Loading...
HomeMy WebLinkAboutContract 38905-A3 (2)STATE OF TEXAS b CATTY SECRETARY CONTRACT NO. COUNTY OF VVZRW`�RT $ %vim%'EI;AS® the City of Fort Worth (CITY) and TranSystems Corporation Consultants (ENGINEER) made and entered into City Secretary Contract No. 33905, ('the CONTRACT) which was authorized by the City Council by M&C C- 23496 on the 26th day of May, 2009, by Amendment Number 1 which was authorized by the City on the 20th day of April, 2010, and by Amendment Number 2 which was authorized by the City on the 23rd day of September 20100 North Beach Street from Timberland Boulevard to Keller -Ricks Roado WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contracts 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated October 20, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $87,252.00. Article II of the Contract the maximum fee to be paid performed under the Contract, the City for all work and $666,9149000 2. nded is ameto provide for an increase in to Engineer for all work and services as amended, so that the total fee paid by services shall not exceed the sum of 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFI 1(:lAL R�&-C�a� CITY C�R�TA�BY FT. WORTH, TX Page -1- EXECUTED Fort Worth, ATTEST: on this the Tarrant County, Texas. day of 2011 in x f�\ ^ 1 4106 h Marty Hendrixt pAa� t yin City Secretary �000 00o �o ox APPROVAL RECOMMENDED: 00 0° �( 00 000000000� a44111.'Q.0 jX O' APPROVED: Fernando Costa Assistant City Manager Gre 'mmo s, P.E. Act Director, Transportation/Public Works Department TRANSYSTEMS CORPORATION CONSULTANTS ENGINEER Raul 1Pena III, P . E . ` Senior Vice President APPROVED AS FORM AND LEGALITY: Doug Black Assistant City Attorney i Page -2- Contract Authorization 31 l to Contract Authorization 31 l to Sytenis h AMENDMENT NO. 3 October 20, 2010 Mr. Michael Weiss, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 7'ra11Systcros Bank of America Nidding 500 Wesl 7"' Street tiulte 1100 I'orl WOil 1, I X 7G 102 Tel 817 3398950 I ax 817 3 302247 www lransyslemsI RE: Amendment No. 3 -Water and Sanitary Sewer Improvements, Roadway Improvements North Beach Street - Timberland Blvd to Keller -Hicks Rd DOE # 6224 City Secretary Contract No 38905 Dear Mr. Weiss, TranSystems (TSC) appreciates the opportunity to present this proposal and fee schedule for your consideration. Specifically, this amendment includes the services to incorporate supplemental contract documents for water and sanitary sewer improvements as indicated in the attached exhibits. This amendment also includes out of scope or additional services items related to the roadway design from the previous phase (Keller -Hick to Bray Birch) and the additional project limits (Bray Birch to Timberland). This work will be included with and will augment the design services associated with the original contract. The specific work to be included is as follows: WATER DEPARTMENT -WATER AND SANITARY SEWER IMPROVEMENT Sanitary Sewer Study $ 5,005 TSC will develop a sanitary sewer study for the properties not currently served by the City. TSC will review water and sanitary sewer city maps and plans, prepare a service area map, develop a conceptual utility layout and recommend pipe sizing. Sanitary Sewer Design $ 15,295 TSC will use previous research and digital plan backgrounds from recently designed street improvements. Sewer plans and related service information will be provided by the Water Department. TSC will develop contract documents (design sheets and the specifications) for approximately 12001f of 12" sewer, 17001f 10" sewer and 4201f of 8"sewer. TSC will review related shop drawings. Subconsultant will assist in plan development as indicated below. Water Design $ 15,295 TSC will use previous research and digital plan backgrounds from recently designed street improvements.. Water plans and related service information will be provided by the Water Department. Systems TSC will develop contract documents (design sheets and the specifications) for approximately 3300 If of 12" water line. TSC will review related shop drawings. Subconsultant will assist in plan development as indicated below. Survey The City will provide TSC survey files from nearby City road improvements projects. Supplemental survey will be required to check critical points in the field. Subconsultants Reproduction Plan sets will be provided to the City Utility Coordinator for utility coordination. Mylars and plan sets for contract administration and construction will be delivered to the City project manager. Water and Sewer Design Assistance will be provided to TSC to develop plan profiles and details sheets and identify specifications. Water Department Subtotal TPW- WATER LINE RELOCATION TSC will develop a study and plans for the relocation 200LF of 20 water line relocation at proposed culvert. TSC will review related shop drawings. TPW Subtotal TPW- ROADWAY DESIGN Aerial Survey Fee included project remobilization and processing of remaining aerial data to complete project limits. Right of Way_Exhibits and Documents Prepare exhibits and design assistance to the City for right of way and driveway/street alternatives for the Pierce, Loddick and Bailey properties. This fee included final right of way documents for the three mentioned properties. Right of Way and Easements —Bray Birch to Timberland Prepare Right -of -Way (8 @ $1250) and Temporary Construction Easements (2 @ $600) documents above the original contract. Off -site Drainage Design Prepare storm drain design alternatives associated with the Children's Lighthouse Learning Center to eliminate reconstruction of existing side streets. This will included 1 Drainage Easement ($800) Page 2 of 2 July 912010 $12,712 $49, 737 $ 6,255 $ 2,000 $ 8,260 $ 5,850 GIFWOBI(15(141ProjectMgmllProposallAmendmenl 11Norfh Beads Ame>ndment 1 2010-04 06.doc <� ; 1 Page 2 of 2 1�yt�tf'� l' July 29, 2010 Incorporation of Funnel to Timberland Into Existinq Plans Fee includes incorporating additional scope into plans and coordination of all sub consultants. TPW Roadway Subtotal $31,260 Total Contract Amendment No. ,2�2 Contract Summary: Original Contract Fee -Phase 1: $368,235.32 Amendment No. 1: $ 30,930.00 Amendment No. 2: $180,496.68 Amendment No. 3: 87 252.00 TOTAL CONTRACT $666,914.00 Easements, hydraulic model, and channel design Phase 2 -- Bray Birch to Timberland added to roadway design scope This amendment This proposal does not include: 1. A separate public meeting and bid package for Water Department items. 2. Easements for sanitary sewer and water lines. 3. Design for the relocation of water and sewer services. 4. Comprehensive survey of Keller Hicks Rd. The MBE participation of this amendment is 28%. Thank you for your consideration. Please contact me should you require any additional information. Sincerely, TranSystems Corporation Consultants Raul Pena III, P.E. Senior Vice President Copy: Mike Hobbs, Project Manager, TranSystems Kent Lunski, P.E., TranSystems G:IF W081(15041ProjeclMgmllProposallAmendmenl 11North E3eadr Amendment 1 2010-D4-OG.doc City of Fort Worth North Beach St. Improvements • Amendment 3 DOE # 6224 712912010 Project: North Beach -Keller Hick to Bray Birch - Water and Sewer Design Design Services HOURLY RATE WORK Estimated Manhours Total Cost WORK TASK DESCRIPTION Pro! Manager 195.00 Senior Engineer 165.00 Engineer 135.00 Techl ROW 90.00 CARD Drag 70.00 PR 90.00 Clerical 50.00 Estimate ($) WATER DEPT.: - WATER AND SEWER IMPROVEMENTS A Sanitary Sewer Study 51005.00 Review of Uility Files 4 360.00 Service Area Map 2 12 1$50.00 Profile 1 2 16 11435.00 Conceptual U651ftr Layout and Section 2 8 990,00 Letter Report 2 4 870.00 B Sanitary Sewer Design 15,295.00 Site Visit 4 4 900.00 Suppiinrenlal Research 1 8 855.00 3320 LF Sewer Design and Spec 13 sheets 1 8 40 40 20 4 12,115.00 Assistance in Sewer Design- See Subconsullanl Shop Drawings sewrer on 1 16 21325.00 C Water Line Design 151295,00 Supplinaenal Research 1 8 855.00 3,200 LF of Water Design and Spec. 13 sheets 1 8 40 40 20 4 12,115.00 Assistance in Water Design - See Subconsultant Shop Drawings water only) 1 16 2,325.00 WORK TASK DESCRIPTION Surveyor 5 130,00 Surveyor 4 115.00 Crew 160.00 ST3 75.00 11 Clerical 50 Coal D Survey 1,430.00 Supplimental Survey to Previous Survey by Other 2 2 4 4 1,430.00 E Subconsultanl 12,712.00 Reproduction UtilityCoordination (13 sets) 250.00 Mylars (1 set) 75.00 Admisbation, inspector, Contractor 10 set 200.00 WORK TASK DESCRIPTION Proj Manager 195.00 Senior Engineer 165.11E80 Engineer Tech/ ROW 90.00 CADD Drag 70.00 PR 90.00 Clerical 50.1� Cost Design Water and Sewer Design (part of 26 total) 10 11,300.00 Subconsullanl Coordination .5;6 887.00 Water Dept: Water and Sewer Subtotal $ 49,137.00 WORK TASK DESCRIPTION Proj Manager 195.00 Senor Engineer 165.00 Engineer 135.00 Tech ROW 90.00 CADD Draft 70.00 PR 90.00 Clerical 50.00 TPW - WATER LINE RELOCATION A. Design 61255.00 20' Water Relocation 200 Coordination & Study 21130,00 20' Water Design 1 2 16 16 4,125.00 TPW: Water Relocation Subtotal S 6,255.00 Water DepC Water and Sewer Subtotal 491737.00 TPW: Water Relocation Subtotal 6,255.00 AMENDMENT SUB TOTAL $ 55*992.00 G'1FM? v%4PropcWgMrProposarAmerMment 3`jNonh Beach AmerMmem 3 Fee 072910xlsl Oeegn Fee - Water City of Fort Worth North Beach St. Improvements - Amendment 3 DOE # 6224 10l2012010 Project: North Beach • Keller Hick to Timberland Design Services _ _ !''HOURLY RATE WORK Estimated Manhours Total Cost WORK TASK DESCRIPTION Proj Manager 195.00 Senior Engineer 165.00 Engineer 135.00 Tech/ ROW 90.00 CARD Drah _ 70.00 _ PR 90.00 Clerical 50.00 - Estimate ($) TPW • Roadway Design A Aerial Survey • Funnel to Timberland 2,000.00 Process Aerial Survey- Funnell to Timbedand B Right of Way Exhibits and Documents • Keller Hicks to Bray Birch Exhibits for Pierce, Loddick and Bailey Property 2 16 _ 28 4,510.00 _ Final Right of Way Documents for Pierce, Loddick and Bailey Properties ($1250 each) 3,750.00 89260,00 C Right of Way and Easements • Bray Birch to Timberland Construction Easements (2 @ $600) 1,200.00 Rightof way Documents 8 @ $1250 10000.00 11,200,00 D Off Site Drainage Design Drainage Alternatives for Childrens Lighthouse Learning Center 2 20 28 5,050.00 Drainage Easement (1 @ $800) 800.00 5,850.00 E Funnel to Timberland Project Incorporation Coordinating Additional Scope with Sub -Consultants 2 16 20 31950,00 3,950.00 TPW • Roadway Design Sub Total 31,260000 6'\FW09\05041ProjectMgmt\ProposaAArnendment 3t North Beach Amendment 3 Fee 072910 xis] Design Fee - Roadway PAGE I TVI&L Review Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FoR� E� DATE: 3/22/2011 REFERENCE **C-24790 LOG NAME: 20NBEACH AMEND3 NO.. — CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of $87,252.00 to City Secretary Contract No. 38905 with Transystems Corporation Consultants for the Design of North Beach Street from Timberland Boulevard to Keller -Hicks Road, thereby Resulting in a Total Contract Cost of $666,914.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 3 in the amount of $87,252.00 to City Secretary Contract No. 38905 with Transystems Corporation Consultants for the design of North Beach Street from Timberland Boulevard to Keller -Hicks Road, thereby resulting in a total contract cost of $666,914.00. DISCUSSION: This contract amendment is needed for a sanitary sewer study, sanitary sewer and waterline design, surveying, offsite drainage design, and providing right-of-way and temporary construction easements. On May 26, 2009, (M&C C-23498) the City Council authorized the City Manager to execute an Engineering Services Agreement with Transystems Corporation Consultants in the amount of $548,732.00 for the design of North Beach Street from Timberland Boulevard to Keller -Hicks Road as a four -lane divided arterial street (City Secretary Contract No. 38905). The City authorized Transystems Corporation Consultants to proceed with the design of North Beach Street from Keller - Hicks Road to Bray Birch Lane while a community facilities agreement was prepared by the developer at the northeast corner of the intersection of North Beach Street/Timberland Boulevard. On April 20, 2010, the City administratively executed Amendment No. 1 to Engineering Services Agreement with Transystems Corporation Consultants in the amount of $30,930.00 for the preparation of six right-of-way and twenty temporary construction easements and hydraulic modeling for design of channel improvements for the tributary to Big Bear Creek. On September 23, 2010, the City administratively executed Amendment No. 2 an Engineering Services Agreement with Transystems Corporation Consultants at no cost to the City for the design of North Beach Street from Bray Birch Drive to Timberland Boulevard. Transystems Corporation Consultants proposes to complete Amendment No. 3 for a lump sum fee of $87,252.00. City Staff considers this fee to be fair and reasonable for the scope of services to be performed. Transystems Corporation Consultants is in compliance with the City's M/WBE Ordinance by committing to an additional eight percent M/WBE participation on this Amendment No. 3. The City's goal on this amendment is eight percent. This project is located in COUNCIL DISTRICT 2, Mapsco 22B, F and K. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvement Fund, Water Capital Projects Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers http://apps.cfwnet.org/council�acket/mc review.asp?ID=14481&councildate=3/22/2011 3/21/2011 �.4&C Review C204 531200 202230129130 $37,515.00 Page 2 of 2 Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: ATTACHMENTS 20BEACH_AMEND3 MAP .pdf P253 531200 602170129133 $22,366.00 P258 531200 702170129133 $27,371.00 Fernando Costa (6122) Greg Simmons (7862) Michael Weiss (8485) http://apps.cfwnet.org/council�acket/mc_review.asp?ID=14481 &councildate=3/22/2011 3/21/2011 MAYOR AND COUNCIL COMMUNICATION IV!Awmw-� 1 B 3,000 () Project No. 01291 DETAIL OF PROJECT LOCATION