Loading...
HomeMy WebLinkAboutContract 38733-A1 (2)STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 3�133-j� COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group, Inc. (ENGINEER) made and entered into City Secretary Contract No. 38733, (the CONTRACT) which was authorized by the City Council by M&C C-23511 on the 12th day of May, 2009; WHEREAS, the Contract involves engineering services for the following project: North Beach Street from Vista Meadows Drive to south of Shiver Road; WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the �t� 2009, copies of which are attached hereto cost to City for the additional design Engineer total $48,553.00. Article II of the the maximum fee to performed under the the City for all $300,371.00. 2. dated November 15, and incorporated herein. The services to be performed by Contract is amended to provide for an be paid to Engineer for all work Contract, as amended, so that the total work and services shall not exceed 3. increase in and services fee paid by the sum of All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXECUTED on this the p� day of 2010 in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary APPROVAL RECOMMENDED: APPROVED: Fernando Costa Assistant City Manager C-24033 Contract Authorization January 26, 2010 Date William,;. Verke�t, P.E. Director, Transportation/Public Works Department JACOBS ENGINEERING GROUP, INC. ENGINEER Kevin P. Nelson Vice President APPROVED AS TO FORM AND LEGALITY: Amy Ramsey � Assistant City Attorney Page -2- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Brown, Kim K. From: Hoff, Chris Sent: Monday, February 01, 2010 4:20 PM To: Brown, Kim K. Subject: FW: North Beach Street (Vista Meadow to south of Shiver) - Supplemental Agreement #1 Revised Attachments: North Beach Drainage Supplemental Scope 20091115.pdf; North Beach Drainage Supplemental Fee Calc 20091115.pdf This, in my opinion, is my "fee proposal correspondence". The reason I did it in an email was most likely because the City and us wanted to get it into the City's process asap, and the City PM and I were in agreement as to the extent of the SA, and he knew it was coming. Let me know if you need anything further. Thanks -chris From: Hoff, Chris Sent: Sunday, November 15, 2009 8:46 PM To: 'Weiss, Michael' Subject: North Beach Street (Vista Meadow to south of Shiver) - Supplemental Agreement #1 Revised Mike - Per our discussion in our quick ROW meeting Wed morning Nov 11 th, I have revised the Supplemental Agreement #1 fee proposal to $48,553 by removing the design which may need to take place after an analysis of how the YMCA's site drainage affects the intersection of Statesman Dr (see scope item III-1c). If we determine that the City may wish to upgrade it's storm drain facilities at this location, we'll submit an additional supplemental scope/fee to remedy the drainage in a manner desirable by City Staff. In regards to the MWBE participation for this project, let me point out a couple factors of note: 1) Our original contract amount, $251,818, contained $104,410 of survey work to be delivered by Gorrondona & Associates (an MWBE firm) which equates to 41.4% of the project. 2) If the City is agreeable to the SA #1 fee contained in my proposal, $48.553, the total contract amount would rise to $300,371, of which the MWBE component would then calculate to 34.8% of the total project. This percentage remains well above the City's goal for the project of 26% 3) I only have two subs on this project, and only one of those qualifies as an MWBE firm (the other sub is Terracon for the geotechnical investigations). Therefore, I am not able to delegate this additional drainage work to an MWBE firm as Gorrondona does not have qualified staff to perform these services. Given that we are exceeding the MWBE goal even with this SA #1 proposal, I have confidence that the City MWBE review can understand that Jacobs has put forth a good faith effort to include MWBE participation and providing additional MWBE work as part of this SA #1 is both infeasible and unwarranted. Please let me know if you have any further questions on this proposal; we'd like to get the work going as soon as possible obviously, as it is critical path now for the project schedule. I do understand the logistics you are facing to gain approval signatures from the various City Staff for an M&C item. If there is anything else I can do to help, 02/01 /2010 Page 2 of 2 just let me know. Thanks! -ch ris �U,t 14.€�?�� %� 7 r�:�,. Of {� f , Y�: bUk); OWIce chris_hoff@Jacobs.com 02/01 /2010 SUPPLEMENT #1 TO DESIGN SERVICES for North Beach Street (Vista Meadow to Shiver) Flood Study, Letter of Map Revision, and Additional Storm Drain Analysis and Design City Project No. TPW=01292 SCOPE OF SERVICES A flood study is required for the design of the North Beach Street crossing of an unnamed Tributary of Stream WB-1. The unnamed Tributary appears on Tarrant County Flood Insurance Rate Map (FIRM) Map No. 48439C panel no. 0070K. The purpose of this scope of services is to provide a flood study and a Letter of Map Revision (LOMR) for a reach of an unnamed tributary of Stream WB-1. The flood study will include calculating water surface elevations for the FEMA Flood Insurance Study profiles, developing a culvert design based on fully developed watershed conditions and delineation of the 100- and 500-year floodplain based on existing watershed conditions. The LOMR will be based on as -built conditions after the roadway is substantially complete and prepared on behalf of the City for submittal to FEMA. Additionally, this supplement to the design services contract provides additional analysis and design services for storm drainage due to adjacent commercial development which alters the existing conditions from the previous designs. This supplement also addresses changes to the City of Fort North's drainage standards effective in 2006 but only as it relates to tabulations and reporting. It is the City's direction that the 2006 Drainage Manual criteria will be waived in favor of maintaining the integrity of the previous design and it's tie-ins because portions of that design have been installed to date. A design waiver form will be submitted in this context for the City's review and approval. I. FLOOD STUDY A. Data Collection 1. Assemble existing hydrologic information for the watershed, including zoning, topography, drainage infrastructure and previous studies. This task also includes a site visit for two (2) engineers to examine existing conditions of the watershed and project site. 2. Obtain site information and existing development plans, to be provided by the Client. 3. Use available topographic information for site, including LIDAR topography, existing project survey, and new survey of the channel flowline outside the limits of the roadway project. B. Hydrology 1. This portion of the unnamed Tributary of Stream WB-1 was not included in the current effective Flood Insurance Study (FIS) for Tarrant County. No adequate existing or "current effective" hydrologic models are available. A new hydrologic model will be prepared using HEC-HMS for the unnamed tributary watershed. 2. Hydrologic modeling will include calculations of the 2-, 10-1 50-1 100-, 500-year existing watershed and 100-year fully developed watershed peak discharges. The fully developed \North Beach Drainage Supplemental Scope 20091021.doc Page 1 November 15, 2009 C. F. G. watershed conditions model will be prepared based on available zoning or other future land use information. Hydraulics 1. No hydraulic models are available for this unnamed Tributary of Stream WB-1. A baseline HEC-RAS model of the stream and existing roadway will be prepared using available information and existing and fully developed watershed conditions hydrology as described in section B of this scope. The limits of this model will be from the confluence of the unnamed Tributary and Stream WB-1 to approximately 300 feet upstream of North Beach Street. 2. Calculate 2-1 10-, 50-7 100-7 500-year and 100-year fully developed water surface elevations (base flood elevation) and velocities based on existing hydraulic conditions. Delineate the existing 100- and 500-year floodplain. Culvert Design 1. A design HEC-RAS model will be prepared by modifying the baseline model to include the proposed roadway. The culvert design will be provided using the fully developed conditions hydrologic data and roadway data coordinated with transportation roadway design. 2. Up to three culvert design alternatives will be modeled through the HEC-RAS model. If additional culvert designs or roadway modifications are necessary and additional hydraulic modeling is required, that effort will be provided through additional services after approval by the City. Flood Study Report 1. One flood study report will be prepared to describe the hydrologic and hydraulic analysis. The study report will provide calculated peak discharges, water surface elevations and floodplain delineations. 2. Jacobs will provide floodplain maps that show calculated 100- and 500-year floodplains for existing watershed development conditions and the 100-year floodplain for fully developed watershed conditions. 3. A City of Fort Worth Floodplain Development Permit (FDP) application will be provided with the flood study report, which will include the required exhibits and maps. Meetings 1. This scope of services includes two (2) meetings with the City to coordinate, explain, and/orjustify the hydrologic and hydraulic analysis. Meeting duration is assumed to be less than two (2) hours per meeting. 2. This scope of services assumes a maximum of twenty (20) hours for coordination with the client. \North Beach Drainage Supplemental Scope 20091021.doc Page 2 November 15, 2009 IIF fL•7►4I O 1. upon completion of the project, a LOMR will be prepared and submitted to revise the FEMA 100-year floodplain for the unnamed tributary to Stream WB-1. The LOMR submittal will include one design report, maps, exhibits and FEMA forms. 2. The LOMR request will be submitted to the City of Fort Worth for review and approval. The City of Fort Worth will submit the requests to FEMA. 3. The required FEMA review fee is the responsibility of the Client. Currently, the review fee this type of LOMR is $4,800. A check for $4,800 payable to "National Flood Insurance Program" will be required prior to submittal to FEMA. This scope of services assumes one LOMR. 4. Coordination of the submittals with the client, City of Fort Worth, FEMA and FEMA contractor assumes a maximum of twenty (20) hours. If additional submittals or coordination are required that will be provided as additional services after approval by the client. STORM DRAIN ANALYSIS &DESIGN overflow 1. The YMCA site near Statesman Dr has noon -site underground storm drainage evident based on our research and field reconnaissance. This runoff appears to all enter the North Beach Street ROW and flows into the intersection. Jacobs will as part of this SA 1 analyze this situation and present findings to the City. a. Check inlet and pipe capacity of system collecting runoff from YMCA b. Check runoff flowing from YMCA driveway onto northbound lanes for street capacity of northbound lanes. c. If the runoff from the YMCA site does require additional storm drain facility design and the scope of that work is agreeable by the City, Jacobs will submit a separate proposal for the additional design work at that time. 2. Recalculate current design of storm drain system along north- and southbound lanes between Heritage Glen and Heritage Trace, using City standard tabulation methodology. 3. Recalculate current design of storm drain system along northbound lanes between Alta Vista and Vista Meadows, using City standard tabulation methodology. a. Redesign pipe connecting privately -owned inlets on Fellowship of the Parks church site to the proposed pipe. b. Analyze 60" outfall pipe inform Heritage Addition for capacity, c. Analyze storm drain runoff from Fellowship of the Parks church site) to check for into northbound lanes of North Beach Street. \North Beach Drainage Supplemental Scope 20091021.doc Page 3 November 15, 2009 ASSUMPTIONS 1. Hydraulic modeling will be performed only within the limits as described in this scope of services. Should modeling be required on other waterways they will be accomplished as Additional Services, after approval by the Client. 2. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. s. This scope of services does not include preparation or submittal of a Conditional Letter of Map Revision (CLOMR). 4. If additional meetings or additional meeting duration are required, they will be performed as additional services. 5. This study does not include coordination fora 404 Permit through the USCOE. \North Beach Drainage Supplemental Scope 20091021.doc Page 4 November 15, 2009 N a> t LM V O C 0 r _M V R U M N O Q 0 L m m LL C O LTom N d N T T C C a) d L Q M C d E a7 Elow Q F) O O O O Co O 0 0 0 CDO O O O O O CD CD M M 47 (n 0 M 1� O O (D (oO O b9 (D O (O V' CO '1 N Lo CO (f) V O M 00 m 00 N O N O (h co (D N LL7 69 69 69 (A 69 69 R. (M N 69 (fl 69 H9 O N EA 69 69 69 M (� Oo CO 3 b9 tR te � 0 O O O O O N N O V O a V' (O O N 00 (D (D (D N N (D N h CO m � N O 0 d O (D O O O N 7 N O N V (D 00 (D O 00 N V co N N Lo W � N CO M .- M (n (D (n NLo (D a) W m a � o 0 0 U N N O E O C O) (L Lo Lo O) O a 69oat e o K(D Z+ co �a o^ V N y � 3 2 am C T C O M Q a) C C) (7 @ m a) I Z O N 0 C d > +OOOf (n X a) 4OOOMN N O U a) aci aci �c > c c O o m 0 E ' m a, om Em m U 0)d N (n C C Q a) O Z N C C O _Y v C C 0 T N N O a) a3 7 C U) J J N J O t N c m m c U e o 3a�i > CO Z 3 o O (�0 3 E U � m � ° U U c c in C Q (n } O Q. a a) O O Z � m U N O O O a3 coO(l ZOO o v) in c U C -C '� 0) 0 '00 W a) >% 0] (n 0 o U O j a) o OI ow o _ D o c az o E (o .c a c c c o� (� U y (D (D m U o� oQ (n oU 3 �.0) rn c Qc C @p (`moo .� ° y 'yam W N n Li w N cOi N U d� � 'c Waaaa N U E N� U �m LL (0 �d 00 (0� al N @p rnC �a w� 3 �Q�3 cc�CaNi����3a.a�E OOP i1 ? u o Q v 0 o Q m c' c c 0) vo c -o 0 0 E n o m 0 e o m.m�yo m •N o c$ � o c$ o 0 L) m aa) a� O 0 .2 O 4 v) o m m o a p o m a p p T t t Z m co= @ a o m> iR °� � ai 3 0.�>. D a'i 0y �,a��i oo(cUU o* (L) c nn W aQ c CO) .° F-i LLVJSSU2'U J2dU �Q co > QJ � 0lbaft >\Q&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 1/26/2010 DATE: 1/26/2010 REFERENCE NO.: **C-24033 LOG NAME: 20N. BEACH _AMEND 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendment No. 1 in the Amount of $48,553.00 to City Secretary Contract No. 38733, an Engineering Services Agreement with Jacobs Engineering Group, Inc., for the Design of North Beach Street from Vista Meadows Drive to Near Shiver Road (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 in the amount of $48,553.00 to City Secretary Contract No. 38733, an Engineering Services Agreement with Jacobs Engineering Group, Inc., for the design of North Beach Street from Vista Meadows Drive to near Shiver Road for a total Contract cost of $300,371.00. DISCUSSION: The 2008 Bond Program included funds for the reconstruction of arterial streets. North Beach Street from Vista Meadows Drive to near Shiver Road was included as one of the arterial streets in this program. This contract amendment is needed for the following additional design services: Provide a flood study and Letter of Map Revision for the unnamed tributary of Stream WB-1 of White's Branch from west of North Beach Street to north of Heritage Trace Parkway. A new culvert will also be designed for North Beach Street at this tributary; and Provide additional analysis and design services for storm drains due to new development along North Beach Street. On May 12, 2009, (M&C C-23511) the City Council authorized the City Manager to execute City Secretary Contract No. 38733 with Jacobs Engineering Group, Inc., in the amount of $251,818.00 for the design of North Beach Street from Vista Meadows Drive to near Shiver Road as a four lane divided arterial street. Jacobs Engineering Group, Inc., has proposed to complete the additional necessary services for a lump sum fee of $48,553.00. City staff considers this fee to be fair and reasonable for the scope of services to be performed. Since the amount of this contract amendment is less than $50,000.00, no M/VI/BE Goal is required. Jacobs Engineering Group, Inc., is in compliance with the City' s M/WBE Ordinance. This project is located in COUNCIL DISTRICT 2, Mapsco 22S, 22W and 36A. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements 2008 Fund. FORTFI http://apps.cfwnet.org/councilpacket/mc_review.asp?ID=12814&councildate=l/26/2010 2/17/2010 ��&C Review Page 2 of 2 1'O Fund/Account/Centers Submitted for Cif Manager's Office by: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers C204 531200 202230129230 $48,553.00 Fernando Costa (6122) William Verkest (7801) Andy Anderson (8648) ATTACHMENTS 20BEACH_AMEND 1.pdf North Beach Drainage Supplemental Scope 20091115.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=12814&councildate=l/26/2010 2/17/2010 MAYOR AND COUNCIL COMMUNICATION MAF () Project No. 01292 DETAIL OF PROJECT LOCATION