Loading...
HomeMy WebLinkAboutContract 38775-A4 (2)TO CITY SECRETARY CONTRACT No. WHEREAS, the City of Fort Worth (CITY) and Kennedy Consulting, Ltd., (ENGINEER) made and entered into City Secretary Contract No. 38775, the CONTRACT) which was authorized by M&C C-23596 on the 16th day of June, 2009 in the amount of $ 1,465,379; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 21,154.05 which was administratively authorized on the 29th day of November 2010, Amendment Number 2 in the amount of $121,950.80 which was authorized by M&C # C-25348 on the 13th day of December 2011, Amendment Number 3 in the amount of $64,400.00 which was authorized by M&C # C-25893 on the 2nd day of October 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Dirks Road Phase 2 from Bryant Irvin Road to Granbury Road; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 1, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $132,200.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,805,083.85. 3. - -r=-® her pro isions of the Contract, which are not expressly amen ���Ii���l2L'C1 remain in full force and effect. eiffy MCWTAKY Page - 1 - ' tgynRTH,YX RECEIVED MAR 112013 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: S �� APPROVAL RECOMMENDED: ENGINEER Kennedy Consulting, Ltd. Kurt W. Aunct, P.E. Senior Associate of the General Partner DATE : JIG A3 L/ % Dougl SW. Wiersig, P Director, Transportat on/Public Works Department APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney Date: 3-� -13 CITY 0R"RRZ'ARY *ORTIfi 'fit 1 FUNDING BREAKDOWN SHEET City Secretary No. 38775 Amendment No. 4 Department Fund -Account -Center Amount 20 C295 531200 203230076830 $132,200.00 Total. $132,200.00 w4cl I<ENNEDY CONSULTING February 1, 2013 Mr. Dennis Ingram, P.E. City of Fort Worth Transportation and Public Fort Worth, TX 76102 Works Re: Dirks Road —Bryant Irvin Road to Granbury Road City Project No. 00768, City Secretary Contract No. 38775 Proposal to provide, Suite 101 1871 Harroun Avenue McKinney, Texas 75069 TEL 972 542 1754 FAX 972 529 2294 1) Additional geotechnical analysis for cantilever spread footing and/or drilled shaft retaining wall under RR surcharges. 2) Additional structural design and analysis for cantilever spread footing and/or drilled shaft retaining walls under RR surcharges. Dear Mr. Ingram: This letter is written in response to your request for Kennedy Consulting, Ltd. to prepare a contract amendment for additional engineering services to amend and/or develop additional construction documents for Dirks Road (East) due to changes to the FWWR Railroad retaining walls from mechanically stabilized earth walls to cast -in -place spread footing and drilled shaft retaining walls. Kennedy Consulting, Ltd. will complete the following additional scope: Additional Proiect Scope — Geotechnical Analysis A previous geotechnical investigation along the wall alignment has been accomplished by drilling nine 30-foot borings, which penetrated limestone, spaced at approximately 200 feet. The original purpose of the borings was to identify subsurface conditions for the design of MSE walls. We propose to utilize the same information from these borings to provide additional geotechnical recommendations for cast -in -place spread footing walls, cast -in -place spread footing supported on drilled shaft walls, and drilled shaft walls. Additional Project Scope —Structural Design The contract amendment shall also include additional structural design and layouts of cast -in -place spread footing walls, cast -in -place spread footing walls supported on drilled shafts, and drilled shaft walls. Design will also include miscellaneous wall details to accommodate a culvert and utility penetrations. Additionally Temporary Special Shoring KCl KENNEDY CONSULTING Mr. Dennis Ingram, P.E., February 1, 2013 Page 2 of 2 design calculations and layouts prepared and submitted by the Contractor will also be reviewed for approval. Additional Proleet cone- PS&E Plan Sheets The contract amendment shall also include modifying the currently developed railroad pIan sheets to show additional information regarding the various retaining wall designs. Additional design coordination will be needed between structural, geotechnical, and roadway designers. Additional coordination meetings are expected with the City and TxDOT to discuss review comments and resolutions. Total Compensation Kennedy Consulting, Ltd. proposes to provide the above mentioned services for the lump sum amount of $132,200.00 (see attached fee proposals for additional details). If you have any questions concerning this proposal, please do not hesitate to contact me 972-542-1754. Thank you for this opportunity. Very truly yours, Kennedy Consulting, Ltd! K ef Kurt Aungst, P.E. Sr. Project Manager COST PROPOSAL FOR ADDITIONAL DESIGN ITEMS (GEOTECHNICAL, STRUCTURAL) KENNEDY CONSULTING, LTD. DIRKS ROAD (EAST OF SH 121) FROM SH 121 (CHISHOLM TRAIL PARKWAY) TO GRANBURY ROAD IN molalavasimmal For services describe in the Scope of Services, we request the compensation as detailed below. Cost breakdowns and specified rates for each type of labor for engineering services and explanation of expenses are shown on the following pages. TOTAL COMPENSATION CONTRACT AMOUNT $ 132,200.00 AMENDMENT NO. 4 Kennedy Consulting, Ltd. Dirks Road (East of SH 121) City of Fort Worth Summary of All Services KCI Direct Salary Cost Project Manager 42 Hrs. @ $215.00 / Hr = $9,030.00 Senior Professional 44 Hrs. @ $184.00 / Hr = $8,096.00 Professional II 20 Hrs. @ $147.00 / Hr = $2,940.00 Professional I 20 Hrs. @ $116.00 / Hr = $2,320.00 Admin /Clerical 0 Hrs. @ $78.00 / Hr = $0.00 Total Hours KCI General Expenses 126 Labor Cost Total $22,386.00 CADD Time 0 Hrs. @ $20.00 / Hr = $0.00 General Expense Total $0.00 KCI Fee Total $22,386.00 Subconsultant Expenses HDR Engineering, Inc. (Wall Design) $92,831.13 HVJ Associates, Inc. (MBE) (Geotechncial Services) $7,000.00 Administrative Fee (10%) on Subconsultants $9,982.87 Total Compensation $132,200.00 2/1/2013 kCD o00 CD �� CD a kt. CO) - 2 $co 2 § u % M cq N § H rR § FM E .■J/ § I � _ § I ca co N k 0 - a o)) - e WtT a a a kk} �- �kk m Re wo p k 0Mg ° e # \ Fm § j ° ) I 0 am - % ® \ ) 0 2 G § ] { u f �§/ �b k M \ G £ f E . CL4)aeoa c c E [ ) { & E ) ]«e/]< /§tt) k)m) —0 k J/<Ia.iL< [ LU o / a w ) .V. c\ W O� Co J U p J 14 FQ•- Q' OFIN C9 LL Q Q J Q F Q' W a oa F N � O O Z W O Fq LL O W 0 0 n 0 0 W m O O O C 0 UI j N � UI O O O O O O O O O O 00 O MCD� D) M 0 d• M V' O � M M � M M Q) r cr r � L6 O) r% W C u� va f» to va v� va va v3 i» (O (O (O GO (O 'VII" o N O I� � CO � O) t� 0 N N 0 0 0 0 0 0 0 0 0 0 (O �� � N 'd• CO (O O O N N M N V' d' N N N N N d• a0 V' U Vl c0 L U (n m m `oo m U) cn ca J 06 p p m Q U) U) > > a> n n T 9 0 N CL T E E J .J U) ~ Q Q m m m E m N 22UOa�rn ❑QQ Q m O w0 cC (C > U O_ N N N N y N Co m m E ❑ ❑ ❑ ❑ �— C ma mo C C O O O O orn— ca m cu cUU m C: c c c 3 3 o 0 0 a of wo M N LO � N V' N r 0 N V N M N U N O C C ca rn 0 W W ai ai o rn ❑ 0 o aa) a` )i Q (D d L U) C) u u u u u n Qo0U❑ W LL N C 0 U E E O O_ U (n U j Mn o U N oCL p c m LLUj o Q cacoi LL cn Q C N m? 06 (� o 0 y z d o_o_o c E (u o w CL C) CL Z U W U aTi f°IMM U C 7 0 Z o N c9 O Z r O U F U Z O U m N J F O r GEOTECHNICAL ESTIMATE Dirks Road - East (Additional Cantilever/Drilled Shaft Retaining Walls Analysis) Kennedy Consulting Ltd HVJ Proposal No. DGO8-17000 January 29, 2013 1 :: • IR•la�iC•1:fIf:3:�51:�:17.1�:�/►1 Field Work: (None) Mob/Demob 0 @ $500,00 LS $0.00 Drilling and Sampling Soil 0 ft @ $15.00 per ft $0.00 Drilling Rock 0 ft @ $18.00 per ft $0.00 TxDOT Cone/ SPT 0 @ $20.00 each $0.00 Grouting 0 @ $7.00 each $0.00 Railroad Flagging 0 @ $1,000.00 per day $0.00 Railroad Permit & Additional Insurance 0 @ $57000.00 LS $0.00 Field Technician (rig/traffic coordinaton, utilities, staking, etc) 0 hr @ $45.00 per hour $0.00 Vehicle Trips 0 @ $50.00 per trip S0100 Subtotal $0.00 Laboratory Testing: (None) Moisture Content 0 ea @ $6.00 each $0.00 Atterberg Limits 0 ea @ $50.00 each $0.00 Percent Passing No. 200 Sieve 0 ea @ $35.00 each $0.00 Sieve Analysis 0 ea @ $45.00 each $0.00 Unconfined Compressive Strength 0 ea @ $50.00 each $0.00 Sulfates, Chlorides, and pH 0 ea @ $100.00 each $0.00 CBR 0 ea @ $450.00 each $0.00 Consolidated Undrained 0 ea @ $1,300.00 each $0.00 Consolidation Test 0 @ $350.00 each S0100 Subtotal $0.00 Engineering Report Preparation Senior Engineer, P.E. 24 hr @ $125.00 per hour $3,000.00 (Project Engineer, PE 24 hr @ $110.00 per hour $23640,00 Engineer Associate 16 hr @ $85.00 per hour $1,360.00 Clerk/Typist 0 hr @ $45.00 per hour S0100 Subtotal $73000.00 Total Geotechnical Services $7,000.00 COUNCIL ACTION: Approved on 3/5/2013 DATE: 3/5/2013 REFERENCE NO.: **C-26124 LOG NAME: 20DIRKS RD PHASE 2 AMENDMENT-4 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 4 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the Amount of $132,200.00 for the Design of Dirks Road from Bryant Irvin Road to Granbury Road, Thereby Increasing the Total Contract Amount to $1,805,083.85 (COUNCIL DISTRICTS 3 and 6) ��ti- � �, _. �.,. � � ��� �_.r�_. � �-.. ..�_ m_. . � � _����ba�� � �_t,� � ,, _- - . �, � :._ _, s e. � �_7 r . �w � - - _ RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 4 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the amount of $132,200.00 for the design of Dirks Road from Bryant Irvin Road to Granbury Road, thereby increasing the total contract amount to $1,805,083.85. DISCUSSION: This Agreement is for the design of Dirks Road as a six lane divided principal arterial from Bryant Irvin Road to Granbury Road. Phase I of the Project has been completed. This amendment applies to the design of Phase II. This contract amendment is for additional engineering services required to revise the proposed retaining wall system to be in compliance with the Federal Highway Administration funding requirements. The required design change was recently identified in coordination with the Texas Department of Transportation (TxDOT) in conjunction with its oversight role of federal funds. Additionally, the proposed retaining wall design change was developed in coordination with TxDOT and the Fort Worth and Western Railroad to support anticipated heavy rail traffic loads. Funds for this amendment will be provided from the 2007 Critical Capital Projects Fund. The following table summarizes previous contract action and amendments: Initial Contract ; $ Project Description M&C No. � Approved Design of Dirks Road � C-23596 j 6/16/2009 Page 1 of 2 j 1,465,379.00 €from Bryant Irvin Road _ � to Cranbury Road Amendment ' $ 21,154.05 ;Historic resources [ N/A _ (11 /29/2010 No. 1 � I survey and preparation _ � of Section 404 Permit _ E _ Amendment ; $ 121,950.80 C Revise to TxDOT � C-25348 12/13/2011 No. 2 ;requirements, ,construction inspection, and 404 Permit Amendment $ 64,400.00 i Illumination and 24-in I C-25893 10/02/2012 No 3 ;water line relocation __. ____ _._-__._ ... __.______ � _�_.___ __. .....___ _E Amendment i $ 132,200.00 � Design changes to the No. 4 ! � proposed retaining wall ( system Total $ 1,805,083.85 Kennedy Consulting, Ltd., proposes to complete Amendment No. 4 for a fee not to exceed $132,200.00. Staff considers this fee to be fair and reasonable for the scope of services proposed to be performed. M/WBE Office: Kennedy Consulting, Ltd., is in compliance with the City's M/WBE Ordinance by committing to an additional five percent M/WBE participation on this Amendment No. 4. The City's goal on this amendment is five percent. This project is located in COUNCIL DISTRICTS 3 and 6, Mapsco 1026, 102C and 102D. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2007 Critical Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS 20Dirks Rd Phase 2 Amendment 4 MAP.pdf FROM Fund/AccountlCenters C295 531200 203230076830 $132,200.00 Fernando Costa (6122) Douglas W. Wiersig (7801) Dennis R. Ingram (2294) Page 2 of 2 AMENDMENT No . 3 TO CITY SECRETARY CONTRACT No. WHEREAS, the City of Fort Worth (CITY) and Kennedy Consulting, (ENGINEER) made and entered into City Secretary Contract No. 38775, the CONTRACT) which was authorized by M&C C-23596 on the 16th day of June, 2009 in the amount of $ 1,465,379, and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 21,154.05 which as administratively authorized on the 29th day of November, 2010, Amendment Number 2 in the amount of $121,950.80 which as authorized by M&C # C-25348 on the 9th day of June, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project. Dirks Road Phase 2 from Bryant Irvin Road to Granbury Road, and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified a proposal dated June 7, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $64,400.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,672,883.85. All other provisions amended herei OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 3. Contract of the , which are not expressly in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager APPROU-�L RECOMMENDED: Douglas � Director, ersig, WiP Transportat ENGINEER Kennedy Consulting, Ltd. Kurt W. P/Cingst, P.E. Senior Associate of the General Partner DATE : ( O L 3/1 Z n/Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney 1� ATTEST: Mary J. Kayser City Secretary x OFF�ICIAI. RRCdRD CITY SECRETARY GTo WORT"r,, TX Suite 101 1871 Harroun Avenue McKinney, Texas 75069 TEL 972 542 1754 FAX 972 5292294 June 7, 2012 Mr. Leon Wilson Jr., P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton St. Fort Worth, TX 76102 Re: Dirks Road —Bryant Irvin Road to Granbury Road City Project No. 00768, City Secretary Contract No. 38775 Proposal to provide: 1) Add continuous lighting from proposed SH 121 to Granbury Rd. 2) Add relocation of ~100 LF of 244nch water line conflicting with proposed Dirks Rd. improvements. Dear Mr. Wilson: This letter is written in response to your request for Kennedy Consulting, Ltd. to prepare a contract amendment for additional engineering services to amend and/or develop additional construction documents for Dirks Road (East) due to the addition of continuous lighting from SH 121 to Granbury Rd and relocation of �100 LF of 24-inch water line conflicting with the proposed Dirks Road (East) improvements. Kennedy Consulting, Ltd. will complete the following additional scope: Additional Project Scope —Continuous Lighting The contract amendment shall include the design a continuous lighting system for Dirks Road East from proposed SH 121 to Granbury Road in accordance with Texas Department of Transportation (TxDOT) and City of Fort Worth standards. Additional Project Scope —Water Line Relocation The contract amendment shall also include the relocation of City of Fort Worth's (City) water facilities that are in conflict with the proposed storm drain improvements for the Dirks Road East reconstruction. Approximately 100 LF of 24-inch water relocations are planned due to these conflicts. Total Compensation FUNDING BREAKDOWN SHEET City Secretary No. 38775 Amendment U. 3 Department Fund -Account -Center Amount 20 C295 531200 203230076830 $64,400.00 Total. $64,400.00 Mayor and Council Communication DATE: Tuesday, October 02, 2012 LOG NAME: 20DIRKS ROAD AMENDMENT 3 SUBJECT: REFERENCE NO.: **C-25893 Authorize Execution of Amendment No. 3 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the Amount of $64,400.00 for the Design of Dirks Road from Bryant Irvin Road to Granbury Road for a Total Contract Amount of $1,672,883.85 (COUNCIL DISTRICTS 3 and 6) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 3 to City Secretary Contract No. 38775, an engineering Agreement, with Kennedy Consulting, Ltd., in the amount of $64,400.00 for the design of Dirks Road from Bryant Irvin Road to Granbury Road, thereby revising the total contract amount of $1,672,883.85. DISCUSSION: This Agreement is for design services associated with the construction of Dirks Road as a six lane divided principal arterial from Bryant Irvin Road to Granbury Road. Phase I of the Project has been completed. This Amendment applies to the design for Phase 11. The proposed Amendment is for additional design services associated with the relocation of an existing 24-inch waterline which is in conflict with proposed storm drainage box culverts and more efficient construction sequencing as well as the design of streetlights which were not included in the original design scope. The City Council approved an Engineering Agreement for this project with Kennedy Consulting, Ltd., on June 16, 2009, (M&C C-23596) in the amount of $1,465,379.00. Amendment No. 1 was administratively approved on November 29, 2010 in the amount of $21,154.05. Amendment No. 2 was approved by the City Council on December 13, 2011, (M&C C-25348) in the amount of $121,950.80. Funding for this Amendment will be provided from the 2007 Critical Capital Projects Fund. Kennedy Consulting, Ltd., proposes to perform these design services for a lump sum fee of $64,400.00. Staff considers this fee to be fair and reasonable for the scope of services proposed. Kennedy Consulting, Ltd., is in compliance with the City's M/WBE Ordinance by committing to an additional 23 percent M/WBE participation on this Amendment No. 3. The City's goal on this Amendment is 23 percent. This project is located in COUNCIL DISTRICTS 3 and 6, Mapsco 102B, 102C and 102D. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2007 Critical Capital Projects Fund. Logname: 20DIRKS ROAD AMENDMENT 3 Page I of 2 FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers C295 531200 203230076830 $64,400.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Dennis R. Ingram (2294) ATTACHMENTS 1. 00768 20DIRKS ROAD AMENDMENT 3.docx (CFW Internal) 2. 20DIRKS ROAD AMENDMENT 3 Compliance Memo (TPW-00768 6129).pdf (CFW Internal) 3. 20DIRKSRD AMEND 2 MAP 00768.PDF (Public) Logname: 20DIRKS ROAD AMENDMENT 3 Page 2 of 2