WHEREAS, the use of the Facility as City Hall would necessitate renovations to the Facility (the "Project"); and WHEREAS, Concho is willing to assist City with its study of the feasibility of the use of the Facility as a new City Hall, including assisting with necessary design of renovations to the Facility according to City plans and specifications; and WHEREAS, if City and Concho are able to reach an agreement on a mutually beneficial transaction for the renovation of the Facility, USPS will relocate its postal operations from the Facility to a new postal facility to be located in downtown Fort Worth, NOW, THEREFORE, in furtherance of the foregoing, City, USPS and Concho hereby agree as follows: 1. Upon execution of this MOU, City will deliver to Concho all recent and pertinent studies prepared relative to relocating City Hall to the Facility. 2. City and Concho will meet with City Departments and confirm their space requirements relative to the studies recently completed by City. 3. City and Concho each will identify and appoint an authorized representative who will be authorized to coordinate and facilitate the review and approval of schematic design plans. 4. Concho will provide conceptual plans and preliminary specifications showing planned site improvements buildings and potential upgrades or amenities such as, but not limited to, HVAC, electrical, security, life safety improvements, and energy management, and will provide a construction schedule. A preliminary site plan is attached as Exhibit "A", a conceptual elevation is attached as Exhibit `B", an overall preliminary schedule is Ud FIC`AL RECORD CIMUECRETARY r�T: WORTH, T attached as Exhibit "C", a breakdown of estimated assessment costs is attached as Exhibit "D and a preliminary overall budget is attached as Exhibit "E". Exhibits "A" through "E" are attached to this MOU and made a part hereof for all purposes. 5. Concho will pursue the development of a schematic design and guaranteed lease rate for the Project. The Project will be designed in accordance with agreed -upon plans and City design standards incorporated therein. The design will be subject to City review and approval, and City shall provide a prompt and complete review of the design plans within timeframes hereinafter mutually agreed to by the City and Concho. 6. As part of the determination of the feasibility of the Project for City, the Parties will proceed with all due diligence to determine the structure of the transactions that will be equitable to all parties and will use their reasonable best faith efforts to come to a preliminary agreement on term sheets for (a) an agreement between USPS and Concho for the conveyance of the Facility to Concho by special warranty deed with title insurance and (b) an agreement between Concho and City for a lease. 7. Upon completion by Concho of its obligations in Sections 5 and 6 above, City shall determine, in its sole discretion, whether the Project is in the best interest of City. City shall notify Concho and USPS in writing of its determination 30 days after Concho and City agree that the obligations in Sections 5 and 6 are complete. 8. Concho represents by its execution of this MOU that it is capable of causing the renovation of the Facility necessary to meet the needs of City. This transaction is contingent upon Concho's ability to obtain financing which will be based solely upon the creditworthiness of the lease from the City. 9. Term and Termination a. This MOU shall commence upon the Effective Date and shall expire upon the date of the written notification by City referenced in Section 7 above ("Expiration Date") or one year from the Effective Date whichever is sooner. The Parties acknowledge that any Party may terminate this MOU at any time. The Parties acknowledge that in the performance of its obligations under this MOU, Concho will incur certain costs related to the Project, which are estimated not to exceed $400,000.00. b. If City determines not to proceed with the Project pursuant to Section 7, City agrees, at its sole option, to either: 1. pay to Concho an amount equal to half of the costs expended related to the Project in an amount not to exceed $200,000.00, said Project costs to be verified through invoices for costs expended, said invoices to be provided by Concho to City; or 2. enter into an agreement with Concho to convey to Concho for fair market value City property located at the southeast corner of Texas Street and Cherry Street, which was formerly the site of the City's downtown service center (or identify 2 another City owned property which generates enough cash proceeds to pay Concho for the City's obligation of its share of the study cost) said obligation to be paid by the City to Concho within a 12 month period after City's notification not to proceed with the project and to carry a 5% annualized interest assessed from City's notification not to proceed with the project. c. If LISPS terminates its existing agreement with Eagle Development Corporation or allows said agreement to expire at any time prior to the expiration of three years from the Effective Date, USPS agrees to reimburse Concho an amount not to exceed $200,000.00 and upon such payment, Concho shall release or cause to be released to USPS and USPS will become the owner of, all plans, specifications, design documents and all other documents relating to the Facility or the Project. d. If Concho decides not to proceed with the Project or at any time terminates this MOU for any reason, City will pay to Concho an amount equal to half of the approved costs expended related to the Project in an amount not to exceed $200,000.00, said Project costs to be verified through invoices for approved costs expended up until the time of termination, said invoices to be provided by Concho to City. City will only pay costs incurred by Concho prior to termination of the MOU. e. The provisions of Sections 9a, 9b, 9c and 9d shall survive the termination or expiration of this MOU. 10. This MOU is not intended to create any rights in third parties. Any Party at any time may offer amendments to this MOU, provided, however, all Parties must concur in writing before the amendments become part of this MOU. 11. Concho is expressly authorized to make a collateral assignment of this MOU to secure funding for the Project costs. [SIGNATURE PAGES FOLLOW] 3 EXECUTED as of the Effective Date, CONCHO DEVELOPMENT I, L.P., a Texas, limited partnership its general partner L (Printed �Ti Page 4 of 6 Memorandum of Understanding between United States Postal Service. Coneho Development I, L.P. and City of Fort Worth UNITED STATES POSTAL SERVICE sy9 (Printed Name) LOc�Za�� tr! G OFFtCI52_ Page 5 of 6 Memorandum of Understanding between United States Postal Service, Concho Development I, L.P. and City of Fort Worth CITY OF FORT WORTH, TEXAS By� _ Llel sn�-- Assistant City Manager Approved as to Fortn and Legality: ez C-23S 27 Assistant City Attey ,5_ / g _ o 9 ATTEST: Marty Hendrix City Secretary OFFICIAL RECORC CITY SECRETARY FT. WORTH, TX Page 6 of 6 Memorandum of Understanding between United States Postal Service, Concho Development I, L.P, and City of Fort Worth sa Exhibit C New City Hall - United States Post Office Building Preliminary Schedule May 12, 2009 Start Finish Assessment Period 1/5/2009 1/15/2010 Execute MOU 1/5/2009 5/22/2009 Verify Program Requirements 6/l/2009 9/4/2009 Environmental Assessment 6/l/2009 10/9/2009 Structural/System Assessment 6/l/2009 10/16/2009 Historic Modifications Assessment 6/l/2009 10/30/2009 Locate Site for New Post Office 6/l/2009 11/27/2009 General Contractor Selection 6/15/2009 7/24/2009 !MAX Pricing 11/2/2009 12/4/2009 Negotiate & Execute Lease 9/6/2009 1/15/2010 Financing Period 1/18/2010 4/30/2010 Secure Bonds 1/18/2010 4/23/2010 Purchase New Post Office Site 12/7/2009 4/30/2010 New Postal Facility 5/3/2010 12/2/2011 Design New Postal Facility 5/3/2010 9/10/2010 Demolish buildings & construct new facility 11/15/2010 9/30/2011 Relocate Postal Operations 10/3/2011 12/12/2011 New City Hall 5/3/2010 8/30/2013 Design New City Hall 5/3/2010 8/5/2011 Historic Renovation Approvals 6/2 7/2011 3/9/2012 Review Subcontractor Pricing 8/8/2011 9/16/2011 Issue Subcontracts & Secure Materials 9/19/2011 12/23/2011 Environmental Cleanup(if necessary) 12/5/2011 1/20/2012 Building & Site Demolition 1/23/2012 5/11/2012 Exterior Building Renovation 12/5/2011 7/27/2012 Interior Demolition 1/23/2012 4/27/2012 Construct Parking Garages 3/12/2012 5/31/2013 Interior Finishes 5/14/2012 7/26/2013 Exterior Landscape/Hardscape 12/3/2012 7/16/2013 Information Technology 12/3/2012 7/26/2013 City Staff & Council Relocate 7/29/2013 8/30/2013 EYhlbit D New City Hall - United States Post Office Building Breakdown of Assessment Costs New City Hall - United States Post Office Building Description Amount Architectural &Engineering $120,000 Geotechnical Investigation $35,000 Environmental Assessment $90,000 Materials Conservation $54,000 Fire and Life Safety $16,000 Historian $59000 Legal/Financing $50,000 Reimbursable Expenses (travel, reproduction, etc) $105000 Surveying $209000 Total $4009000 Exhibit E New City Hall - United States Post Office Building Description Land/Building Purchase Costs Soft Costs(Architectural, Engineering, Consultants) Main Post Office Renovations (197,000 GSF) New Council Chambers (34,000 GSF) Parking Garage Landscape/Hardscape Contingency Totai (231,000 GSF) Add Alternates Furniture, Fixtures & Equipment Moving Information Technology Subtotal Alternates Best Case Estimate $7,395,000 $5,915,279 $255335,080 $9,34%856 $8,5945775 $3,5619600 $2,6775500 $629829,090 $5,000,000 $500,000 $3,930,000 $9,4309000 Expected Case Estimate $68 $5,000,000 $500,000 $3,930,000 $9,4309000 * Price good through October 1, 2009; after which time there will be a one time price escalation of 3%. DATE: Tuesday, May 19, 2009 LOG NAME: 02POST OFFICE1 • • �.. •:: REFERENCE NO.: C-23527 SUBJECT: Authorize a Memorandum of Understanding with the United States Postal Service and Concho I, LP, for the Purpose of Evaluating Redevelopment of the Downtown Post Office for Use as a New City Hall in Exchange for the Value of Real Property up to $200,000.00 or an Amount Not to Exceed $200,000.00 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to enter into a Memorandum of Understanding with Concho Development I, LP, and the United States Postal Service for the purpose of evaluating redevelopment of the Downtown Post Office for use as a new City Hall in exchange for the value of real property up to $200,000.00 or an amount not to exceed $200,000.00. DISCUSSION: The City has been in the process of evaluating options for allocating adequate space for the operation of the City departments to serve the citizens of Fort Worth. That process resulted in the Facilities Master Plan which examined the high level need for City Hall facilities. The master planning effort identified a need for additional office space for a City Hall complex. This plan identified the Downtown Post Office at 251 West Lancaster as part of the most economical and efficient way to move towards meeting the goal of having adequate City Hall space. The Memorandum of Understanding (MOU) is between the United States Postal Service (LISPS), Concho Development I, LP, (Concho) and the City of Fort Worth. The MOU is for the purpose of determining the feasibility of redeveloping the Downtown Post Office property at 251 West Lancaster for use as a City Hall facility. The MOU would provide information to determine if the post office will meet current and future space needs. The addition of this facility would allow the City to relinquish all other leased facilities and combine those in the current City Hall and New City Hall or the flexibility to distribute facilities regionally throughout the City. The MOU defines a process for the three parties to use to achieve the necessary agreements for the redevelopment of the Post Office property as a City Hall. The terms of the MOU are: . The City is interested in using the Post Office building located at 251 West Lancaster as a new City Hall; . Concho and the City will each appoint one authorized representative to coordinate and facilitate the review and approval of design plans and negotiate the proposal lease agreements; . The proposed renovation will provide approximately 231,000 gross square feet of space and approximately 155,524 useable square feet of space and preserve the historical character and significance of the building; . Council will develop plans for the site for City use and draft a Lonc�Term Lease Agreement with the City: Logname: 02POST OFFICEI Page 1 of 2 ® The City will provide all space planning documents to Concho; . The City and Concho representatives will meet with City departments to determine space needs; . The City may enter into an agreement to provide the Downtown Service Center Property to Concho and USPS to offset some of the costs of design and use feasibility study undertaken by Concho for the 251 West Lancaster Post Office site as a new City Hall up to a value of $200,000.00; . If the above -referenced land transaction does not occur for any reason, the City will pay Concho one-half (1/2) of the design and use feasibility study undertaken by Concho for the 251 West Lancaster Post Office site to be used as a new City Hall, not to exceed $200,000.00; . Concho will provide conceptual plans, schematic designs and specifications for needed renovations to the Post Office building; . Concho will provide a guaranteed maximum lease price based on the design plans; and . Concho will provide a schedule for the implementation of the renovation plans. The proposed schedule in the MOU is as follows: Execute MOU and begin assessment period May 2009, to August 2009; . Financing period July 2009, to December 2009; . Development of new postal facility December 2009, to July 2011; and Design and development of a new City Hall facility December 2009, to February 2013. The proposed new City Hall is located at 251 West Lancaster in COUNCIL DISTRICT 9 and will serve all of the citizens of Fort Worth. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that this action will have no material effect on City funds. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers GG01 531200 0905500 Fernando Costa (8476) Randle Harwood (6101) Randle Harwood (6101) $200,000.00 Logname: 02POST OFFICEI Page 2 of 2