HomeMy WebLinkAboutContract 39023CSJ # 090248-742
District # 02-Fort Worth
Code Chart 64 # 50-15000
Project: Silver Creek Rd. at Silver Creek
NBI Structure # 022200ZS4528002
CFDA # 20.205
STATE OF TEXAS § U1 I Y SECRETARY
COUNTY OF TRAVIS § CONTRACT NO,
ADVANCE FUNbING AGREEMENT
For Bridge Replacement or Rehabilitation
Off the State System
THIS Advance Funding Agreement (the Agreement) is made by and between the State of
Texas, acting by and through the Texas Department of Transportation, hereinafter called the
"State", and the City of Fort Worth, acting by and through its duly authorized officials,
hereinafter called the "Local Government."
WITNESSETH
WHEREAS, Title 23, United States Code Section 144 authorizes federal funds to assist the
States in the replacement or rehabilitation of deficient bridges located on public highways, roads
and streets, including those under the jurisdiction of local governments; and
WHEREAS, the Texas Transportation Code, Sections 201.103 and 222.052 establish that the
State shall plan and make policies for the construction of a comprehensive system of state
highways and public roads in cooperation with local governments; and
WHEREAS, the Local Government owns a bridge or bridges located on a public road or street
located at Silver Creek on Silver Creek Road and said bridges) is included in the currently
approved off -state system federal -aid Highway Bridge Replacement and Rehabilitation Program
(HBRRP) as authorized by Texas Transportation Commission Minute Order number 110479.
dated March, 2006; and
WHEREAS, the Governing Body of the Local Government has approved entering into this
Agreement by resolution or ordinance which is attached hereto and made a part hereof as
Attachment A and which provides for development of the specific programmed replacement or
rehabilitation project, hereinafter called the "Project", identified in the location map shown as
Attachment B.
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto, to be by them respectively kept and performed as hereinafter set
forth, it is agreed as follows.
CITY SECRETAR"
Bridge-Bridge_AFA -- -- Page 1 of 16 Bridge Division
Rev 02/02/09 02-2002-L.1
District 02�Fort Worth
Code Chart ♦• 000
ect: Silver -1.. • Creek Mat Silver Creek
i. # 20*205
This Agreement becomes effective when signed by the last party whose signing makes the
Agreement fully executed. This Agreement shall remain in effect until terminated as
provided in Article 2.
a. The Agreement is terminated in writing with the mutual consent of the parties; or
b. Breach of this Agreement, in which case any cost incurred shall be paid by the
breaching party; or
c. If the Local Government elects not to develop the project and the project does not
proceed, in which case the Local Government agrees to reimburse the State for 100
percent of its reasonable actual direct and indirect costs incurred for the project.
Amendments to this Agreement may be made due to changes in the character of the work,
the terms of the Agreement, or the responsibilities of the parties. Amendments shall be
enacted through a mutually agreed upon, written amendment executed by all parties to this
Agreement.
This Agreement shall not be considered as specifying the exclusive remedy for any
Agreement default, but all remedies existing at law and in equity may be availed of by
either party to this Agreement and shall be cumulative.
The scope of work for this Agreement is the replacement or rehabilitation of the bridges)
identified in the recitals of this Agreement. This replacement or rehabilitation shall be
accomplished in the manner described in the plans, specifications and estimates developed
in accordance with this Agreement and which are incorporated herein by reference.
Bridge-Bridge_AFA Page 2 of 16 Bridge Division
Rev 02/02109 02-2002-L. l
090248vmoM
District 02bbrFort Worth
Code Chart 64 5045000
• -ct: Silver Creek• at SilverCreek
NBI Structure . 022200ZS4528002
i _ # 20*205
ght • • •„ • • ^• • • • -• -Lloom •
The Local Government authorizes the State, its consultant, contractor, or other designated
representative to enter the site(s) of said bridge(s) and adjacent right of way or relocation
right of way to perform surveys, inspections, construction and other activities necessary to
replace or rehabilitate said bridge and approaches.
The Local Government shall be responsible for the adjustment, removal, or relocation of
utility facilities in accordance with applicable State laws, regulations, rules, policies, and
procedures, including any cost to the State of a delay resulting from the Local
Government's failure to ensure that utility facilities are adjusted, removed, or relocated
before the scheduled beginning of construction. The Local Government will not be
reimbursed with federal or state funds for the cost of required utility work." The Local
Government must obtain advance approval for any variance from established procedures.
Before a construction contract is let, the Local Government shall provide, at the State's
request, a certification stating that the Local Government has completed the adjustment of
IF
all utilities that must be adjusted before construction is completed.
Development of the Project must comply with the National Environmental Policy Act and
the National Historic Preservation Act of 19b6, which require environmental clearance of
federal -aid projects.
a. The State is responsible for the identification and assessment of any environmental
problems associated with the development of the Project governed by this Agreement.
b. Cost participation in environmental assessment and remediation work shall be paid by
the parties in the same ratio as construction costs and will be included in the
construction costs identified in Attachment D, "Estimate of Direct Costs".
a The State is responsible for providing any public meetings or public hearings required
for development of the environmental assessment
The State will not begin construction of the Project until identified environmental problems
have been remediated, unless provided for otherwise.
Bridge°Bridge AFA Page 3 of 16 Bridge Division
Rev o2/02/09 02�2002-L. l
CSJ . i•1 4r
District ./ ort Worth
•w.Chart64 # 5045000
Creekect: Silver ,
. at Silver Creek
NBI Structure # 022200ZS4528002
D:# 200205
All parties to this Agreement shall ensure that the plans for and the construction of the
Project subject to this Agreement are in compliance with the Texas Accessibility Standards
(TAS) issued by the Texas Department of Licensing and Regulation, under the
Architectural Barriers Act, Article 9102, Texas Civil Statutes. The TAS establishes
minimum accessibility requirements to be consistent with minimum accessibility
requirements of the Americans with Disabilities Act (RL. 101®336) (ADA).
The State is responsible for performance of any required architectural or preliminary
engineering work. The Local Government may review and comment on the work as
required to accomplish the public purposes of the Local Government. The State will
cooperate fully with the Local Government in accomplishing these local public purposes to
the degree permitted by state and federal law. The Local Government review shall not
unduly delay the development of the Project.
a. The State shall advertise for construction bids, issue bid proposals, receive and tabulate
the bids and award and administer the contract for construction of the Project.
Administration of the contract includes the responsibility for construction engineering
and for issuance of any change orders, supplemental agreements, amendments, or
additional work orders, which may become necessary subsequent to the award of the
construction contract. In order to ensure federal funding eligibility, projects must be
authorized by the State prior to advertising for construction.
b. Upon completion of the Project, the State will issue a "Notification of Completion"
acknowledging the Project's construction completion.
After
the Project has been completed, the Local Government shall accept full ownership,
and operate and maintain the facilities authorized by this Agreement for the benefit of and
at no charge of toll to the public. This covenant shall survive the completion of
construction under this Agreement.
a. A Project Cost Estimate is provided in Attachment D, "Estimate of Direct Costs".
Bridge-BridgeAFA Page 4 of 16 Bridge Division
Rev 02/02/09 02-2002-L.1
CSJ 09024&742
District # i ort Worth
••- Chart 6+ , 5045000
•Creek•
. at Silver Creek i
022200ZS4528002
CFDA # 20205
Attachment D provides a source of funds estimate as well as the estimated direct
preliminary engineering, construction engineering, and construction costs for the
Project in totalby ♦ • -
estimatedThe required Local Government participation is based solely upon the State's estimate
of the eligible work at the time this Agreement is executed and will not be adjusted
during construction except as needed to include any Project cost item or portion of a
cost item ineligible for state or federal participation. In addition to its share of
direct engineering and constructioncosts,•
responsible for the direct ♦ of project costor portion of cost item that is
not eligible for federal participation under the federal HBRRP.
The Local Government is also responsible for any cost resulting from changes made at
the request of the Local Government.
d. Aii:er execution of this Agreement, but thirty (30) days prior to the performance of any
work by the State, the Local Government will remit a check or warrant made payable to
the "Texas Department of Transportation" in the amount specified in Attachment D for
the Local Government's contribution for preliminary engineering. The Local
Government will pay at a minimum its funding share for this estimated cost of
preliminary engineering.
e. Forty-five (45) days prior to the date set for receipt of the construction bids, the Local
Government shall remit its remaining financial share for the State's estimated
construction oversight and construction costs and any other costs owing.
f. If at the completion or termination of the Project the State determines that additional
funding is required by the Local Government, the State shall notify the Local
Government in writing. The Local Government shall make payment to the State within
thirty (30) days from receipt of the State's written notification.
g. Upon completion of the Project, the State will perform an audit of the Project costs.
Any funds due to the Local Government, the State, or the Federal Government will be
promptly paid by the owing party.
h. The State will not pay interest on any funds provided by the Local Government.
i. The Local Government funding participation responsibilities include Project direct
costs only, except when the Project is terminated before completion at the request of the
Local Government as addressed in the Termination provision of this Agreement.
j. The amounts shown on Attachment D are estimates only. If actual costs exceed the
estimates, this shall be considered a fixed price agreement, and no additional funding
shall be required of the Local Government except to the extent that the additional costs
result from changes made at the request of the Local Government or to the extent that
the additional costs are not eligible for federal participation under the Federal Highway
Bridge Replacement and Rehabilitation Program. If actual costs are less than the
estimates, Local Government participation shall be recalculated based on actual costs.
If the recalculation results in a reduction in participation by the Local Government, the
State shall pay the difference to the Local Government upon completion of the Project.
Bridge�Bridge AFA Page 5 of 16 Bridge Division
Rev o2/02/09 02-2002®L. l
1•i
District #1 ort Worth
Code Chart •450w 15000
Project:Silver Creek Rd.atSilver Creek
NBI Structure . 022200ZS45280l
200205
Under• • of Transportation Code•222.053 certain
counties quality as Economically Disadvantaged Counties (EDC) in comparison to
other counties in the state as below average per capita property value, and below
average per capita income, and above average unemployment, for certain years. if
applicable, in consideration of such EDC status that may be applicable for the Projec
the
required • • participation•.. adjusted • 1 percent.
1. The State will not execute the contract for the construction of a Project until the
required funding has been made available by the Local Government in accordance with
this Agreement.
m. The state auditor may conduct an audit or investigation of any entity receiving funds
from the state directly under the contract or indirectly through a subcontract under the
contract. Acceptance of funds directly under the contract or indirectly through a
subcontract under this contract acts as acceptance of the authority of the state auditor,
under the direction of the legislative audit committee, to conduct an audit or
investigation in connection with those funds.
An entity that is the subject of an audit or investigation must provide the state auditor
with access to any information the state auditor considers relevant to the investigation
or audit.
for Waiver of Local Participation . c
a. Applicability. If a request for waiver has been received and approved by the State's
District Engineer, then the required ten percent matching fund participation or percent
as adjusted for EDC consideration, as shown in Attachment D, "Estimate of Direct
Costs", but excluding ineligible costs under the bridge program, is waived. This waiver
is based on the commitment of the Local Government to spend an equivalent amount of
funds for structural or safety improvement on "other" bridge structures and other
conditions as specified in 43 TAC Section 15.55(d). If a waiver has been granted, the
Project shall be defined to be a Participation -Waived Project (PWP) and the work on
the "other" bridge structures that will be improved by the Local Government shall be
defined to be the Equivalent -Match Project(s) (EMP). Attachment C to this Agreement
shows a list of EMP(s) under this Agreement.
b. Project Cost Estimate for PWP. Attachment D to this Agreement shows the estimated
direct preliminary engineering, construction engineering and construction costs for the
PWP in total and local match fund participation being waived, or partially waived.
c. Credit Against ENV Work. Any local match fund participation that has already been
paid, or which the Local Government is agreeable to paying to the State, will be
credited against EMP work to be performed by the Local Government. If applicable,
this credit(s) will be reflected in Attachment D to this Agreement.
Bridge-Bridge_AFA Page 6 of 16 Bridge Division
Rev o2io2io9 Oz-2oa2-L.1
SJ 9 ,;
District 1 .
Code Chart 64 , 5045000
_Silver CreekRd.at Silver Creek
NBI Structure # 022200ZS452801
t • # 20105
d. Responsibilities of the Local Government on ENiP(s).
(1) The Local (government shall be responsible for all engineering and construction,
and related costs thereto, and complying with all applicable state and federal
environmental regulations and permitting requirements.
(2) The structural or safety improvement work on the EW(s) shall be performed
subsequent to the final execution of this Agreement but within three (3) calendar
years after the earliest contract award of the related PWP(s).
(3) Written documentation, suitable for audit, of the structural or safety improvement
work completed on the EW(s) shall be kept on file by the Local Government for
four (4) years after completion of work or claims, lawsuits, or audits related
thereto, whichever is longer. A notice of completion of work on the ENV(s) shall
be delivered to the State's District Engineer no later than thirty (30) calendar days
after work is completed on the EW(s).
(4) Failure by the Local Government to adequately complete the ElVIP(s) within the
stated three-year period shall result in the Local Government being excluded from
receiving such waivers for a minimum of five (5) years.
e. Funding of Ineligible or Additional Work Not Waived. Regardless of any waiver of
eligible program costs, the Local Government shall pay the State 100 percent of the
cost of any PWP item or portion of a cost item that is not eligible for federal or state
participation, and 100 percent of the costs resulting from additional work on the PWP
performed solely at the request of the Local Government. If the ineligible or additional
work is preliminary engineering, the payment shall be made at least thirty (30) days
prior to the beginning of preliminary engineering work on the PWP.
If the ineligible or additional work is for construction or construction engineering, the
payment shall be made at least forty-five (45) days prior to the date set for receipt of bids
for construction of the PWP.
All notices to either party by the other required under this Agreement shall be delivered
personally or sent by certified or U.S. mail, postage prepaid, addressed to such party at the
following addresses:
State: District Engineer Maribel P. Chavez, P.E.
Texas Department of Transportation
2501 S.W. Loop 820
Fort Worth, Texas 76133
Bridge-Bridge_AFA Page 7 of 16 Bridge Division
Rev o2/02/09 02-2002-L.1
1' 1
District # 02�Fort
Worth
•r- Chart 64 5045000
• -ct: Silver Creek Rd. at Silver Cree
StructureNBI , 022200ZS4528002
CFDA # 20105
ocai Uovernment:• •
111 Throckmorton
• t Wortb, Texas76102
All notices shall be deemed given on the date so delivered or so depasited in the mail,
unless otherwise provided herein. Either party may change the above address by sending
written notice of the change to the other party. Either party may request in writing that
such notices shall be delivered personally or by certified U. S. mail and such request shall
be honored and carried out by the other party.
In case one or more of the provisions contained in this Agreement shall for any reason be
held invalid, illegal or unenforceable in any respect, such invalidity, illegality or
unenforceability shall not affect any other provisions and this Agreement shall be construed
as if it did not contain the invalid, illegal or unenforceable provision.
The parties to this Agreement agree that no party is an agent, servant, or employee of the
other party and each party agrees it is responsible for its individual acts and deeds as well
as the acts and deeds of its contractors, employees, representatives, and agents.
Upon completion or termination of this Agreement, all documents prepared by the State
shall remain the property of the State. All data prepared under this Agreement shall be
made available to the State without restriction or limitation on their further use.
All documents produced or approved or otherwise created by the Local Government shall
be transmitted to the State in the farm of photocopy reproduction on a monthly basis as
required by the State. The originals shall remain the property of the Local Government. At
the request of the State, the Local Government shall submit any information required by the
State in the format directed by the State.
The parties shall comply with all federal, state, and local laws, statutes, ordinances, rules
and regulations, and the orders and decrees of any courts or administrative bodies or
tribunals in any manner affecting the performance of this Agreement. When required, the
Local Government shall furnish the State with satisfactory proof of this compliance.
Bridge-Bridge_AFA Page S of 16 Bridge Division
Rev o2�02109 02-2002-L. l
i•! ,i 4_
District # 0. ort Worth
••' Chart •- 5045000
{Silver CreekRd. at Silver Creek
NBI Structure..
CFDA . 206205
WAMMM&1J&1W
M
rrr
ny prior understandings or written or oral agreements respecting this Agreement's subject
In order to be reimbursed with federal funds, the parties shall comply with the Cost
Principles established in OMB Circular A-87 that specify that all reimbursed costs are
allowable, reasonable and allocable to the Project.
The pariies shall adhere to the procurement standards established in Title 49 CFR §15.36
and with the property management standard established in Title 49 CFR § 1 8.32.
The parties to the Agreement shall maintain all books, documents, papers, accounting
records and other documentation relating to costs incurred under this Agreement and shall
make such materials available to the State, the Local Government, and, if federally funded,
the Federal Highway Administration (FHWA), and the U.S. Office of the Inspector
General, or their duly authorized representatives for review and inspection at its office
during the contract period and for four (4) years from the date of completion of work
defined under this contract or until any impending litigation, or claims are resolved.
Additionally, the State, the Local Government, and the FHWA and their duly authorized
representatives shall have access to all the governmental records that are directly applicable
to this Agreement for the purpose of making audits, examinations, excerpts, and
transcriptions.
The parties shall comply with the requirements of the Single Audit Act of 19�4,
P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in OMB
Circular No. A-1211 through August 31, Z000 and stipulated in OMB Circular A433 after
August 31, 2000.
The parties to this Agreement shall comply with the regulations of the U.S. Department of
Transportation as they relate to nondiscrimination (49 CFR Chapter 21 and 23 CFR
-Bridge_A Page 9 of 16 Bridge Division
Rev o2/02/09 02-2002-L.1
CSJ # 090248442
District # 02-Fort Worth
Code Chart 64 # 50-15000
Project: Silver Creek Rd.at Silver Creek
NBI Structure # 022200ZS4528002
CFDA # 20.205
§710.405(B)), and Executive Order 11246 titled "Equal Employment Opportunity," as
amended by Executive Order 11375 and supplemented in the Department of Labor
Regulations (41 CFR Part 60).
The parties are prohibited from making any award at any tier to any party that is debarred
or suspended or otherwise excluded from or ineligible for participation in Federal
Assistance Programs under Executive Order 12549, "Debarment and Suspension." By
executing this agreement, the [Contractor, Local Government, Engineer, or whatever]
certifies that it is not currently debarred, suspended, or otherwise excluded from or
ineligible for participation in Federal Assistance Programs under Executive Order 12549.
The parties to this contract shall require any party to a subcontract or purchase order
awarded under this contract to certify its eligibility to receive Federal funds and, when
requested by the State, to furnish a copy of the certification.
In executing this Agreement, the signatories certify to the best of his or her knowledge and
belief, that:
a. No federal appropriated funds have been paid or will be paid by or on behalf of the
parties to any person for influencing or attempting to influence an officer or employee
of any federal agency, a Member of Congress, an officer or employee of Congress, or
an employee of a Member of Congress in connection with the awarding of any federal
contract, the making of any federal grant, the making of any federal loan, the entering
into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any federal contract, grant, loan, or cooperative
agreement.
b. If any funds other than federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any agency,
a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with federal contracts, grants, loans, or cooperative
agreements, the signatory for the Local Government shall complete and submit the
Federal Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance
with its instructions.
Bridge-Bridge_AFA
Rev 02/02/09
Page 10 of 16 Bridge Division
02-2002-L.1
CSJ # 090248-742
District # 02-Fort Worth
Code Chart 64 # 50-15000
Project: Silver Creek Rd.at Silver Creek
NBI Structure # 022200ZS4528002
CFDA # 20.205
c. The parties shall require that the language of this certification be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and
contracts under grants, loans, and cooperative agreements) and that all subrecipients
shall certify and disclose accordingly.
By executing this Agreement, the parties affirm this lobbying certification with respect to
the Project and affirm this certification of the material representation of facts upon which
reliance will be made. Submission of this certification is a prerequisite for making or
entering into this transaction imposed by Title 31 U.S.C. §1352. Any person who fails to
file the required certification shall be subject to a civil penalty of not less than $10,000 and
not more than $1001000 for each such failure.
29. Successors and Assigns
The State and the Local Government each binds itself, its successors, executors, assigns,
and administrators to the other party to this Agreement and to the successors, executors,
assigns, and administrators of such other party in respect to all covenants of this
Agreement.
30. Local Government Restrictions
In the case that the local government has an existing, future or proposed local ordinance
commissioners court order, rule policy, or other directive that is more restrictive than the
state or federal regulations that results in an increase cost to the State for the project, the
local government is responsible for all increased costs associated with the ordinance, order,
policy, directive, or change.
31. Signatory Warranty
The signatories to this Agreement warrant that each has the authority to enter into this
Agreement on behalf of the party represented.
IN TESTIMONY HEREOF, the parties hereto have caused these presents to be executed in
duplicate counterparts.
THE LOCAL GOVERNMENT
By:
Printed Name of Signatory
idge_AFA
Bridge-BrPage 11 of 16 Bridge Division
Rev 02/02/09 02-2002-L.1
Title:
Date:
THE STATE OF TEXAS
r
CSJ # 090248-742
District # 02-Fort Worth
Code Chart 64 # 50-15000
Project: Silver Creek EWA Silver Creek
NBI Structure # 022200ZS4528002
CFDA # 20.205
Executed for the Executive Director and approved for the Texas Transportation Commission for
the purpose and effect of activating and/or carrying out the orders, established policies or work
programs heretofore approved and authorized by the Texas Transportation Commission.
B47 M
David P. Hohmann, PE
Director, Bridge Division
�i�w��w� �tCORb
OITY SECRETARY
PT WOI:tTH9 TX.
Bridge-Bridge_AFA Page 12 of 16 Bridge Division
Rev 02/02/09 02-2002-L.1
Bridge-Bridge_AFA
Rev 02/02/09
Page 13 of 16
. 1.1- • c
•�- •� . .1 111
� 1 i
Bridge Division
02-2002-L.1
NO. 3753-06-2009
A RESOLUTION AUTHORIZING THE EXECUTION OF AN ADVANCE FUNDING
AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR THE
DIVISION OF COSTS AND RESPONSIBILITIES ASSOCIATED WITH RECONSTRUCTION
OF THE SILVER CREEK ROAD BRIDGE AT SILVER CREEK
WHEREAS, Title 23, United States Code Section 144 authorizes federal funds to assist the
States in the replacement of deficient bridges located on public highways, roads and streets, including
those under the jurisdiction of local governments; and
WHEREAS, the Texas Transportation Code, Sections 201.103 and 222.052 establish that the
State shall plan and make policies for the construction of a comprehensive system of state highways and
public roads in cooperation with local governments; and
WHEREAS, the City of Fort Worth owns a bridge located on a public road or street located at
Silver Creek on Silver Creek Road and said bridge is included in the currently approved off -state system
Federal -aid Highway Bridge Replacement and Rehabilitation Program (HBRRP) as authorized by Texas
Transportation Commission Minute Order No. 110479, dated March 2006 by which the City of Fort
Worth is eligible to receive up to $1,635,000 HBRRP funds for the reconstruction of said bridge; and
WHEREAS, the City of Fort Worth and the Texas Department of Transportation wish to enter
into an Advance Funding Agreement to set forth the division of costs and responsibilities associated
with the reconstruction of the Silver Creek Road Bridge at Silver Creek.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FORT WORTH, TEXAS:
Authorizes the City Manager, or his designee, to execute an Advance Funding Agreement with
the Texas Department of Transportation to share the costs and responsibilities associated with the
reconstruction of the Silver Creek Road Bridge at Silver Creek.
PASSED AND APPROVED by the City Council of the City of Fort Worth, Texas on this the
23`a day of June, 2009. APPfiOVED
CITY COUNCIL
ATTEST.
JUN 2 3 2009
`(tea:-���^j�^A
City Secretary of the
City of Fort Worth, Texas
c=sY or ro>re: wo>tesu
CSJ # 0902-48-742
District # 02-Fort Worth
Code Chart 64 # 50-15000
Project: Silver Creek Rd. at Silver Creek
NBI Structure: 022200ZS4528002
CFDA # 20.205
ATTACHMENT B
PROJECT LOCATION MAP
tr e�
� � ��� c�
'�o� � �-
� �� , �� ��
Mile t3rid e
- �-�l
a *'r r ,� a 1� 1 __
Lr ��-a = d f -- 't.
� I�' ���
,,
r' �- , -: �
�� a � s�f .4 ti''j .l �- ti _ .� --- Casino �• r—.,_�`i
�', !.`' � Park
� —� Qt , ;� Aale Ave
� � ��� � Lake Wor#h
�, � � �— -
Bridge No: 022200254528002
Silver Creek Rd at Silver Creek
t`1?1rt� ���`
�- i
O and [P) 19$$-2006 A�fcrosoft Coi
�'�'�� i ake Worti�
��r� �
Wildwood Park
�n andlor
�ge Ftd
iers. �I rii
G
Dr`
Maia�a� '
,n�
�::
Marine Creek_,J�d
�, ' Sansom Park
J ,,
�' e5'r'
� ��
st
Naval Air Station Fort Worth ' '
�_ �Dr
White i. 0 1Nestw�
Siettlement' c� � ; «
a �
i � ,i341j �,�
�� �� � �
-� 19--- , `. ,t11�IV��r
Dennis Ave,'�.��J
Bridge -Bridge AFA Page 14 of 16 Bridge Division
Rev 04/17/06 10-2002-L.1
DCCSS: 02-220-ZS45-28-002
Feature Carried: Silver Creek Road
Approach - I,00lflng North
02-220-ZS4548-002
Feature Crossed:
04-22-2004
TFB
Underview -North 04-22-2004
02-220-ZS45-28-002 TFB
CSJ # 090248-742
District # 02-Fort Worth
Code Chart 64 # 5045000
Project: Silver Creek Rd. at Silver Creek
NBI Structure: 022200ZS4528002
CFDA # 20.205
Date Printed: 23-Mar-09
Silver Creek
No>th Abutment
02-220-ZS45-28-002
04-22-2004
TFB
02-220-ZS45-28-002 JEC 04-22-2008
Silver Creek Road over Silver Creek
Debris Upstream Channel
Bridge Inspection Photos (page I of 1)
1'i=4: 42
District # i Worth
Code Chart •• # 50000
)Ject: Silver Creek Mat Silver Creek
NBI Structure # 022200ZS4528002
200205
Location (and structure
identification number, if
applicable)
On
School
Bus
Route?
(Yes/No)
Historic
Bridge?
(Yes/No)
Description of Structural
or Safety Improvement
Work
Estimated Cost
W. Vickery Blvd. over
Henderson Street
NBI # 022200ZV4040006
No
No
Remove the bridge
$3755000
Craven Rd at Wild Cat
Branch
NBI #022200ZC8175001
Yes
Fort
Worth
ISD
No
Replace the bridge
$1,023,000
Nine Mile Bridge at
Tributary to Lake Worth
NBI#022200ZN3580001
No
No
Remove the existing bridge
$95,000
Total
$1,49300
EMP work credited to this PWP See Note *)
$163,500
Balance of EMP work available to associated PWP(s)
$1,3291500
Associated PWP(s) Control-Section4ob (CSI)
Amount to be Credited to Associated PWP (s)
090248-505
$1,200,000
0902=48=743
$ 100,800
Note This total should typically equal the "Balance of Local Government Participation" that
is waived as shown in Attachment D.
Note": This attachment not applicable for non -Participation -Waived Projects (PWP)
Bridge-Bridge_AFA Page 15 of 16 Bridge Division
Rev 02/02/09 02-2002-1,.1
Preliminary Engineering (PE)
Ten (10) Percent or EDC Adjusted Percent
of PE for Local Government Participation
Construction
Engineering and Contingency (E&C)
The Sum of Construction and E&C
Ten (10) Percent or EDC Adjusted Percent
of the Sum of Construction and E&C for
Local Government Participation
Amount of Advance Funds Paid by Local
Government
Amount of Advance Funds to be Paid by
Local Government
Balance of Local Government Participation
which is to be Waived where the
Project is a PWP
Total Project Direct Cost
1`1:4; ,
District i ort Worth
•Silver CreekRd.at Silver Creek
NBI Structure . / 1/ 11
l - 20105
Estimated Cost
(1) $202,500
$1,230,000
(2) $1,432,500
* Credited Against Local Government Participation Amount
If this Project is to be a PWP, Amount of
EMP Work Being Credited to this PWP as
Shown on Attachment C.
Local Government
Participation
(3) $20,250
(4) $143,250
(5)
Bridge-Bridge_AFA Page 16 of 16 Bridge Division
Rev 02/02/09 02-2002-L.1
City of Fort Worth, Texas
Mayor and Council Communication
COUNCILA IIUN.a Approved on 612W2009 -Res. No, 3753-06-2009 & Ord. No. 18690-06-
2009
DATE: Tuesday, June 23, 2009
LOG NAME: 20SILVER CREEK BRDG
REFERENCE NO.: C-23621
SUBJECT:
Adopt a Resolution Authorizing Execution of an Advance Funding Agreement with the Texas Department
of Transportation in the Amount of $1,635,000.00 with City Participation Up to $163,500.00 for the
Reconstruction of Silver Creek Road Bridge over Silver Creek and Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that City Council:
1. Adopt the attached resolution authorizing the City Manager to execute an Advance Funding Agreement
with the Texas Department of Transportation for the reconstruction of Silver Creek Bridge over Silver
Creek in the amount of $1,635,000.00 with City participation up to $163,500.00;
2. Authorize the City Manager to accept $1,635,000.00 non -cash federal funds from the Highway Bridge
Replacement and Rehabilitation Program through Texas Department of Transportation;
3. Authorize the transfer of $163,500.00 from the 2004 Street Improvements Fund to the Grants Fund
towards the City's 10 percent required equivalent match for this project; and
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Grants Fund by $1,798,500.00.
DISCUSSION:
The existing Silver Creek Bridge over Silver Creek (Bridge No. 022200ZS4528002) was built in 1950.
Texas Department of Transportation's (TxDOT) structural evaluation for the bridge determined that the
bridge must be replaced.
The estimated cost for reconstruction of Silver Creek Bridge over Silver Creek is $1,635,000.00. The City
is responsible for 10 percent of the eligible cost which is estimated to be $163,500.00. Under TxDOT's
Equivalent -Match program, no direct payment by the City is required for the City's share of the eligible
costs of reconstruction of Silver Creek Bridge.
On May 27, 2008, (M&C C-22828) the City Council approved an advanced funding agreement with
TxDOT for reconstruction and rehabilitation of West 7th Street Bridge. As an option under TxDOT's
Equivalent -Match program, no direct payment by the City was required for the City's share of the eligible
costs of reconstruction of the West 7th Street Bridge. In lieu of the 10 percent cash participation for the
eligible portion of the project, the City will replace the minor bridge at Cravens Road over Wildcat Branch
(estimated cost $1,023,000.00) and remove Vickery Boulevard Bridge over Henderson Street (estimated
cost $375,000.00) and Nine Mile Bridge over the tributary to Lake Worth (estimated cost $95,000.00),
Logname: 20SILVER CREEK BRDG Page 1 of 2
totaling $1,493,000.00.
The City's match required for West 7th Street Bridge project was only $1,200,000.00 leaving a credit of
$293,000.00. Staff has negotiated with TxDOT to add two additional bridges to the grant program; Silver
Creek Bridge over Live Oak Creek (estimated cost $1,008,000.00) and Silver Creek Bridge over Silver
Creek (estimated cost $1,635,000.00).
These Equivalent -Match projects, totaling $1,493,000.00, will now be credited to the West 7th Street
Bridge for $1,200,000.00; the Silver Creek Bridge over Live Oak for $100,800,00; the Silver Creek Bridge
over Silver Creek for $163,500.00; and leave an unallocated credit of $28,700.00.
The 2004 Capital Improvement Program provided $1,200,000.00 for the West 7th Street Bridge over
Trinity River and $325,000.00 for Cravens Road over Wildcat Branch Bridge. These funds will be used for
the City's equivalent match projects listed above.
The City agrees to complete the equivalent match projects within three years of the contract for the Silver
Creek Road Bridge project.
These projects are located in COUNCIL DISTRICT 7.
FISCAL INFORMATION /CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Grants Fund.
FUND CENTERS:
TO Fund/Account/Centers
3) GR74 472200 020302366000
2) GR74 451962 020302366000
GR74 5(VARIOUS) 020302366XXX
4) GR74 541180 020302366XXX
CERTIFICATIONS:
FROM Fund/Account/Centers
$163,500.00 3) C200 538070 208260131983
$1,635,000.00
$163,500.00
$1,635, 000.00
Submitted for City Manager's Office b�
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
1. 20SILVER CREEK BRDG AO.doc (Public)
Fernando Costa (6122)
William Verkest (8255)
George Behmanesh (7914)
2. Accounting Info.pdf (CFW Internal)
3. FAR Silver Creek.�df (CFW Internal)
4. LPAFA Silver Creek.pdf (CFW Internal)
5. MAP Silver Creekpdf.pdf (Public)
6. Resolution Silver Creek.Silver Creek.doc (Public)
$163,500.00
Logname: 20SILVER CREEK BRDG Page 2 of 2