HomeMy WebLinkAboutContract 38733-A6 (2)AMENDMENT No . 6 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc, (ENGINEER) made and entered into City Secretary Contract No. 38733, (the CONTRACT) which was authorized by M&C-23511 on the 12th day of May, 2009 in the amount of $251,818.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $48,553.00 authorized by the City Council by M&C C- 24033 on January 26, 2010, Amendment Number 2 in the amount of $19,969.00 administratively authorized by the City on May 26, 2010, Amendment Number 3 in the amount of $37,616.00 administratively authorized by the City Council on September 30, 2010, and Amendment Number 4 in the amount of $0.00 administratively authorized by the City on June 27, 2011, and Amendment Number 5 in the amount of $24,475.00 authorized by the City Council by M&C C-25794 on August 21, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: North Beach Street from Vista Meadows Drive to south of Shiver Road, WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Article I of the CONTRACT engineering services specified in copy of which is attached hereto City for the additional design totals $48,864.00. 1. is amended to include the additional a proposal dated January 22, 2013, a and incorporated herein. The cost to SE to be performed by Engineer 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $430,895.00. Page -1- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager APPROVAL RECOMMENDED: L 1*J.w40 Douglas,Wiersig; P.E. Director,, Transportati ENGINEER Jacobs Engineering Group, Inc. Scott Bussell Regional Manager nd Public Works Department APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ATTEST: � 00 �� �y p0000ao 0 o 10 114ak z ry J. Kayser o a° ity Secretary Q� od oo° }SAY ax ��000000° Page -2- January 22, 2013 Mr. Mike Weiss, P.E. Project Manager City of Fort Worth Transportation 1 Public Works Department 1000 Throckmorton Street Fort Worth, Texas 76102 Reference: North Beach Street (Vista Meadows to 0.2 mi. South of Shiver) Supplement #6 Dear Mr. Weiss: Attached please find our scope and fee proposal for Supplement #6 to design services for North Beach Street.' This scope includes culvert adjustments for Bewley Drive, Alta Vista tie-in to the adjacent CoFW project, traffic control and sequencing modifications, and additional requested median openings. Please feel free to contact me if you have any questions or need anything further. We are happy to be of service. Sincerely Scott Yates, P.E. SUPPLEMENT #6 TO DESIGN SERVICES for North Beach Street (Vista Meadows to Shiver) City Project No. TPW=01292 SCOPE OF SERVICES This supplement to the design services contract provides for revisions to the Paving and Drainage plans at Bewley Drive and Alta Vista. I. Bewley Dr 1. Culvert Hydrology and update report a. Due to the downstream development (Bewley Dr), update the hydraulic model to ensure 'no -rise' of the flood plain. Per preliminary calculations, the culvert will need to be lowered approximately 1'. 2. Culvert re -design I . Adjust the down stream headwall and grading due to meet the existing Bewley Dr. b. Lower the flow line to meet the 'no -rise' criteria, as mentioned above 3. Roadway adjustment a. Adjust the N. Beach Street profile to shift the low point south in order to avoid conflict with existing Bewley Dr. b. Adjust cross sections and earthwork quantity to match the profile revisions 4. Storm Drain re -design a. Adjust storm drainage sheets to match new alignment (3 outfalls to culvert) II. Alta Vista Dr 1. Adjust typical section a. Change the typical section to match the proposed adjacent project to the east. Revise section sheets to match 2. Adjust profile and limits a. Adjust the profile to match the proposed adjacent project to the east. Revise profile sheets to match. b. Adjust the limits to match the proposed adjacent project to the east. Revise plan sheets to match. 3. Adjust cross sections a. Update/change the proposed cross sections to match the changes above. 4. Modify Traffic Control Plan (TCP) a. Modify the TCP sequence/limits to match the proposed adjacent project to the east. b. This includes full closure at Alta Vista during the summer time, this allows for '/2 construction per phase, versus the '/4 as currently designed. c. Revise TCP sheets to match. 5. Modify the N Beach Street SB leftturn lane a. Per request of CoFW, add 50' storage to the SB leftturn lane at Alta Vista. Revise paving and removal sheets to match. III. Add additional median openings 1. Add median opening south of Heritage Trace Parkway a. Add median opening vicinity of Station 125+00, near Bewley Drive. Coordinate with Hillwood Communities (Gena Terrell) for layout. b. Add layout sheets/details as required. Adjust paving plans, TCP, removal plans, and cross sections to match. Note that the existing NB dual left turn lane might need to be adjusted. c. It is assumed that no changes to the current profile of North Beach will be affected. Any profile changes due to the median opening which affect drainage will be considered additional services. 2. Add median opening north of Heritage Trace Parkway North Beach Supplemental 6 Scope 2013-01-22.doc Page 1 of 2 d. Add median opening vicinity of Station 135+00, between Heritage Trace Parkway and Alta Vista. Coordinate with Hillwood Communities (Gena Terrell) for layout. a. Add layout sheets/details as required. Adjust paving plans, TCP, removal plans, and cross sections to match. IV. Miscellaneous 1. Provide 5 full size bound plan sets for City use. Assume 300 sheets per set at $1.50/sheet. V. ATTACHMENTS Al. Fee Proposal Calculation Worksheet ASSUMPTIONS 1. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. 2. If additional meetings or additional meeting duration are required, they will be performed as additional services. North Beach Supplemental 6 Scope 2013-01-22.doc Page 2 of 2 fC � O� � a+ s O 7 = N M � C~O O 1 LO O � O O tOA (O 00 N tf) LO (0 tf) N N N CO � 61 � 6N? � � M• 69 64 6cy N 9;T IT N N N V' W V' W 9CT Op CN NWMMOLO N (» CO ��� (» � � sNv M N 00 NT M M M VM' 0 N N M �t .N- O « c�0 tip M c 3 3 Y Y yO4Vm��^..+ oey aQ« yp�ON1p4Q 0 oc a«y�y� ; w�oa�'`pEEcp `Nm:o 'd+ �cti�ro`oyamV� , tdt�y to N Ma a aLQ) w ) Las IONS,. 4 o 4"a ' O y Raqww m ce V'0) .N (A ho w cmmrj a to@z °ady u MMONANO N M � ' � I J =_