Loading...
HomeMy WebLinkAboutContract 38679-A2 (2)CITE' ISM ETAR Amendment No. 2 CONTRACT NO, STATE OF TEXAS § CITY SECRETARY NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation (Engineer) made and entered into City Secretary Contract No. 38679 (the Contract) which was authorized by the City Council by M&C C- 23533 on the 19th of May, 2009, and WHEREAS, the Contract involves engineering services for the following project: Pavement Reconstruction and Water and Sanitary Sewer Replacement on Avenue I (Campbell Street to Wallace Street), Arch Drive (Avenue C to East Rosedale Street), Avalon Court (Northwest Cull -de -Sac to Meadowbrook Drive), Crenshaw Avenue (Martin Luther King Jr. Freeway to Thrall Street), Forby Avenue (Meadowbrook Drive to Mount Vernon Street), Haynes Avenue (Avenue C to East Rosedale Street), Perkins Street (Mount Vernon Street to East Lancaster Avenue), Westhill Road (Martin Luther King Jr. Freeway to Strong Avenue) and Woodrow Avenue (Camilla Street to East Vickery Boulevard) 2008 CIP Contract 8A, Project No. 01236 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, their duly -authorized representatives, enter which amends the Contract: 1. acting herein by and through into the following agreement Article I of the Contract is amended to include engineering services specified in a proposal letter dated May the additional 4, 2011, a copy of which is attached hereto and incorporated fierein: The cost�l additional services to be performed by Engine�0"bMArto ity for the Contract Amendment No. 2 Page 1 of 2 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $314,966,00, 3. All other provisions of the Contract, which are not expressly, amended herein, shall remain in full force and effect. Executed on this the day of J uq 2011, in Fort Worth, Tarrant County, Texas, ATTEST: Marty Hendrix City Secretary APPROVAL RECOMMENDED: Douglas�l'V. Wiersig, P.E. \/ Director Transportation and Public Works Dannenbaum Engineering Corporation ENGINEER B .G G Wayne G. Ahrens, P.E. Principal 6421 Camp Bowie Blvd., Suite 400 Fort Worth, Texas 76116 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney APPROVED: 'Fernando► Costa " Assistant City Manage Contract Amendment No. 2 Page 2 of 2 DANNENBAUM ENGINEERING CORPORATION 6421 CAMP BOWIE BLVn., SUITE 4W FORT WORTH, TEXAS 761165421 (817) 763-8883 May 4, 2011 Mr. Richard Argomaniz, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 2008 Capital Improvements Project (Contract BA): Avenue I, Avalon Court, Arch Street, Crenshaw Avenue, Forby Avenue, Haynes Avenue, Perkins Street, Westhill Road, and Woodrow Avenue Supplemental Agreement No. 2 City Project No. 01236 Dear Mr. Argomaniz: Dannenbaum is submitting this fee Amendment to the above reference contract for preparation of a separate instrument dedication document for a 71-ft by 15-ft drainage easement located on Lot A of the P.S. Hollis Addition on Haynes Avenue. Summary of Contract Fee for Contract 8A: Original Contract Amount $ 305,237.00 Amendment No. 1 $ 8,079000 Amendment No. 2 $ 1,650.00 Revised Contract Amount $ 314,966.00 Work Phase Summary (Includes all Amendments to date): Work Water Sewer T/PW avin & Draina e Phase Original Revised Original I Revised Ori inal Revised 51 15,502.00 189428.00 L778.00 1,778.00 23,400000 25,0%00 31 26,344.00 275890.00 3,021.00 32021400 502002.00 50,002.00 32 522687.00 55,779.00 6,042.00 62042900 100,005.00 100,005.00 L33 8,781.00 %296.00 1,007.00 1,007.00 1 162668.00 16,668.00 Total 103, 314.00 111,39100 11984 8.00 11, 848.00 190.075.00 1917725.00 Thank you for your consideration of this amendment request. If you have any questions in the meantime, please do not hesitate to call. Sincerely, --hurt Caldwell, P.E. Project Manager cc: Mark C. Lorance, P.E. File 4397-32 G:1121014464-011Admin�Agreemeilt�.SA#2\Letter Argomani2 OS-04-201 l.doc M�iC Review Page 1 of 3 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FoR_ T�orrEi COUNCIL ACTION: Approved on 5/19/2009 -Ord. No. 18623-05-2009 DATE: 5/19/2009 REFERENCE C-23533 LOG NAME: 202008CONTRACT8A NO.. CODE: C TYPE: CONSENT HEARING: NO SUBJECT: Authorize an Engineering Agreement in the Amount of $305,237.00 with Dannenbaum Engineering Corporation for Pavement Reconstruction and Water and Sanitary Sewer Main Replacement on Avenue I, Arch Drive, Avalon Court, Crenshaw Avenue, Forby Avenue, Haynes Avenue, Perkins Street, Westhill Road and Woodrow Avenue and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $151,114.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of $131,966.00 and Sewer Capital Projects Fund in the amount of $19,148.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $131,966.00 and the Sewer Capital Projects Fund in the amount of $19,148.00 from available funds; and 3. Authorize the City Manager to execute an Engineering Agreement with Dannenbaum Engineering Corporation in the amount of $305,237.00 for pavement reconstruction and water and sanitary sewer main replacement on Avenue I, Arch Drive, Avalon Court, Crenshaw Avenue, Forby Avenue, Haynes Avenue, Perkins Street, Westhill Road and Woodrow Avenue. DISCUSSION: The 2008 Capital Improvement Program (CIP) includes funds for pavement reconstruction on the following streets: Avenuel Arch Drive Avalon Court Crenshaw Avenue Forby Avenue Haynes Avenue Perkins Street Westhill Road Woodrow Avenue Campbell Street to Wallace Street Avenue C to East Rosedale Street Northwest Cul-De-Sac to Meadowbrook Drive Martin Luther King Jr Freeway to Thrall Street Meadowbrook Drive to Mount Vernon Street Avenue C to East Rosedale Street Mount Vernon Street to East Lancaster Avenue Martin Luther King Jr Freeway to Strong Avenue Camilla Street to East Vickery Boulevard In addition, the Water Department has determined that the existing water mains on the identified streets are severely deteriorated and should be replaced with this project. Dannenbaum Engineering Corporation proposes to perform the necessary design work for a lump sum fee of $305,237.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the Engineering Agreement, $97,120.00 ($28,652.00 water; $7,300.00 sewer; and file://C:\Documents and Settings\ArgomaR\My Documents\2008 CIP\2008 CIP 8A\M&C Review... 6/27/2011 M�iC Review Page 2 of 3 $61,168.00 street) is needed for project management and design review. M/WBE — Dannenbaum Engineering Corporation is in compliance with the City's M/WBE Ordinance by committing to 27 percent M/WBE participation. The City's goal on this project is 22 percent. This project is located in COUNCIL DISTRICT 8, Mapsco, 78E, 78G, 78H, 78J, 78L, 78M, 78Q, 78S and 78T. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund and the Street Improvements 2008 Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2� 1) PE45 538040 0609020 $131 966.00 P253 476045 6081701236ZZ $131,966.00 1) PE45 538040 0709020 $19,148.00 2) P253 531350 608170123610 4 710.00 � P253 531200 608170123631 $26,344.00 P253 531350 608170123620 4 710.00 3) P253 531200 608170123632 $52,687.00 2)P253 531200 608170123631 $26,344.00 � P253 531200 608170123633 8 781.00 2)P253 531350 608170123631 9 813.00 3) P253 531200 608170123651 $15,502.00 P253 531200 608170123632 $52,687.00 3) P258 531200 708170123631 $3,021.00 2)P253 531350 608170123632 4 906.00 P258 531200 708170123632 6 042.00 2) P253 531200 608170123633 8 781.00 3) P258 531200 708170123633 1 007.00 2) P253 531350 608170123633 2 943.00 3) P258 531200 708170123651 1 778.00 2) P253 531200 608170123651 $15,502.00 C204 531200 208400123631 $50,002.00 P253 531350 608170123660 785.00 2)P253 533010 608170123681 785.00 3)C204 531200 208400123632 $100,005.00 2) P258 531350 708170123610 1 200.00 � C204 531200 208400123633 $16,668.00 3) C204 531200 208400123651 $23,400.00 2) P258 531350 708170123620 1 200.00 2)P258 531200 708170123631 3 021.00 P258 531350 708170123631 2 500.00 P258 531200 708170123632 6 042.00 2)P258 531350 708170123632 1 250.00 P258 531200 708170123633 1 007.00 2) P258 531350 708170123633 750.00 2)P258 531200 708170123651 1 778.00 2)P258 531350 708170123660 200.00 2)P258 533010 708170123681 200.00 1 &2� $19,148.00 P258 476045 7081701236ZZ file://C:\Documents and Settings\ArgomaR\My Documents\2008 CIP\2008 CIP 8A\M&C Review... 6/27/2011 M&C Review Page 3 of 3 Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: ATTACHMENTS 202008CONTRACT8A AOC.doc 202008C O NTRACT8A. pdf Fernando Costa (8476) �Iliam Verkest (7801) Richard Argomaniz (8653) file://C:\Documents and Settings\ArgomaR\My Documents\2008 CIP\2008 CIP 8A\M&C Review... 6/27/2011