Loading...
HomeMy WebLinkAboutContract 38733-A4 (2)STATE OF TEXAS 8 COUNTY OF TARRANT 8 AMENDMENT No. 4 CITY SECRETARY CONTRACT NO. 3 $13L/-9 WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc., (ENGINEER) made and entered into City Secretary Contract No. 38733, (the CONTRACT) which was authorized by the City Council by M&C C-23511 on the 12th day of May, 2009 in the amount of $251,818.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 I n the amount of $48,553.00 administratively authorized by the City on January 26, 2010, Amendment Number 2 in the amount of $19,969.00 administratively authorized by the City on May 26, 2010, Amendment Number 3 in the amount of $37,616.00 administratively authorized by the City Council on September 30, 2010; WHEREAS, the CONTRACT involves engineering services for the following project: North Beach Street from Vista Meadows Drive to south of Shiver Road; WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal letter dated May 11, 2011, a copy of which is attached hereto and incorporated herein. There is no cost to City for the additional design services to be performed by Engineer. 2. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- EXECUTED on this the OLI day of Fort Worth, Tarrant County, ATTEST: art Hendrix ity Secretary Date: June 2011 No M&C Required APPROVAL RECOMMENDED: Texas. r rr a APPROVED: Fernando Costa Assistant City Manager Douglas W. Wiersig, Director, Transportation/Public Works Department JACOBS ENGINEERING GROUP, INC. ENGINEER Vice President AS TO FORM AND LEGALITY: Douglas W. Bla`ck Assistant City Attorney 2011 in Page -2- May 11, 2011 Mr. Mike Weiss, P.E. Project Manager City of Fort Worth Transportation / Public Works Department 1000 Throckmorton Street Fort Worth, Texas 76102 Reference: North Beach Street (Vista Meadows to 0.2 mi. South of Shiver) — Supplement #4 Dear Mr, Weiss: Attached please find our revised scope and fee proposal for Supplement #4 to design services for North Beach Street. The revisions include the additional public open space and permanent drainage easement document preparation, and the removal of pre -construction services from the original contract scope. This supplemental will close out this contract. Please feel free to contact me if you have any questions or need anything further. We are happy to be of service. Scoff Yates, P.E. for North Beach Street (Vista Meadows to Shiver) Additional Right -of -Way Services, Elimination of Pre -Construction Services City Project No. TPW=01292 SCOPE OF SERVICES This supplement to the design services contract provides the property/right-of-way services for additional permanent easement preparation. In addition, the supplement provides a revision to the original contract to eliminate pre -construction services. This supplement will close out the contract. PRE -CONSTRUCTION SERVICES Exhibit "A-2" Part C —Pre-Construction Assistance of the original contract will be removed from the scope of services. This includes the removal of the pre -bid assistance and the attendance of the pre -bid conference, the bid opening and the pre -construction public meeting as well as printing cost. The following items will be removed from the contract: 1. Public Meeting (Exhibit production and attendance) 2. Pre -Bid Assistance 3. Bid Opening 4. Pre Construction Conference 5. Printing —(partial cost) II. RIGHT-OF-WAY SERVICES 1. PUBLIC OPEN SPACE DOCUMENT PREPARATION —Prepare five (5) public open space easement documents that include a legal description with exhibit to City of Fort Worth standards. An additional fee of $1000.00 per document will be required for additional public open space easement document preparation. 2. DRAINAGE EASEMENT DOCUMENT PREPARATION — Prepare one (1) permanent drainage easement document that includes a legal description with exhibit to City of Fort Worth standards. An additional fee of $1000.00 per document will be required for additional permanent drainage easement document preparation. I11. ATTACHMENTS Al. Fee Proposal Calculation Worksheet A2, Gorondona's Invoice for Additional Easements ASSUMPTIONS 1. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. 2. If additional meetings or additional meeting duration are required, they will be performed as additional services: North Beach Drainage Supplemental 4 Scope 20110511.doc May 11, 2011 Page 1 \�\j m k § 2 0 $_ k/ k a) 2 M 0 . � 2 0 § \ � § Cq 2 � � �Qa � § k� §0 a � $ �LL � m ° m (0 co/ /LO / ƒ \ / « o 0 \ \ / \ a a m a k � [ k / q \ \� \ / E / \ Gorrondona & Associates, Inc. Jacobs Engineering Group, Inc. Scott Yates 777 Main Street Fort Worth, TX 76102 Subconsulting No. JEMPL012-109-0000 Delivery Order No. W FXH6300d()9-001 W BS No. W FXH6300.0370 Prime Task Order No. W FXH6300 G&AI Project No, 0907-3723 G&AI Project Mgr Richard Kennedy, RPLS Invoice number 9327 Date 01 /21 /2011 Project NORTH BEACH STREET Contract Total Current Description Amount Billed Remaining Billed Over and Above Contract Amount Units 1.00 1.00 0.00 0.00 Easement Document Amount 1,200.00 11200,00 0.00 0.00 Units 5.00 5.00 0.00 5.00 P.O.S.E. Amount 5,000.00 5,000.00 0.00 5,000.00 Units 1.00 1.00 0.00 1.00 Permanent Drainage Amount 1,000.00 1,000200 0.00 11000200 Units 7.00 7.00 0.00 6.00 Total Amount 7,200.00 7,200.00 0.00 6,000.00 Invoice total 6,000.00 Page 1 of 2 7524 Jack Newell Blvd. So. •Fort Worth, Texas 76118 •817.496.1424 •Fax 817.496.1768 • www.ga-inc.net