HomeMy WebLinkAboutContract 38905-A3 (2)STATE OF TEXAS b CATTY SECRETARY CONTRACT NO.
COUNTY OF VVZRW`�RT $
%vim%'EI;AS® the City of Fort Worth (CITY) and TranSystems Corporation
Consultants (ENGINEER) made and entered into City Secretary Contract No.
33905, ('the CONTRACT) which was authorized by the City Council by M&C C-
23496 on the 26th day of May, 2009, by Amendment Number 1 which was
authorized by the City on the 20th day of April, 2010, and by Amendment
Number 2 which was authorized by the City on the 23rd day of September
20100
North Beach Street from Timberland Boulevard to Keller -Ricks Roado
WHEREAS, it has become necessary to execute Amendment No. 3 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the Contracts
1.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated October 20,
2010, copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by
Engineer total $87,252.00.
Article II of the Contract
the maximum fee to be paid
performed under the Contract,
the City for all work and
$666,9149000
2.
nded
is ameto provide for an increase in
to Engineer for all work and services
as amended, so that the total fee paid by
services shall not exceed the sum of
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFI 1(:lAL R�&-C�a�
CITY C�R�TA�BY
FT. WORTH, TX
Page -1-
EXECUTED
Fort Worth,
ATTEST:
on this the
Tarrant County,
Texas.
day of 2011 in
x
f�\ ^
1 4106 h
Marty Hendrixt pAa� t yin
City Secretary �000 00o
�o ox
APPROVAL RECOMMENDED:
00 0° �(
00 000000000�
a44111.'Q.0 jX O'
APPROVED:
Fernando Costa
Assistant City Manager
Gre 'mmo s, P.E.
Act Director, Transportation/Public Works Department
TRANSYSTEMS CORPORATION CONSULTANTS
ENGINEER
Raul 1Pena III, P . E . `
Senior Vice President
APPROVED AS
FORM AND LEGALITY:
Doug Black
Assistant City Attorney
i
Page -2-
Contract Authorization
31
l to
Contract Authorization
31
l to
Sytenis
h
AMENDMENT NO. 3
October 20, 2010
Mr. Michael Weiss, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
7'ra11Systcros
Bank of America Nidding
500 Wesl 7"' Street
tiulte 1100
I'orl WOil 1, I X 7G 102
Tel 817 3398950
I ax 817 3 302247
www lransyslemsI
RE: Amendment No. 3 -Water and Sanitary Sewer Improvements, Roadway Improvements
North Beach Street - Timberland Blvd to Keller -Hicks Rd
DOE # 6224
City Secretary Contract No 38905
Dear Mr. Weiss,
TranSystems (TSC) appreciates the opportunity to present this proposal and fee schedule for your
consideration. Specifically, this amendment includes the services to incorporate supplemental contract
documents for water and sanitary sewer improvements as indicated in the attached exhibits. This
amendment also includes out of scope or additional services items related to the roadway design from the
previous phase (Keller -Hick to Bray Birch) and the additional project limits (Bray Birch to Timberland). This
work will be included with and will augment the design services associated with the original contract. The
specific work to be included is as follows:
WATER DEPARTMENT -WATER AND SANITARY SEWER IMPROVEMENT
Sanitary Sewer Study $ 5,005
TSC will develop a sanitary sewer study for the properties not currently served by the
City. TSC will review water and sanitary sewer city maps and plans, prepare a service
area map, develop a conceptual utility layout and recommend pipe sizing.
Sanitary Sewer Design $ 15,295
TSC will use previous research and digital plan backgrounds from recently designed
street improvements. Sewer plans and related service information will be provided
by the Water Department.
TSC will develop contract documents (design sheets and the specifications) for approximately
12001f of 12" sewer, 17001f 10" sewer and 4201f of 8"sewer. TSC will review related shop drawings.
Subconsultant will assist in plan development as indicated below.
Water Design $ 15,295
TSC will use previous research and digital plan backgrounds from recently designed
street improvements.. Water plans and related service information will be provided by
the Water Department.
Systems
TSC will develop contract documents (design sheets and the specifications) for approximately
3300 If of 12" water line. TSC will review related shop drawings. Subconsultant
will assist in plan development as indicated below.
Survey
The City will provide TSC survey files from nearby City road improvements projects.
Supplemental survey will be required to check critical points in the field.
Subconsultants
Reproduction
Plan sets will be provided to the City Utility Coordinator for utility coordination.
Mylars and plan sets for contract administration and construction will be
delivered to the City
project manager.
Water and Sewer Design
Assistance will be provided to TSC to develop plan profiles and details sheets
and identify specifications.
Water Department Subtotal
TPW- WATER LINE RELOCATION
TSC will develop a study and plans for the relocation 200LF of 20 water line
relocation at proposed culvert. TSC will review related shop drawings.
TPW Subtotal
TPW- ROADWAY DESIGN
Aerial Survey
Fee included project remobilization and processing of remaining aerial data to
complete project limits.
Right of Way_Exhibits and Documents
Prepare exhibits and design assistance to the City for right of way and
driveway/street alternatives for the Pierce, Loddick and Bailey properties. This
fee included final right of way documents for the three mentioned properties.
Right of Way and Easements —Bray Birch to Timberland
Prepare Right -of -Way (8 @ $1250) and Temporary Construction Easements
(2 @ $600) documents above the original contract.
Off -site Drainage Design
Prepare storm drain design alternatives associated with the Children's
Lighthouse Learning Center to eliminate reconstruction of existing side streets.
This will included 1 Drainage Easement ($800)
Page 2 of 2
July 912010
$12,712
$49, 737
$ 6,255
$ 2,000
$ 8,260
$ 5,850
GIFWOBI(15(141ProjectMgmllProposallAmendmenl 11Norfh Beads Ame>ndment 1 2010-04 06.doc
<� ; 1 Page 2 of 2
1�yt�tf'� l' July 29, 2010
Incorporation of Funnel to Timberland Into Existinq Plans
Fee includes incorporating additional scope into plans and coordination of all sub
consultants.
TPW Roadway Subtotal $31,260
Total Contract Amendment No. ,2�2
Contract Summary:
Original Contract Fee -Phase 1: $368,235.32
Amendment No. 1: $ 30,930.00
Amendment No. 2: $180,496.68
Amendment No. 3: 87 252.00
TOTAL CONTRACT $666,914.00
Easements, hydraulic model, and
channel design
Phase 2 -- Bray Birch to Timberland
added to roadway design scope
This amendment
This proposal does not include:
1. A separate public meeting and bid package for Water Department items.
2. Easements for sanitary sewer and water lines.
3. Design for the relocation of water and sewer services.
4. Comprehensive survey of Keller Hicks Rd.
The MBE participation of this amendment is 28%.
Thank you for your consideration. Please contact me should you require any additional information.
Sincerely,
TranSystems Corporation Consultants
Raul Pena III, P.E.
Senior Vice President
Copy: Mike Hobbs, Project Manager, TranSystems
Kent Lunski, P.E., TranSystems
G:IF W081(15041ProjeclMgmllProposallAmendmenl 11North E3eadr Amendment 1 2010-D4-OG.doc
City of Fort Worth
North Beach St. Improvements • Amendment 3
DOE # 6224
712912010
Project: North Beach -Keller Hick to Bray Birch - Water and Sewer
Design
Design Services
HOURLY RATE WORK
Estimated Manhours
Total
Cost
WORK TASK DESCRIPTION
Pro!
Manager
195.00
Senior
Engineer
165.00
Engineer
135.00
Techl
ROW
90.00
CARD
Drag
70.00
PR
90.00
Clerical
50.00
Estimate
($)
WATER DEPT.: - WATER AND SEWER IMPROVEMENTS
A
Sanitary Sewer Study
51005.00
Review of Uility Files
4
360.00
Service Area Map
2
12
1$50.00
Profile
1
2
16
11435.00
Conceptual U651ftr Layout and Section
2
8
990,00
Letter Report
2
4
870.00
B
Sanitary Sewer Design
15,295.00
Site Visit
4
4
900.00
Suppiinrenlal Research
1
8
855.00
3320 LF Sewer Design and Spec 13 sheets
1
8
40
40
20
4
12,115.00
Assistance in Sewer Design- See Subconsullanl
Shop Drawings sewrer on
1
16
21325.00
C
Water Line Design
151295,00
Supplinaenal Research
1
8
855.00
3,200 LF of Water Design and Spec. 13 sheets
1
8
40
40
20
4
12,115.00
Assistance in Water Design - See Subconsultant
Shop Drawings water only)
1
16
2,325.00
WORK TASK DESCRIPTION
Surveyor 5
130,00
Surveyor 4
115.00
Crew
160.00
ST3
75.00
11
Clerical
50
Coal
D
Survey
1,430.00
Supplimental Survey to Previous Survey by Other
2
2
4
4
1,430.00
E
Subconsultanl
12,712.00
Reproduction
UtilityCoordination (13 sets)
250.00
Mylars (1 set)
75.00
Admisbation, inspector, Contractor 10 set
200.00
WORK TASK DESCRIPTION
Proj
Manager
195.00
Senior
Engineer
165.11E80
Engineer
Tech/
ROW
90.00
CADD
Drag
70.00
PR
90.00
Clerical
50.1�
Cost
Design
Water and Sewer Design (part of 26 total)
10
11,300.00
Subconsullanl Coordination .5;6
887.00
Water Dept: Water and Sewer Subtotal
$ 49,137.00
WORK TASK DESCRIPTION
Proj
Manager
195.00
Senor
Engineer
165.00
Engineer
135.00
Tech
ROW
90.00
CADD
Draft
70.00
PR
90.00
Clerical
50.00
TPW - WATER LINE RELOCATION
A.
Design
61255.00
20' Water Relocation 200 Coordination & Study
21130,00
20' Water Design
1
2
16
16
4,125.00
TPW: Water Relocation Subtotal
S 6,255.00
Water DepC Water and Sewer Subtotal
491737.00
TPW: Water Relocation Subtotal
6,255.00
AMENDMENT SUB TOTAL
$ 55*992.00
G'1FM? v%4PropcWgMrProposarAmerMment 3`jNonh Beach AmerMmem 3 Fee 072910xlsl Oeegn Fee - Water
City of Fort Worth
North Beach St. Improvements - Amendment 3
DOE # 6224
10l2012010
Project: North Beach • Keller Hick to Timberland
Design Services _ _
!''HOURLY
RATE WORK
Estimated Manhours
Total
Cost
WORK TASK DESCRIPTION
Proj
Manager
195.00
Senior
Engineer
165.00
Engineer
135.00
Tech/
ROW
90.00
CARD
Drah
_ 70.00 _
PR
90.00
Clerical
50.00 -
Estimate
($)
TPW • Roadway
Design
A
Aerial Survey • Funnel to Timberland
2,000.00
Process Aerial Survey- Funnell to Timbedand
B
Right of Way Exhibits and Documents • Keller Hicks to Bray
Birch
Exhibits for Pierce, Loddick and Bailey Property
2
16
_
28
4,510.00 _
Final Right of Way Documents for Pierce, Loddick and Bailey
Properties ($1250 each)
3,750.00
89260,00
C
Right of Way and Easements • Bray Birch to Timberland
Construction Easements (2 @ $600)
1,200.00
Rightof way Documents 8 @ $1250
10000.00
11,200,00
D
Off Site Drainage Design
Drainage Alternatives for Childrens Lighthouse Learning Center
2
20
28
5,050.00
Drainage Easement (1 @ $800)
800.00
5,850.00
E
Funnel to Timberland Project Incorporation
Coordinating Additional Scope with Sub -Consultants
2
16
20
31950,00
3,950.00
TPW • Roadway Design Sub Total
31,260000
6'\FW09\05041ProjectMgmt\ProposaAArnendment 3t North Beach Amendment 3 Fee 072910 xis] Design Fee - Roadway
PAGE I
TVI&L Review
Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA
FoR� E�
DATE: 3/22/2011 REFERENCE **C-24790 LOG NAME: 20NBEACH AMEND3
NO.. —
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of $87,252.00 to City Secretary
Contract No. 38905 with Transystems Corporation Consultants for the Design of North
Beach Street from Timberland Boulevard to Keller -Hicks Road, thereby Resulting in a Total
Contract Cost of $666,914.00 (COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 3 in
the amount of $87,252.00 to City Secretary Contract No. 38905 with Transystems Corporation
Consultants for the design of North Beach Street from Timberland Boulevard to Keller -Hicks Road,
thereby resulting in a total contract cost of $666,914.00.
DISCUSSION:
This contract amendment is needed for a sanitary sewer study, sanitary sewer and waterline design,
surveying, offsite drainage design, and providing right-of-way and temporary construction
easements.
On May 26, 2009, (M&C C-23498) the City Council authorized the City Manager to execute an
Engineering Services Agreement with Transystems Corporation Consultants in the amount of
$548,732.00 for the design of North Beach Street from Timberland Boulevard to Keller -Hicks Road as
a four -lane divided arterial street (City Secretary Contract No. 38905). The City authorized
Transystems Corporation Consultants to proceed with the design of North Beach Street from Keller -
Hicks Road to Bray Birch Lane while a community facilities agreement was prepared by the
developer at the northeast corner of the intersection of North Beach Street/Timberland Boulevard.
On April 20, 2010, the City administratively executed Amendment No. 1 to Engineering Services
Agreement with Transystems Corporation Consultants in the amount of $30,930.00 for the
preparation of six right-of-way and twenty temporary construction easements and hydraulic modeling
for design of channel improvements for the tributary to Big Bear Creek.
On September 23, 2010, the City administratively executed Amendment No. 2 an Engineering
Services Agreement with Transystems Corporation Consultants at no cost to the City for the design
of North Beach Street from Bray Birch Drive to Timberland Boulevard.
Transystems Corporation Consultants proposes to complete Amendment No. 3 for a lump sum fee of
$87,252.00. City Staff considers this fee to be fair and reasonable for the scope of services to be
performed.
Transystems Corporation Consultants is in compliance with the City's M/WBE Ordinance by
committing to an additional eight percent M/WBE participation on this Amendment No. 3. The City's
goal on this amendment is eight percent.
This project is located in COUNCIL DISTRICT 2, Mapsco 22B, F and K.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Street Improvement Fund, Water Capital Projects Fund and the
Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
http://apps.cfwnet.org/council�acket/mc review.asp?ID=14481&councildate=3/22/2011 3/21/2011
�.4&C Review
C204 531200 202230129130 $37,515.00
Page 2 of 2
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
20BEACH_AMEND3 MAP .pdf
P253 531200 602170129133 $22,366.00
P258 531200 702170129133 $27,371.00
Fernando Costa (6122)
Greg Simmons (7862)
Michael Weiss (8485)
http://apps.cfwnet.org/council�acket/mc_review.asp?ID=14481 &councildate=3/22/2011
3/21/2011
MAYOR AND COUNCIL COMMUNICATION IV!Awmw-�
1 B
3,000
() Project No. 01291
DETAIL OF PROJECT LOCATION