Loading...
HomeMy WebLinkAboutContract 54021t ms c:ol'Y rs ,r,oR, -------... OONTR C"f()k CSCN 54021 ____ C IT\'SSCRr:TAllY --,--PROJ ECT MANACU ;5i . PMD FIL£ COP'r' THE CITY OF FORT WORTH , TEXAS DESIGN-BUILD NORTHSIDE COMMUNITY C ENTER RENOVATION PMD2019-05 CITY PROJECT# 101654 FORT WORTH ® BETSY PRICE DAVID COOKE MAYO R CITY MA NAGER Victor Turner Director, Neighborhood Services Department Steve Cooke Director, Property Management Department Muckleroy & Falls/Elements of Architecture Apfil 2020 ~~,..._ . ..;:...,.r.t... . ._ .. ,~ .... -, .. ,. --~·~·n,1 I O ,e~•t'·tJ'.f, l:l~'1N,",,~t j 1;rS,:,,,il-H>t ~, ,.'<_.1._;. ·''-', Inst ruction to Offerors City of Fort Worth-Far North. Branch Library (March 2020) City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, April 7, 2020 REFERENCE NO.: **M&C 20-0240 LOG NAME: 21 NORTHSIDE COMMUNITY CENTER RENOVATIONS SUBJECT: Authorize Execution of a Design -Build Contract with HM & MF, Ltd., dlbla Muckleroy & Falls, in the Not -To - Exceed Amount of $4,390,000.00, Based on Design -Build Management Fees of 0.25% for Design and 2.99% for Construction, and to Include an Owner's Construction Contingency Allowance, to Design and Build Renovations to the Northside Community Center, for a Total Project Cost of $5,100,000.00 (2018 Bond Program) (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of a Design -Build Contract with HM & MF, Ltd., dlb/a Muckleroy & Falls, in the not -to -exceed amount of $4,390,000.00, based on design -build management fees of 0.251% for design and 2.991% for construction, and to include an Owner's Construction Contingency Allowance, to design and build renovations to the Northside Community Center. DISCUSSION: Nortside Community Center was constructed in 1960 and is currently over 30,000 square feet. The facility was designed before accessibility laws (ADA) were introduced and has multiple entries at multiple levels. This project is intended to accomodate program expansion and address site and facility accessibility issues. Staff determined that the design -build method of project delivery provided the City with the most expedient means of completion for this project. A Request for Qualifications was advertised in the Fort Worth Star - Telegram on December 5, 2019 and December 12, 2019, The City of Fort Worth received nine proposals from design -build teams. A selection team composed of members of Neighborhood Services Department, Property Management Department and the Office of Business Diversity carefully reviewed these submittals and after scoring and much discussion were able to establish a short list of four highly qualified teams. After ranking the proposals and conducting interviews, the selection team determined that the Muckleroy & Falls/Elements of Architecture, Inc. team's proposal offered the best value to the City. SCORING MATRIX TABLE. HM & MF, Ltd., dlbla Muckleroy & FPI Builders, Prim Speed Fab- Team Name FallslElements LLCIHahnfeld Construction/GSBS Crete/Callahan of Hotter Architects & Freeman Architecture, Stanford Architects Inc. Proposed Fees n0 48 42 40 Firms Design Build 6 9 8 8 Experience Technical Competence 5 4 4 3 Experience 3 4 4 5 References Schedule Past 5 5 4 4 Relationship 8 7 6 5 with City FM/WBE eview 12.5 11.5 13.5 12.5 TOTALS 89.5 88.5 81.5 77.5 The overall project budget for the Project is as follows: PROJECT COST Amount Design Build Cost (Owner's Construction Contingency $4390000.00 Allowance) , , Staff Time, Materials Testing, IT, Security, Fixtures Furnishing & $710,000.00 Equipment (FF&E), Contingency. etc. TOTAL PROJECT COST $5,100,000.00 Funds for this project are included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018) and subsequent actions taken by the Mayor and Council. ✓ Waiver of Building Permits - In accordance with the City Code of Ordinances, Pail II, Chapter 7-1 Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." El 10 Office of Business Diversity - HM & MF, Ltd., d/b/a Muckleroy & Falls is in compliance with the City's BDE Ordinance by committing to 881% SBE participation on the design phase and 151% MBE participation on the construction phase of the design -build project. The City's SSE goal on the design phase is 101% and on the construction phase is 151%. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of the 2018 Bond Program Fund Northside Community Center project to support approval of the above recommendation and award of the contract. Prior to any expenditure being incurred, the Neighborhood Services Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO "FundDepartment ccoun Project Program ctivit Budget Reference ## Amoun ID ID Year (Chartfield 2) FROM Fund Department Accoun Project program ctivit Budget Reference # mouni ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating_Department Head: Steve Cooke (5134) Additional Information Contact: Brian Glass (8088) ATTACHMENTS 1. 200218 SBD MBE Compliance Memo - Northside CommunitV Center. df (CFW Internal) 2. 21 NORTHSIDE CC RENOVATION FID TABLE.xlsx (CFW internal) 3. Northside Community Center Form 1295. df (CFW Internal) 4. Northside Community Center funding availabilit .PNG (CFW Internal) 5. SAM HM & MF Ltd Muckleroy and Falls.pdf (CFW Internal) CITY OF FORT WORTH PROPERTY MANAGEMENT DEPARTMENT ADDENDUM NO. 1 Northside Community Center Renovation Request for Proposals Submittal Date: January 9, 2020 (NO CHANGE) The Request for Proposals for the above project is hereby revised and amended as follows.- 1. The Pre -Proposal Conference was held at 1:30 PM, Tuesday, December 17, 2019 at the Property Management Department/Architectural Services Office located at 401 West 1311, Street. Refer to attached attendees list. 2. A site walk-thru was conducted on Wednesday, December 18, 2019 at 1:30 PM. Refer to the attached attendees list. Acknowledge the receipt of this Addendum No. 1 on your Proposal, Steve Cooke Director, Property Management Department By: \ ' V Ronnie Clements Architectural Services PMD, Facilities Division 817-392-8014, FAX 817--392-8488 Ronald,Clements fortworthtexas. ov RELEASE DATE: December 19, 2019 Addendum NoA Page 1 of 1 Northside Community Center Renovation (December 2019) V t r W rm C m E M C N d C C 4} E E 0) O 2" LL o � � 0 ID0 2 U �' m 0 ILLL p �. U a .p �4 V Z1^ 0 0 w = o O N �o >Ix m LL s M N l� c-- r`' � _ o Z:3� IA kp F� Aj v m CU LD C) CL. LL v 0 0 M cr c� a� a CD - 05 s LL rn U) o D N a- p E I N a "U z '•�1 a cis �, � nc �:, � � � .4M y z u TABLE OF CONTENTS ® NOTICE TO DESIGN -BUILD FIRMS a INSTRUCTIONS TO OFFERORS ® PROPOSAL FORM ® CONFLICT OF INTEREST AFFIDAVIT 6 CONFLICT OF INTEREST QUESTIONAIRE (CIQ) ® CONFLICT DISCLOSURE STATEMENT (CIS) s TEXAS SALES AND USE TAX EXEMPTION CERTIFICATE 9 2013 PREVAILING WAGE RATES ® WEATHER TABLE ® GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (Separate Attachment) ® DESIGN --BUILD AGREEMENT 9 PAYMENT BOND ® PERFORMANCE BOND ® CERTIFICATE OF INSURANCE • OFFEROR COMPLIANCE WITH WORKERS' COMPENSATION LAW • PROJECT SIGN instruction to Offerors Page 2 of 53 City of Fort Worth -Far North Branch Library (March 2020) NOTICE TO DESIGN -BUILD FIRMS CITY OF FORT WORTH Northside Community Center Renovation Statement of Qualifications (SOQs) for the design and renovation (design -build delivery method) of the Northside Community Center Renovation in Fort Worth, Texas, will be received at the Facilities Division, Property Management Department, located at 401 West 13th Street, Fort Worth, Texas 76102. Seven copies of the SOQs must be received not later than 5:00 PM on Thursday, January 9, 2020. A Pre -Submission Meeting will held be at the Facilities Division, Property Management Department offices, 401 West 13th Street, Fort Worth, at 1:30 PM, Tuesday, December 17, 2019. A site walk-thru will be conducted Wednesday, December 18, 2019 at 1:30 PM. The last day for questions will be by 5:00 PM, Friday, January 3, 2020. The project will include providing the design and construction for the renovation of the Northside Community Center facility. The estimated design -build cost is approximately $4 Million Dollar (including all costs, design and construction). The community center is located at 1100 Northwest 18t' Street, Fort Worth. The City will conduct a two-step process to select the Best Value Design -Build Team for this project. In Step 1, Request for Qualifications, Design -Build Teams will be asked to submit seven (7) copies of their Statement of Qualifications, including an introductory letter, business information and history, office location(s), list of comparable projects, professional qualifications, ability to meet schedules, familiarity of applicable rules and regulations. The SOQs are limited to 32 pages maximum. The City will review submitted Statement of Qualifications and create a short list of Design -Build Teams to participate in the next step. In Step 2, Request for Proposals, short listed teams will be asked to submit proposals which will include a "Design Build Proposal Form" associated with costs, a Small Business Enterprise (SBE) Plan for the design portion of this work, a Minority Business Enterprise (MBE) Commitment for the construction portion of this work, etc. and to participate in team interviews. The Small Business Enterprise (SBE) diverse goal is 10% for the professional services (architect, engineer, consultants, etc.) and the Minority Business Enterprise (MBE) diverse goal is 15% for the construction services (subcontractors, suppliers, etc.). Details of requirements for both steps of this process, scoring criteria, and other related information can be found on the Autodesk Buzzsaw website and can be accessed by cutting and pasting the following link into your browser: https:llprojectpoint. buzzsaw.com/fortworthgov/Advertised/101654%20- %20Northside%20Comm unity%20Center%20Renovation? pu blic After selecting the Best Value Design -Build Team in Phase Two, the City will first attempt to negotiate a contract with the selected Design -Build Team. If the City is unable to negotiate a Instruction to Offerors Page 3 of 53 City of Fort Worth -Far North Branch Library (March 2020) I contract with the selected Design -Build Team, the City will, formally and in writing, end negotiations and proceed to the next Design -Build Team in the order of the selection ranking until a contract is reached or all proposals are rejected. For questions, contact Ronnie Clements, Project Manager, by email, ronald.ciementsafortworthtexas.gov or by phone, (817) 392-8014. Advertised: December 5, 2019 December 12, 2019 Instruction to Offerors City of Fort Worth -Far North Branch Library (March 2020) Page 4 of 53 INSTRUCTIONS TO OFFERORS 1. SELECTION PROCESS: The City will conduct a two-step process to select the Best Value Design -Build Team for this project. STEP ONE PROPOSAL REQUIREMENTS: The following requirements shall be used in the preparation of the response to this Request for Qualifications. Statements of Qualifications shall be limited to 32 pages, 10 to 12 point font. Submit seven copies. The City will review submitted Statement of Qualifications and create a short list of Design -Build Teams to participate in the next step. Each copy will contain the following identified tabs with the corresponding tab numbers and title indicated as follows: 1. Introductory Letter (not included in page count. Include an Email and phone number for the primary point of contact regarding questions for this RFQ.) 2. Design Build experience of contractor and design build team in executing design -build process with community centers or similar type projects, as demonstrated by listing past teamwork and collaboration between members of the design team and between the design team and the contractor (in Design -Build or other delivery methods). 3. Provide Organizational Chart to include specific team member assigned to this project. Technical qualifications and experience of key project team members. 4. Experience and references of the design build team as demonstrated by listing past teamwork and collaboration between members of the design team and between the design team and the contractor (in Design -Build or other delivery methods). Examples of similar community center and remodel type projects and references with names and current telephone numbers. 5. Provide a brief written description of your understanding of the schedule. Describe potential opportunities to shorten the schedule and potential issues that can impact the schedule. 6. Provide a description of similar projects completed in the City of Fort Worth. Describe experiences with the City's Pre -Design Conferences, obtaining building permits, and interaction with Building Inspectors and other building officials, experience with local franchise utilities. Indicate if you have completed any City of Fort Worth projects. 7. Submit the completed Conflict of Interest Disclosure Requirement forms. STEP ONE STATEMNT OF QUALIFICATIONS EVALUATION: Statements of Qualifications will be ranked on the following factors: 1) Firm's Experience (25 Points) — Experience of contractor and design build team in executing design -build process with community centers or similar type projects, as demonstrated by listing past teamwork and collaboration between members of the design team and between the design team and the contractor (in Design -Build or other delivery methods). 2) Technical Competence (20 Points) — Technical qualifications and experience of key project team members. Architect and/or Engineer of Record that is a team member must be licensed to practice in the State of Texas. 3) Capability to Perform (20 Points) --- Experience and references of the design build team as demonstrated by listing past teamwork and collaboration between members of the design team and between the design team and the contractor (in Design -Build or other delivery methods). 4) Capability to Perform -- Schedule (10 Points) — Understanding the project, design and construction with respect to the schedule and City of Fort Worth Processes. 5) Past Performance (25 points) Points shall be awarded for experience working on similar projects within the city limits of the City of Fort Worth. Contractors with no experience in the Instruction to Offerors Page 5 of 53 City of Fort Worth -Far North Branch Library (March 2020) City of Fort Worth will receive 13 points. Contractors demonstrating strong experience will receive more than 13 points. Contractors with poor examples may receive less than 13 points. if the score for any individual rating criteria is rated as zero, this will result in the overall score being zero regardless of how many points could have been earned in the other categories. The top scoring Design Build Teams will be asked to participate in Step Two and submit sealed proposals and participate in interviews. All firms responding to this invitation shall note that it is the policy of the City of Fort Worth to establish a Small Business Enterprise (SBE) goal on contracts of $50.000 or more. Short listed firms invited to submit proposals (Step Two) will be required to address the utilization of SBEs and to commit to meeting the MBE goal. STEP TWO PROPOSAL REQUIREMENTS: Selected Design Build Teams will be requested to submit seven (7) copies of a sealed proposal. The following requirements shall be used in the preparation of the response to this Request for Sealed Proposals. Each copy will contain the following identified tabs with the corresponding tab numbers and title indicated as follows: 1. Use the Design Build Proposal Form provided for Step 2. Entries on the Proposal Form may be handwritten or typed. Have a Principal sign the Proposal. If the Offeror is a corporation, the president or a vice-president must sign the Proposal. If the Offeror is a partnership, then the person/entity who is the managing/general partner must sign the proposal. 2. Provide a General Schedule for Step 2, in Gantt chart format, illustrating major phases of the project and key steps. At a minimum provide various phases of design, bidding, and construction, and date facility would be occupied by the City of Fort Worth. Provide a brief description of your understanding of the most important aspects of the schedule and potential issues with maintaining the schedule. Once a selected Design Build Team establishes a GMP, they will be required to provide bonds. For Step 2, Letter indicating that the Design Build Team can provide Bonding for the project must be provided. In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 4. The SBE plan and statement of MBE commitment. 5. Any additional information as requested following the Step One to be included in the proposals. STEP TWO PROPOSAL EVALUATION: The City shall select the Offeror that offers the best value, based upon the following criteria and on its ranking evaluation. In determining the Best Value Offeror, the City will consider: 1) Proposed Fees (50 points) — A cost spreadsheet is included, offerors are asked to allocate a proposed $4,000,000.00 budget across cost categories. Maximum points will be awarded for the highest dollar amount going directly into the building construction (Materials & Labor). instruction to Offerors Page 6 of 53 City of Fort Worth -Far North Branch Library (March 2020) 2) iFirm's Experience (10 Points) — Experience of contractor and design build team in executing design -build process with community centers or similar type projects (in Design -Build or other delivery methods). 3) Technical Competence (5 Points) — Technical qualifications and experience of key project team members. Architect and/or Engineer of Record that is a team member must be licensed to practice in the State of Texas. 4) Capability to Perform (5 Points) — Experience and references of the design build team as demonstrated by listing past teamwork and collaboration between members of the design team and between the design team and the contractor (in Design -Build or other delivery methods). 5) Capability to Perform -- Schedule (5 Points) — Demonstrate a complete understanding the project, design and construction with respect to the schedule and City of Fort Worth Processes as illustrated by your General Project Schedule. 6) Past Performance (10 points) — Points shall be awarded for experience working on similar projects within the city limits of the City of Fort Worth. Contractors with no experience in the City of Fort Worth will receive 5 points. Contractors demonstrating strong experience will receive more than 5 points. Contractors with poor examples may receive less than 5 points. 7) MIWBE (15 Points) — Proposals may be granted up to 7.5 points based on the proposals meeting or exceeding the established 10% Small Business Enterprise (SBE) goal for design and identifying the SBE sub -consultants) selected to participate on the project. Additionally, proposals may be granted up to 7.5 points based on the proposal committing to meeting or exceeding the 15% Minority Business Enterprise (MBE) goal for construction. The SBE plan and MBE commitment will be part of the final weighted selection criteria. Failure to include the SBE utilization plan and address the MBE commitment shall render the Proposer non- responsive. If the score for any individual rating criteria is rated as zero, this will result in the overall score being zero regardless of how many points could have been earned in the other categories. After ranking the responses to the Request for Proposal (RFP), the City shall first attempt to negotiate a contract with the selected Offeror. The City and its architect may discuss with the selected Offeror options for a scope or time modification and any price change associated with the modification. If the City is unable to negotiate a contract with the selected Offeror, the City shall, formally and in writing, end negotiations with that Offeror and proceed to the next Offeror in the order of the selection ranking until a contract is reached or all proposals are rejected. Instruction to Offorors Page 7 of 53 City of Fort Worth -Far North Branch Library (March 2020) 2. BUSINESS DIVERSITY ENTERPRISE (BDE) ORDINANCE PROVISION: All proposers shall note that the Business Diversity Enterprise Ordinance (Chapter 20, Article X of the Fort Worth Code of Ordinances, as amended) was adopted to ensure the full and equitable participation of Minority Business Enterprises (MBEs) and Small Business Enterprises (SBEs) in the procurement of services $50,000 or more. This design -build project will consist of two separate diverse goals that will be addressed independently of one another. The Minority Business Enterprise (MBE) diverse goal is 15% for the construction services (subcontractors, suppliers, etc.) and the Small Business Enterprise (SBE) diverse goal is 10% for the professional services (architect, engineer, consultants, etc.). Firms providing responses to a Design -Build RFQ shall state the Firm's ability to provide opportunities to SBE and MBE companies and provide a written response to demonstrate the Firm's past history of engaging SBE and MBE companies. It is acceptable to document individual team members' historical engagement of SBE and MBE companies where the members are part of a firm created specifically to provide a response to an RFQ. A response submitted hereto will be part of the RFQ evaluation and ranking and shall be assigned points as per the scoring matrix. Firms which are subsequently qualified and invited to submit a response a response to a Design -Build RFP, shall comply as described herein. All proposals shall include an SBE Plan to address the SBE diverse goal and an MBE Plan to address the MBE diverse goal. At a minimum, the Plans must provide: SBE Plan: ■ The company name, address, point of contact, email address, office and fax telephone numbers of identified SBEs; • A detailed description of the work to be performed by each SBE; ■ The tier level, i.e., 181 2bd, 3rd, etc. (if other than 15t tier, the plan must clearly identify the firm name and tier from whom the SBE firm will be receiving payment); • The sub -contract value or percentage of the design cost for each phase of work identified for each SBE participant; ■ Clearly state the SBE percentage level of commitment achieved; and • Provide the same identification information for all non-SBE participants NOTE: As the design team will be contacted with or a part of the Design -Build firm, the prime design firm, if SBE certified and accepted by the City, may count towards the SBE diverse goal. MBE COMMITMENT • The company name, address, point of contact, email address, office and fax telephone numbers of the MBE subcontractors and suppliers, if known; ■ Identification and detailed description of the work to be performed by each MBE; • The tier level, i.e. 15t 2nd 3rd etc. (if other than 15t tier, the plan must clearly identify the firm name and tier from whom the MBE firm will be receiving payment) ■ The sub -contract value or percentage of the GMP construction cost for each phase of work identified for each MBE participant; • State the MBE percentage level of commitment achieved; and • Provide the same identification information for all non -MBE participants In regards to the MBE diverse goal, all proposals shall include a detailed explanation of the steps it plans to implement in order to address the MBE diverse goal and must state the level of commitment it will achieve. The proposal must also include the name of the individual(s) that will be responsible for implementing the plan, reporting on the status of the MBE commitment achievement and performing liaison duties to the City as it relates to all MBE and SBE issues during the completion of this project. Only the MBE subcontractors and suppliers that perform a commercially useful function may count towards the MBE diverse goal. If the Design -Build construction firm is certified as a DBE, MBE, SBE or WISE firm, Instruction to Offerors Page 8 of 53 City of Fort Worth -Far North Branch library (March 2020) it is not permissible to count itself or its subsidiary -owned companies towards the established goal: the goal represents subcontracting opportunities. The participation commitment of the SBE goal as identified above and the level of the MBE commitment will be part of the final weighted selection criteria. Proposers must obtain MBE and SBE listing from the City of Fort Worth's Office of Business Diversity at (817) 392-2674 or email mwbeofficeCa)-fortworthtexas.gov. This will ensure that Design -Build firms are acknowledging MBE and SBE firms currently certified by the North Central Texas Regional Certification Agency (NCTRCA), Texas Department of Transportation (TxDOT), Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and the Women's Business Council Southwest (WBCS) and accepted by the City of Fort Worth at the time proposals are submitted, in order for the participation to be counted towards the established diverse goals. The firms must be located in the City's six (6) county_ geographic marketplace that includes the counties of: Tarrant, Dallas, Denton, Johnson, barker and Wise. After a Design -Build firm is selected and the City issues a notice to proceed, the implementation of the MBE plan will commence for the performance of all major elements of the Work. Proposers responding to an RFP may be granted up to 10 points based on how well the proposals meet or exceed the goals. There are 5 points for the Small Business Enterprise (SBE) goal. Proposers teaming with a certified SBE firm will be granted the full points. Proposers may be granted up to 5 points based on the proposal commitment to meet or exceed the Minority Business Enterprise (MBE) goal for construction. The SBE plan and MBE commitment will be incorporated into the negotiated contract. Failure to include the SBE utilization plan and address the MBE commitment shall render the Proposer non -responsive. PAYMENT BOND AND PERFORMANCE BOND: For projects in excess of $25,000, the successful Offeror entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded at GMP. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Texas Government Code Section 2253, as amended. In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsures that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the Offeror to that effect and the Offeror shall immediately provide a new surety satisfactory to the City. If the total contract price is $25,000 or less, payment to the Offeror shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. If the contract is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and materials in the prosecution of the work. Instruction to Offerors Page 9 of 53 City of Fort Worth -Far North Branch Library (March 2020) If the contract amount is in excess of $100,000, a Performance Bond shall also be provided, in the amount of the contract, conditioned on the faithful performance of the work in accordance with the plans, specification, and contract documents. Said bond shall be solely for the protection of the City of Fort Worth. 4. PRE -PROPOSAL SITE INVESTIGATION: Prior to filing a response, the Offeror shall examine the site(s) proposed and the details of the requirements set out in these specifications to satisfy itself as to the conditions which will be encountered relating to the character, quality, and quantity of the work to be performed and materials and equipment required. The filing of a response by the Offeror shall be considered evidence that it has complied with these requirements. 5 WAGE RATES: Not less than the prevailing wage rates set forth in the Contract Documents must be paid on this project. 6. DISCREPANCIES AND ADDENDA: Should an Offeror find any discrepancies in the documents associated with the Request for Proposal, or should it be in doubt as to their meaning, it shall notify the City at once, if required, the City will then prepare a written addendum that will be available to all Offerors at the place designated for distribution of the Request for Proposal Documents by the Notice to Offerors. The Offeror is responsible for determining if addenda are available and for securing copies prior to submitting a response to this request for sealed proposals. Oral instructions or decisions unless confirmed by written addenda will not be considered valid, legal or binding. No extras will be authorized because of failure of the Offeror to include work called for in the addenda. Offeror must acknowledge addenda in the Proposal. Failure to acknowledge addenda may cause the Proposal to be ruled non -responsive. It is the Offeror's responsibility to obtain Addenda and include its information in the Proposal. 7. WORKERS COMPENSATION INSURANCE: Offerors will be required to demonstrate that coverage is in effect at time of Award of Contract. Sample Certificate of Insurance, or other proof that Workers Compensation Insurance will be obtained, must be submitted within five working days of bid opening. S. TAXES: Equipment and materials not consumed by or incorporated into the work are subject to State sales taxes under House Bill 11, enacted August 15, 1991. 9. PERMITS: The Offeror shall apply for all City of Fort Worth Permits and for any other permits required by this project. City of Fort Worth Building and Trade Permit fees are waived. Separate permits may be required for each work location. 10. UTILITIES AND IMPACT FEES: The Offeror shall pay water and sewer utilities tap fees and impact fees. Unless shown otherwise, the Offeror shall coordinate and pay for water and sewer taps and meters to the property line. The Offeror will include all remaining fees from the electrical and gas companies in the Base Proposal. The Offeror will be responsible for coordinating with City and utility companies for installation of utilities. The Offeror will be responsible for all fees for electrical, gas, and other utilities within the property line of the project. Unless indicated otherwise on the plans, the Offeror will be responsible for costs and installations from the building side of the water meter and sewer tap. 11. BID DOCUMENTS: Hard copies of bidding documents may be downloaded and printed by the Offeror. 12. CITY OF FORT WORTH DESIGN GUIDELINES: The City of Fort Worth has established design guidelines available on the City's Buzzsaw website. Catalog, brand names, and manufacturer's references are descriptive, not restrictive. Use of brands of like nature and quality will be Instruction to Offerors Page 10 of 53 City of Fort Worth -Far North Branch Library (March 2020) considered. Upon request of the architect or Offeror, the Offeror will submit a full sized sample and/or detailed information as required to allow the architect to determine the acceptability of proposed substitutions. Where equipment has been listed as "no substitute accepted", the City will accept no alternates to the specified equipment. Also, refer to specification's product requirements. 13. TESTING SERVICES: The City shall provide for, independently of the Offeror, the inspection services, the testing of construction materials engineering, and the verification testing services necessary for the acceptance of the construction work. 14. STATE FORM 1295 "CERTIFICATE OF INTERESTED PARTIES": Texas Ethics Commission regulations require that the business entity must fill out the Form 1295 on an electronic filing application on the Texas Ethics Commission website (www.ethics. state. tx.us). The business entity that wishes to enter into the contract must supply the completed, signed and notarized Form 1295 to the City. 15. IMMIGRATION NATIONALITY ACT: City actively supports the Immigration & Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Vendor shall verify the identity and employment eligibility of all employees who perform work under this Agreement. Vendor shall complete the Employment Eligibility Verification Form (1-9), maintain photocopies of all supporting employment eligibility and identity documentation for all employees, and upon request, provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Vendor shall establish appropriate procedures and controls so that no services will be performed by any employee who is not legally eligible to perform such services. Vendor shall provide City with a certification letter that it has complied with the verification requirements required by this Agreement. Vendor shall indemnify City from any penalties or liabilities due to violations of this provision. City shall have the right to immediately terminate this Agreement for violations of this provision by Vendor. 16. NO BOYCOTT OF ISRAEL: If Contractor has fewer than 10 employees or the Agreement is for less than $100,000, this section does not apply. Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government Code, City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel' and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this Agreement, Contractor certifies that Contractor's signature provides written verification to City that Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the Agreement. 17. ORAL COMMUNICATIONS: Any oral communications are considered unofficial and non -binding with regard to this proposal. Instruction to Offerors Pagel 1 of 53 City of Fort Worth -Far North Branch Library (March 2020) CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may be downloaded fi-om the website links provided below. http://www.ethics.state.tx.us/forms/CIQ.pdf http://www.ethics.state.tx.us/forms/CIS.pdf ►( CIQ Form is on file with City Secretary 0 CIQ Form is being provided to the City Secretary ZCIS Form is on File with City Secretary 0 CIS Form is being provided to the City Secretary BIDDER: Company y1-5 By: AOW- A� Xf (Please Print) O W h- nv&7w- 'augnature: Address A 09T "19A 77 7WZ7 _ Title: City/State/Zip (Please Print) Instruction to Offerors City of Fort Worth -Far North Branch Library (March 2020) Page 93 of 53 WeAff- G� law,wh o o d Scrukes Depainme Defti Budd PropmW Form Surbaolidng Teacuie 6lfuaoe:lcleroV R—. Falls 2/4/2020 Item DESIGN COST 1.1 Design Services (to Include any required Geotechnical Reports, Siee Survey, FP Analysis, iSWM, TAS/ADA Reviews, etc.) _ i$`300,000 1.2 Design -Build Management Fee on Design Services $10,050 1.3 TOTAL DESIGN COST $310,050 Itern CONSTRUCTION COST 2.1 General Conditions & Miscellaneous (to Include Temporary Facilities, Clean Up, Safety/QC, Bonds & Insurance, etc.) $244,792 2.2 CONSTRUCTION COST (to Include all Materials, Labor, Site Work, Parking, Landscaping, Building Utilities, etc.) $3,325,505 2.3 Contractor's Contingency $0.00 2.4 Design -Build Management Fee on Construction $119,653 2.5 TOTAL CONSTRUCTION COST $3,689,950 TOTAL DESIGN BUILD COST ($4,000,000.00) $4,000,000 CONFLICT OF INTEREST QUESTIONNAIRE For vendor doing business with local governmental entity F0RRIf C-4(P This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session. 1' OFFICEUSEONLY This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who Date Received has a business relationship as definod by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Section 176.006(a). By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code. A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor. Name ofvendorwho has a business relationship with local governmental entity. Check this box if you arefiling an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.) Name of local government officer aboutwhom the information is being disclosed. Name of Officer Describe each employment or other business relationship with the local government officer, or a family member of the officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer. Complete subparts A and B foreach employmentor business relationship described. Attach additional pages tothis Form CIQ as necessary. A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income, other than investment income, from the vendor? 0 Yes D No B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer or a family member of the officer AND the taxable income is not received from the local governmental entity? Yes F1 No Describe each employment orbusiness relationship thatthe vendor named in Section 1 maintains with a corporation or other business entity with respect to which the local government officer serves as an officer or director, or holds an ownership interest of one percent ormore. ❑ Check this box if the vendor has given the local government officer or a family member ofthe officer one or more gifts as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1). Signature of vendor doing business with the governmental entity lMtumt0aVd@ f&pFF4axas Ethics Commission www.ethics.state.tx.us Page 14 of53Revised 11/30/2015 City of Fort Worth -Far North Branch Library (March 2020) CONFLICT OF INTEREST QUESTIONNAIRE For vendor doing business with local governmental entity A complete copy of Chapter 176 of the Local Government Code maybe found at http://www.statutes.legis.state.tx.us/ Does/LG/htm/LG.176.htm. For easy reference, below are some of the sections cited on this form. Local Government Code § 176.001(1-a): "Business relationship" means a connection between two or more parties based on commercial activity of one of the parties. The term does not include a connection based on: (A) a transaction that is subject to rate or fee regulation by a federal, state, or local governmental entity or an agency of a federal, state, or local governmental entity; (B) a transaction conducted at a price and subject to terms available to the public; or (C) a purchase or lease of goods or services from a person that is chartered by a state or federal agency and that is subject to regular examination by, and reporting to, that agency. .1 LOCAL GOVERNMENT CODE § 176.003(A)(2)(A) AND (B): (a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if: (2) the vendor: (A) has an employment or other business relationship with the local government officer or a family member of the officer that results in the officer or family member receiving taxable income, other than investment income, that exceeds $2,500 during the 12-month period preceding the date that the officer becomes aware that (i) a contract between the local governmental entity and vendor has been executed; or (ii) the local governmental entity is considering entering into a contract with the vendor; (B) has given to the local government officer ora family memberof the officer one ormore gifts that have an aggregate value of more than $100 in the 12-month period preceding the date the officer becomes aware that: (I) a contract between the local governmental entity and vendor has been executed; or (ii) the local governmental entity is considering entering into a contract with the vendor. .2 LOCAL GOVERNMENT CODE & 176.006(A) AND (A-1 (a) Avendor shall file a completed conflict of interest questionnaire if the vendor has a business relationship with a local governmental entity and: (1) has an employment or other business relationship with a local government officer of that local governmental entity, or a family member of the officer, described by Section 176.003(a)(2) (A); (2) has given a local government officer of that local governmental entity, ora family member of the officer, one or more gifts with the aggregate value specified by Section 176.003(a)(2)(B), excluding any gift described by Section 176.003(a-1); or (3) has a family relationship with a local government officer of that local governmental entity. (a-1) The completed conflict of interest questionnaire mustbe filed with the appropriate records administrator not later than the seventh business day after the later of: (1) the date that the vendor: (A) begins discussions or negotiations to enter into a contract with the local governmental entity; or (B) submits to the local governmental entity an application, response to a request for proposals or bids, correspondence, or another writing related to a potential contract with the local governmental entity; or (2) the date the vendor becomes aware: (A) of an employment or other business relationship with a local government officer, or a family member of the officer, described by Subsection (a); (B) that the vendor has given one or more gifts described by Subsection (a); or (C) of a family relationship with a local government officer. Instruction to Offerors Page 15 of 53 City of Fort Worth -Far North Branch Library (March 2020) LOCAL G®VI RNMF--N n 0FFW,-R FoRIifCONFLICTS DISCLOSURE 5-11APTERE-WT (instructions for completing and filing this form are provided on the next page.) This questionnaire reflects changes made to the law by H,B. 23, 84th Leg., Regular Session. OFFICE USEONLY This is the notice to the appropriate local governmental entity that the following local government officer has become aware of facts that require the officer to file this statement Date Received in accordance with Chapter 176, Local Government Code. Name of Local Government Officer Office Held Name of vendor described by Sections 176.001(7) and 176.003(a), Local Government Code Description of the nature and extent of each employment or other business relationship and each family relationship with vendor named in item 3. List gifts accepted by the local government officer and any family member, if aggregate value of the gifts accepted from vendor named in item 3 exceeds $100 during the 12-month period described by Section 176.003(a)(2)(B). Date Gift Accepted Description of Gift Date Gift Accepted Description of Gift Date Gift Accepted Description of Gift (attach additional forms as necessary) AFFIDAVIT i swear under penalty of perjury that the above statement is true and correct. I acknowledge that the disclosure applies to each family member (as defined by Section 176.001(2), Local Government Code) of this local government officer. I also acknowledge that this statement covers the 12-month period described by Section 176.003(a)(2)(B), Local Government Code. Signature of Local Government Officer AFFIX NOTARY STAMP 1 SEAL ABOVE Sworn to and subscribed before me-, by the 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath this Title of officer administering oath day Instruction to u terors CiFpUPIli@tiYrt4l&bFa%CaVtlFtl 95ChcLUM"igAarch 2020) www.ethics.state.tx.us Page 16 of 53 Revised 11/30/2015 LOCAL GOVERNMENT OFFICER CONFLICTS DISCLOSURE STATEMENT Section 176.003 of the Local Government Code requires certain local government officers to file this form. A 'local government officer" is defined as a member of the governing body of a local governmental entity; a director, superintendent, administrator, president, or other person designated as the executive officer of a local governmental entity; or an agent of a local governmental entity who exercises discretion in the planning, recommending, selecting, or contracting of a vendor. This form is required to be filed with the records administrator of the local governmental entity not later than 5 p.m. on the seventh business day afterthe date on which the officer becomes.aware of the facts that require the filing ofthis statement. A local government officer commits an offense if the offrcer,knowingly violates Section 176.003, Local Government Code. An offense under this section is a misdemeanor. Refer to chapter 176 of the Local Government Code for detailed information regarding the requirement to file this form. PART 2 - INSTRUCTIONS FOR COMPLETING THIS FORM The following numbers correspond to the numbered boxes on the other side. 1. Name of Local Government Officer. Enter the name of the local government officer filing this statement. 2. Office Held. Enter the name of the office held by the local government officer filing this statement. 3. Name of vendor described by Sections 176.001(7) and 176.003(a), Local Government Code. Enter the name of the vendor described by Section 176.001(7), Local Government Code, if the vendor: a) has an employment or other business relationship with the local government officer or a family member of the officer as described by Section 176.003(a)(2)(A), Local Government Code; b) has given to the local government officer or a family member of the officer one or more gifts as described by Section 176.003(a)(2)(B), Local Government Code; or c) has a family relationship with the local government officer as defined by Section 176.001(2-a), Local Government Code. 4. Description of the nature and extent of each employment or other business relationship and each family relationship with vendor named in item 3. Describe the nature and extent of the employment or other business relationship the vendor has with the local government officer or a family member of the officer as described by Section 176.003(a)(2)(A), Local Government Code, and each family relationship the vendor has with the local government officer as defined by Section 176.001(2-a), Local Government Code. S. List gifts accepted, if the aggregate value of the gifts accepted from vendor named in item 3 exceeds $100. List gifts accepted during the 12-month period (described by Section 176.003(a)(2)(B), Local Government Code) by the local government officer orfam i ly member of the officer from the vendor named in item 3 that in the agg reg ate exceed $100 in value. 6. Affidavit. Signature of local government officer. Local Government Code § 176.001(2-a): "Family relationship" means a relationship between a person and another person within the third degree by consanguinity or the second degree by affinity, as those terms are defined by Subchapter B, Chapters PART 3 - LOCAL GOVERNMENT CODE § 176.003(A)(2)(A); (a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if: (2) the vendor: (A) has an employment or other business relationship with the local government officer or a family member of the officer that results in the officer or family member receiving taxable income, other than investment income, that exceeds $2,500 during the 12-month period preceding the date that the officer becomes aware that: (i) a contract between the local governmental entity and vendor has been executed; or (ii) the local governmental entity is considering entering into a contract with the vendor. Instruction to Offerors Page 17 of 53 City of Fort Worth -Far North Branch Library (March 2020) �r af.339 (ea -A) (ReV.44 NJ Texas Sales and Use Tax Exemption Certification This certificate does not require a number to be valid. Name ofpurchaser, form or agency City of Fort Worth, Texas Address (Street a number, P.O. Box arRaure number) Phone (Area code andnumberl 200 Texas Street 817-382-8360 City, State, ZIP code Fort Worth, Texas 76102 I, the purchaser named above, claim an exemption from payment of sales and use taxes (for the purchase of taxable items described below or on the attached order or invoice) from: Seller: Street address: City, State, .ZIP code: Description of items to be purchased or on the attached order or invoice: All items. Purchaser acknowledges that this Certificate cannot be used for the purchase, lease or rental of a motor vehicle. Purchaser claims this exemption for the following reason_ Municipality, Governmental Entity [ understand that I will be Gable for payment of all state and local sales or use taxes which may become due for failure to comply with the piovisions of the Tax Code andfor all applicable law. t understand ibetitisa criminaloffense togive an exemptioncerth7cate to theseAerfortaxableitems that!know, atthe time ofpurchase, willbeusedinamannerotherthanthatexpressedirtthis certificate, anddependingon the amountoftaxevaded, thooffensemayronge from a Class C misdemeanor to a felony of the second degree. Purchaser flue Pale here k ��i Finance Director/CFO S,efrf/WIiJyo,X18 NOTE: This certificate cannot be issued for the purchase, lease, or rental of a motor vehicle. THIS CERTIFICATE DOI=S NOT REQUIRE A NUMBER TO BE VALID. Sales and Use Tax "Exemption Numbers" or "Tax Exempt" Numbers do not exist. This certificate should be furnished to the supplier. Do not send the completed certificate to the Comptroller of Public Accounts. Instructions to Offerors Page 18 of 53 Northside Community Center Renovation (December 2019) 2013 PREVAILING WAGE RATES Commercial Construction Projects CLASSIFICATION DESCRIPTION Wage Rate — $ AC Mechanic 25.24 $ AC Mechanic Helper 13.67 $ Acoustical Ceiling Installer 16.83 $ Acoustical Ceiling Installer Helper 12.70 Bricklayer/Stone Mason 19.45 $ Bricklayer/Stone Mason Trainee 13.31 .1 Bricklayer/Stone Mason Helper 11 10.91 $ Carpenter 17.75 $ Carpenter Helper 14.32 Concrete Cutter/Saver $ 1.7.00 Concrete Cutter/Sawer Helper 11.00 Concrete Finisher 15.77 $ Concrete Finisher Helper 11.00 $ Concrete Form Builder 15.27 $ Concrete Form Builder Helper 11.00 $ Drywall Mechanic 15.36 $ Drywall Helper 12.54 $ Drywall Taper 15.00 Drywall Taper Helper 11.50 $ Electrician (Journeyman) 19.63 Electrician Apprentice (Helper) 15.64 $ Electronic Technician 20.00 $ Floor Layer 18.00 Floor Layer Helper 00 1 Instructions to Offerors Page 19 of 53 Northside Community Center Renovation (December 2019) $ Glazier 21.03 $ Glazier Helper 12.81 $ Insulator 16.59 $ Insulator Helper 11.21 $ Laborer Common 10.89 Laborer Skilled y 14.15 $ Lather 12.99 Metal Building Assembler p0 16 Metal Building Assembler Helper 12.00 $ Metal Installer (Miscellaneous) 13.00 $ Metal Installer Helper (Miscellaneous) 11.00 $ Metal Stud Framer 16.12 $ Metal Stud Framer Helper 12.54 $ Painter 16.44 $ Painter Helper 9.98 $ Pipefitter 21.22 $ Pipefitter Helper 15.39 Plasterer 16.17 $ Plasterer Helper 12.85 $ Plumber 21.98 Plumber Helper 15.85 $ Reinforcing Steel Setter 12.87 $ Reinforcing Steel Setter Helper 11.08 $ Roofer 16.90 $ Roofer Helper 11.15 $ Sheet Metal Worker 16.35 Sheet Metal Worker Helper 13.11 Instructions to Offerors Page 20 of 53 Northside Community Center Renovation (December 2019) $ Sprinkler System Installer 19.17 Sprinkler System Installer Helper 14.15 $ Steel Worker Structural 17.00 Steel Worker Structural Helper 13$74 Waterproofer 15A0 Equipment Operators Concrete Pump 18.50 Crane, Clamsheli, Backhoe, Derrick, D`Line Shovel 19.31 $ Forklift 1G.45 Foundation Drill Operator 22.50 $ Front End Loader 16.97 $ Truck Driver 16.77 $ Welder 19.96 Welder Helper 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry (Fall 2012) Independently compiled by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TFXO's (The Construction Association) website. www.texoassociation.org/Chapter/wagerates,asp Instructions to Offerors Page 21 of 53 Northside Community Center Renovation (December 2019) CITY OF FORT WORTH WEATHER TABLE Average Days of RainlSnowllce Inches of Rainfall F 6 2.51 7 2.23 9 3A9 7 2.97 10 4.56 June 8 3.31 July 4 1.83 August 5 1.88 September 5 2.34 October 7 3.65 November 7 2.70 December 6 2.34 nually 81 33.81 (1) Mean number of days precipitation of 0.01" or more or 1l2" snowlice (2) Average normal precipitation, in inches This table is based on information reported from Dallas -Fort Worth International Airport, Texas_ Latitude 32 deg 54 min north, longitude 97 deg 02 min west, elevation (ground) 551 fL Average number of days of rain, snow, and ice days are based on records covering 21 years_ Precipitation is based on recorded Information from 1996 through 2016 period_ This table is to be used as a baisis for calculation of excess rain or weather days for projects with duration in calendar days. If the site records Indicate that the Contractorwas unable to carry out operations due to weather, it is counted as a weather day. If the number of weather days exceeds the number of average rain days plus the snowlice days forth contract duration, the contract will be adjusted by Change Order. L, FortWonh Weather Table MpO12017 Instructions to Offerors Page 22 of 53 Northside Community Center Renovation (December 2019) STANDARD FORM OF DESIGN -BUILD AGREEMENT BETWEEN OWNER AND DESIGN -BUILDER ON OPEN BOOK PRiCE BASIS AGREEMENT made as of the 7th day of April in the year of 2020, between the Design -Builder: HIM & MF, LTD. d/b/a Muckleroy & Fails, a Texas Limited Partnership 3200 Riverfront Drive, Suite 200 Fort Worth, Texas 76107 and the Owner: CITY OF FORT WORTH 200 Texas Street Fort Worth, TX 76102 For the services in connection with the following Project. - Design and Construction of the new City of Fort Worth Police Department's NORTHSIDE COMMUNITY CENTER RENOVATION. ARTICLE 1 - GENERAL PROVISIONS 1.1 Mutual Obligations. Design -Builder and Owner agree to fully cooperate with each other in providing to each other information available, and in facilitating the design and Construction Work within the scope of this Agreement. Design -Builder agrees to provide the architectural and engineering services as set forth below, and to furnish construction and administration of the Construction Work. 1.2 Extent of Agreement. This agreement is solely and exclusively for the benefit of the Owner and the Design -Builder and not for the benefit of any third party. The Owner and the Design -Builder agree that there are no third -party beneficiaries and each agrees that the obligations in this Agreement are owed exclusively to the other party to the Agreement. The Parties agree that this Agreement represents the entire and integrated Agreement between the Owner and the Design -Builder, and supersedes all prior negotiations, representations or agreements, either written or oral. 1.3 Architect/Engineer. Licensed, independent design professionals retained by the Design -Builder in conformance with Chapter 2254, Texas Government Code or furnished by licensed employees of the Design -Builder shall provide architectural and engineering services required for the project. The person or entity providing architectural and engineering services shall be referred to as the Architect/Engineer, 1.4 Definitions. 1.4.1 The term "Agreement" shall mean this executed Standard Form of Design -Build Agreement between the Owner and the Design -Builder on Open Book Price Basis. Instructions to Offorors Page 23 of 53 Northside Community Center Renovation (December 2019) 1.4.2 The term "Contract Documents" shall mean (I) this Agreement; (ii) written change orders and amendments to this Agreement, including exhibits and appendices signed by both the Owner and the Design -Builder; (iii) the Design Criteria Documents as defined in paragraph 1.4.10; (iv) the information provided by the Owner pursuant to Subparagraph 3.2.2; (v) the Schematic Design Documents as defined in paragraph 1.4.19 and (vi) the Open Book Price Proposal as defined in paragraph 5.2.1. 1.4.3 The term "Contract Time" shall mean the number of calendar days stated in the Price Proposal (as provided in paragraph 5.2.1) during which the Design -Builder has agreed to achieve Substantial Completion of the Construction Work. 1.4.4 "Price Proposal" shall mean the cost of the design and construction proposed at the time of execution of this contract, 1.4.5 The term "Contract Price" shall have the meaning defined in paragraph 5.1 1.4.6 "Guaranteed Maximum Price" (GMP) shall be the total cost of the project set at the time the construction is authorized. The Design -Builder shall provide Payment, Performance Bonds and Builders Risk Insurance in this amount. The Owner shall not be obligated to any costs in excess of the GMP. 1.4.7 "Conceptual Budget Update" shall mean the budget submitted by the Contractor for the estimated cost to construct the project as f the date of the budget submission. 1.4.8 The term "Construction Documents" shall mean the drawings, specifications and other documents prepared by the Architect/Engineer and approved by the Owner for the construction of the Project. 1.4.9 The term "Construction Work" shall mean all of Design -Builder's construction services required by the Contract Documents, as defined in paragraph 1.4.2. 1.4.10 The term "Date of Commencement" shall have the meaning defined in paragraph 5.2.3, or 5.2.4.1, as applicable. The Owner will promptly proceed to obtain all easements, zoning changes, approvals, and other legal requirements to allow construction to proceed without delay. 1.4.11 The term "day" or "days" shall mean calendar days unless otherwise specifically noted in the Contract Documents. 1.4.12 The term "Defective Work" shall mean any portion of the Construction Work not in conformance with the Construction Documents. 1.4.13 The term "Design Criteria Documents" shall mean the documents provided by the Owner to the Design -Builder that provide sufficient basic programming information to permit the Design -Builder to prepare a response to the Owner's request for proposal ("RIFF"). The Design Criteria Documents must specify functional design and construction criteria the Owner considers necessary and salient to describe the Project. The Design Criteria Documents may include, as appropriate, basic interior space requirements, special material requirements, material quality standards, conceptual criteria for this Project, special equipment requirements, cost or budget estimates, time schedules, quality assurance and quality control requirements, site development requirements, applicable codes and ordinances, provisions for utilities, parking requirements, or any other requirements determined by the Owner to establish the salient characteristics of the proposed project. Instructions to Offerors Page 24 of 53 Northside Community Center Renovation (December 2019) 1.4.14 The term "Design Consultants" shall mean the engineering or architectural firm(s) employed by the Design -Builder to perform design or consulting work for the Project site, and the building improvements. Such Design Consultants services may include civil engineering for utilities, storm drainage, and pavement; geotechnical engineering; landscape architecture; environmental engineering or consulting; and surveying and construction staking for site work. Design Consultants for the building design may include electrical, structural, mechanical, plumbing, architectural, ADAITSA and other specialty design areas. 1.4.15 The term "Differing Site Conditions" shall mean concealed or latent physical conditions, or subsurface conditions at the Project site that (i) materially differ from the conditions indicated in the Construction Design Documents or (ii) are of an unusual nature, differing materially from the conditions ordinarily encountered and generally recognized as inherent in construction work. 1.4.16 The term "Hazardous Material(s)" shall mean any materials, waste, substances, and/or chemicals deemed to be hazardous under all applicable federal, state, and/or local laws, codes, ordinances, rules, regulations, orders and decrees of any governmental entity having jurisdiction over the Project or the Project site. 1.4.17 The term "Other Contractors" shall mean any other independent contractor, agent or representative employed by the Owner at the Project site who is not employed by the Design -Builder, or its subcontractors. 1.4.18 The term "Project" is the building, facility, or other improvements at the location provided by the Owner, which the Design -Builder has agreed to complete pursuant to the requirements of the Construction Design Documents, as defined in paragraph 1.4.16. 1.4.19 The term "Schematic Design Documents" shall mean the drawings, outline specifications, and/or other conceptual documents illustrating the Project's elements, scale, and features, which documents address the requirements of the Owner's Design Criteria Documents submitted by the Owner to the Design -Builder. The Schematic Design Documents shall be the documents prepared and submitted to the Owner with a Conceptual Budget Update. 1.4.20 The term "Subcontractor(s)" shall mean any party or entity retained by the Design -Builder as an independent contractor to provide any of the labor, materials, equipment, and/or services necessary to complete a specific portion of the Construction Work under this Agreement. The term Subcontractor does not include an architect, engineer, other design consultants, if any, or any Other Contractors retained by the Owner with the Conceptual Budget Update. 1.4.21 The term "Substantial Completion" shall be the date on which the Construction Work, or an agreed portion of the Construction Work, is sufficiently complete so that the Owner can beneficially occupy or use the Project, or portion thereof, for its intended purposes. The issuance of a certificate of occupancy is not a prerequisite for Substantial Completion if the certificate of occupancy cannot be obtained due to factors beyond the Design -Builder's control. The Design -Builder and the Owner agree to sign a certificate of Substantial Completion confirming the date of Substantial Completion. 1.4.22 The term "Work Product" shall mean all drawings, specifications, and other design documents, including those in electronic format prepared by or procured by the Design - Builder in performance of this Agreement. 1.4.23 The term "Open Book Price" shall refer to the price of subcontracts and Instructions to Offerors Page 25 of 53 Northside community Center Renovation (December 2019) purchases, the site expenses for superintendence and professional services directly supporting the construction effort plus agreed overhead and profit. ARTICLE 2 - DESIGN -BUILDER'S SERVICES AND RESPONSIBILITIES 2. Design Services. 2.1 Schematic Design. The Design -Builder shall prepare a schematic design sufficient in detail and scope to clearly identify all major features of the project, prepare a preliminary project schedule, and to present a Conceptual Budget Update. The Owner shall accept, in writing, the Schematic Design prior to detailed design and execution of the construction. 2.2 Final Design. Pursuant to a mutually agreeable schedule, the Design -Builder shall submit for the Owner's approval Construction Documents that meet the requirements of the Schematic Design Documents, and any change orders executed by both the Owner and the Design -Builder after the date of this Agreement and prior to the submission of the Construction Documents to the Owner. 2.3 Construction Documents. The Construction Documents shall set forth the requirements for the Construction Work, and shall be based upon codes, laws or regulations effective on the date of this Agreement. If any codes, laws, or regulations are changed or are enacted after the date of this Agreement affecting the performance of the Construction Work, the Contract Price and the Contract Time shall be equitably adjusted to compensate the Design - Builder for the changes. When the Design -Builder submits the Construction Documents to the Owner, the Design -Builder shall identify in writing all material changes and deviations from the requirements of the Schematic Design Documents. Material changes, if any, between the Construction Documents and the Schematic Design Documents necessitated by changes in codes, laws or regulations shall be documented by a Change Order pursuant paragraph 7.2 equitably adjusting the Contract Price and/or the Contract Time. Three (3) sets of the Construction Documents shall be furnished to the Owner prior to the date of commencement of construction. Construction shall not start without a "Notice to Proceed". The Notice to Proceed shall not be issued without bonds in place. 2.4 Construction Services. 2.4.1 The Design -Builder agrees to timely complete the design and commence construction to substantially complete the construction within the Contract Time. The Design - Builder and its Subcontractors shall provide all necessary construction labor, materials, tools, equipment, as well as all construction supervision, inspection, and temporary utilities as required to complete construction required by the Construction Documents. 2.4.2 The Design -Builder shall perform all Construction Work in accordance with the requirements of the Construction Documents. Design -Builder shall at all times exercise complete and exclusive control over the construction means, methods, sequences, and techniques. The Design -Builder shall be responsible for the proper performance of the work, including all work performed by its Subcontractors, and any acts and omissions in connection with such performance. 2.4.3 The Design -Builder shall keep the Project site reasonably free from debris, trash, and construction wastes to permit Design -Builder to perform the Construction Work efficiently, safely, and without interference in the use of adjacent properties. Upon Substantial Completion Instructions to Offerors Page 26 of 53 Northside Community Center Renovation (December 2019) of the Project, the Design -Builder shall remove all debris, trash, construction waste, materials, equipment, machinery, and tools arising from the Construction Work, to permit Owner to occupy the Project for its intended use. Upon completion of the Project, Contractor shall complete the removal of all debris, trash, construction waste, materials, equipment, machinery, and tools arising from the Construction Work prior to final payment being due. 2.5 Safety of Persons and Property. The Design -Builder shall require each of its Subcontractors to be responsible for the safety of its workmen performing the Construction Work at the Project site, as well as the safety of all persons and property which could be injured during the prosecution of any subcontract work. The provisions of this Agreement shall not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of subcontract work, nor for compliance with the applicable laws and regulations. The Design - Builder shall be responsible for the safety of all employees and workmen directly employed by the Design -Builder at the Project site. 2.5.1 Safety Representative. The Design -Builder shall designate an individual at the Project site in the employment of the Design -Builder who shall act as the Design -Builder's designated safety representative. Unless otherwise identified by the Design -Builder in writing to the Owner, the designated safety representative shall be the Design -Builder's project superintendent, The Design -Builder will promptly report to the Owner in writing all accidents and injuries occurring at the Project site. When the Design -Builder is required to file an accident report with a public authority, the Design -Builder shall furnish a copy of the report to the Owner. The Design -Builder and its Subcontractors shall comply with all legal requirements relating to the safety, as well as any of Owner's specific safety requirements if specified in the Contract Documents. 2.5.2 _Reproduction, Use and Ownership of Work Product. All designs, drawings, specifications, documents, and other work products of the Design -Builder whether in hard copy or in electronic form, are instruments of service for this Project, whether the Project is completed or not. Reuse, change, or alteration by the Owner or by others acting through or on behalf of the Owner of any such instruments of service without the written permission of the Design -Builder will be at the Owner's sole risk. The Owner shall own the final, printed designs, drawings, specifications and documents. Transfer of ownership of the contract documents does not constitute sale of the documents. 2.5.3 Standard of Care. Qualified, licensed design professionals employed by the Design -Builder or procured from qualified, independent licensed design consultants shall prepare the Construction Documents. The standard of care for all design professional services performed under this Agreement shall be the care and skill ordinarily used by members of the architectural and engineering professions practicing under similar conditions at the same time and locality as the Project. This Agreement does not establish or create any legal or contractual obligations between the Owner and the design professionals employed by the Design -Builder, and the design professionals shall not be deemed to be a third party beneficiaries under this Agreement. The design professionals shall be selected based upon demonstrated competence and qualifications in accord with Section 2254.004, Texas Government Code. 2.5.4 Hazardous Materials. The Design -Builder shall not be obligated to commence or continue the Construction Work until all known or suspected Hazardous Material discovered at the Project site not introduced onto the Project site by the Design -Builder have been removed or rendered harmless by the Owner, as certified by an independent testing laboratory and approved by the appropriate government agency. Instructions to offerors Page 27 of 53 Northside Community Center Renovation (December 2019) 2.5.4.1 The Design -Builder and its Subcontractors shall not knowingly enter upon any portion of the Construction Work containing Hazardous Material. If after the commencement of the Construction Work known or suspected Hazardous Materials are discovered at the Project, the Design -Builder shall be entitled to immediately stop Construction Work in the affected area, unless such Hazardous Materials are introduced onto the Project site by the Design -Builder. The Design -Builder shall report the condition to the Owner, and, if required, the governmental agency having jurisdiction. If the Design -Builder incurs additional cost and/or is delayed due to the presence or remediation of Hazardous Material, the Design -Builder shall be entitled to an equitable adjustment in the Contract Price and/or the Contract Time, unless such Hazardous Materials are introduced onto the Project site by the Design -Builder. The Design -Builder shall not be required to perform any Construction Work related to or in the area of Hazardous Material not introduced into the Project site by it unless a written agreement is entered into between the Design -Builder and the Owner to provide for extra cost, if any, extra time, if any, and additional risk incurred by the Design -Builder. 2.5.4.2 If potentially hazardous materials are discovered at the Project site that were not introduced by the Design -Builder, the Owner shall be responsible for retaining an independent testing laboratory to determine the nature of the material encountered and whether it is a Hazardous Material requiring corrective measures and/or remedial action, otherwise the Design - Builder shall be responsible for such testing. Such measures shall be the sole responsibility of the Owner, and shall be performed in a manner minimizing any adverse effect upon the Construction Work of the Design -Builder, unless such Hazardous Materials are introduced onto the Project site by the Design -Builder. The Design -Builder shall resume the Construction Work in the area affected by any Hazardous Material only after written agreement between the Owner and the Design -Builder has been executed, after the Hazardous Material has been removed or rendered harmless, and after approval of the governmental agency or agencies with jurisdiction, if required. 2.5.4.3 If hazardous materials are encountered as a result of the Owner's failure to identify or remove hazardous materials existing at the Project site prior to the commencement of construction, the Owner agrees to (1) release the Design -Builder, its Subcontractors, and their officers, directors and employees from any and all claims, damages, losses, or expenses incurred by the Owner arising out of or related to the performance of the construction work in the area affected by the Hazardous Material existing at the Project site prior to commencement of the Project; (2) release the Design -Builder from any indemnification obligations in this Agreement as it relates to Hazardous Materials only; (3) extend the Contract Time by the actual number of days that the Design -Builder is delayed in the completion of the Contract Work arising out of or related to the identification, testing, and abatement of the Hazardous Material existing at the Project site prior to commencement of performance; (4) execute a Change Order increasing the Contract Price by any costs or losses incurred by Design -Builder which arise out of the testing or abatement of the Hazardous Material existing at the Project site prior to commencement of performance, or relate to the performance of Construction Work in the area affected by the Hazardous Material prior to the Design -Builder's discovery of the Hazardous Material existing at the Project site prior to commencement of performance. 2.5.4.4 During performance of the Construction Work, the Design -Builder shall be responsible for the proper handling of all materials brought to the Project site by the Design - Builder or its Subcontractors. Upon the issuance of the certificate of Substantial Completion, the Design -Builder shall continue to be responsible for materials and substances brought to the Project site, if such materials or substances are required by the Construction Documents. 2.5.4.5 If Hazardous Materials are encountered as a result of the Design -Builder or its Instructions to Offerors Page 28 of 53 Northside Community Center Renovation (December 2019) Subcontractors' importation of such materials onto the Project site, the Design -Builder shall defend, indemnify and hold harmless the Owner, its officers, directors, and employees from and against any and all claims, damages, losses, costs and expenses, including but not limited to attorney's fees, arising out of or related to the Construction Work in any area affected by Hazardous Materials This indemnification shall apply without regard to the fault, negligence, breach of warranty or contract, or strict liability of the Owner and shall indemnify the indemnities for their own fault or negligence. 2.6 Design -Builder's Warrant. Design -Builder warrants to Owner that all materials and equipment furnished under this Agreement will be new, unless otherwise specified. The Design -Builder also warrants to the Owner that all materials and equipment furnished under this Agreement will be in conformance with the Construction Documents. Design -Builder's warranty obligations exclude defects caused by abuse, alterations, or failure to maintain the Construction Work by persons other than the Design -Builder. The Design -Builder agrees to correct all Defective Work for which the Owner provides notice to the Design -Builder within a period of One Year from the date of Substantial Completion. The Design -Builder shall collect written warranties as defined in the contract documents from manufacturers, as well as all equipment manuals, and deliver them to the Owner for the Owner's use. To the extent that products, equipment, systems or materials incorporated into the Construction Work are covered by a warranty from the manufacturer of such products, equipment, systems or material in excess of one year, the Owner's remedy to correct the defective products, equipment, systems, or materials after the one-year period shall be exclusively against the warranty of the manufacturer. Prior to the expiration of the one year warranty there will be a walk through attended by the Owner, Architect, and Contractor to identify any items that need to be addressed. These items will be agreed upon by all parties and the contractor will complete the work within 30 days. ARTICLE 3 - OWNER'S RESPONSIBILITIES 3.1 Cooperation with Design -Builder, 3.1.1 Owner shall, throughout the performance of the Construction Work, cooperate with Design -Builder and perform its responsibilities, obligations and services in a timely manner to facilitate Design -Builder's timely and efficient performance of the Construction Work and so as not to delay or interfere with Design -Builder's performance of its obligations under the Contract Documents and/or Construction Documents. The Owner shall cooperate and provide reasonable assistance to the Design -Builder in obtaining the permits, approvals, and licenses that are the responsibility of the Design -Builder. 3.1.2 Owner shall provide timely reviews and approvals of interim design submissions, Schematic Design Documents, and Construction Documents consistent with Owner's normal business practices and within the negotiated times set forth in Design -Builder's schedule. 3.2 Information and Services Provided by Owner. 3.2.1 The Owner shall provide full information in a timely manner regarding requirements for the Project including all information contained in the Design Criteria Documents. 3.2.2 Owner will assist with securing and executing all necessary easements and agreements with adjacent land or property owners that are necessary to enable Design -Builder to perform the Work. Instructions to Offerors Page 29 of 53 Northside Community Center Renovation (December 2019) 3.3 Approval of Construction Documents. At the time of the Owner's approval of the Conceptual Budget Update, as provided in paragraph 5.2, the Owner shall review, modify as required, and approve the Construction Documents provided to the Owner by the Design -Builder. Upon the Owner's approval, the Construction Documents shall be part of the Contract Documents and shall constitute the scope of the design and construction services to be performed by Design - Builder. 3.4 Owner's Construction Responsibilities 3.4.1 Throughout the performance of the Construction Work, the Owner shall cooperate with Design -Builder to assure that the Construction Work is timely and efficiently performed without delay or interference to the services provided by Design -Builder. The Owner shall assign Ronald Clements, Project manager, as the Owner representative who shall be fully acquainted with the Project and who shall have authority to bind the Owner in all matters requiring the Owner's approval, authorization, or written notice. If the Owner changes its representative or the representative's authority as listed above, the Owner shall notify the Design -Builder in writing, in advance of such change. 3.4.2 Owner is responsible for all work performed on the Project or at the location of the Project by other contractors under separate contracts with the Owner. Owner shall contractually require its separate contractors to cooperate with and coordinate their activities with Design - Builder, so as not to interfere with Design -Builder in performance of this Agreement. 3.4.3 Owner shall contract for, independently of the Design -Builder, the inspection services, the testing of construction materials, and the verification testing services necessary for acceptance of the Project. 3.4.4 Any change order or cumulative change orders in an amount greater than $100,000 requires the prior approval of the City Council of the City of Fort Worth. ARTICLE 4 - CONTRACT TIME 4.1 Substantial Completion and Final Completion. Substantial Completion of the Construction Work shall be achieved after the Date of Commencement, within the Contract Time as specified pursuant to paragraph 5.2.1,4 and as extended pursuant to paragraph 4.2, Unless causes beyond the Design -Builder's control delay final completion, the Design -Builder shall achieve final completion of the Construction Work, including all punch list work, within sixty (60) days from the date of Substantial Completion. 4.2 Extensions of Time. 4.2.1 If causes beyond the Design -Builder's control extend the time for the commencement or progress of the Construction Work, then the Contract Time shall be extended as appropriate. Such causes shall include but not be limited to: changes ordered in the Construction Work by the Owner, negligent acts or omissions of the Owner or Other Contractors, the Owner's interference in the Design -Builder's performance of Construction Work, the presence of Hazardous Materials at the Project site, the presence of Differing Site Conditions, adverse weather conditions not reasonably anticipated, fire, unusual transportation delays, labor disputes impacting the Project, actions by governmental agencies, and/or unavoidable accidents or circumstances. Causes beyond the control of the Design -Builder do not include negligent acts or omissions on the part of the Design -Builder, Subcontractors, or the Architect/Engineer. 4.2.2 In the event delays to the Project are encountered for any reason, both the Owner Instructions to Offerors Page 30 of 53 Northside Community Center Renovation (December 2019) and the Design -Builder agree to undertake reasonable efforts to mitigate the effects of such delays. 4.3 Liquidated Damages. The parties agree and acknowledge that actual damages are uncertain and difficult to ascertain because the Project relates to construction for a municipality. Normal damages of lost rent or profit are not applicable in this circumstance because the City is a municipality and the Project will not receive rent and the City will not have lost profits. Therefore, the parties agree that because City's actual damages are too difficult to ascertain that the liquidated damages stated below are reasonable and a correct representation of actual damages to the City. The parties also agree that the liquidated damages called for in this contract are not a penalty but an agreed upon damages calculation by two sophisticated parties. The deduction for liquidated damages shall be as follows: Amount of Contract $15,000 or less $15,001 to $25,000 $25,001 to $50,000 $50,001 to $100,000 $100,000 to $500,000 $500,001 to $1,000,000 $1,000,001 to $2,000,000 $2, 000, 001 to $5, 000, 000 $5,000,001 to $10,000,000 Over $10,000,000 ARTICLE 5 - CONTRACT PRICE Liquidated Damages per Day $45 $63 $105 $154 $210 $315 $420 $630 $840 $980 5.1 Contract Price. Owner shall pay Design -Builder, in accordance with Article 6 hereof, total compensation ("Contract Price") not to exceed the Guaranteed Maximum Price. 5.2 Contract Cost. 5.2.1 Guaranteed Maximum Price Proposal ("GMP"). The Design -Builder shall submit a Price Proposal to the Owner for each phase working toward a GMP, which shall be limited to a not -to -exceed amount of $4,390,000.00, based on Design -Build management fees of 3.35% for design and 3.59% for construction, and to include a $300,000.00 Owner's Construction Contingency Allowance. All unspent contingencies belong to the City at the completion of the project. 5.2.1.2 The construction Documents shall be the basis for the procurement and trade bids. The Construction Documents, in conjunction with the trade bids, shall be the basis for the Guaranteed Maximum Price and Final Schedule. 6.2.1.3 A list of the assumptions and clarifications made by Design -Builder in establishing the GMP, which list Is intended to supplement the information contained in the Construction Design Documents, 5.2.1.4 The Contract Time upon which the proposed GMP is based; Instructions to Offerors Page 31 of 53 Northside Community Center Renovation (December 2019) 5.2.1.5 If applicable, a list of allowances and a statement of their basis; a schedule of alternate prices; a schedule of unit prices; and/or a statement of Additional Services; and 5.2.1.6 The time limit for acceptance of the GMP Proposal. 5.2.2 Review and Adjustment to GMP Proposal. After submission of the GMP Proposal, Design -Builder and Owner shall meet to discuss and review the Design Documents and the Price Proposal. if Owner has any comments regarding the GMP Proposal, or finds any inconsistencies or inaccuracies in the information presented, the Owner shall promptly give written notice to Design -Builder of such comments or findings. If appropriate, Design -Builder shall, upon receipt of Owner's notice, make appropriate adjustments to the GMP Proposal. 5.2.3 Acceptance of Price Proposal. If Owner accepts the GMP Proposal, the GMP Proposal and all documents submitted with the GMP Proposal shall amend and become a part of this Agreement. The Date of Commencement shall be ten (10) business days after Design - Builder's receipt of Owner's acceptance of the GMP Proposal. Design -Builder will proceed with completion of design and ordering of long lead-time materials required for the Project. 5.2.4 Failure to Accept the GMP Proposal. If Owner rejects the GMP Proposal, or fails to notify Design -Builder in writing on or before the date specified in the GMP Proposal that it accepts GMP Proposal, the GMP Proposal shall be deemed withdrawn and of no effect. In such event, Owner and Design -Builder shall meet and confer as to how the Project will proceed, with Owner having the following options: 5.2.4.1 Owner shall suggest modifications to the GMP Proposal, whereupon, if such modifications are accepted in writing by Design -Builder, the GMP Proposal shall be deemed accepted, as modified, and the parties shall proceed in accordance with paragraph 5.2.3 above, except the Date of Commencement shall be the date of Design -Builder's written acceptance of such modifications; or 5.2.4.2 Owner shall terminate this Agreement by payment to Design -Builder 50% of the Design Fee and the associated Management Fees for the preparation of the Schematic Design Documents, such payment being the total compensation Design -Builder will be entitled to for any and all work performed prior to the date of such termination. 5.3 Adiustments to Price The GMP Price shall be equitably adjusted to provide for changes in the scope of the Construction Work, including: 5.3.1 Delays encountered in performing the work caused by or resulting from acts or omissions of the Owner, the Owner's representatives, or any Other Contractors; 5.3.2 Changes to the Project or Construction Work as provided in Article 7 hereof; 5.3.3 Additional work and/or delays caused by or resulting from the presence of Hazardous Materials on the Project site other than materials brought onto the site by Design - Builder; 5.3.4 The Owner's suspension of the work under this Agreement; or 5.3.5 Differing Site Conditions; and/or other occurrences or circumstances for which the Design -Builder is entitled to a price adjustment under this Agreement. ARTICLE 6 - PAYMENT Instructions to Offerors Page 32 of 53 Northside Community Center Renovation (December 2019) 6.1 Schedule of Values. 6.1.1 Prior to submitting the first application for payment during the Construction Work, the Design -Builder shall provide to the Owner a schedule of values consisting of a breakdown of the Open Book Price with separate line items for the major elements of the Construction Work included in the Lump Sum Price. .. 6.1.2 If the Owner disagrees with the values utilized by the Design -Builder in the schedule of values, the Owner shall provide the Design -Builder a written objection to the schedule of values within seven (7) days after the Owner's receipt of the schedule of values, specifically stating the items with which the Owner objects, the basis for such objection, and the adjustment in the schedule of values which would be satisfactory to the Owner. In the event of objection by the Owner, the Design -Builder and the Owner shall negotiate in good faith to resolve any such objection before commencement of the Construction Work. The Design -Builder shall not be required to commence the Construction Work until all such objections are resolved. If any such delays in the commencement of the Construction Work are encountered, the Design -Builder shall be entitled to an adjustment of the Contract Time. 6.2 Monthly Progress Payments. 6.2.1 On the first day of each month after the Date of Commencement, the Design - Builder shall submit to the Owner an application for payment based on the percentage of work completed for each item on the schedule of values, and the materials suitably stored at the Project site (or at other locations approved in writing by the Owner). Approval of payment applications for such stored materials shall be conditioned upon submission by the Design -Builder of bills of sale or such other procedures satisfactory to the Owner to establish the Owner's title to such materials. 6.2.2 Within ten (10) days after the Owner's receipt of each monthly application for payment, the Owner shall give written notice to the Design -Builder of the Owner's acceptance, rejection, or adjustment of such application for payment. The Owner's adjustment or rejection of an application for payment shall only be based on a justification stated in paragraph 6.2.3. Within fifteen (15) days after receipt of each monthly application for payment, the Owner shall pay directly to the Design -Builder, the amount for which the application for payment is made, less any amounts previously paid by the Owner. If such application is rejected or adjusted, the Owner shall provide with the written notice of rejection or adjustment, a statement of the specific portion of the items in the schedule of values rejected or adjusted and the Owner's basis for such rejection or adjustment. If the Owner and Design -Builder cannot agree on a revised amount, the Owner shall pay directly to the Design -Builder the amount of those items not rejected and the uncontested amount of items adjusted, less amounts previously paid by the Owner. The items rejected or adjusted by the Owner shall be due and payable when the reasons for the Owner's rejection or adjustment have been removed or cured. 6.2.3 Justification for Owner's Adiustment. For the following reasons, the Owner may reject or adjust an application for payment submitted by the Design -Builder to the extent necessary to protect the Owner from loss or damage for which Design -Builder is responsible under this Agreement: 6.2.3.1 The Design -Builder repeatedly fails to perform the Construction Work as required by the Construction Documents; 6.2.3.2 The Owner suffers or incurs a loss or damage arising out of this Agreement and Instructions to Offerors Page 33 of 53 Northside community Center Renovation (December 2019) caused by the Design -Builder, but only to the extent that such loss or damage is not covered by insurance provided by Design -Builder or by Owner pursuant to the terms of this Agreement; 6.2.3.3 The Owner receives notice that the Design -Builder has failed to pay Design Consultants, Subcontractors, or other persons supplying materials, equipment or supplies incorporated into the Construction Work, when the Owner has paid the Design -Builder for such Construction Work; 6.2.3.4 The Design -Builder fails to correct Defective Work in a timely manner as provided in this Agreement; or 6.2.3.5 If the unpaid balance of the Contract Price is insufficient to pay for the cost to complete the Construction Work required under this Agreement. 6.2.3.5 When the above basis for rejecting or adjusting an application for payment has been removed, the Owner will make payment within thirty (30) days to the Design -Builder for the amounts previously withheld. 6.2.4 Retainage Before Substantial Completion. From each progress payment made prior to the time of Substantial Completion of the Construction Work, the Owner may retain five percent (5%) of the amount otherwise due under this Agreement. 6.2.5 Retainage After Substantial Completion. Upon Substantial Completion of the Construction Work, the Owner shall -pay the Design -Builder the unpaid balance of the Contract Price, less a sum equal to 150% of the Owner's estimated cost of completing any unfinished items, as agreed to between the Owner and the Design -Builder. The Owner thereafter shall pay the Design -Builder monthly the amount retained for unfinished items as each item is completed. 6.2.6 Owner's Failure to Pay. If the Owner fails to pay the Design -Builder at the time payment of any amount becomes due, and such amount remains unpaid for a period of thirty (30) days, then (i) within three (3) Owner business days after the Owner's receipt of notice from the Design -Builder of the Design -Builder's intention to cease work on the Project, the Design -Builder may stop all work on the Project until full payment of the amount owing has been received by the Design -Builder and (ii) within seven (7) days after the Owner's receipt of notice of termination from the Design -Builder, the Design -Builder may terminate this Agreement. Payments due but unpaid pursuant to this Agreement shall bear interest at the rate set forth for past due construction payments in Chapter 2251 of the Texas Government Code. 6.2.7 Warranty of Clear Title. The Design -Builder warrants and guarantees that title to all work, materials, and equipment covered by an application for payment, whether incorporated in the Project or not, will pass to the Owner upon receipt by Design -Builder of payment for the application for payment, free and clear of all liens, claims, security interests, or encumbrances. The Owner's payment of an application for payment, whether in whole or in part, shall not be deemed acceptance of any Construction Work not conforming to the requirements of the Construction Documents, it being the duty and responsibility of the Design -Builder to perform the Construction Work in accordance with the requirements of the Construction Documents. 6.3 Final Payment, 6.3.1 Upon completion of all work under this Agreement, including punch list work, Design -Builder shall submit an invoice to Owner for the final Contract Price, less progress payments previously received (the "Final Invoice"). 6.3.2 Owner shall have 30 days to review and audit Design -Builder's Final Invoice, if Instructions to Offerors Page 34 of 53 Northside Community Center Renovation (December 2019) the Owner disagrees with the Design -Builder's Final Invoice notice thereof shall be provided to Design -Builder not later than 35 days following Design -Builder's submission of its Final Invoice. Such notice of disagreement must describe in detail those portions of the Final Invoice disputed and the reason(s). 6.3.3 If Owner disagrees or objects with the Final Invoice, payment shall nevertheless be made for the undisputed balance, if any, due Design -Builder. Such payment of the undisputed balance is due not later than 45 days following Design -Builder's submission of the Final Invoice. With respect to the disputed amount of Design -Builder's Final Invoice the parties shall meet within the 30-day period following Owner's notice of disagreement and attempt to resolve the dispute by agreement. If that process is unsuccessful, the Owner and Design Builder shall submit the dispute to non -binding mediation, and if such mediation is unsuccessful in resolving the dispute, either Owner or Design -Builder may bring suit in a court of competent jurisdiction located in Tarrant County, Texas. 6.3.4 In the event the final total Contract Price payable under this Agreement is less than the sum of progress payments previously received, Design -Builder shall refund the amount of such excess progress payments received to Owner within 10 days following the final determination of the final total Contract Price. Any refund not so made shall bear interest at the rate of ten percent (10%) per annum. 6.3.5 Owner shall pay Design -Builder interest at the rate set forth for past due construction payments in Chapter 2251 of the Texas Government Code on any amounts not timely paid under this Agreement. To the extent any disputed entitlement to payment is resolved in favor of the Design -Builder, such interest shall be paid on the amount determined to be due Design -Builder from the original due date of the disputed payment. ARTICLE 7 - CHANGES IN THE WORK 7.1 Changes in the Work. Changes in the Construction Work which are within the general scope of this Agreement may be accomplished without invaliding the Agreement by Change Order as provided in paragraph 7.2, a Work Change Directive as provided in paragraph 7.3, or a Minor Change in the Work as provided in paragraph 7.4. 7.2 Change Orders. The Owner may order changes in the Construction Work within the general scope of the Construction Documents by a Change Order. All such changes in the Construction Work shall be authorized by the Owner pursuant to a written change order executed by the Owner and the Design -Builder, and shall be performed under applicable conditions of the Contract Documents. Each adjustment in the Contract Price and/or Contract Time resulting from a Change Order shall clearly separate the amount attributable to design services. The Owner and the Design -Builder shall negotiate in good faith an equitable adjustment to the Contract Price and the Contract Time and shall conclude these negotiations as expeditiously as possible. Neither the Design -Builder nor the Owner shall unreasonably withhold acceptance of the Change Order, any adjustment in the Contract Price, and/or Contract Time. 7.3 Work Change Directive. In the event the Owner and the Design -Builder cannot agree on an equitable adjustment to the Contract Price or the Contract Time, the Owner may issue a Work Change Directive, directing a change in the Construction Work if the changed work is within the general scope of the Construction Documents. If the Owner issues a Work Change Directive, the Design -Builder shall provide an accounting to the Owner for all extra costs incurred by the Design -Builder as a result of the Work Change Directive. The Design -Builder shall also record all extra time required for the completion of the work required by the Work Change Directive. The Contract Price will be increased by the amount of such additional costs plus fifteen percent (15%) of such costs for Design -Builder's overhead and profit. The Design -Builder will also be entitled to an extension of the Contract Time that corresponds with the additional time required to complete the work under the Work Change Directive. If the Owner and Design -Builder subsequently agree [nstructions to Offerors Page 35 of 53 Northside Community Center Renovation (December 2019) to the adjustments in the Contract Price and the Contract Time for work under the Work Change Directive, such agreement shall be documented by completion of a Change Order. 7.4 Minor Changes in the Work. Design -Builder, with the written approval of the Owner, may make minor changes in the design and construction of the Project consistent with the intent of the Contract Documents, which do not involve an adjustment of the Contract Price and/or the Contract Time, and which do not materially or adversely affect the design of the Project, the quality of any of the materials or equipment specified in the Construction Documents, the performance of any equipment or systems specified in the Construction Documents, or the quality of workmanship required by the Construction Documents. 7.5 Differing Site Conditions. If Design -Builder encounters a Differing Site Condition that is manmade, Design -Builder will be entitled to an adjustment in the Contract Price, and/or the Contract Time, to the extent that the Differing Site Condition adversely impacts design -Builder's costs and/or time of performance. Upon encountering a manmade Differing Site Condition, Design -Builder shall provide prompt written notice to Owner of such condition, which notice shall not be later than five (5) business days after the impact of such manmade Differing Site Condition has been determined by Design -Builder. Design -Builder shall, to the extent reasonably possible, provide such notice in a manner to allow the Owner to mitigate any costs or extra expenses arising out of the manmade Differing Site Condition. Design -Builder waives any claim for additional time and/or compensation for failure to provide written notice as required herein. Design -Builder shall not be entitled to any additional compensation for a naturally occurring Differing Site Condition, but shall be entitled to and adjustment in Contract Time. ARTICLE 8 - INDEMNITY, INSURANCE AND BONDS 8.1 IndemnitV. DESIGN -BUILDER COVENANTS AND AGREES TO, AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND OWNER, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS OR SUITS FOR PROPERTY DAMAGE OR LOSS AND/OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, OF WHATSOEVER KIND OR CHARACTER, WHETHER REAL OR ASSERTED, ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THIS AGREEMENT, ITS OFFICERS, AGENTS, EMPLOYEES, CONTRACTORS OR SUBCONTRACTORS, WHETHER OR NOT CAUSED IN WHOLE OR IN PART BY ALLEGED NEGLIGENCE ON THE PART OF THE OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, LICENSEES AND INVITEES OF OWNER. DESIGN - BUILDER DOES HEREBY COVENANT AND AGREE TO ASSUME ALL LIABILITY AND RESPONSIBILITY OF OWNER, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES FOR PROPERTY DAMAGE OR LOSS, ANDIOR PERSONAL INJURIES, INCLUDING DEATH, TO ANY AND ALL PERSONS OF WHATSOEVER KIND OR CHARACTER, WHETHER REAL OR ASSERTED, ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THIS AGREEMENT, WHETHER OR NOT CAUSED, IN WHOLE OR IN PART, BY ALLEGED NEGLIGENCE OF OWNER, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, LICENSEES, OR INVITEES. DESIGN -BUILDER LIKEWISE COVENANTS AND AGREES TO, AND DOES HEREBY, INDEMNIFY AND HOLD OWNER HARMLESS FROM AND AGAINST ANY AND ALL INJURIES, LOSS, OR DAMAGES TO PROPERTY OF OWNER DURING THE PERFORMANCE OF THIS AGREEMENT, WHETHER ARISING OUT OF OR IN CONNECTION WITH OR RESULTING FROM, IN WHOLE OR IN PART, ANY AND ALL ALLEGED ACTS OR OMISSIONS OF OWNER'S OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, LICENSEES OR INVITEES. THE INTENT OF THIS PARAGRAPH IS TO REQUIRE DESIGN -BUILDER TO INDEMNIFY THE OWNER FOR ITS SOLE OR CONCURRENT NEGLIGENCE; PROVIDED, HOWEVER, THIS INDEMNITY SHALL NOT BE CONSTRUED SO AS TO REQUIRE THE DESIGN Instructions to Offerors Page 36 of 53 Northside Community Center Renovation (December 2019) PROFESSIONAL TO INDEMNIFY OWNER OR ANYONE UNDER OWNER. FOR THE OWNER'S SOLE NEGLIGENCE. 8.2 Design -Builder's Liability Insurance. The Design -Builder shall obtain and maintain insurance coverage for the following claims which may arise out of the performance of this Agreement, whether resulting from the Design -Builder's operations or from the operations of any Subcontractors, their employees, or by an individual or entity for whose acts they are liable: 8:2.1 Claims under Workers' Compensation statutes or'other disability benefits statutes applicable to the Construction Work; 8.2.2 Claims under applicable employer's liability statutes or laws for bodily injury, occupational sickness, disease or death claims of the Design -Builder's employees; 8.2.3 Claims for bodily injury, sickness, disease, death or damages to persons not employed by the Design -Builder; 8.2.4 Claims for personal injury disability for damages directly or indirectly related to the person's employment by the Design -Builder; 8.2.5 Claims for damage to or destruction of tangible property; 8.2.6 Claims for bodily injury, death, or property damage resulting from motor vehicle liability for motor vehicles used or operated by the Design -Builder; and 8.2.7 Claims for contractual liability involving the Design -Builder's obligations under the indemnity provided in this Agreement. 8.2.8 Claims for loss of use of Owner's property located at the Project site occurring before Substantial Completion. 8.2.9 Claims for damage to boiler and machinery located at the Project site occurring before Substantial Completion. 8.2.8 The Design -Builder's liability insurance policies shall be written for not less than the following limits of liability: Commercial General Liability Insurance: (a) Each occurrence limit: $1,000,000 (b) General Aggregate: $2,000,000 (c) Products/Completed Operations Aggregate: $2,000,000 (d) Personal and advertising Injury Limit: $2,000,000 Automobile Liability $1,000,000 each accident on a combined single limit basis Or $250,000 Property Damage $500,000 Bodily Injury per person per occurrence A commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. Workers' Compensation Instructions to Offerors Page 37 of 53 Northside Community Center Renovation (December 2019) Statutory limits Employer's liability $100,000 Each accident/occurrence $100,000 Disease - per each employee $500,000 Bodily Injury/Disease - policy limit This coverage may be written as follows: Workers' Compensation and Employers' Liability coverage with limits consistent with statutory benefits outlined in the Texas workers' Compensation Act (Art. 8308 -- 1.01 et seq. Tex. Rev. Civ. Stat.) and minimum policy limits for Employers' Liability of $100,000 each accident/occurrence, $500,000 bodily injury disease policy limit and $100,000 per disease per employee 8.2.9 Commercial General Liability Insurance maybe arranged under a single policy for the full limits required or by a combination of underlying policies and an excess of umbrella liability policy. The policy shall contain a provisions that coverage will not be cancelled or not renewed until at least thirty (30) days prior written notice has been given to the Owner. Certificates of insurance showing required coverage to be in force shall be filed with the Owner prior to commencement of the Construction Work. Products and completed operations insurance shall be maintained for a minimum period of one year after the date of Substantial Completion. 8.3 Professional Liability Insurance. The Design -Builder shall obtain or require its Design Consultants to obtain professional liability insurance for claims arising out of the negligent performance of the professional services required under this Agreement. The professional liability insurance shall be written for an amount not less than $2,000,000 per claim and in the aggregate, with a deductible amount not to exceed $50,000. Such coverage shall be maintained for a period of three (3) years following the date of final completion. 8.4 Builder's Risk Insurance. The Design -Builder shall obtain and maintain All Risk Builder's Risk insurance for the Construction Work required under this Agreement. This insurance shall include as named insureds the Owner and the Design -Builder. This insurance shall include all risk insurance for physical loss or damage including without duplication of coverage, at least: theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, temporary buildings, debris removal, testing, and demolition resulting from enforcement of any applicable legal requirements. 8.5 Additional Insurance Requirements. 8.5.1 The Owner, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. 8.5.2 Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. 8.5.3 Any failure on part of the Owner to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. 8.5.4 Each insurance policy shall be endorsed to provide the Owner a minimum thirty days notice of cancellation, non -renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. Instructions to Offerors Page 38 of 53 Northside Community Center Renovation (December 2019) 8.6.5 Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. 8.5.6 Deductible limits, or self -funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the Owner. 8.5.7 Other than worker's compensation insurance,', in lieu of traditional insurance, Owner may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The Owner must approve in writing any alternative coverage. 8.5.8 Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the Owner. 8.5.9 Owner shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. 8.5.10 Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self -funded or commercial coverage maintained by Owner shall not be called upon to contribute to loss recovery. 8.5.11 In the course of the project, Contractor shall report, in a timely manner, to Owner's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. 8.5.12 Contractor's liability shall not be limited to the specified amounts of insurance required herein. 8.5.13 Upon the request of Owner, Contractor shall provide complete copies of all insurance policies required by these contract documents. 8.6 Bonds and Other Performance Security. 8.6.1 The Design -Builder shall give the Owner surety in a sum equal to the amount of the Lump Sum Price, as reduced by cost of the design services. The Design -Builder shall be required to furnish bonds as follows. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. In order for a surety to be acceptable to the Owner, it must meet the requirements of V. A. T. S. Insurance Code, art. 7.19-1. 8.6.2 If the total Lump Sum Price as reduced by the cost of the design services is in excess of $50,000, a Payment Bond shall be executed in the amount of the contract solely for the protection of all claimants supplying labor and material in the prosecution of the work. 8.6.3 If the total Lump Sum Price as reduced by the cost of the design services is in excess of $100,000, a Performance Bond shall be executed in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the Owner. 8.6.4 No sureties will be accepted by the Owner that are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the Owner. Instructions to Offerors Page 39 of 53 Northside Community Gentef Ronovation (December 2019) 8.7 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: 8.7.1 Definitions: 8.7.1.1 Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TVVCC- 81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 8.7.1.2 Duration of the project includes the time from the beginning of the work on the project until the contra ctor'slperson's work on the project has been completed and accepted by the governmental entity. 8.7.1.3 Persons providing services on the project ("sub -contractor" in §406.096) includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 8.7.2 Design Builder shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Design -Builder providing services on the project, for the duration of the project. 8.7.3 Design Builder must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 8.7,4 If the coverage period shown on the Design -Builder's current certificate of coverage ends during the duration of the project, the Design -Builder must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. 8.7.6 The Design -Builder shall obtain from each person providing services on a project, and provide the governmental entity: 8.7.5.1 A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 8.7.5.2 No later than seven days after receipt by the Design -Builder, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 8.7.6 The Design -Builder shall retain all required certificates of coverage for the duration of the project and for one year thereafter. Instructions to Offerors Page 40 of 53 Northside Community center Renovation (December 2019) 8.7.7 The Design -Builder shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the Design -Builder knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the project. 8.7.8 The Design -Builder shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify'coverage and report lack of coverage. 8.7.9 The Design -Builder shall contractually require each person with whom it contracts to provide services on a project, to: 8.7.9.1 Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 8.7.9.2 Provide to the Design -Builder, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 8.7.9.3 Provide the Design -Builder, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 8.7.10 Obtain from each other person with whom it contracts, and provide to the Design - Builder: 8.7.10.1 Provide a certificate of coverage, prior to the other person beginning work on the project; and 8.7.10.2 A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 8.7.11 Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 8.7.12 Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 8.7.13 Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8.7.14 By signing this contract or providing or causing to be provided a certificate of coverage, the Design -Builder is representing to the governmental entity that all employees of the Design -Builder who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Instructions to Offerors Page 41 of 53 Northsido Community Center Renovation (December 2019) Self -Insurance Regulation. Providing false or misleading information may subject the Design - Builder to administrative, criminal, civil penalties or other civil actions. 8.7.15The Design -Builder's failure to comply with any of these provisions is a breach of contract by the Design -Builder which entitles the governmental entity to declare the contract void if the Design -Builder does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. 8.7.16 The Design -Builder shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, orto report an employer's failure to provide coverage". Part 4 - ARTICLE 9 - SUSPENSION AND TERMINATION OF THE AGREEMENT 9.1 Suspension bV the Owner for Convenience. Owner may order Design -Builder in writing to suspend, delay or interrupt all or any part of the Work without cause for such period of time as the Owner may determine to be appropriate for its convenience without additional compensation to the Design -Builder. To the extent the time for performance of the Construction Work is impacted by such suspension, delay or interruption an equitable adjustment shall be made in the Contract Price and/or Contract Time. No adjustment shall be made if the Design - Builder is or otherwise would have been solely responsible for the suspension, delay or interruption of the Construction Work, or if another provision of this Agreement is applied to render an equitable adjustment. 9.2 Termination by the Owner for Cause. 9.2.1 If Design -Builder persistently fails to perform any of its obligations under this Agreement and fails within seven days after receipt of written notice from Owner of such failure to commence and continue correction of such failure, then the Owner may undertake to perform such obligations. The costs incurred by the Owner in performing such obligations may be deducted from the Contract Price. 9.2.2 If Design -Builder fails to cure upon seven (7) days' written notice to Design -Builder and Design -Builder's surety, Owner may, after seven days following receipt by the Design -Builder of an additional written notice, terminate this Agreement for any of the following reasons: Instructions to Offorors Page 42 of 53 Northside Community Center Renovation (December 2019) 9.2.2.1 If Design -Builder persistently utilizes improper materials and/or inadequately skilled workers; 9.2.2.2 If Owner receives notice that the Design -Builder has not made proper payment to laborers, material suppliers or Sub -contractors, provided that the Owner has fully paid to the Design -Builder in accordance with the terms of this Agreement, the payment sought by such laborers, material suppliers or Sub -contractor, or 9.2.2.3If Design -Builder persistently fails to abide by the orders, regulations, rules, ordinances or laws of governmental authorities having jurisdiction; or 9.2.2.4 If Design -Builder is in breach of any other requirement of the Contract Documents. 9.2.3 Owner may terminate this Agreement for cause if Design -Builder files a petition under the Bankruptcy Code, and Design -Builder or the Design -Builder's trustee rejects the Agreement or, if there has been a default, the Design -Builder is unable to give adequate assurance that Design -Builder will perform as required by this Agreement or otherwise is unable to comply with the requirements for assuming this Agreement under the applicable provisions of the Bankruptcy Code. 9.2.4 In the event the Owner exercises its rights under Subparagraph 9.2.1 9.2.2 or 9.2.3, upon the request of the Design -Builder, the Owner shall provide a detailed accounting of the obligations or work of the Design -Builder performed by Owner and the cost incurred by the Owner in performing such obligations or work. 9.3 Termination by the Owner Without Cause. If Owner terminates this Agreement other than as set forth in paragraph 9.2, then Owner shall pay Design -Builder for all work completed as of the termination date (including any withheld retainage), plus all proven losses, costs or expenses incurred in connection with demobilization and termination of the Construction Work. Design -Builder shall not be entitled to any compensation for lost or anticipated profits. 9.4 Termination by the Design -Builder. 9.4.1 Upon seven (7) days' written notice to the Owner, the Design -Builder may terminate this Agreement for any of the following reasons: a) if the Owner suspends the Work for sixty (60) days; b) if the Owner fails to furnish reasonable evidence that sufficient funds are available and committed for the entire cost of the Project; or c) if the Owner has for thirty (30) days failed to pay the Design -Builder pursuant to Subparagraph 6.2. 9.4.2 Upon termination by the Design -Builder in accordance with paragraph 9.4.1, the Design -Builder shall be entitled to recover payment from the Owner as if the Owner had terminated this Agreement under paragraph 9.3. Design -Builder shall not be entitled to any compensation for lost or anticipated profits. ARTICLE 10 --- MINORITYIWOMEN BUSINESS ENTERPRISE PARTICIPATION 10.1 The goals of twenty-five percent (25%) SBE for design and twenty-five percent (25%) MBE for construction have been established for Minority and Women Business Instructions to Offerors Page 43 of 53 Northside community center Renovation (December 2019) Enterprise (MMNBE) participation in this Agreement. Design -Builder shall fully comply with all requirements of Owner of Fort Worth Ordinance No. 15530 in meeting this established goal. 10.2 In accord with City of Fort Worth Ordinance No. 15530, Owner has goals for the participation of minority business enterprises and woman business enterprises in Owner's contracts. Design -Builder acknowledges the MIWBE goal established for this contract and its f commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by Design -Builder may result in the termination of this agreement and debarment from participating in Owner contracts for a period of time of not less than three (3) years. ARTICLE I I -MISCELLANEOUS 11.1 Notices. All notices required to be given under this Agreement shall be deemed delivered when deposited in the United States mail, first class postage prepaid, addressed to the recipient at: HM & MF, LTD. dlbla Muckleroy & Falls, a Texas Limited Partnership 3200 Riverfront Drive, Suite 200 Fort Worth, Texas 76107 CITY OF FORT WORTH Architectural Services Manager Property Management Department 401 West 131' Street Fort Worth, TX 76102 11.2 Conflict in Terms. In the event there is a conflict between the terms of this Agreement, and any other Contract Document, the terms of this Agreement shall control over the other Contract Documents. 11.3 Governing Law., The laws of the State of Texas shall govern this Agreement and the parties agree that any suit arising out of or relating to this Agreement shall be exclusively in Tarrant County, Texas. 11.4 IMMIGRATION NATIONALITY ACT City actively supports the Immigration & Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Vendor shall verify the identity and employment eligibility of all employees who perform work under this Agreement. Vendor shall complete the Employment Eligibility Verification Form (1-9), maintain photocopies of all supporting employment eligibility and identity documentation for all employees, and upon request, provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Vendor shall establish appropriate procedures and controls so that no services will be performed by any employee who is not legally eligible to perform such services. Vendor shall provide City with a certification letter that it has complied with the verification requirements required by this Agreement. Vendor shall indemnify City from any penalties or liabilities due to violations of this provision. City shall have the right to immediately terminate this Agreement for violations of this provision by Vendor. 11.5 No Boycott of Israel If Contractor has fewer than 10 employees or the Agreement is for less than $100,000, this section does not apply. Contractor acknowledges that in accordance with Chapter 2270 of the Texas Instructions to Offerors Page 44 of 53 Northside Community Center Renovation (December 2019) Government Code, City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this Agreement, Contractor certifies that Contractor's signature provides written verification to City that Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the Agreement, 11.6 No Waiver of Performance. The failure of either the Owner or the Design -Builder to insist, in any one or more instances, on the performance of any of the terms, covenants or conditions of this Agreement, or to exercise any rights under this Agreement, shall not be construed as a waiver or relinquishment of such term, covenant, condition or right with respect to further performance. 11.7 Severability. The partial or complete invalidity of any one or more provisions to this Agreement shall not affect the validity or continuing force and effect of any other provision. 11.8 Right to Audit. 11.8.1 Design -Builder agrees that Owner shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Design -Builder involving transactions relating to this Agreement. Design -Builder agrees that the Owner shall have access during normal working hours to all necessary Design -Builder facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. Owner shall give Design -Builder reasonable advance notice of intended audits. 11.8.2 Design -Builder shall include in all its subconsultant agreements and subcontracts hereunder a provision to the effect that the subconsultant and/or sub -contractor agree that the Owner shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant or sub -contractor involving transactions to the sub -agreement, and further, that Owner shall have access during normal working hours to all subconsultant or sub -contractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this section. Owner shall give subconsultants or sub -contractors reasonable advance notice of intended audits. 11.8.3 Design -Builder agrees to photocopy such documents as may be requested by Owner, and further agrees to include such a provision in any subconsultant or sub -contractor agreement. Owner agrees to reimburse for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 11.9 Additional Compensation Anywhere in this Agreement where Design -Builder may be entitled to additional compensation, the calculation to determine such additional compensation shall not include any costs or expenses for any home -office overhead and expenses, and shall be limited to the costs incurred at the Project site, examples of which include Project site trailer, Project site utility costs, Project site supervision, Project Engineer (billed on hourly rate) and Project Manager (based on hourly rate) and like Project site specific costs. Instructions to Offerors Page 45 of 53 Northside Community Center Renovation (December 2019) A TI C L E i 2 -C ounte rpa cs Execu t ed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth By : Name : Dana Burghdoff, AICP Title : Assistant City Manager Date: Jun 16, 2020 Approval Recommended: By: Steve Cooke (Jun 15, 2020 09:27 CDT) Name : Steve Cooke Contract Compliance Manager: By signing I acknowledge that I am the person responsible-Jar the monitoring and administration of this contract, includin g ensuring all performance and reporting requirements . By : ~-~ ~. ~ Name: Brian Glass Title : Architectural Services Manager Approved as to Form and Lega lity : Title : Director, Property Man · •me,,..,_,.,.,, 1-S S/r(lt111_ · y , JB Strong(.);.;¥, 2020 17:01 CDT) Attest: ___ :. o\.· a.me: ---Jo_h_n_B __ -S-tr_o_n_g ____ _ ·:· _. itle: Assistant City Attorney By: Name: Mary J. Kay Title : City Sec retary t '•···1i;{iif "~----<-- CONTRACTOR: HM & MF, LTD . d/b/a Muckleroy & Falls, a Texas Limited Partnership ~~m:-IS;. ,/1<2 Title: VP, Preconstruction/Estimating Date : 6/1/u;w HM & MF, Ltd .. d/b/a MUCl<LEROY & FA LLS , a Tex as Limited Partnership by Muckleroy & Fall s Construction Co .• a Texas Corporation and General Partn er Instructions to Offerers Northside Community Center Renovation (December 2019) Contract Authorization: \M&C: 20-0240 4-7-2020 OFFICIAL RECOR D CITY SECRETARY FT. WORTH, TX Page 46 of 53 Bond # 2302765 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, HM & MF, LTD. dlbla Muckleroy & Falls , known as "Principal" herein and Westport Insurance Corporation , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Four Million Three Hundred Ninety Thousand Dollars and No Cents 4 390 000.00 , lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the City awarded the 7th day of April , 2020, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Northside Community Center Renovation located at 1100 Northwest 8111 Street Fort Worth Texas PMD2019-05 CitV Project #101654. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations render the Contract and shall in all respects duly and faithfully perform the Work, including Change Orders, under the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of the City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. Instructions to Offerors Page 49 of 53 Northside Cnmmunily Center Renovalion (December 2M) This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 4th day of May , 2020. ATTEST: (Principal) Secretary Witness as to Principal cjz� L_� Witness as to Surety PRINCIPAL: HIM & MF dba Muckleroy & Falls, LP Mill 11 j v.16M �c�� Name and Title Address: 5801 Edwards Ranch Road, Suite 100 Fort Worth, TX 76109 HM & MF, Ltd., dlbla MUCKLEROY & FALLS a Te as Umifed Partnership by Muckleroy & Falls Construction Co.. a Texas Corporation and General Partner SURETY: Westport Insurance Corporation BY: Signature Debra Lee Moon, Attorney -in -Fact Name and Title Address: 1200 Main St, #800 Kansas City, MO 64105 Telephone Number: (M) 676-5200 _ "Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. Instructions to Offerors Northside Community Center Renovation (December 2019) Page 50 or 63 Bond ## 2302765 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, HM & MF, LTD. d/b/a Muckleroy & Falls _, known as "Principal" herein, and Westport Insurance Corporation , a corporate surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of, Four Million Three Hundred Ninety Thousand Dollars and No Cents ($4,390,000.00), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Principal has entered into a certain written Contract with City, awarded the 7th day ofApril , 2020, which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Northside Community Center Renovation located at 1100 Northwest 1811 Street, Fort Worth, Texas PMD2019-05 City Project #101654. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. Instructions to Offerors Page 47 of 53 Northside Community Center Renovation (December 2019) IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 4th day of May , 2020, ATTEST: (Principal) Secretary Witness as to Principal ATTEST: (Surety) ecretary Witness as to Surety PRINCIPAL: HM & MF dba Muckleroy & Falls, LP BY: Si re Name and Title Address: 5801 Edwards Ranch Road, Suite 100 Fort Worth, TX 76109_ HM & MF, Ltd„ d/b/a MUCKLEAOY & PALLS, a Texas Urniled Partnership by Muckleroy & Falls Construction Co., a Texas Corporation and Generaf Partner SURETY: Westport Insurance Corporation BY Signature Debra Lee Moon, Attorney -in -Fact Narne and Title Address: 1200 Main St, #800 Kansas City, MO 64105 Telephone Number: —(913) 676-5200 *Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided, The date of the bond shall not be prior to the date the Contract is awarded. Instructions to Offerors Page 40 of 53 Northside Community Center Renovation (December 2019) SWISS RE CORPORATE SOLUTIONS NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY WESTPORT INSURANCE CORPORATION GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under laws of the State of New Hampshire, and leaving its principal office in the City of Kansas City, Missouri and Washington International Insurance Company a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City the Cans s City, Kansas sours and W each Insurance oes an hereby make Lion, o anand . undert he laws of the State of Missouri, and having Its principal office m City City, Y pp JOHN WILLIAM NEWBY, TROY RUSSELL KEY, DEBRA LEE MOON, AND.REA ROSE CRAWFORD, SANDRA LEE RONEY, LINDA MICHELLE STALDER SUZANNE ELIZABETH NIED7.WTED7.,, SFTERIE MICHELLE. GREENOUGH, CHERI LYNN IRBY, AND JOSHUA D. TRITT, JOTN MY OR SEVERALLY Its true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed wider this authority shall exceed the amount of. TWO HUNDRED MILLION ($200,000,000.00) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on March 24, 2000 and Westport Insurance Corporation by written consent of its Executive Committee dated July 18, 2011. "RESOLVED, that any two of the President, any Senior Vice President, any Vice President, any Assistant Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be. affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached." I By Steven P. Anderson, Senior vice President oas ingion international insurance Company id &Senior Vice Present ofNorib American Speeiaaylnsurance Company ��~s F, & Senior Vice President of Westport Insurance Corporation = � •'dI jar By A. Ito, Senior Vice President of Washington Internafinnal insurance Company & Senior We President of Nonh American Specialty Insurance Company * �� oV & Senior Vice President ur Westport insurance Corporation IN WITNESS WHEREOF, North American Specialty Insurance Company, Washington International Insurance Company and Westport Insurance Corporation have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this this 12th day of FEBRUARY , 20 20 North American Specialty Insurance Company Washington International Insurance Company State of Illinois Westport Insurance Corporation County of Cook ss: On this 12th day of FEBRUARY 20 20, before me, allotary Public personally appeared Steven P. Anderson , Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation and Michael A. Ito Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Senior Vice President of Westport Insurance Corporation, personally known to me, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. OFFICIAL SEAL �• Notary Public - Slate of Illinois _ 1 1 1 'k, laycnm2to`41AnzDiiii`x M. Kenny, Notary Public I, Jeffrey Goldberg the duly elected Vice President and Assistant Secretary of North American Specialty Insurance Company, Washington International Insurance Company and Westport Insurance Corporation do hereby certify that the above and foregoing is a true and correct copy, of a Power of Attorney given by said North American Specialty Insurance Company, Washington International Insurance Company and Westport Insurance Corporation which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 4th day of May 20 20 Jeffrey Goldberg. Vice President & Assistant Secretary or Washington Intemalional Insurance Cogxv y & North American Specially Insurance Company & Vice President & Assistant Secretary of Westpon fasurance Corporation North American Specialty Insurance Company Washington International Insurance Company Westport Insurance Corporation TEXAS CLAIMS INFORMATION IMPORTANT NOTICE ADVISO IMPORTAN7E In order to obtain information or make a complaint You may contact Jeffrey Goldberg, Vice President - Claims at 1-800-338-0753 You may call Washington International Insurance Company and/or North American Specialty Insurance Company's and/or Westport Insurance Corporation toll -free number for information or to make a complaint at: 1-800-338-0753 You may also write to Washington International Insurance Company and/or North American Specialty Insurance Company and/or Westport Insurance Corporation at the following address: 1450 American Lane Suite 1100 Schaumburg, IL 60173 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httn://www.tda.state.lA.us Email: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the Washington International Insurance Company and/or North American Specialty Insurance Company and/or Westport Insurance Corporation. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. Para obtener informacion o para someter un queja: Puede comunicarse con Jeffrey Goldberg, Vice President - Claims, al 1-800-338-0753 Usted puede Ilamr al numero de telefono gratis de Washington International Insurance Company and/or North American Specialty Insurance Compan,�(s and/or Westport lnsurance Corporation para informacion o para someter una queja al: 1-800-338-0753 Usted tambien puede escribir a Washington International Insurance Company and/or North American Specialty Insurance Company and/or Westport Insurance Corporation al: 1450 American Lane Suite 1100 Schaumburg, IL 60173 Puede escribir al Departmento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departmento de Seguros de Texas: P.O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httn://`Zo=.td0.state.tx.us Email: ConsumerProtection@tdi.state.tx.us DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el Washington International Insurance Company and/or North American Specialty Insurance Company and/or Westport Insurance Corporation primero. Si no se resuelve la disputa, puede entonces comunicarse con el Departmento de Seguros de Texas. UNA ESTE AVISO A SU POLIZA Este aviso es solo para proposito de infromacion y no se convene en parte o condicion del documento adjunto. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project, Northside Community Center Renovation located at 1100 Northwest 18th Street, Fort Worth, Texas PMD2019-05 City Project #101654. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Company (Please Print) U,4q4kr ;5��.&Signature:. Address Title: _ J�l City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned a (Please Print) HM & MF, Ltd., d/bla MUCKLEROY & FALLS, a Texas Limited Partnership by Muckleroy & Falls Construction Co., a Texas Corporation and General Partner § KNOW ALL BY THESE PRESENTS: rity, on this day personally appeared known to me to fie the person whose name is subscribed to the foregoing instrument, and ack led ed to me that he/s e executed the same as the act and deed of F - a " �/" zfor the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY LAND AND SEAL OF OFFICE this J ay ofy /0�— , 2020. BETH AMIN� Notary Public, State of Texas ec Comm. Expires 05-28-2022 Notary ID 3494766 Notary Public in and for the State of Texas Instructions to Offerors Northside Community Center Renovation (December 2019) Page 52 of 53 4' -011 two CENTERLINE OF SIGN, LOGO & TEXT INFORMATION ART RTH@ Project Title Architect: Architect's Name Contractor: Contractor's Name FUNDED BY (List Band Fund, etc.) SCHEDULED COMPLETION DATE YEAR SIGN COLOR & FONT: BACKGROUND - WHITE BORDER - 5116"WIDE, YRADIUS CORNERS, PMS 288 (BLUE) TEXT - HELVETICA or ARIAL, PMS 288 (BLUE) FORT WORTH LOGO COLORS & FONT: FORT WORTH - PMS 288 (BLUE), CHELTENHAM BOLD LONGHORN LOGO - PMS 725 (BROWN) PROJECT DESIGNATION SIGN Instructions to Offerors Rage 53 of 53 Northside Community Center Renovation (December 2019) From: �iotewood. Sophia D. To: MQon&d_Yjc� Cc: g ,kill ; Strong. JB; Glass, Brian R. Subject: RE; NORTHSIDE COMMUNITY CENTER PROJECT #101654 Date: Thursday, June 11, 2020 3:42:42 PM Attachments: II . pdf M&C 20-0240 4-7-2020.odf imaae004.ona imaae005.nna Approved, Sophia Gatewood, CPCU, ARM-P, AIC, AIMS, FCLS Property & Casualty Manager HR/ Risk Management al (817) 392-7784 1 tM (817) 392-5874 City of Fort Worth — Working together to build a strolrg coftmunrity. FORT WORTH, Follow Fort Worth sm From: McDonald, Vicki Sent: Thursday, June 11, 2020 1:54 PM To. Gatewood, Sophia D. <Sophia.Gatewood@fortworthtexas.gov> Cc: Ramirez, Priscilla <Priscilla.Ramirez@fortworthtexas.gov>; Strong, JB <John.Strong@fortworthtexas.gov>; Glass, Brian R. <Brian.Glass@fortworthtexas.gov> Subject: NORTHSIDF COMMUNITY CENTER PROJECT#101654 Please review and approve the certificate of insurance for the above project. Contract is the amount of $4,390,000.00. Thanks. V khi Ji tzl) tl iW Adminstrative Assistant Property Management Department 401 West 13th Street Fort Worth Texas 76102 817-392-2586 vicki.mcdonald@fog worthtexas.gov From: Marie Revere To: McDonald, Vicki Subject: RE: BOND#2302765 MUCKLEROY & FALLS - NORTI (SIDE CC Date: Thursday, June 11, 2020 2:40:21 PM CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Hello Vicki, This email is verification that this Performance and Payment bond have been approved. If you need further assistance let me know. Marie Marie Revere I Branch Manager - Dallas I Vice President I Corporate Solutions SwissRe 112750 Merit Drive Suite 500, 75251 Dallas, United States (USA) Direct: +1 972 776 8542 Mobile: +1 972 809 0313 Email: Marie_Revere@swissre.com swissre.com From: McDonald, Vicki <Vicki.McDonald@fortworthtexas.gov> Sent: Thursday, June 11, 2020 2:06 PM To: Marie Revere <Marie Revere@swissre.com> Subject: BOLD#2302765 MUCKLEROY & FALLS - NORTHSIDE CC Please verifythe amount of the performance and payment bond for HM & MF Ltd dba Muckleroy & Falls. Thank you. Adminstrative Assistant Property Management Department 401 West 13th Street Fort Worth Texas 76102 817-392-2586 vicki.mcdonald for r v This e-mail, including attachments, is intended for the person(s) or company named and may contain confidential and/or legally privileged information. Unauthorized disclosure, copying or use of this information may be unlawful and is prohibited. If you are not the intended recipient, please delete this message and notify the sender. All incoming and outgoing e-mail messages are stored in the Swiss Re Electronic Message Repository. If you do not wish the retention of potentially private c-mails by Swiss Re, we strongly advise YOU not to use the Swiss Re e-mail account for any private, non -business related communications.