Loading...
HomeMy WebLinkAboutContract 38733-A8 (2)TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc, (ENGINEER) made and entered into City Secretary Contract No. 38733, (the CONTRACT) which was authorized by M&C-23511 on the 12th day of May, 2009 in the amount of $251,818.00, and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $48,553.00 authorized by the City Council by M&C C- 24033 on January 26, 2010, Amendment Number 2 in the amount of $19,969.00 administratively authorized by the City on May 26, 2010, Amendment Number 3 in the amount of $37,616.00 administratively authorized by the City on September 30, 2010, and Amendment Number 4 in the amount of $0.00 administratively authorized by the City on June 27, 2011; and Amendment Number 5 in the amount of $24,475.00 authorized by the City Council by M&C C-25794 on August 21, 2012; and Amendment Number 6 in the amount of $48,864.00 administratively authorized by the City on January 29, 20138 and Amendment Number 7 in the amount of $7,854.00 administratively authorized by the City on September 18, 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: North Beach Street from Vista Meadows Drive to south of Shiver Road; WHEREAS, it has become necessary to execute Amendment No. 8 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Article I of the CONTRACT engineering services specified in copy of which is attached hereto City for the additional design totals $17,814.00. 1. is amended to include the additional a proposal dated November 12, 2013, a and incorporated herein. The cost to services to be performed by Engineer 2. Article II of the CONTRACT is amended the fee to be paid to Engineer for all work the Contract, as amended, so that the total RECEIVED FEB 0 4 2014 Page -1- to provide for an increase in and services performed under fee paid by Vhe�=C ' or a r. WORTH, TX work and services shall be an amount of $456,963.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: 113,044 APPROVAL RECOMMENDED: Douglas, Wiersig, P.E. Director, Transportati ENGINEER Jacobs Engineering Group, Inc. "r(w Scott Bussell Vice President and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: C- 2�� �O 11nn ^^ Date IV` Michelle M. Kretz Assistant City Attorney ATTEST: ®� pO� � o ,0°o a 0 ®°o 0 Mary J.1414er °° °City Secry °°°°°°°�°°°° Page -2- SUPPLEMENT #8 TO DESIGN SERVICES for North Beach Street (Vista Meadows to Shiver) City Project No. TPW=01292 SCOPE OF SERVICES This supplement to the design services contract provides for revisions to the Paving and Drainage plans due to waterline conflicts. 1. Raise southbound roadway profile between approximate Station 132+00 to Station 141+00 to clear two existing 36" Waterlines and one existing 24" Waterline. The waterlines are substantially higher than the as-builts and have been potholed, survey locates have been provided to Engineer. Per meeting on 10/28/13, maintain a minimum of 4' from top of pavement (3.5' absolute minimum) to top of waterline. a. Adjust Paving plan/profile sheets i. Sheets 103, 104, 105, & 106 ii. Shift median opening from Sta 136+00 to Sta 138+00, due to elevation of existing waterlines. iii. A sag profile curve might need to be included to allow for cover, which would add storm drain inlet and pipe. b. Adjust Cross section sheet 34, 35, 36, 37 c. Adjust retaining wall sheets 113 & 114 d. Project Management/Coordination/Meetings i. Project management, coordination as necessary and miscellaneous meetings 2. Adjust northbound profile and Inlet C3 to allow for direct drop inlet to Culvert 1. a. Shift sag inlet C3 to approx Station 125+40, adjust profile as necessary. b. Adjust sheets 102, 132, & 145 to reflect changes 3. Adjust 5-8'x4' MBC (Culvert 1) alignment (plan & profile) to miss 36" waterline, per field pothole elevations of existing waterline. a. Shift Culvert centerline 5' north b. Raise profile approximately V c. Design layout and wingwalls for pre -cast, which increases overall width of culvert d. Adjust sheets 145, and 145a 4. Re -design Storm Drain SD-C, from Heritage Trace south to Culvert 1, to minimize jack/bore operations. a. Combine N/S crossing/jack/bore of Heritage Trace to one bore on the west side and eliminate the east bore under Heritage Trace. b. Add additional inlet and storm drain, if necessary, per profile adjustments for number 1 above. c. Adjust sheets 132, 133, 134, and 135 5. Re -design Storm Drain SD=FB to miss 36" waterline in center and minimize storm drain construction at YMCA parking lot. The existing 36" waterline in this location is substantially higher than as-builts in this location. a. Shift the storm drain crossing in the median to the north, next to the existing storm drain crossing, to allow for storm drain over the 36" waterline. b. Eliminate the proposed construction to the existing inlets in the YMCA parking lot in order to minimize the construction impact to YMCA and utility conflicts. The existing inlets North Beach Supplemental 8 Scope 2013-11-12.doc Page 1 of 2 currently tie into and existing storm system. This was originally proposed to separate these inlets from the existing system and decrease the flow in that system. c. Adjust sheets 141 and 142 6. Update Signal sheets at Alta Vista to reflect field changes per City direction, see sketch. a. Redesign signal and ped poles per CoFW sketch/email (from Ken Brock, 10/14/13). b. Adjust sheet 196 ATTACHMENTS Al. Fee Proposal Calculation Worksheet ASSUMPTIONS 1. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. 2. If additional meetings or additional meeting duration are required, they will be performed as additional services. North Beach Supplemental 8 Scope 2013-11-12.doc Page 2 of 2 co Y7 LO M N m N N 0 (LO W N co W m r a c �» o0co o 09 sv � e» i» r ti 7 J It! mU 69 r O N (D O N O CID (D M O (D m O m U N Y � �+ (A fA b4 fH 69 � J(C 0 64 m co (n co (n r� rr o LO O ma O 7 = N (D 00 N (D OD (D lt N U ~ N W toj 0 0 simBB W (n i a 69 0 U N d' 00 OD V• OD N m MINES C C;)2 0 � a(�, a (n ` M N c(DD N arNOOMP= 0 G O so) ayi — O m ate, a ` °' 10 c ,nnk WEBB .wwc aGa m3 m c yN �. v C CQtarYNy U- N ls�w n � "NBC aoo( �a ° IV .k cw ;cG; o IIIIII y> a CA. o u O IsIss; % BE IssImB y so U G E c a Q C'y LZ y to y Q U •... W .o d v0) sommi 0) less, T O s G v o w LaLL N y m oo � .`0 —m n essIss o Lam o o° O G rn� y Q� y G k s.,asss so Q IsmImBv'S. N m m .G ; O �' N O � r C zz V v 0 L U W loll ° n c) 3 c v a y �y Fo,cy E o QoQ y 0 O ar w nr •G w o u CAB Rf c 00 G o O ORIONIrBas V n = G C � y G y G ,� m a w um a, ��O�'.rh°�yo °o+ 'v•y�. �aN�+(yo eCrGte. t�Uey oymEoep�OaN aEoVm cx °° IN; Esee E nassim ycC U° ° y olc m a�ci iyy00oo f e �s°y=c • �°l�•Us NBtoE y *siBRa O� zMm000N c•e�a C (ts a > A III, waV sQ E =� «Qn .t n •c 1. S 15) c U o G (D U O m 0 o. c .c am c O m V2 ro m m co O, a k y n n O) y m U) IS n y O W Qa Iq.2 8 d u n J n �- (o o m ns a m a m aEi � N M Re N (O y •u M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas COUNCIL ACTION: Approved on 1/28/2014 FO RT BYO R41` 11 DATE: 1/28/2014 REFERENCE NO.: **C-26648 LOG NAME: 20NORTH BEACH_AMEND8 CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: Authorize Execution of Amendment No. 8 to City Secretary Contract No. 38733, an Engineering Services Agreement with Jacobs Engineering Group, Inc., in the Amount of $17,814.00 for the Design of North Beach Street from Vista Meadows Drive to South of Shiver Road, Thereby Increasing the Total Contract Amount to $456,963.00 (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 8 to City Secretary Contract No. 38733, an Engineering Services Contract with Jacobs Engineering Group, Inc., in the amount of $17,814.00 for the design of North Beach Street from Vista Meadows Drive to south of Shiver Road, thereby increasing the total contract amount to $456,963,00, DISCUSSION: This Agreement is for the design of North Beach Street from Vista Meadows Drive to south of Shiver Road (City Project No. 01292) as a four -lane divided roadway. The proposed Amendment is for the re -design of the southbound road profile between Alta Vista Road and Heritage Trace Parkway, and adjust the culvert and storm drain to provide additional cover over shallow waterlines, and update the traffic signal plan at Alta Vista Road. Funds for this Amendment will be provided from the 2008 Street Improvements Fund. The following table summarizes previous contract action and Amendments: Amount Project Description Nunmber Approved Initial Design of North Beach Street from Vista Contract $251,818000 Meadows Drive to South of Shiver C-23511 5/12/2009 Road nqJ $ 48,553,00IF Flood Study, Letter of Map Revision, and C-24033 1/26/2010 No. 1 Storm Drain Analysis Amendment Temporary Traffic Signal Designs at the No. 2 $ 19,969.00 Alta Vista Road and Shiver Road N/A 5/26/2010 Intersections Amendment Additional Right -of -Way Surveys and No. 3 $ 37,616.00 Exhibits, Design of Storm Drain South of N/A 9/30/2010 Heritage Glen and Retaining Walls Amendment Additional Right -of -Way Surveys and No. 4 $ 0.0 EExhibits and Remove Bidding Services N/A 6/27/2011 http: //apps. cfwnet. org/council�acket/mc_review. asp?ID=19403 ... 1 /2 9/2014 M&C Review Page 2 of 2 Revisions Right -of -Way Documents Due to New Amendment $ 24,475.00 Development, Use New City C-25794 8/21/2012 No. 5 Specifications, Add Bidding Services and Additional Public Meeting Amendment $ 48,861*00 Revisions to Design Plans Due N/A 2/19/2013 No. 6 to New Development Amendment Design of 3&Inch Waterline No. 7 $ 7,854.00 Between Heritage Glen Drive N/A 9/18/2013 to Heritage Trace Parkway Amendment $ 17,814.00 Revisions to Roadway, Storm N/A N/A No. 8 Drain, and Traffic Signal Plans Contract IFs456,963.00 Subtotal Jacobs Engineering Group, Inc., proposes to complete Amendment No. 8 for a lump sum fee in the amount of $17,814.00, for a revised total contract in the amount of $456,963,00. Staff considers this fee to be fair and reasonable for the scope of services to be performed. These added design services are needed in order to address unforeseen conditions encountered on the project during construction. This project is located in COUNCIL DISTRICT 4, Mapsco 22S, 221AI and 36A. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2008 Street Improvements Fund. TO Fund/Account/Centers Submitted for City Manager's Office bL:, Ori iy Hating Department Head: Additional Information Contact: FROM Fernando Costa (6122) Douglas W. Wiersig (7801) Michael Weiss (8485) ATTACHMENTS 20N BEACH AMEND8 01292 MAP.pdf http: //apps. cfwnet. org/council�acket/mc_review. asp?ID=19403 ... 1 /29/2014 )RAND COUNCIL COMMUNICATION MAF 20N BEACH AMENDS :!> tEr1#Ll�ik YiloR.li�fYLL ��Lk! 1 ��•m J1 A 'RID ir►wki :J yfJ�(�yl �y � g r�ria�,.�*i.L Rk . gRIA� , :zr�