Loading...
HomeMy WebLinkAboutContract 39265-A2 (2)► R9INJrlIi3v�i�Ts TO CITY SECRETARY CONTRACT NO. 39265 STATE OF TEXAS §❑ § CITY SECRETARY CONTRACT NO. D 1 i. COUNTY OF TARRANT §❑ WHEREAS, the City of Fort Worth ("City") and Kinsman &Associates, Consulting Engineers ("Engineer") made and entered into City Secretary Contract No. 39265 (the "Contract") which was authorized by City Council via MSC C-23788 on September 22, 2009; and WHEREAS, the Contract involves engineering services for the following project: Third Party Review of the Detailed Energy Study and Energy Savings Performance Contract, Phase V, at Village Creek Wastewater Treatment Plant WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to increase the scope of services and/or the maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: 1. Section I, of the Contract is amended to include the additional engineering services specified in the Engineer's proposal letter dated June 30, 2010 and attached hereto. The cost to the City for the additional services to be performed by Engineer total $10,000.00. 1-20-1 0 A09 � 1 7 I N -1- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 2. Section v of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $58,000.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. Texas. EXECUTED on this the / day of Qy , 2010, in Fort Worth, Tarrant County, (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) -2- ATTEST: Marty Hendrix AND LEGALITY: ef Iff myJ.RamseV s Assistant City Attorney CITY OF FORT WORTH Fernando Costa Assistant City Manager APPROVAL RECOMMENDED: S. Frank Crumb, P.E., Director Water Department -3- KINSMAN &ASSOCIATES, CONSULTING ENGINEERS Frank E. Kinsman President KINSMAN & ASSOCIATES, Consulting Engineers Systems Analysis and Design June 30, 2010 Ms. Madelene Rafalko, P.E. Senior Professional Engineer City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Third -party Review of Phase V Energy Savings Performance Proposal (ESPC) of Johnson Controls, Inc. for the Village Creek Wastewater Treatment Plant — Two Additional Sub -groupings of Projects Dear Ms. Rafallco: We are hereby proposing to perform athird-party review of two additional sub -groupings of Facility Improvement Measures for the subject WWTP. Our work will include review of new submittals related to portions of the original scope of work by Johnson Controls, Inc. Our tasks will include: 1. Verification and requests for corrections and review of corrections as necessary to insure that all modifications and corrections made to the original Johnson Controls' proposal are carried over appropriately into this revised proposal. This includes text, pricing, and technical sections. 2. Verification and requests for corrections and review of corrections as necessary to insure that financial plans meet state code. 3. Verification and requests for corrections and review of corrections as necessary to insure the proposed Measurement and Verification (M&V) Plan includes all modifications made to the original M&V Plan and that the results are applicable to the revised list of projects. 4. Verification and requests for corrections and review of corrections as necessary to insure the technical interest of the Owner is protected in the Contract Documents. We have already started our review of the Johnson Controls proposed sub -grouping of FIMs #2, #3A, #3B, and #5 and will await the submission of a final sub -grouping proposal from Johnson Controls at a later date. We expect to complete our review of the present proposed sub -grouping of projects by July 5, 2010.. No schedule can be provided at this time for the final sub -grouping of projects since it has not yet been submitted. 8533 Ferndale Road Suite 102 •Dallas, Texas 75238 • Ph. (972) 644-7876 •Fax: (972) 644-3355 www. ki nsma ne ng inee rim g, co m Ms. Madelene Rafalko June 30, 2010 Page 2 Our proposed fee for the currently submitted proposal documents (FIM $6,000.00. Our proposed fee for the final sub -group proposal is $4,000.00. If there are any questions regarding this proposal, we would be pleased to respond. Thank you for this opportunity to be of service. Sincerely, Frank E. Kinsman President /pt