Loading...
HomeMy WebLinkAboutContract 38775-A5 (2)I SECRETARY? �. AMENDMENT No . s CONTRACT NO, _.J ' 1 3 TO CITY SECRETARY CONTRACT No. WHEREAS, the City of Fort Worth (CITY) and Kennedy Consulting, Ltd., (ENGINEER) made and entered into City Secretary Contract No. 38775, the CONTRACT) which was authorized by M&C C-23596 on the 16th day of June, 2009 in the amount of $ 1,465,379; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $ 21,154.05 which was administratively authorized on the 29th day of November 2010, Amendment Number 2 in the amount of $121,950.80 which was authorized by M&C # C-25348 on the 13th day of December 2011, Amendment Number 3 in the amount of $64,400.00 which was authorized by M&C # C-25893 on the 2'd day of October 2012, Amendment Number 4 in the amount of $132,200.00 which was authorized by M&C # C- 26124 on the 5th day of March 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: Dirks Road Phase 2 from Bryant Irvin Road to Granbury Road; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 23, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $63,017.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,868,100.85. 3. 2 5 i�i3 �- [�ECE��IED g j �aeTARY T. ORTHO TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: 9 I AR�R•QVAL RECOMMENDED: Douglas/�V� D, irecto Wiersig, P.E Transportatio ENGINEER Kennedy Consulting, Ltd. Kurt W. Aungst, P.E. Senior Associate of the General Partner DATE : �I /13 3 Public Works Department APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney 0 OFF�C�A� RECORD CITY SECRETARY �T. WORTH, TX I City Secretary No. 38775 Amendment No. 5 Department Fund -Account -Center Amount 20 C295 531200 203230076830 $63,017.00 Total. $63,017.00 TEL 972 542 1754 FAX 972 529 2294 July 23, 2013 Mr. Dennis Ingram, P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton St. Fort Worth, TX 76102 Re: Dirks Road —Bryant Irvin Road to Granbury Road City Project No. 00768, City Secretary Contract No. 38775 Proposal to provide: 1) Revise proposed railroad retaining wall layouts, details, and affect construction documents (plans and specifications) to reflect a proprietary T- Wall System in lieu of a cantilever spread footing and/or drilled shaft retaining wall system. 2) Additional plan sheet preparation, modifications, and coordination due to revised retaining wall type. Dear Mr. Ingram: This letter is written in response to your request for Kennedy Consulting, Ltd. to prepare a contract amendment for additional engineering services to amend and/or develop additional construction documents for Dirks Road (East) due to changes to the FWWR Railroad retaining walls from cast -in -place spread footing and drilled shaft retaining walls to a T-Wall Retaining Wall System (proprietary wall system from The Neel Company). The change in wall type is the result of the recent approval of a Public Interest Finding submitted by the City of Fort Worth to the Texas Department of Transportation (TxDOT) to allow the use of this proprietary system. TxDOT's concurrence on this finding will allow the City to realize a significant time (reduced construction time by 3.5 months) and cost (� M) savings on this project. Kennedy Consulting, Ltd. will complete the following additional scope: Additional Project Scone —Structural Layout and Details The contract amendment shall include developing additional structural layout and details specific to the T-Wall System for inclusion in the final plans and construction documents. Revisions will also include miscellaneous wall details to accommodate a culvert and utility penetrations, wall under drain details, and modified track cross sections. Mr. Dennis Ingram, P.E., July 15, 2013 Page 2 of 2 Additional Project Scone — Modify Construction Plans and Specifications The contract amendment shall also include modifying the currently developed plan sheets and specifications to show additional information regarding the revised retaining wall system. The following changes to the construction documents will be required: 1. Replace all references to the currently proposed retaining wall system with a T-Wall retaining wall system. 2. Remove, update, or replace impacted plan sheets. This includes addition of new sheets, as needed. 3. Remove, update, or replace impacted specifications and special provisions. This includes addition of new specification and special provisions, as needed. 4. Revise construction schedule and sequence of construction based on construction of a T-Wall system. 5. Revise quantities and engineer's cost estimate based on construction of a T-Wall system. Additional coordination time is also expected with the City and TxDOT to discuss review comments and resolutions. The contract amendment shall also include additional effort for extended coordination with the City, NTTA, TxDOT and the FWWR concerning the revised wall system, plan modifications, Railroad Agreement preparation, TxDOT plan submittal and delivery schedule meetings, and CIP Manager coordination. Total Compensation Kennedy Consulting, Ltd. proposes to provide the above mentioned services for the lump sum amount of $63,017.00 (see attached fee proposals for additional details). If you have any questions concerning this proposal, please do not hesitate to contact me 912-542-1754. Thank you for this opportunity. Very truly yours, Kennedy Consulting, Lt�l Kurt Aungst, P.E. Sr. Project Manager COST PROPOSAL FOR FINAL PLANS PREPARATION (T-WALLS) KENNEDY CONSULTING, LTD. DIRKS ROAD (EAST OF SH 121) FROM SH 121 (CHISHOLM TRAIL PARKWAY) TO GRANBURY ROAD IN FORT WORTH, TEXAS For services describe in the Scope of Services, we request the compensation as detailed below. Cost breakdowns and specified rates for each type of labor for engineering services and explanation of expenses are shown on the following pages. 'CONTRACT AMOUNT $ 63,017.00 hNZ FBI11 FA M d U I • Kennedy Consulting, Ltd. Dirks Road (East of SH 121) City of Fort Worth Summary of All Services KCI Direct Salary Cost Project Manager 16 Hrs. @ $215.00 / Hr = $31440600 Senior Professional 28 Hrs. @ $184.00 / Hr = $5,152000 Professional II 40 Hrs. @ $147.00 / Hr = $5,880.00 Professional 1 40 Hrs. @ $116.00 / Hr = $4,640600 Admin / Clerical 10 Hrs. @ $78.00 / Hr = $780600 Total Hours KCI General Expenses 134 Labor Cost Total $197892.00 CADD Time 40 Hrs. @ $20.00 / Hr = $800.00 Revised Final Plans 22x34 (Mylar) 108 SF @ $3.50 / SF = $378600 General Expense Total $11178.00 KCI Fee Total $21,070.00 Subconsultant Expenses HDR Engineering, Inc. (Wall Layouts and Details) $38,134.00 Administrative Fee (10%) on Subconsultants $3,813.00 Total Compensation $639017.00 7/23/2013 / § ■ � a k ) / ) A // ,ae�,,, ,,, � r 2 � � ��k 2fe -- Q&&&&a& -- - Q®R - u = _ �{§ a a §« ))/ 000000c oa= e a 7)/ - I § � - »»=moo ■ ■ ƒ � § £ $_\ ■ a } �)k A)2 �_ �� � ��k k Q ) i \ / \ \ ~ � ° ) - � � � _ ))\� - / \ k)\ )/§\/ / � �2ƒ«AE/2/ \ § � c�m°aEc]c §® ��§})Q°�°-�#� � E�-�_ «�]=!�#m S 2 � o ! # / t | ) c / � 2 f � �tme�,®£§=§eu ]{7fAJ/�{/[/§ ) k\/))\\\}\ƒf/ S or<a���a�§��E w . o e E � o % ƒ w w E . M O N N N C Z W Y U Z �� O 0 W Y a w �m O Y � � O oz � Q F- � O Z F- W � w O Z LL � LL Z OW 1}- � _ 0 U S � N O O N 'O O �- O. O U � 0 O O � N � V m � J0 M V3 O = N h 0 0 � � a' 0 0 o � � � lq `- � O S Z O Q o � U 'r � O m O � N ER O O N Q N O ER N N m O .O J ,O c ... O .� .� aNi � m C .0 .� d' Y (n (6 O O O O Y-1 SIN N N 0 N � �Im O � N N C O .� U 4- N (V U o` n J F- n � ` O U o � __ m`� a� J ~ O W _� 0 J H O 1- N O. @ C c Cl c• .� � ��� n. � ti.i W � U U 0 0) 0 U N N . O O O N Q� aacnoUU u u u n u u QC�UO WtL O '�i' � t{') O OI � � � f0 M � � � ��� M � EA ti S O � a� � ci '� fn U •� > � � F- � � � � a � � to �_? U v l— Q otf ca O 1— � n U x � U � U F � � � � LL � W ai � w � Q r � � O ° = U �_ � m � :_. � a'c ~0� _ J Q ~ d Q O 0 � bA Ga _M O N H M 00 (D C)M Q) M W N N N N O M S r 2 N MFm O (O (O (O C)(O UM) (O 0 0 0 (q O V• M (O V' O V' M r O N W O F- r� (O N CO M N V 1� C)r N N w m co N (O N (O M (V N 44 M J H Vn NM0' N N O N OS N O O U, ti O O O O O O O O N N O 49, O uJ p) O C)d 00 N N C) O O 00 O O O O r 00 CO 'd' 'V' 'V' O O U w O S Q O O V LI) 'd• 'd• N d' (O 00 d' O N O O U G ba � O � O ba O r (D (O W m 0 O N d' N N r r (p r N e� O O N Q N CDr r r C)r r r 0 0 0 69 N N (0 (, 0 cu W v a) 0E cc (D c E U rn E (n 0 - rn >m n w C (0 Q > (n (D y O i •— 'C .N wO C N C a) w C O N N (n N .0 L� fl. LL Y _ o = > ) 0 ur ca o U•C•o w O� I J crn 0m c a) io m mOia f6 oaU aoi = O c C6 Y 00 >U2 0)m E S d o c c a-o c 3 d m m OZ 3 .6.E a�iv E rnpY E F- Q d' N N C N '= � U X cr � o Q O� Co (D U) •O C9 (NO ..0. .,0. O N N a) a) U O Z H (6 N 0J N co R{ is i6 of n' nanaa) Q.Q.0.aaa � LU W O>> O>> D D Z) a O O Z a) cl }O W (7 U N r (O r N (OLL r I-- ) r N �Y (O (0 r� 00 O C) N � U S N L}] C�] Q 0 c c •C rn 0E W W 0 c Or U '0 •O O N N Q N aa(nC)UU u u u n if n Q [0 U O W tL C O U E E 0 ti o U U) n o O 0 a) a C)off$ N W0 Q (Xu 0 ULL(n w C 0 (� 3 L O Z a) O-Q 0 > CE a) O W C) a Z Z W Z N (O Report HDR Engineering, Inc. 7/23/2013 CITY OF FORT WORTH = DIRKS ROAD/FWWR TRACK DESIGN MR ENGINEERING - MANHOUR BREAKDOWN HDR Direct Expense Proposed New Sheet Count (11x17) Standard Sheet Count (8 1/2x11) Printing &Reproduction # of sets Cost Units 11 x 17 Sheets Working Drawings (print) Plotting Working Drawings 30% Submittal (print) Plotting Submittal Working Drawings (print) Plotting Working Drawings 90% Submittal (print) Plotting Submittal Working Drawings (print) Plotting Working Drawings Final Submittal (print) Plotting Submittal Final PS&E (mylar) Plotting Final Submittal Xerox Standards Drawings (Worki Printing/Specs, etc. (Final, 8 1/2x1 Ret Wall Rewor4 31 0 8 $0.12 !ea $39 2 $1.02 /ea $82 4 $0.12 /ea $19 12 $0.12 /ea $58 3 $1.02 /ea $123 4 $0.12 /ea $19 12 $0.12 /ea $58 3 $1.02 /ea $123 1 $5.40 /ea $218 4 $0.12 /ea $19 0 $0.12 /ea $0 12 $0.06 /ea $0 Total Direct Cost Associated w/ Printing $764 Report HDR Engineering, Inc. 7/23/2013 CITY OF FORT WORTH - DIRKS ROAD/FWWR TRACK DESIGN HDR ENGINEERING - MANHOUR BREAKDOWN (trip) HDR Direct Expense Travel Expense Trips to Client (KCl) Trips to Railroad (FWWR) Trips to Site �# of milesltrip Cost Units Ret Wall Rewor4 2 0 0 1 Mileage to Client 500 $0.585 /mile (Average) $585 1 Mileage to Railroad 0 $0.585 /mile (Average) $0 1 Mileage to Site 0 $0.585 /mile (Average) $0 Lodging @ Client/per 0 $60 /day $0 Lodging @ Cons/per 0 $60 /day $0 Lodging @ Site/per 0 $60 /day $0 Subsistence @ Client/per 0 $35 /day (Average) $0 Subsistence @ Subs/per 0 $35 /day (Average) $0 Subsistence @ Site/per 0 $35 /day (Average) $0 Rental Car (client) 0 $65.00 /day (Average) $0 Rental Car (consultant) 0 $65.00 /day (Average) $0 Rental Car (site) 0 $65.00 /day (Average) $0 (# of days Cost Units Airport Parking @Client 0 $8.00 Max, (Average) $0 Airport Parking @Consultant 0 $8.00 /day (Average) $0 Airport Parking @ Site 0 $8.00 /day (Average) $0 Total Direct Cost Associated w/ Travel Page 4 City of Fort Worth, Texas Mayor and councii c COUNCIL ACTION: Approved on 9/10/2013 unication DATE: Tuesday, September 10, 2013 REFERENCE NO.: **C-26418 LOG NAME: 20DIRKS ROAD PHASE 2 AMENDMENT-5 WB.IECT: Authorize Execution of Amendment No. 5 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the Amount of $63,017.00 for the Design of Altamesa Boulevard Formerly Known as Dirks Road from Bryant Irvin Road to Granbury Road, Thereby Increasing the Total Contract Amount to $1,868,100.85 (COUNCIL DISTRICT 6) It is recommended that the City Council authorize execution of Amendment No. 5 to City Secretary Contract No. 38775, an Engineering Agreement with Kennedy Consulting, Ltd., in the amount of $63,017.00 for the design of Altamesa Boulevard formerly known as Dirks Road from Bryant Irvin Road to Granbury Road, thereby increasing the total contract amount to $1,868,100.85. 1 • � This Agreement is for the design of Altamesa Boulevard formerly known as Dirks Road as a six lane divided principal arterial from Bryant Irvin Road to Cranbury Road. Phase I of the Project has been completed. This Amendment applies to the design of Phase II. This contract amendment is for additional engineering services required to replace the currently proposed retaining wall system with a T—Wall retaining wall system to reduce construction cost and time. The T—Wall is a proprietary retaining wall system. Therefore, its use must be approved by the Texas Department of Transportation (TxDOT), through a Public Interest Finding, in accordance with the Federal Highway Administration (FHWA) funding requirements. The T—Wall system was recently approved by TxDOT and FHWA based on the Public Interest Finding report prepared by Staff. The report specified that the T—Wall system best served the public's interest because it provides a construction cost savings of $3,000,000.00, reduces construction time by 3.5 months, and is easily constructed which creates an overall safer working environment. Funds for this Amendment will be provided from the 2007 Critical Capital Projects Fund. The following table summarizes previous contract action and amendments: Amoun Proiect Description A oy Initial Contract $1,465,379.00 Design of Dirks Road from Bryant Irvin Road to Granbury Road C-23596 6/16/2009 Amendment No. 1 $ 21,154.05 Historic resources survey and preparation of Section 404 Permit N/A 11/29/2010 Amendment No. 2 $ 121,950.80 Revise to TxDOT requirements, construction inspection, and 404 Permit C-25348 12/13/2011 Amendment No. 3 $ 64,400.00 Illumination and 24—in water line relocation C-25893 10/2/2012 Amendment No. 4 $ 132,200.00 Design changes to the proposed retaining wall system C-26124 3/5/2013 Amendment No. $ 63,017.00 Design changes to the proposed retaining wall 5 system Total $1,868,100.85 Kennedy Consulting, Ltd., proposes to complete Amendment No. 5 for a fee not to exceed $63,017.00. Staff considers this fee to be fair and reasonable for the scope of services proposed to be performed. M/WBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE Office, in accordance with the MIWBE or BDE Ordinance, because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible. This project is located in COUNCIL DISTRICT 6, Mapsco 102C and 102D. FISCAL INFORMATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the 2007 Critical Capital Projects Fund. am NO MIMI ii ( 1 M...J._i J1 1.1.. 1 _ ATTACHMENTS • 11 1 11 •: 1 '• 1 11 Fernando Costa (6122) Douglas W. Wiersig (7801) Dennis R. Ingram (2294) 1. ALTAMESA Phase 2 Amendment 5 00768.pdf 2. C295 00768.docx 3. FAR Dirks Rd Adm 5-00019.12df 4. Kennedy Amend No 5 Waiver.12df