HomeMy WebLinkAboutContract 38905-A5 (2)STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO.
COUNTY OF TARRANT 6
WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation
Consultants (ENGINEER) made and entered into City Secretary Contract No.
38905, (the CONTRACT) in the amount of $368,235.32 which was authorized by
the City Council by M&C C-23498 on the 26th day of May, 2009; and
WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in
the amount of $30,930.00 administratively authorized by the City on the
20th day of April, 2010, Amendment Number 2 in the amount of $180,496.68
authorized by the City Council by M&C C-23498 on the 26th day of May,
2009; and Amendment #3 in the amount of $87,252.00 authorized by the City
Council by M&C C-24790 on the 22nd day of March 2011; and subsequently
revised by Amendment Number 4 in the amount of $47,126.00 administratively
authorized by the City on the 9th day of January, 2012;
WHEREAS, the Contract involves engineering services for the following
project:
North Beach Street from Timberland Boulevard to Keller -Hicks Road;
WHEREAS, it has become necessary to execute Amendment No. 5 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated December 12,
2012, copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by
Engineer total $12,130.00.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for
all work and services shall not exceed the sum of $726,170.00.
Page -1-
OFFICIAL RECORD
CITY SECRETARY
6�Ta WORTH, TX
36
I
3.
All other provisions of the Contract, which are not expressly
herein, shall remain in full force and effect.
EXECUTED on this the iL day of ,
Fort Worth, Tarrant County, Texas.
ATTEST:
City Secretar o
Ule.,V�VL W. �.J
APPROVED:
Fernando Costa
Assistant City Manager
Douglas �Lf . Wiersig,
Director, Transportation/Public Works Department
TRANSYSTEMS CORPORATION CONSULTANTS
ENGINEER
Raul Pena III, P.E.
Senior Vice President
APPROVED AS TO FORM AND LEGALITY:
Lougias w. alacx
Assistant City Attorney
Page -2-
amended
2012 in
and
AMENDMENT NO. 5
December 22, 2012
Mr. Michael Weiss, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
TranSystems
Bank of America Building
500 West 7th Street
Suite 1100
Fort Worth, TX 76102
Tel 817 339 8950
Fax 817 336 2247
www.transystems.com
RE: Amendment No. 5 —Water and Sanitary Sewer Improvements, Roadway Improvements
North Beach Street — Timberland Blvd to Keller -Hicks Rd
DOE # 6224
City Secretary Contract No. 38905
Dear Mr. Weiss,
TranSystems (TSC) appreciates the opportunity to present this proposal and fee schedule for your
consideration. Specifically, this amendment includes the services to incorporate supplemental contract
documents for water main improvements as indicated herein. This work will be included with and will
augment the design services associated with the original contract. The specific work to be included is as
follows:
WATER DEPARTMENT -WATER IMPROVEMENTS
Relocation 30" Water Main from Timberline Blvd. to Keller Hicks Rd.
• Revisions to Plan and Profile sheets to extend the limits of the 30" water main
replacement. Water line is to be replaced from sta. 76+70 to sta. 82+80 and
from sta. 99+80 to sta. 108+55.
• Revisions to Plan and Profile sheets to revise valves and related
appurtenances to reflect added sections of water main replacement.
Total Contract Amendment No. 5
$ 12,130.00
12130.00
Contract Summary:
Original Contract Fee — Phase 1:
Amendment No. 1:
Amendment No. 2:
Amendment No. 3:
Amendment No. 4:
Amendment No. 5:
TOTAL CONTRACT
Page 2 of 2
July 912010
$368,235.32
$ 30,930.00 Easements, hydraulic model, and
channel design
$180,496.68
$ 87,252.00
$ 47,126.00
12130.00
$726,170.00
Phase 2 —Bray Birch to Timberland
added to roadway design scope
Local Water and Sewer main
Improvements
21"and 30" water line relocation
30" water line field changes
This proposal is base on the following conditions:
1. Water Department will work directly with Field Operations and Production to determine shutdowns
and sequencing methods that will be communicated to TranSystems.
2. Water Department will prepare change order.
3. Water Department will review shop drawings.
4. This project will not include any special detailing; it is assumed that standard City details are all that
is needed.
Thank you for your consideration. Please contact me should you require any additional information.
Sincerely,
TranSystems Corporation Consultants
Raul Pena III, P.E.
Senior Vice President
Copy: Mike Hobbs, Project Manager, TranSystems
Kent Lunski, P.E., TranSystems
m
o
0
0
0
0
0
N
N
m
�
_
�
F
N
C o
d o
rn
Q o
o m o
Uo
�
F
O
3 0
L
W �
E
m w
O
w
2
o
o�i o
c
W
o0
o W
- c
W 'rn
o
U)
W
� o
d
N
N
Q�j
O
�
N
—
N
N
>
U
�
�
�
Z
U
m
'N
O
kf
U
d
CO
O
a
J
o
3
N
Y
m
c
M
O
O
c
`
(n