Loading...
HomeMy WebLinkAboutContract 54016ti Flhk o r M: CONTRACT FOR THE CONSTRUCTION QP AT]ER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 Water No. 596010600430-C42727-CO1783 Sewer No. 59607-0700430-CO2727-CO1783 'UPW No. 30100-0200431-CO2727-006283 Betsy Price David Cooke Mayor City Manager Chris Harder, P.E. Director, Water Department William Johnson Director, Transportation, and Public Works Department Prepared for The City of Fort Worth WATER DEPART VIENT 2020 OF �"iY`A�tiA i4laq�,{�Vp s p V VV� Y �jI{r`Y c %v ll�t LAWRENCE HAP,,IUON r(n/W20 C" SECRF-T,4n,y 00 00 00 - I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page I of SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions 0005 10 Mayor and Council Communication 0005 15 Addenda 00 11 13 Invitation to Bidders 0021 13 Instructions to Bidders 0031 15 Engineer Project Schedule 0032 15 Construction Project Schedule 0035 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 0043 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 0045 11 Bidders Prequalifications 00 45 12 Prequalification Statement 0045 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 40 Minority Business Enterprise Goal 00 45 41 Small Business Enterprise Goal 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01 - General Requirements 01 1100 Summary of Work 01 2500 Substitution Procedures 0131 19 Preconstruction Meeting 01 31 20 Project Meetings 01 32 16 Construction Progress Schedule 01 3233 Preconstruction Video 01 3300 Submittals 01 35 13 Special Project Procedures 01 4523 Testing and Inspection Services 01 5000 Temporary Facilities and Controls 01 5526 Street Use Permit and Modifications to Traffic Control 0157 13 Storm Water Pollution Prevention Plan 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 6600 Product Storage and Handling Requirements 01 70 00 Mobilization and Remobilization 01 71 23 Construction Staking and Survey 01 74 23 Cleaning 01 7719 Closeout Requirements CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 2, 2016 City Project No. 02727 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 4 01 7823 Operation and Maintenance Data 01 78 39 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions 0241 14 Utility Removal/Abandonment Division 03 - Concrete None Division 26 - Electrical None Division 31 - Earthwork None Division 32 - Exterior Improvements None Division 33 - Utilities 33 12 10 Water Services 1-inch to 2-inch Division 34 - Transportation None Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's Buzzsaw site at: htps://Vrogectoo nt.buzzsaw.com/client/fortworthgov/Resources/02%20- %20Construction%o2ODocuments/S ecifications Division 02 - Existing Conditions 0241 15 Paving Removal Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 0334 13 Controlled Low Strength Material (CLSM) 0334 16 Concrete Base Material for Trench Repair Division 26 - Electrical None Division 31 - Earthwork 3123 16 Unclassified Excavation Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 3201 18 Temporary Asphalt Paving Repair CITY OF FORT WORTFI WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 2, 2016 City Project No. 02727 000000-3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 4 3201 29 Concrete Paving Repair 32 1123 Flexible Base Courses 32 1133 Cement Treated Base Courses 32 12 16 Asphalt Paving 32 1273 Asphalt Paving Crack Sealants 32 1.3 13 Concrete Paving 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 1723 Pavement Markings 3232 13 Cast -in -Place Concrete Retaining Walls 3291 19 Topsoil Placement and Finishing of Parkways 3292 13 Hydro -Mulching, Seeding, and Sodding 32 93 43 Trees and Shrubs Division 33 - Utilities 33 01 30 Sewer and Manhole "Testing 3301 31 Closed Circuit Television (CCTV) Inspection 3303 10 Bypass Pumping of Existing Sewer Systems 33 04 30 Temporary Water Services 33 04 40 Cleaning and Acceptance Testing of Water Mains 33 0450 Cleaning of Sewer Mains 33 05 10 Utility Trench Excavation, Embedment, and Backfill 3305 12 Water Line Lowering 33 05 13 Frame, Cover and Grade Rings 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 05 17 Concrete Collars 33 05 30 Location of Existing Utilities 33 11 0S Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 1220 Resilient Seated Gate Valve 33 1225 Connection to Existing Water Mains 33 1240 Fire Hydrants 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 31 50 Sanitary Sewer Service Connections and Service Line 33 39 10 Cast -in -Place Concrete Manholes 33 39 20 Precast Concrete Manholes Division 34 - Transportation 3471 13 Traffic Control Appendix GC-4.02 Subsurface and Physical Conditions GC-6.06.1) Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates END OFSECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 2, 2016 City Project No. 02727 Uly of Fort Worth - Adian i-?t -W, i IS�fa� Fiie #: M&C 20-0305 1i, sion 1 Type: Award of Contract Consent Title: Autnorize the Fxect ion of a Contract with Gra Tex Utilities, Inc., in the Amount of for Mower. Result Agenda note: !r ftuxtes rote. ktion, n taut. Consent Votes (0;fi) t3 records Person Naw& Iv rewrds to disviay. die 2016 Water line and Sanitary Sever Ref'zoement WS.'ff, Part 2 Projec4 Adopt Appropriation Ordinances and ilptlaiv the FY2020-2024 Capital Improvement Plan (COUNCIL DISTRICT 8) Sec-r-J -. Approved Approved. Af iropriaficn Ordinance Nc.:. 24185-55-2320 and 24166-05-202' City of Fort Worth., Texas Mayor and Council Communication DATE: Tuesday, May 5, 2020 LOG NAME: 602016WSMFP2-GRATEX REFERENCE NO.: **M&C 20-0305 SUBJECT: Authorize the Execution of a Contract with Gra-Tex Utilities, Inc., in the Amount of $4,010,153.00, for the 2016 Water Line and Sanitary Sewer Replacement WSM-F, Part 2 Project, Adopt Appropriation Ordinances and Update the FY2020-2024 Capital Improvement Plan (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached Appropriation Ordinance increasing appropriations in the Water and Sewer Capital Projects Fund in the amount of $3,100,039.00 transferred from available funds within the Water and Sewer Fund; 2. Adopt the attached Appropriation Ordinance to adjust appropriations in the General Capital Projects Fund by decreasing receipts and appropriations in the Contract Street Maintenance Programmable Project (City Project No. P00020) in the amount of $1,591,786.00 and increasing receipts and appropriations in the 2016 Water Line & Sanitary Sewer Replacement WSM-L project (City Project No. CO2727) by the same amount; and 3. Authorize the execution of a contract with Gra-Tex Utilities, Inc., in the amount of $4,010,153.00 for the 2016 Water Line & Sanitary Sewer Replacement WSM-F, Part 2 project. DISCUSSION: This Mayor and Council Communication is to authorize a construction contract for the replacement of deteriorated water and/or sanitary sewer mains as indicated on the following streets: Street From Fo Scope of Work Mount Vernon Avenue Sanborn Street Newark Avenue Water Newark Avenue Mount Vernon Avenue Lancaster Avenue Water Sanderson Avenue Mount Vernon JAvenue Purington Avenue Water/Sewer Crestview Drive Meadowbrook Drive Oakland Boulevard _—] Water In conjunction with replacement of the water mains, all connecting lead service lines will be removed and replaced. There are a total of 29 identified lead service lines that will be replaced as part of this contract. Additionally, asphalt pavement rehabilitation will be conducted on all four streets, subsequent to the water and sanitary sewer main replacement. The Transportation & Public Works Department's share of this contract is $1,283,697.75 and the Water Department's share of the contract is $2,726,455.25. The project was advertised for bids on February 6, 2020 and February 13, 2020 in the Fort Worth Star - Telegram. On March 5, 2020, the following bids were received: Bidder IlAmount Time of Completion Gra-Tex Utilities, Inc. $4,010,153.00 1365 Calendar Days Woody Contractors, Inc. $4,190,547.00 FNH Construction, LLC $4,779,250.00 In addition to the contract amount, $533,681.25 (Water: $273,465.00; Sewer: $16,313.00; Paving: $243,903.25) is required for project management, material testing and inspection, and $147,990.00 (Water: $78,776.00; Sewer: $5,029.00; Paving: $64,185.00) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project will have no impact on the Transportation & Public Works' annual operation budget nor on the Water Department's operating budget when completed. Construction is expected to start in June 2020 and be completed by June 2021. The General Capital funding was included in the 2020-2024 Capital Improvement Plan for project P00020. In order to administratively track the spending of all funding sources in one project, appropriation ordinances are needed to move appropriations from the programmable project to the jointly funded static project. This action will amend the 2020-2024 Capital Improvement Plan. Appropriations for the 2016 Water Line & Sanitary Sewer Replacement WSM-F, Part 2 project are as depicted below: Fund Existing Appropriations Additional Appropriations Project Total* Water & Sewer Capital Projects $2,456,243.00 $3,100,039.00 $5,556,282.00 Fund 56002 General Capital Projects Fund $932,923.00 $1,591,786.00 $2,524,709.00 30100 Project Total $3,389,166.00 $4,691,825.00 $8,080 991.00 Numbers rounded for presentation purposes. MNVBE OFFICE: Gra-Tex Utilities, Inc., is in compliance with the City's MBE Ordinance by committing to 32 percent MBE participation on this project. The City's MBE goal on this project is 14 percent. The project is located in (COUNCIL DISTRICT 8) FISCAL INFORMATION 1 CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget of the Water and Sewer Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Water & Sewer Capital Projects (W&S Capital Projects) Fund and the General Capital Projects Fund. Prior to any expenditure being incurred, the Water and Transportation & Public Works Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO _ _ _ _ Fund' Department ccoun Project Program ci6iity Budget Reference # moon ID ID Year_ Chartfietd 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Chris Underwood (2629) ATTACHMENTS 1. 602016WSMFP2-GRATEX -Compliance Memo.gdf (CFW Internal) 2. 602016WSMFP2-GRATEX - Form 1295.pdf (CFW Internal) 3. 602016WSMFP2-GRATEX SAM.pdf (CFW Internal) 4. 602016WSMFP2-GRATEX 30100 A020Rev.docx (Public) 5. 602016WSMFP2-GRATEX 56002 A020(R1).docx (Public) 6. 602016WSMFP2-GRATEX FID Table IJ dated.docx (CFW Internal) 7. 602016WSMFP2-GRATEX Funds Avail.docx (CFW Internal) 8. M&C Ma - 602016WSMFP2-GRATEX 1of2. df (Public) 9. M&C Ma - 602016WSMFP2-GRATEX 2of2. df (Public) ■ W W W W Ol (St Cn (n to M Cn (3l Cn Cn (n (n Cn (n 0 0 0 0 O 0) O W 0) m W m p O m W O W O O O O O O O 0 0 0 0 0 0 0 O O O O O O O O O O O p p p p O O O • p CD C) p N N) N N N N N N N N N N N N O O O O O O O O O O O O O p p p p O N N N N �1 -I -4 � -4 v v CA 6l W CA CA W a) �1 O O O O O O O O O O O C7 O O O p p p i O O O O p p p p C) 0 C) Cl O O O O O O 4�- -P- -P -P- .A � -P .A .A .W 4hA 4 .A 4 .A -P -P 4�- W W W W W W W W W W W W w W W W W w 1 1 1 1 O O O O O O O O O O O O O p (n(n(ncn004 m(n(s,(n(n(n- ,. (() co W W W Cn 4 1 (D W W W Ol —1 1 (D 1 1 — 1 w .A -ph. (n -1 -1 W � -D. 1 CSl 0 0 Co O CD - - OO " • cnn O- O W W (.Oil CD p C? (n Cn 0 0 1 0 0 Cn (n 0 0 -1 0 0 CD( D O C) C)CDj 1 C) CD C)1 C)1 1 /� C) (D 0 0 0 0 0(D 0 O O O O (D CD p p C) N 0 N O N N N N IN N N N N N N N N N • '`I O �1 O —1 —1 �l �! �1 �l -4 y -4 � � -4 � -4 N N N N N N N N N N N N N N N N N N 4 O rl O �1 —1 —1 -4 � � y -4 -4 -4 � � O O O O O O O O O O O O CD (D rl v v �1 �1 �l �1 �1 �I � V V y � co w w co w 00 (b co co 00 OD Cb ou m Cn 4 4 O 0 0 0 Cn -P .A 0 0 0 0 N N N N N N N N N N N N N N N N N e s p(D p p p O O O O O O O O O O O O N N N N N N N N N N N N N N N N N Ca p p p p O Cl O O O O O O O O O O ■ • • -69 ffl 69 s Cn � � f_A N N ► Cn (DD C3l (D CAD (D fig f9 -69 -69 0 w N O .A. (3) 69 O (n -4 # N 3 al co 1 OD O —J W -Al -A m �I OD rl CDW 1 W O (3) a C0 1 Cn W C-) W C-)-� OD O 00 M co 4 C] 1 W N DO —1 1 O -PP (D 1 d3 Cn W N 0 0 0) Cb (D W O 0) p (n (A) (D O 0 O CD CD CD CD CD '(D O CD C)p p 0 O CDCDCD.r p p 0 0 0 0 0 0 0 0 0 0 0 0 ■ • s rn O N Q Y C� C N K N Gi m m x a CD • n n ■ Ni C r • • • • v X [D �I CIY i� 0005 10- 1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page I of I I SECTION 00 0510 2 MAYOR AND COUNCIL COMMUNICATION (M&C) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 CITY OF FORT WORTH WATER DEPARTMFNT ENGWERING SERVICES DIVIKON SIDDENDUM X0, 1 WATER ANIP SANTr RY MWER UPLACEWNT CONTRACT 7.016 SM-F- PART 2 MY PROM CT NO, 02727 Water No. 59601-0600430-0O2727C017 3 Sewer No. 5907«0700430-0O2 `727 C01783 T/PW No. 30100-0200431-02727C062S3 CEASE DATE, Felsruaty 21, 2020 W-ORMATION TO BIDDERS; The SpeciflMdOns Md C ttrad Dommento for the above m-eationed project are raosed and amended n follows; 1. On SHEET 15 of21 PLAPT A PROFILE, the Sewer Pipe, for L-1081 shall be Dualle Iron Pipe 1 terlal from Matihofe to Manhole, 2. In SECTION 00 42 43 PROPOSAL FOW, pay it ; shall be revised 1n UNIT fI SEWED MPROVEI `ENTS reducing 8-inch PVC Sewer)Pipe to 01 F and increasing 9-inch DIP Sewer Pape 230 LF as follows-, ra scram s�:� �4` a� �. 4 3 , € 3i 92 - "8, I4 RA - AA Tease wknowledge receipt of the Addondura in the bld proposal attd on the outside of the sealed envelope. RECO'T ACKNOWLEDGED CMIS HARDER, PX, DIRECTOR, WATER DEFARTM8NT i awvrewe flan "lt , P.E, Water Department Engitteer%ng Services 0005 15-1 ADDENDA Pave I of 1 I SECTION 00 05 15 2 ADDENDA 4 5 6 9 10 11 12 13 I4 15 16 17 18 19 20 21 22 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0011 13- 1 INVITATION TO BIDDERS Page I of 2 1 SECTION 00 1113 2 INVITATION TO BIDDERS 3 RECEIPT OF BIDS 4 Sealed bids for the construction of WATER AND SANITARY SEWER REPLACEMENT 5 CONTRACT 2016 WSM-F, PART 2, City Project No. 02727 will be received by the City of 6 Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 200Texas Street 11 Fort Worth, Texas 76102 12 until 1:30 P.M. CST Thursday March 5, 2020 , and bids will be opened publicly and read aloud 13 at 2.00 PM CST in the Council Chambers. I4 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the (approximate) following: 17 18 2,150 LF 12-inch Water Replacement 19 5,300 LF 8-inch Water Replacement 20 230 LF 8-inch Sewer Replacement by Open Cut 21 22,600 SY Asphalt Pavement Rehabilitation 22 23 PREQUALIFICATION 24 The improvements included in this project must be performed by a contractor who is pre- 25 qualified by the City at the time of bid opening. The procedures for qualification and pre- 26 qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. 27 28 DOCUMENT EXAMINATION AND PROCUREMENTS 29 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 30 of Fort Worth's Purchasing Division website at http://www.fortworthtexas.gov/purchasing/ and 31 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The 32 Contract Documents may be downloaded, viewed, and printed by interested contractors and/or 33 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 34 Parties Form 1295 and the form must be submitted to the Project Manager before the 35 contract will be presented to the City Council. The form can be obtained at 36 httns://www.ethics.state.tx.us/tec/l295-Info.htm . 37 38 Copies of the Bidding and Contract Documents may be purchased from 39 J. Chris Underwood 40 Water Department, Design Services 41 927 Taylor Street 42 Fort Worth, Texas 76102 43 44 The cost of Bidding and Contract Documents is: 45 Set of Bidding and Contract Documents with full size drawings: No Cost 46 Set of Bidding and Contract Documents with half size (if available) drawings: No Cost 47 48 49 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 22, 2016 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 I 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 001t 13-2 INVITATION TO BIDDERS Page 2 of 2 PREBID CONFERENCE A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following location, date, and time: DATE: Thursday February 20, 2020 TIME: 9:00 a.m. PLACE: 311 W. Tenth Street Fort Worth, Texas 76102 LOCATION: Conference Room CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject bids. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: J. Chris Underwood, City of Fort Worth Water Department Email: john.underwood@fortworthtexas.gov Phone: (817) 392-2629 Fax: (817)392-2527 AND/OR Attn: Lawrence Hamilton, P.E., City of Fort Worth Water Department Email: lawrence.hamiIton@fortwortbtexas.gov Phone: (817) 392-2626 Fax: (817)392-2527 ADVERTISEMENT DATES February 6, 2020 February 13, 2020 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 22, 2016 City Project No. 02727 0021 13 - 1 INSTRUCTIONS TO BIDDERS Page 1 of 9 I SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1. 1, Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 6 00 - GENERAL CONDITIONS. 7 8 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. I0 11 1.2.I. Bidder: Any person, firm, partnership, company, association, or corporation acting 12 directly through a duly authorized representative, submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or 16 corporation acting directly through a duly authorized representative, submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided) makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.I.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2. City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 30 for any other use. 31 32 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 33 34 3.1. All Bidders and their subcontractors are required to be prequalified for the work types 35 requiring prequalifrcation at the time of bidding. Bids received from contractors who are 36 not prequalified (even if inadvertently opened) shall not be considered. Prequalification 37 requirement work types and documentation are as follows: 38 39 3.1.1. Paving — Requirements document located at; 40 Mips://proicgVoint.buzzsaw.eom/fortworthpov/Resources/02%20- 41 %20Construction%2ODocuments/Contractor%2OPregualification/TPW%20Paving 42%20Contractor%2OPrequalification%2OProgram/PREOUALIFICATION%20REO 43 UIREMENTS% o20F0_R%20PAVING%2000NTRACTORS.PDF?public 44 45 3.1.2. Water and Sanitary Sewer — Requirements document located at; 46 httns:/lproiegVoint.buzzsaw.com/fortworthaov/Resources/02%20- 47 %2OConstruction%2ODocuments/Contractor%20Prequalification/Water%20and%2 48 OSanitM%2OSewer%2OContractor%2OPrequalification%20Program/WSS%2Opre 49 qual%2Orequirements.doc?public CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 002113-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 2 3 3.2. Each Bidder unless currently prequal ified, must be prepared to submit to City within 4 seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 5 45 11, BIDDERS PREQUALIFICATIONS. 6 7 3.2.1. Submission of and/or questions related to prequalification should be addressed to 8 the City contact as provided in Paragraph 6.1. 9 10 3,3 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 The City reserves the right to require any pre -qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 3.5. Not Used 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder shall: 31 4.1.1. Examine and carefully study the Contract Documents and other related data 32 identified in the Bidding Documents (including "technical data" referred to in 33 Paragraph 4.2. below). No information given by City or any representative of the 34 City other than that contained in the Contract Documents and officially 35 promulgated addenda thereto, shall be binding upon the City. 36 37 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 38 site conditions that may affect cost, progress, performance or furnishing of the 39 Work. 40 41 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 42 progress, performance or furnishing of the Work. 43 44 4.1.4. Not Used CITY OF FOR"1' WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPL,ACIMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 002113-3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.5. Study all: (i) reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site (except Underground Facilities) that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 9 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 10 the information which the City will furnish. All additional information and data l I which the City wiII supply after promulgation of the formal Contract Documents 12 shall be issued in the form of written addenda and shall become part of the Contract 13 Documents just as though such addenda were actually written into the original 14 Contract Documents. No information given by the City other than that contained in 15 the Contract Documents and officially promulgated addenda thereto, shall be 16 binding upon the City. 17 18 4.1.7. Perform independent research, investigations, tests, borings, and such other means 19 as may be necessary to gain a complete knowledge of the conditions which will be 20 encountered during the construction of the project. On request, City may provide 21 each Bidder access to the site to conduct such examinations, investigations, 22 explorations, tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fill all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations, tests and studies. 25 26 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 27 cost of doing the Work, time required for its completion, and obtain all information 28 required to make a proposal. Bidders shall rely exclusively and solely upon thew 29 own estimates, investigation, research, tests, explorations, and other data which are 30 necessary for full and complete information upon which the proposal is to be based. 31 It is understood that the submission of a proposal is prima -facie evidence that the 32 Bidder has made the investigation, examinations and tests herein required. Claims 33 for additional compensation due to variations between conditions actually 34 encountered in construction and as indicated in the Contract Documents will not be 35 allowed. 36 37 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 38 between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted to make such corrections or interpretations as may 41 be deemed necessary for fulfillment of the intent of the Contract Documents. 42 43 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 44 45 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 0021 13 - 4 INSTRUCTIONS TO BIDDERS Page 4 of 1 4.2.2, those drawings of physical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities) which are at or contiguous to 3 the site that have been utilized by City in preparation of the Contract Documents. 4 5 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 6 on request. Those reports and drawings may not be part of the Contract 7 Documents, but the "technical data" contained tberein upon which Bidder is entitled 8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawn from any "technical data" or 11 any other data, interpretations, opinions or information. 12 13 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) 14 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 15 exception the Bid is premised upon performing and furnishing the Work required by the 16 Contract Documents and applying the specific means, methods, techniques, sequences or 17 procedures of construction (if any) that may be shown or indicated or expressly required 18 by the Contract Documents, (iii) that Bidder has given City written notice of all 19 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 20 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 21 etc., have not been resolved through the interpretations by City as described in 22 Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate 23 and convey understanding of all terms and conditions for performing and furnishing the 24 Work. 25 26 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 27 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 28 Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract 29 Documents. 30 31 S. Availability of Lands for Work, Etc. 32 33 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for 34 access thereto and other lands designated for use by Contractor in performing the Work 35 are identified in the Contract Documents. All additional lands and access thereto 36 required for temporary construction facilities, construction equipment or storage of 37 materials and equipment to be incorporated in the Work are to be obtained and paid for 38 by Contractor. Easements for permanent structures or permanent changes in existing 39 facilities are to be obtained and paid for by City unless otherwise provided in the 40 Contract Documents. 41 42 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 43 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 44 of -way, easements, and/or permits are not obtained, the City reserves the right to cancel 45 the award of contract at any time before the Bidder begins any construction work on the 46 project. 47 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Projcot No. 02727 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 2 way, easements, and/or permits, and shall submit a schedule to the City of how 3 construction will proceed in the other areas of the project that do not require permits 4 and/or easements. 5 6 6. Interpretations and Addenda 7 8 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 9 City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions I0 received after this day may not be responded to. Interpretations or clarifications 1 i considered necessary by City in response to such questions will be issued by Addenda 12 delivered to all parties recorded by City as having received the Bidding Documents. 13 Only questions answered by formal written Addenda will be binding. Oral and other 14 interpretations or clarifications will be without legal effect. IS 16 Address questions to: 17 18 City of Fort Worth 19 1000 Throckmorton Street 20 Fort Worth, TX 76102 21 Attn: J. Chris underwood, City of Fort Worth Water Department 22 Fax: (817) 392-2527 23 Email: John.underwood@fortworthtexas.gov 24 Phone. (817) 392-2629 25 26 27 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 28 City. 29 30 6.3. Addenda or clarifications may be posted via Buzzsaw at <Insert Link to Documents>. 31 32 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or 33 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 34 Project. Bidders are encouraged to attend and participate in the conference. City will 35 transmit to all prospective Bidders of record such Addenda as City considers necessary 36 in response to questions arising at the conference. Oral statements may not be relied 37 upon and will not be binding or legally effective. 38 39 7. Bid Security 40 41 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 42 (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 43 the requirements of Paragraphs 5.01 of the General Conditions. 44 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 2 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 3 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 4 default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 6 other Bidders whom City believes to have a reasonable chance of receiving the award 7 will be retained by City until final contract execution. 8 9 8. Contract Times 10 The number of days within which, or the dates by which, Milestones are to be achieved in I I accordance with the General Requirements and the Work is to be completed and ready for 12 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 13 attached Bid Form. 14 15 9. Liquidated Damages 16 Provisions for liquidated damages are set forth in the Agreement. 17 18 10. Substitute and "Or -Equal" Items 19 The Contract, if awarded, will be on the basis of materials and equipment described in the 20 Bidding Documents without consideration of possible substitute or "or -equal" items. 21 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 23 City, application for such acceptance will not be considered by City until after the Effective 24 Date of the Agreement. The procedure for submission of any such application by Contractor 25 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 26 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 27 28 11. Subcontractors, Suppliers and Others 29 30 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 31 12-2011 (as amended), the City has goals for the participation of minority business 32 and/or small business enterprises in City contracts. A copy of the Ordinance can be 33 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 34 SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor 35 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 36 Venture Form as appropriate. The Forms including documentation must be received 37 by the City no later than 2:00 P.M. CST, on the second business days after the bid 38 opening date. The Bidder shall obtain a receipt from the City as evidence the 39 documentation was received. Failure to comply shall render the bid as non- 40 responsive. 41 42 11.2, No Contractor shall be required to employ any Subcontractor, Supplier, other person 43 or organization against whom Contractor has reasonable objection. 44 45 12. Bid Form 46 47 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 48 obtained from the City. 49 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No 02727 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 2 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 3 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 4 price item listed therein. In the case of optional alternatives, the wards "No Bid," 5 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 6 written in ink in both words and numerals, for which the Bidder proposes to do the 7 work contemplated or furnish materials required. All prices shall be written legibly. 8 In case of discrepancy between price in written words and the price in written 9 numerals, the price in written words shall govern. I0 11 12.3. Bids by corporations shall be executed in the corporate name by the president or a 12 vice-president or other corporate officer accompanied by evidence of authority to 13 sign. The corporate seal shall be affixed. The corporate address and state of 14 incorporation shall be shown below the signature. 15 16 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 17 partner, whose title must appear under the signature accompanied by evidence of 18 authority to sign. The official address of the partnership shall be shown below the 19 signature. 20 21 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 22 member and accompanied by evidence of authority to sign. The state of formation of 23 the firm and the official address of the firm shall be shown. 24 25 12.6. Bids by individuals shall show the Bidder's name and official address. 26 27 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 28 indicated on the Bid Form. The official address of the joint venture shall be shown. 29 30 12.8. All names shall be typed or printed in ink below the signature. 31 32 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of 33 which shall be filled in on the Bid Form. 34 35 12.10. Postal and e-mail addresses and telephone number for communications regarding the 36 Bid shall be shown. 37 38 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the ,state of 39 Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance 40 to State Law Non Resident Bidder. 41 42 13. Submission of Bids 43 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 44 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 45 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 46 envelope, marked with the City Project Number, Project title, the name and address of 47 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 48 through the mail or other delivery system, the sealed envelope shall be enclosed in a separate 49 envelope with the notation "BID ENCLOSED" on the face of it. 50 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14. Modification and Withdrawal of Bids 3 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 4 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 5 must be made in writing by an appropriate document duly executed in the manner 6 that a Bid must be executed and delivered to the place where Bids are to be submitted 7 at any time prior to the opening of Bids. After all Bids not requested for withdrawal 8 are opened and publicly read aloud, the Bids for which a withdrawal request has been 9 properly filed may, at the option of the City, be returned unopened. 10 11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 12 time set for the closing of Bid receipt. 13 14 15. Opening of Bids 15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 16 abstract of the amounts of the base Bids and major alternates (if any) will be made available 17 to Bidders after the opening of Bids. 18 19 16. Bids to Remain Subject to Acceptance 20 All Bids will remain subject to acceptance for the time period specified for Notice of Award 21 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 22 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 23 24 17. Evaluation of Bids and Award of Contract 25 26 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 27 to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids 28 and to reject the Bid of any Bidder if City believes that it would not be in the best 29 interest of the Project to make an award to that Bidder, whether because the Bid is 30 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 31 meet any other pertinent standard or criteria established by City. City also reserves 32 the right to waive informalities not involving price, contract time or changes in the 33 Work with the Successful Bidder. Discrepancies between the multiplication of units 34 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 35 between the indicated sum of any column of figures and the correct sum thereof will 36 be resolved in favor of the correct sum. Discrepancies between words and figures 37 will be resolved in favor of the words. 38 39 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 40 among the Bidders, Bidder is an interested party to any litigation against City, 41 City or Bidder may have a claim against the other or be engaged in litigation, 42 Bidder is in arrears on any existing contract or has defaulted on a previous 43 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 44 Bidder has uncompleted work which in the judgment of the City will prevent or 45 hinder the prompt completion of additional work if awarded. 46 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 002113-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 2 other persons and organizations proposed for those portions of the Work as to which 3 the identity of Subcontractors, Suppliers, and other persons and organizations must 4 be submitted as provided in the Contract Documents or upon the request of the City. 5 City also may consider the operating costs, maintenance requirements, performance 6 data and guarantees of major items of materials and equipment proposed for 7 incorporation in the Work when such data is required to be submitted prior to the 8 Notice of Award. 10 17.3. City may conduct such investigations as City deems necessary to assist in the I evaluation of any Bid and to establish the responsibility, qualifications, and financial 12 ability of Bidders, proposed Subcontractors, Suppliers and other persons and 13 organizations to perform and furnish the Work in accordance with the Contract 14 Documents to City's satisfaction within the prescribed time. 15 16 17.4. Contractor shall perform with his own organization, work of a value not less than I7 35% of the value embraced on the Contract, unless otherwise approved by the City. 18 19 I T5. If the Contract is to be awarded, it will be awarded to lowest responsible and 20 responsive Bidder whose evaluation by City indicates that the award will be in the 21 best interests of the City. 22 23 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award 24 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 25 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 26 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 27 comparable contract in the state in which the nonresident's principal place of 28 business is located. 29 30 ITT A contract is not awarded until formal City Council authorization. If the Contract is 31 to be awarded, City will award the Contract within 90 days after the day of the Bid 32 opening unless extended in writing. No other act of City or others will constitute 33 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 34 the City. 35 36 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 37 38 1.8. ,Signing of Agreement 39 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 40 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 41 Contractor shall sign and deliver the required number of counterparts of the Agreement to 42 City with the required Bonds, Certificates of Insurance, and all other required documentation. 43 City shall thereafter deliver one fully signed counterpart to Contractor. 44 45 46 47 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 21, 2015 City Project No. 02727 003513 BID FORM Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. CIQ Form is on file with City Secretary 11 CIQ Form is being provided to the City Secretary L�f1CIS Form is on File with City Secretary L1 CIS Form is being provided to the City Secretary BIDDER: Gra-Tex Utilities, Inc. By: James Brent P.O. Box 700 Signature: Arlington, TX 76004 Title: Estimator END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 New Bid Proposal Workbook CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ For vendor or other person doing business with local governmental entity This questionnaire reflects changes made to the law by H.B. 1491, 80th Leg., Regular Session. OFFICE USE ONLY This questionnaire is being filed in accordance with Chapter 176, Local Government Code We Received by a person who has a business -relationship as defined by Section 176.001(1-a) with a local governmental entity and the person meets requirements under Section 176.006(a). By law this questionnaire must be fled with the records administrator of the local governmental entity not later than the 7th business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. A person commits an offense if the person knowingly violates Section 176.006, Local Government Code. An offense underthis section is a Class C misdemeanor. 1 Name of person who has a business relationship with local governmental entity. 2 ❑ — Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date the originally filed questionnaire becomes incomplete or inaccurate.) - 3 _ Name of local government officer with whom filer has employment or business relationship. Name of Officer This section (item 3 including subparts A, B, C & D) must be completed for each officer with whom the filer has an employment or other business relationship as defined by Section 176.001 (1 -a), Local Government Code. Attach additional pages to this Form CIQ as necessary. A. Is the local government officer named in this section receiving or likely to receive taxable income, other than investment income, from the filer of the questionnaire? FlYes E] No D. Is the filer of the questionnaire receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer named in this section AND the taxable income is not received from the local governmental entity? FlYes F-1 No C. Is the filer of this questionnaire employed by a corporation or other business entity with respect to which the local government officer serves as an officer or director, or holds an ownership of 10 percent or more? 71Yes F-1No 0. Describe each employment or business relationship with the local government officer named in this section. 4 Signature of person doing business with the governmental entity Date Adopted 06/29/2007 LOCAL GOVERNMENT OFFICER FORM CIS CONFLICTS DISCLOSURE STATEMENT (Instructions for completing and filing this form are provided on the next page.) This questionnaire reflects changes made to the law by H.B. 1491, 80th Leg., Regular Session. OFFICE USE ONLY This is the notice to the appropriate focal governmental entity that the following local government officer has become aware of facts that require the officer to file this statement Date Received in accordance with Chapter 176, Local Government Code. 1 Name of Local Government Officer 2 Offiice Held 3 Name of person described by Sections 176.002(a) and 176.003(a), Local Government Code 4 Description of the nature and extent of employment or other business relationship with person named in item 3 5 List gifts accepted by the local government officer and any family member, excluding gifts described by Section 176.003(a-1), if aggregate value of the gifts accepted from person named in item 3 exceed $250 during the 12-month period described by Section 176.003(a)(2)(8) Date Gift Accepted Description of Gift Date Gift Accepted Description of Gift Date Gift Accepted Description of Gift (attach additional forms as necessary) 6 AFFIDAVIT swear under penalty of perjury that the above statement is true and correct. I acknowledge that the disclosure applies to a family member (as defined by Section 176.001(2), Local Government Code) of this local government officer. 1 also acknowledge that this statement covers the 12-month period described by Section 176.003(a), Local Government Code. Signature of Local Government Officer AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day Of , 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Adopted 06/29/2007 LOCAL GOVERNMENT OFFICER CONFLICTS DISCLOSURE STATEMENT Section 176.003 of the Local Government Code requires certain local government officers to file this form. A "local government officer" is defined as a member of the governing body of a local governmental entity; a director, superintendent, administrator, president, or other person designated as the executive officer of the local governmental entity; or an employee of a local governmental entity with respect to whom the local governmental entity has, in accordance with Section 176.005, extended the requirements of Sections 176.003 and 176.004. This form is required to be filed with the records administrator of the local governmental entity not later than 5 p.m. on the seventh business day after the date on which the officer becomes aware of the facts that require the filing of this statement. A local government officer commits an offense if the officer knowingly violates Section 176.003, Local Government Code. An offense under this section is a Class C misdemeanor. Please refer to chapter 176 of the Local Government Code for detailed information regarding the requirement to file this form. INSTRUCTIONS FOR COMPLETING THIS FORM The following numbers correspond to the numbered boxes on the other side. 1. Name of local Government Officer. Enter the name of the local government officer filing this statement. 2. Office Held. Enter the name of the office held by the local government officer filing this statement. 3. dame of person described by Sections 176.002(a) and 176.003(a), Local Government Code. Enter the name of the person described by Section 176.002, Local Government Code with whom the officer has an employment or other business relationship as described by Section 176.003(a), Local Government Code. 4. Description of the nature and extent of employment or business relationship with person named in item 3. Describe the nature and extent of the employment or other business relationship with the person in item 3 as described by Section 176.003(a), Local Government Code. 5. List gifts accepted, excluding gifts described by Section 176.003(a-1), if aggregate value of the gifts accepted from person named in item 3 exceed $250. List gifts accepted during the 12-month period (described by Section 176.003(a), Local Government Code) by the local government officer orfamily member of the officer, excluding gifts described by Section 176.003(a-1), from the person named in item 3 that in the aggregate exceed $250 in value. 6. Affidavit. Signature of local government officer. Adopted 0612912007 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 004100 BID FORM Page 1 of 3 FOR: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Mount Vernon Avenue, Newark Avenue, Sanderson Avenue and Crestview Drive City Project No.: 2727 Units/Sections: UNIT I: Water Improvements UNIT II: Sanitary Sewer Improvements UNIT III: Paving Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Form Revised 20150821 City Project No. 02727 0041 00 BID FORM Page 2of3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Improvements -12-inch Water Main Replacement by Open Cut b. Water Improvements - 8-inch Water Main Replacement by Open Cut c. Sanitary Sewer Improvements - 8-inch Sanitary Sewer Replacement by Open Cut d. Paving Improvements - Full Milling e. Paving Improvements - Pulverization I Overlay 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 365 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Form Revised 20150821 City Project No. 02727 004100 BID FORM Page 3 of 3 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each,pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid Amount UNIT I: Water Improvements Bid $2,625,868.25 UNIT II: Sanitary Sewer Improvements Bid $100,587.00 UNIT III. Paving Improvements Bid $1,283,697.75 #REF! Total Bid 7. Bid Submittal This Bid is submitted on 3/4/2020 Respectfully submitted, By: &47 (Signature) James Brent (Printed Name) Title: Estimator Company: Gra-Tex Utilities, Inc. Address: P.O. Box 700 Arlington, TX 76004 State of Incorporation: Texas Email ©rac�lrlst Phone: 817-276-5800 or 225-301-5462 END OF SECTION S4,010,1 53-04 by the entity named below. Receipt is acknowledged of the following Addenda: Initial Addendum No. 1: JEB Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Form Revised 20150821 City Project No. 02727 004243 BID PROPOSAL NO-t arlo SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Prajecl Item Infannation Bidder's Proposal Pay Item Bid List Item No. Specification Section No. Bid Quantity Unit of Measore4nent Description Unit Price Sid Value UNIT I: WATER IMPROVEMENTS W-1 3311.0461 33 11 12 2,100 LF 12-inch PVC Water Pipe one, Kmktd 5Ix Dollars (u.. Cents $106.00 $229,600.00 W-2 3311.0451 33 11 10 45 LF 12-inch DIP Water Pipe - D(V h1AAJ j S,'Rfl� Dollars .✓ Cents $470.00 $21,150.00 W-3 3311.0261 33 11 12 5,200 LF 8-inch PVC Water Pipe � 41IJP )CAI Dollars Z [V Cents $65.00 $338,000.00 W-4 3311.0251 3311 10 110 LF 8-inch DIP Water Pipe �Sy c>ufu[f t�I i kY Dollars Eia _ Cents $450.00 $49 600,00 W-5 3311.0141 33 11 12 75 LF 6-inch PVC Water Pipe 0 �7��t Dollars eA Cents $45.00 $3.375.00 W-6 3312,3002 33 12 20 7 EA 6-inch Gate Valve tj 2�eVer� plUlY�fiL Dollars a Cents $1.100.00 $7700.00 W-7 3312.3003 33 12 20 12 EA 8-inch Gate Valve -6i t,um r } ollars Cents $1450.00 $17,400.00 W-8 3312.3005 331220 6 EA 12-cinch Gate Valve '1f e44 Jijf, W Cj _ _ Dollars I Z W Cents $2 500.00 $15,000.00 W-9 3311.0001 3311 11 10 Tons Ductile Iron Water Fittings w/Restraint s 12-inch �►ie �tA fed Dollars fir Cents $100.00 $1,000.00 W-10 0241 A302 02 41 14 12 EA Remove 6-inch Water Valve Dollars Cents $90.00 $1,080.00 W-11 0241.1303 0241 14 2 EA Remove 8-inch Water Valve IYA Dollars �Cents $90.00 $180.00 W-12 0241.1304 0241 14 5 EA Remove 10-inch Water Valve Dollars C, Cents _. __. $90.00 $450.00 CRY OF FORT WORTH Foam Revi d 20120120 WATER AND SANITARY SENOR REPLACEMENT CONTRACT 2016 WSM-F, PART City Praje tNv.02727 00 42 43 BID PROPOSAL PsC.2 of to SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Wbrmation Bidders Prpposar Pay Item Bid List Item Specification Bid Quantity Unit of Description Unit Price Did Value No. Section No. mcasurcmea[ W-13 0241,1218 02 41 14 2 CA 4-inch to 12-inch Abandonment Plug SIX i T14 Dollars _ Cents $650.00 $1300.00 W-14 3312.0001 33 12 40 6 1 EA Fire Hydrant 70(- SNO) Dollars III f9 Cents $4.700.00 $28 200.00 W 15 0241A510 0241 14 6 EA Salvage Fire Hydrant L �Mtv h�¢rC Y lnl?,1 Dollars Zp,(,jCents $390.00 $2,340.00 W-16 3312.0117 33 12 25 28 EA Connection to Existing 4-inch to 12-inch Water Main orgy �Wa�l�f f)PfyDollars O Cents $4,250.00 $119,000.00 W-17 3312.2003 33 12 10 186 EA 1-inch Water Service ��f�$f>1 Yluf��� �1f�Dolfars a QF7 Cents $1,420.00 $264,120.00 W-18 3312.2001 33 12 10 184 EA 1-inch Water Service, Meter Reconnection lrlfie, �Vvkjfj p_fc oilers $ fa Cents $385.00 $70840,00 W-19 3312.2004 33 12 10 150 LF 314-inch Private Water Service, Relocation pIcvm Dollars 7tl0 Cents $11.00 $1650.00 W-20 3312.2203 33 12 10 3 EA 2-inch Water Service tyj2`vi� hU1 4 4 Dollars Cents $1 250.00 $3 750.00 W-21 3312.2201 33 12 10 3 EA 2-inch Water Service, Meter Reconnection -1hCep dlC�d i� Rollars fU Cents $350.00 $1,050.00 W-22 3305.0206 33 05 10 100 CY Imported Embedment/Backfill Pjewn Dollars -2 eN _ Cents $11.00 $1,100.00 W-23 3201.0400 3201 18 1,310 LF Temporary Asphalt raving Repair (2-inch HMAC on 6-inch CTB) "&MI't Sew Dollars -2-C(Q Cents $27.00 $35,370.00 W-24 3201.0112 3201 17 6,400 LF 5-foot Wide Asphalt Pavement Repair, Residential 1-1 IjtV13 Dollars _ 71*3 Cents $52.00 $332,800.00 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONS]RCCUON SPBMCATTON DOCUMENTS RL'PLACEvrtiNST CONrRACT 2016 WSM-P, RAR7 2 Posm Revised 2ol20f20 CityPmject Nm 02727 004243 DID PROPOSAL Page 3 or 10 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item LlrOnnation Biddeds Proposal Pay Item Bid Lest Item No. Specification Section No. Bid Quantity unit 0f Measurement Description Chit Price Bid Value W-25 3201.0201 32 01 17 100 SY Asphalt Pavement Repair, Beyond Defined Width, Residential e�CI� Dollars (� Cents $82.00 $8,200.00 W-26 3201.0151 1 32 01 17 1,725 LF Permanent Asphalt Pavement Repair, Water �Services Dollars 2 Cents $42.00 $72,45Q00 W-27 3201.0614 32 01 29 100 SY Concrete Pavement Repair, Residential one h4f(A 1is(I I' I'Dollars T Cents $145.00 $14,500.00 W-28 10241,11001 0241 14 8 CY Water Line Grouting Ole �f 4vi IM%& } Dollars Cents $190,00 $1520.00 W-29 0241.1300 02 41 15 5,760 LF Remove Concrete Curb & Gutter (50150) (AL Dollars 1110 Cents $9.35 $53 856.00 W-30 3216.0102 32 16 13 6,010 LF 7-inch Concrete Curb and Gutter (50150) ±fti t Dollars ZGifz�, Cents $45.00 $270450.00 W-31 0241.1300 0241 15 10,400 SF Remove Concrete Driveway (50150) 0 Dollars hfjw, Cents $2.25 $23,400.00 W-32 3213.0401 32 13 20 10,550 SF 6-inch Concrete Driveway (60150) �f �Z Dollars 'y Cents $9.00 $94 950.00 W-33 0241.1400 0241 15 25 SY Remove Concrete Valley Gutter (50150) Or I i" Dollars Uie+ VQ. Cents $44.25 $1,106.25 W-34 3216.0301 32 16 13 25 SY 9-inch Concrete Valley G tter, Residential (60150) �E VZDollars a'lt y `ZQroI Cents $153.00 $3,825.00 W-35 0241.1506 0241 15 9,650 SY 2-inch Surface Milling (50150) Art t Dollars . l . . Cents $3.30 $31,845.00 W-36 0241.1600 0241 15 260 LF Butt Milling (50150) 414 �V4 Dollars _ _ W Cents $42.00 $10,920.00 CrrY OF FORT woRM WATER AND SANITARY SF%V]3R STANDARD CONSTRUCTION SPECR3CARON DOCUMENTS REPLACEMENT CONTRACT 2016 WSM F, PART 2 F— Revised 20120120 City N jecl No. U2727 M 42 43 BID PROPOSAL Pogo 4 of le SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Inrormation Bidders Proposal Pay ,am Bid List Item Specification Bid Quantity Unitni Description ❑nit Price Bid Valuc NO. Section No. Measurement W-37 3212.0900 32 12 73 35 GAL Asphalt Crack Sealant (50150) ehf' f Dollars Cents $24.50 $857,50 W-38 0241.1700 0241 15 1,625 SY 10-inch Pavement Pulverization (50150) SJ Dollars 4 Cents $6.30 $10237.50 W-39 3211.0600 3211 33 11 Tons Cement Modification - 13 Lbs/SY (50/50) ``__ �ll 4ID rl� �Ctll f�{ f7YC Dollars `Z�tJ l Cents $255,00 $2,805.00 W-40 9999.0001 13 GAL Road Bond EN1 - (50150) O d! .. hq [C2 ;S Dollars ` (J Cents $121.00 1 $1573.00 W-41 3123,0101 31 23 16 47 CY Unclassified Street Excavation (50150) 1I 4 MneDollars Cents $59.00 $2,773.00 W-42 3212.0302 32 12 16 11,300 SY 2-inch Asphalt Pavement, Type "D" (50150)1 �, } W �GV?, Dollars sxw Cents $12.60 $142 380.00 W-43 3305.0111 33 05 14 10 EA Water Valve Box AbIjustment w/ 33 05 17 Concrete Collar (50160) �t 1 _ Dollars L :ZQ Cents $840.00 $8 400.00 W-44 3305.0108 33 05 14 40 EA Misc. Adjustment - Water Meter Box (50J50) l` ��e I)irltRdtf Dollars Cents $100.00 $4 000.00 W-45 3305.0107 330514 2 EA Manhole Adjustment, Minorw/ 33 05 17 Concrete Collar (50150) F 420,yl 644W. JJ�L Dollars `7- t V Cents $1 550.00 $3,100.00 W-46 3217.6001 32 17 25 75 EA Curb Address Painting (60150) Dollars let.) Cents $85.00 $6,375.00 W-47 3291.0100 3291 19 160 CY Topsoil (50150) Dollars `ZQ-Jl Cents $62.00 $9,920.00 W48 3292,0100 32 92 13 1,425 SY Block Sod Placement (50150) Sl�c Dollars a Cents $6,40 $9,120.00 CITY Or FORT WORTII WATER AND SANDARY WWL'R Sl ANDA RE] CONSTRUCTION SPECIFICATION DOCUMENTS REPLACLNZa CONTRACT 2016 WSM-F, PART F—R—v d20120120 City Proj¢t No. 02727 004243 DR)PROPOSN. Page 5 ar 10 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item information Bidders Proposal Pay llem Bid List Item Specification Bid Quantity Unit of Description Ueul Price Bid Value No. Section Na. Measurement W-49 3125.0101 31 2500 1 LS SWPPP 2 1 Acre 'fte 1ACitlSUgL� Dollars Cents $3 000.00 $3 000.00 W-50 3304.0101 33 04 30 1 LS Temporary Water Services Y7Y)P, �1/i9lUlret� �?i'.� �a�sot� Dollars Cents $150 000.00 $150 000.00 W-51 0171.0001 0171 23 1 LS Construction Staking Six SWA �(ArAf d I ; Dollars Cents $6 750.00 $6,750.00 W-52 0171.0002 0171 23 1 LS Constructio(n� Survey, As -Built Redlines *HY 7i�z Tlutftdr�d Dollars �L Cents $3,500.00 $3,50000 W-53 3471.0001 34 71 13 6 MO Traffic Control _ Dollars O Cents $2,500.00 $15,000.00 W-54 3471.0003 34 71 13 1 EA Traffic Control Details Vie- 'AVkslftJ _ Dollars U Cents $100.00 $100.00 Wa55 9999.0002 1 LS Construction Allowance One Hundred -Twenty Thousand Dollars no Cents $120,000.00 $120.o00.0o UNIT I Water Improvements Sid Total $2,625,668.25 CITYOF PORT WORTH WATER AND SAPHTARY sHWCR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Form ft-i-i 20120120 City Pmjecl No. 02727 0042 43 80PROPOSAL Page 6 of ]0 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application; Project Item Information Biddees Proposal Pay Item Bid Listhem No. Specification Section No. Bid Quantity Unit of Description Measurement Unit Price Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS S-1 3331.4115 33 11 12 t.F 8-inch PVC Sewer Pipe Dollars @V ���•4 Cents S-2 3331.4119 33 11 10 230 FF 8-inch DIP Sewer Pipe fy � tp� DT16 ' YJW * IDollars Cents $130.00 $29,900.00 S-3 3339.1001 33 39 10 3 EA 4-foot Manhole 33 39 20 � '�y seven htAV4(J Dollars Cents $5.750.00 $17250.00 S-4 3305.0112 33 o5 17 3 EA Concrete Collar Dollars r� Cents $1,280.00 $3,840.00 S-5 3301.0101 3301 30 3 EA Manhole Vacuum Testing 0l [nGlfG_ Dollars Cents $240.00 $720.00 S-6 0241.2201 02 41 14 2 EA 4-foot Remove iManhole Ugil/ Dollars y P- (d Cents $560,00 $1 120.00 S-7 3331.3101 33 31 50 3 EA 4-inch Sewer Service y six NLi4red Dollars _ e [q Cents $4.600.00 $13800.00 S-8 3331.3311 33 31 50 3 EA 4-inch Sewer Service, jReconnection 4ZkAr �kJ( tq d1 t Dollars Cents $410.00 $1,230.00 S-9 3305.0206 33 05 10 20 CY Imparted Embedment/Backfill e� Dollars S� Cents $10.00 $200.00 S-10 3301.0002 33 01 31 227 LF Post -Construction CCTV Inspection YiIne Dollars `2 k� Cents $9.00 $2,043.00 S-11 3305.0109 33 05 14 227 l-F Trench Safety System Dollars z�2 Cents $3.00 $681.00 S-12 3201.0400 32 01 18 35 I_F Temporary Asphalt Paving Repair (2-inch MMAC 6-inch CT8) T11jon iVe Dollars Z Cents $35.00 $1,22600 CRY oP i•DRT WORTH STANDARD Cot STRU"ON SPBCIFICA'rION WCUMENFS Form R-iad 2012032G WATER AND SANITARY SEWER RBPLACBMBNr CONTRACT2036 WSM-F, PART 2 0(y Pmla1 N. 02727 W 4243 BID PROPOSAL Page 7nr10 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item lnformntion Bidder's Proposal Pay Item Bid List Item Specification Bid Quantity Unit of Description Unit Price Bid Value No. Section No. Measurement S-13 3201.0112 3201 17 190 LF 5-loot Wide Asphalt Pavement Repair, Residential Z. Dollars Cents $51.00 $9,690.00 S-14 3201.0201 3201 17 20 SY Asphalt Pavement Repair, Beyond Defined Width, Residential Dollars Cents $97.00 $1 940.00 S-15 3201.0150 3201 17 22 LF Permanent Asphalt Pavement Repair, Sewer Services `%Dn,01 Dollars _ f e(6 Cents $51.00 $1122.00 S-16 3291.0100 3291 19 1 CY Topsoil R!+:1-1_�� Dollars DA CJ Cents $62.00 $62.00 S-17 3292.0100 32 92 13 10 SY Block Sod Placement s iQ Dollars Cents $6.40 $64.00 S-18 0171.0001 01 71 23 1 LS Construction Staking onehawsUlla erg¢ Al4 N Dollars O Cents $1,850.00 $1,850.00 S-19 0171.0002 01 71 23 1 LS Construction Sulveyi/AAs�Built Reclines 6 2�Vv IIVIYViIfC�fR i1T 1 Dollars _ 2Ca Cents $1.250.00 $1,250.00 S-20 3471,0001 3471 13 1 MO Traffic Control Dollars L Cents $2.500.00 $2,500.00 S-21 3471.0003 3471 13 1 EA Traffic Control Details eShv- �WJCJ Dollars Cents $100.00 $100.00 S-22 9999.0003 1 LS Construction Allowance Ten Thousand Dollars no Cents $10,000.00 $10,000.00 UNIT II Sewer Improvements Bid Total $100,587.00 MY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCIMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 F—Revised 20120120 City Proje t No. 02727 o0 4243 RID PROPOSAL Nmg.f to SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Pmject Item Information Bidders Proposal Pay Item Bid Listltem Specification Dnitnf B1d Quantity Description Unit Pricy Bid Value No_ Section No. Measurement UNIT III: PAVING IMPROVE, IPNTS P-1 0241.0100 0241 13 29,800 SF Remove Sidewalk Dollars Z Cents $2.00 $59,600.00 P-2 3213.0301 32 13 20 38,550 SF 4-inch Concrete Sidewalk $Q.vtl1 Dollars 1f Cents $7.20 $277560.00 P-3 3213.6311 32 13 20 185 Sr 4-inch Concrete Side%Wk, Adjacent to Curb Q�eyeh Dollars so -vent'? Cents $11,70 $2164.50 P4 0241.0300 0241 13 12 EA Remove ADA Wheel air Ramp �tPR-��f�i �✓g�'��ollars Cents $375.00 $4,500.00 P-5 9999.0004 26 EA ADA Wheelchair Ramp Vr2r!" �V° hvte+AL' A -if 14 Dollars Liu Cents $2.250.00 $58,500.00 P-6 3232.0100 32 32 13 3,450 SF Concrete Retaining Wall, Adjacent to Sidewalk (18-inch - 24-inch) 7� Dollars Cents $34,25 $116,162,50 P-7 0241.1300 02 41 15 5,760 LF Remove Concrete Cufb and Gutter (50150) Ihlt. Dollars Cents $9.35 $53 856.00 P-8 3216.0102 32 16 13 6,010 LF 7-inch Concrete Curb and Gutter (50160) (1 TI�Q Dollars :Iefu Cents $45.00 $270 450.00 P-9 0241.0401 02 41 13 10,400 SF Remove Concrete Driveway (50150) Dollars 4h Cents $2.25 $23 400.00 P-10 3213.0401 32 13 20 10,550 SF 6-inch Concrete Driv ay (60150) �ltt@ Dollars ')A0a Cents $9,00 $94 950.00 P-11 0241.1400 0241 15 25 SY Remove Concrete Valley Gutter (50150) o a4r _ Dollars Cents $44.25 $1,106.25 P-12 3216.0301 32 16 13 25 SY 9-inch Concrete Valley dutter, Residential (50150) }f� � Dfollars �Ul «d J t fLt Cents $153.00 $3 825,00 CQY OF FORT WORTH Faon Reds d 20120121) WATFiR AND aANIrARY SEWER REPLACEMENT CONTRACT 200 WSM-F, PART 2 City Pt j-Nn_ 027V 00 42 43 BD PROPOSAL P.R. 9 dro SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application PTaject Item Information Biddeis Proposal Pay Item Bid List Item No. Specification Section No. Bid Quantrty Unit of Measurement Description unit Price Bid Value P-13 0241.1506 0241 16 9,650 SY 2-inch Surface Milling (50150) Dollars Cents $3.30 $31,845.00 P-14 0241.1600 0241 15 260 LF Butt Milling (50150) Dollars Cents $42.00 $10,920.00 P-15 3212.0900 1 32 12 73 50 GAL Asphalt Crack Sealant (50150) '^i Dollars Cents $24.50 $1,225.00 P-16 0241.1700 024115 1,625 SY 10-inch PavementPulverzation (50150) rx Dollars Cents $6.30 $10237,50 P-17 3211,0600 3211 33 11 Tons Cement Modificati n - 13 Lbs/SY (50150) Dollars Cents $255.00 $2805.00 P-18 9999.0001 13 GAL Road Bond EN1 (50/50)yy� + ent- hilldra . V %ollars 67 Cents $121,00 $1573,00 P-19 3123.0101 31 23 16 47 CY Unclassifted Street Excavation (,5[0?160) 1')AI-hle, Dollars ___ _ Cents $59.00 $2,773,00 P-20 3212.0302 32 12 16 11.300 SY 2-inch Asphalt Pavement, Type "D" (50150) _ eIYe Dollars 1 Cents 1 $12.60 $142,380.00 P-21 3305.0111 33 05 14 10 EA Water Valve Box Ad ustment w1 33 05 17 Concrete C�yq�ollar(50160) l '1l f(t,lJ lr Dollars W Cents $840.00 $8,400.00 P-22 3305.0108 33 05 14 40 EA Misc. Adjustment - Water Meter Box (50150) PIC, Dollars Cents $100.00 $4,000.00 P-23 3305.0107 330514 2 F4 Manhole Adjustment, Minorw/ 33 05 17 Concrete Collar (60150) tV- Ze CC 1�}I Dollars —7—&0 Cents $1,550.00 $3,100.00 P-24 3217.5001 32 17 25 75 EA Curb Address Painting (50150) -ew Twf— Dollars '3�'ca Cents 1 $85.00 1 $6,375.00 CITY OF FORT WORTH WATER AND SANrTARY SEWER STANDARD CONS'IRUC uoN SpEcwicAucm Doctrmu4TS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 F.- Re A.d 20120120 City Pfojml No. 02727 00 42 43 DID PROPOSAL Page io of io SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Pay Item Bid Listitem Specification Bid Quanhey Unit of Description Unit Price bid Value No Section No. Measurement P-25 3291.0100 3291 19 160 CY Topsoil (50150) �I-A, `V0 Dollars 2 Cents $62.00 $9,920.00 P-26 3292.0100 32 92 13 1,425 SY Block Sod Placement (50150) Dollars Cents $6.40 $9120.00 P-27 3110.0105 31 1000 1 EA 24-inch and Larqer-nee Removal V Ahf `i1MkA%Aollars Cents $3 350.00 $3 350.00 P-28 3110.0106 31 10 00 6 EA Remove and Transplant, Yuoca/Cactus -ftrtwe- h�Ihdre�, -;�ji Dollars Cents $1250.00 $7,500.00 P-29 3471.0001 34 71 13 6 MO Traffic Control Dollars Cents $2500.00 $15,000.00 P-30 3471.0003 9471 13 1 EA Traffic Control Details j ro�- it Vi10( iw_- Dollars Cents $100.00 $100.00 P-31 9999.0005 1 LS Construction Allowance Forty -Five Thousand Dollars no Cents $45000.00 $45,000.00 UNIT III Paving Improvements Bid Total $1,283,697.75 UNIT 1, UNIT II and UNIT III Total Bid $4,010,153.00 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD commUC'rloN SPL'(:lFICA DON DOCUMENTS RRPLAcEKuNTCONCRACT 20M WSM F, PART 2 Fan. R.h1.4 20120120 City Pr Sect No. 02727 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Biagi Sond KNOW ALL MEN BY THESE PRESENTS, that we Gra-Tex Utilities fnc. as Principal, hereinafter called the Principal, and Hartford Fire Insurance Company a corporation duly organized under the laves of the State of Texas as Surety, hereinafter called the Surety, are held and firmly bound unto City of Fort Worth as Obligee, hereinafter called the Obligee, in the sum of Five Percent of the Greatest Amount Bid- 5% GAB ;for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Project No. 02727 City of Fort Worth, Water and Sanitary Sewer Replacement THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay tD the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 4th / ;, day of March 2020 . Gra-Tex Utilities, Inc. (Prr real) (Seal) By (Title) President Hartford Fire Insurance Company R ��Surefy)� (Sea!) y � � Rhonda Wells, (Title) Attorney -in -Fact AIA 00CUMENTA370 121 BID BOND 0 AIA ®p FEBRUARY 195 ED B THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C, 20006 t Direct Inquiries/Claims to: _ THE HARTFORD j ATTU'RNE Y BOND, T-12 PO d/ 11/ I� uF One Hartford cut 0V 'd_l1_ Hartford, Connecticut 06155 Band.Claims thehartford.com calla 688-266-3488 or fax. 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK Aqencv Code: 46-510067 Hartford Fire Insurance Company, a corporation duly organized under the taws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the Iaws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies' do hereby make, constitute and appoint up to the amount of Unlimited : JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(les) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. . In Witness Whereof, and as authorized by a Resolution of the Hoard of Directors of the Companies an May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. rrryr, � ^Rrr tl 1ltrs ' 41yq4� 2 t �a:t-_•A� '�.arlo tR'•*'d�5 �1.�1111915 4r�sta. e r X ..-r..�_ r .. John Gray, Assistant Secretary M. Ross Fisher, Senior Vice President STATE OFCONNECTICUT SS, Hartford COUNTY OF HAR.TFORQ On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. KatWcen T. Maynard NGtary Public CERTIF1G iTE My Commission Expires July I1„2021 copy of the the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct Power of Attorne executed b said C h' h ' ill ' f 11 f ff f t y y [ ompanles, w is rs s i fn u arce e echve as oh Signed and sealed at the City of Hartford. S ATC n i 9©�c) 01�'Ivv 't i'pp�16rF. a ���9S�i r: 'tw"It,_���4i'ia4 �!'p •'� },A� F 14 <<1 H945 'i-,�I�iltl�� _ �, Kevin Heckman, flsslstarit Vice PresldPnf FnA 7A18 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of'IC,�llcr H ,our principal place of business, are required to be " t +� rl percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of S!a:e sq�•r :tr b - •j, our principal place of business, are not required to underbid resident bidders. B. The principal place of business our company or our parent company or majority owner is in the State of Texas. 4 BIDDER: Gra-Tex Utilities, Inc. P.O. Box 700 Arlington, TX 76004 END OF SECTION By: James Brent (Signature) Title: Estimator Date: T CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Form Revised 20110627 City Project No. 02727 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 1. Summary. All contractors are required to be prequalified by the City prior to submitting bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder Prequalification Application in accordance with the requirements below. The prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. The information must be submitted seven (7) days prior to the date of the opening of bids. For example, a contractor wishing to submit bids on projects to be opened on the 7th of April must file the information by the 31st day of March in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's Prequalification Application, the following must accompany the submission. a. A complete set of audited or reviewed financial statements. (1) Classified Balance Sheet (2) Income Statement (3) Statement of Cash Flows (4) Statement of Retained Earnings (5) Notes to the Financial Statements, if any b. A certified copy of the firm's organizational documents (Corporate Charter, Articles of Incorporation, Articles of Organization, Certificate of Formation, LLC Regulations, Certificate of Limited Partnership Agreement). c. A completed Bidder Prequalification Application. (1) The firm's Texas Taxpayer Identification Number as issued by the Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification number visit the Texas Comptroller of Public Accounts online at the following web address www.window.statc.tx.us/taxpermit/ and fill out the application to apply for your Texas tax ID. (2) The firm's e-mail address and fax number. (3) The firm's DUNS number as issued by Dun & Bradstreet. This number is used by the City for required reporting on Federal Aid projects. The DUNS number may be obtained at www.dnb.com. d. Resumes reflecting the construction experience of the principles of the firm for firms submitting their initial prequalifcation. These resumes should include the size and scope of the work performed. e. Other information as requested by the City. 2. Prequalifleation Requirements a. Financial Statements. Financial statement submission most be provided in accordance with the following: (1) The City requires that the original Financial Statement or a certified copy be submitted for consideration. CITY OF PORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Revised July 1, 2011 City Project No. 02727 004511-2 BIDDERS PREQUALIFICATIONS Page 2 of 3 (2) To be satisfactory, the financial statements must be audited or reviewed by an independent, certified public accounting firm registered and in good standing in any state. Current Texas statues also require that accounting firms performing audits or reviews on business entities within the State of Texas be properly licensed or registered with the Texas State Board of Public Accountancy. (3) The accounting firm should state in the audit report or review whether the contractor is an individual, corporation, or limited liability company. (4) Financial Statements must be presented in U.S. dollars at the current rate of exchange of the Balance Sheet date. (5) The City will not recognize any certified public accountant as independent who is not, in fact, independent. (6) The accountant's opinion on the financial statements of the contracting company should state that the audit or review has been conducted in accordance with auditing standards generally accepted in the United States of America. This must be stated in the accounting firm's opinion. It should: (1) express an unqualified opinion, or (2) express a qualified opinion on the statements taken as a whole. (7) The City reserves the right to require a new statement at any time. (8) The financial statement must be prepared as of the last day of any month, not more than one year old and must be on file with the City 16 months thereafter, in accordance with Paragraph 1. (9) The City will determine a contractor's bidding capacity for the purposes of awarding contracts. Bidding capacity is determined by multiplying the positive net working capital (working capital = current assets — current Iiabilities) by a factor of 10. Only those. statements reflecting a positive net working capital position will be considered satisfactory for prequalification purposes. (10) In the case that a bidding date falls within the time a new financial statement is being prepared, the previous statement shall be updated with proper verification. b. Bidden Prequalification Application. A Bidder Prequalification Application must be submitted along with audited or reviewed financial statements by firms wishing to be eligible to bid on all classes of construction and maintenance projects. Incomplete Applications will be rejected. (1) In those schedules where there is nothing to report, the notation of "None" or "NIA" should be inserted. (2) A minimum of five (5) references of related work must be provided. (3) Submission of an equipment schedule which indicates equipment under the control of the Contractor and which is related to the type of work for which the Contactor is seeking prequalification. The schedule must include the manufacturer, model and general common description of each piece of equipment. Abbreviations or means of describing equipment other than provided above will not be accepted. 3. Eligibility to Bid a. The City shall be the sole judge as to a contractor's prequalification. b. The City may reject, suspend, or modify any prequalification for failure by the contractor to demonstrate acceptable financial ability or performance. c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0045 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified warp types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTI{ WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 00 46 12 BID FORM Page 1 of 1 SECTION 00 4 ,12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequafified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalifjcation Expiration Date Water Improvements - 12-inch Water Main Replacement by Gra-Tex Utilities, Inc. 10/31/2020 Open Cut Water Improvements - 8-inch Water Main Replacement by Gra-Tex Utilities, Inc. 10/31/2020 Open Cut Sanitary Sewer Improvements 8-inch Sanitary Sewer Gra-Tex Utilities, Inc. 10131/2020 Replacement by Open Cut Paving Improvements - Full JLB Contracting, LLC 1/1/2021 Milling The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER; Gra-Tex Utilities, Inc. ly-.Xes Brent P.O. Box 700 Arlington, TX 76004 (Signature) Title: Estimator Date: 31's /h 1, END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Form Revised 20120120 City Project No. 02727 Fo R, VV0 R T AR. October 24, 2019 Mr Don E Kemp Gri-TN ; Utilities Inc PO Box 700 Arlington, TX 76004 PREQUAb.IFiCATION TO BID CITY OF FORT WORTH WATER DEPARTMENT PROJECTS Dear Mr. Kemp: Thank you for your submittal of information and data toward prequalification to perform our work. We are pleased to advise that your prequalification has been finalized. A bid limit_ $15,545,050.00 has been established for your organization based on the financial data submitted. Your firm is prequalified to perform the following work: --- Wastewater Mains (24" and under) for New Development, Rehabilitation, and Redevelopment using Open Cut construction methods Water Mains (24" and under) for New Development, Rehabilitation, and Redevelopment using Open Cut construction methods The prequalification and bid limit established above will remain current through .I0Q,U2020 This date was established to be sixteen (16) months from the date of the most recent financial statement received, unless rescinded for cause. Should you desire prequalification in the future beyond the aforementioned, submittal of updated financials, work experience, and equipment list will be necessary for this department to establish a new bid limit. Please be advised that the plans and documents for the work to be performed must be submitted to and approved by the City of Fort Worth Water Department. We appreciate your interest in our work and should you have some question in this or other matters within our purview, please do not hesitate to contact Mr. John Kasavich at (817)392-8480 or Cheryl Howe at (817)392-- 2752. Yours very truly, MAIL TO: John Kasavich, P.E. F (0 ort Worth Water Department t Engineering & Regulatory Services Chris Harder, P.E_ 200 Texas Street Water Director Fort Worth, TX 76102 Fort Worth cn m WATER DEPARTMENT 4 l F ENGINEERING AND REGULATORY SERVICES 1 THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * i~oRT WORTH, Texas 76102 m 817-392-8240 * Fax 817-392-8195 1964. 1993 a 2(11 `a) Printed an recycled paper City of Fort Worth Transportation Public Works Dept. Lire -Qualified Paving Contractors (as of January 1, 2019) �o � 0 0 ��a� -w nQ� - W noo K naoa wW LU Q xao3�2 x z— �r Wii M ZZn CONTRACTOR ZZ.p 0z � :0.a' ZLd , �� a O V) Q O oZ Z v � � i wV�yv �uaw �Z�uC~ 2L Construction, LLC P.O. Box 397 - Rhome, TX 76078 Attn: Chip Fisher X 8/112018 8/18/2016 Advanced Paving Company 2257 Joe Field Road Dallas, TX 75229 Attn: Sam Garrett X 8130/2020 11/26/2014 Armour Concrete L.P. 4287 Beltline Rd., No. 234 Addison, TX 75001 Attn: Tim Armour X 913012016 Atll Special Projects Groups, LLC 4775 North Freeway Fort Worth, Texas 76106, Attn: Jane Ratliff X X 5/112017 5/6/2015 CD Builders, Inc. P.D. Box 1002 Hurst, TX 76053 Attn: William Taylor X 10/3112016 Chris Harp Construction, LLC P.O. Box 640 Nevada TX 75173 Attn: Jamey Burchett X 1/112021 Conatser Construction TX., L.P. P.O. Box 15448 Fart Worth, TX 76119 Attn: Jerry Conatser X X X 1/1/2019 Cutler Repaving, Inc. 921 E. 27th St. Lawrence, KS 66046.4917 Attn: John Miles X 5/1/2019 Ed Bell Construction P.O. Box 540787 Dallas, TX 75354-0787 Attn: Doug Teter X 4/1/2018 Fain P.O. Box 750 Fort Worth, TX 76101 Attn: Larry Frazier X 8/1/2019 FNH Construction, LLC 4099 McEwen Road, Suite 610 Farmers Branch, TX 75244 Attn: Candace Gillespie X 4/112018 4/20/2016 Gibson K Associates, Inc. P.D. Box 800679 Balch Springs, TX 75180-0579 Attn: Pam Davis X 1/3112019 Gilco Contracting, Inc. 6331 Southwest Blvd. Benhrook, TX 76123 Attn: Kaye Gill X 1/1/2021 Glenn Thurman, Inc. P.O. Box 850842 Mesquite, TX 75185.0842 Attn: Richard W. Triplett X 12/1/2019 Haydon Building Corp. 4640 East Cotton Gln Loop Phoenix, Arizona 85040 Attn: Debbie O'Connor X 111/2021 Page 1 of 3 City of Fort Worth Transportation Public Works Dept. Pre -Qualified Paving Contractors (as of January 1, 2019) W 0 uFiu� J0. JV w !a], -11Fm O QIAXD U UJ a U? i s x a Y Z oq = ~4~ � 7 h J ZZv; Z Z�� Z a�N {/J2 a.�Z- NZ W �Q1 Ip�s.: N� 0.0 ,Ww,Q ,� CONTRACTOR 0 V v c4i cO7 x Q V v Q L)� Q v Q � W Heritage Asphalt Company LLC 608 Henrietta Creak Rd. Roanoke TX, 76262 Attn: Larry Jackson X 8/31/2020 Jackson Construction, Ltd. 5112 Sun Valley Dr. Fort Worth, TX 76119 Attn: Larry Jackson X X 4/112020 Jay Reese Contractor's, Inc. 32780 Ranch Road 12 Dripping Springs, Texas 78620 Attn: Chandra Aouveille X X 5/1/2017 4127/2015 JLB i~onlrar.Unq, LLr. PA). OEM 24131 Fort Wo0h, TX 71124.1 111 nN: 54nl taaVt9 X X X 111/2021 Kodiak Trenching and Boring LLC P.O. Box 93929 Southlake, TX 76092 Attn: Clayton Harp X X 12/3112018 1111/2016 Lacy Construction 1880 Crown Rd. Dallas TX 75234 Attn: Darlene Coney X 8/1/2019 Lane Construction Corp. 90 Fieldstone Ct. Cheshire, CT 06410 Attn: Lisa Patino X X X 1/1/2019 Lone Star Civil Construction, Inc. 4320 Windsor Centre Trail, Suite 500 Flower Mound, TX 75028 Attn: Bradley Misster I X I 1 1 12/3112016 11/26/2014 McCarthy Building Companies 12001 N. Central Expressway, Suite 400 Dallas, TX 75001 Attn. Kyle Masters X X X 7/3112017 7/27/20015 McClendon ons ruc ion Co., Inc. P.O. Box 999 Burleson, TX 76097 Attn: Dan McClendon X 811/2019 c a on Contracting L.P. 3019 Roy Orr Blvd. Grand Prairie, TX 75050 Attn: Russell Rogers X 8/30/2020 Oscar Ronda Contracting, Inc. 608 Henrietta Creek Road Roanoke, TX 76262 Attn: Janie Rodriues X I X 12/112017 12/1412015 Pavecon 3022 Roy Orr Blvd. Grand Prairie, TX 75050 Attn: Tim Mulgray X X 12131/2018 111112016 Peachtree Construction, Ltd. 5801 Park Vista Cir. Kellar, TX 76244 Attn: J. Barry Clark X X 1/1/2021 REBCON, Inc. 1868 W. Northwest Hwy Dallas, TX 75220 Attn:Robert Bibby X 8/1/2019 Page 2 of 3 City of Fort Worth Transportation Public Works Dept. Pre -Qualified Paving Contractors (as of January 1, 2019) I -Our awo HOiv 0:LU tiON QuUlc SOW auUi~ � o Qzo w QzE= O F=� QNf�Cd VXCo coo' X n.e� XIt o.—� s-o o_Q o x;Rk o.Q-1 O r?www w�r..i w¢ z`�ri z Z`.r z UV= wz Quv wz QvZ 0 Q WM Q ii X uz1W ���� CONTRACTOR c0iUv v LU Reliable Paving, Inc. 1903 N. Peyco Dr. Arlington, TX 76001 Attn: John Morris, P.E. X X X 1/31/2019 Reyes Group Ltd. 1520 Parker Rd. Grand Prairie, TX 75050 Attn: Mary Reyes X X 511/2020 Reynolds Asphalt and Construction Co. ATTN. Bart McKay 710 S. Industrial Blvd, Suite 100 Euless, Texas 76039 X X 8/112019 RKM Utility Service, Inc. 1805 Royal Lane, Suite 107 Farmers Branch, TX 75229 Attn: Dennis R. Gulley X X X 3/1/2018 Smith Contracting, Inc. P.O. Box 278 Royse City, TX 75189 Attn: Delilah Smith X 8/1/2018 Stabile & Winn, Inc. P.O. Box 79380 Saginaw, TX 76179-0380 Attn: Jerry Henderson, P.E. X X 9/1/2020 Steele & Freeman, Inc. 1301 Lawson Road Fort Worth, TX 76131 Attn: Karen Benson X 12131/2016 11125/2014 Sundt Construction, Inc. 911 Central Parkway N., Suite 375 San Antonio, TX 78232 Attn: Gus Hurtado X X X 12/31/2016 1/29/2014 SYS Construction Co., Inc. 421 Compton Ave. Irving, TX 75061 Attn: Shirley Bennett X 101112019 TexasBit 2121 Irving Blvd. Irving, TX 75207 Attn: Nina Flores X X 1/1/2019 8/1/2013 Texas Sterling Construction, LP 20310 Fernbush Ln. Houston, TX 77073-3599 Attn: Kim Sheets X X X 12/31/2016 10/2112013 THB Construction, LLC. 1544 Valwood Pkwy., Suite 100 Carrollton, TX 75006 Attn: Glenn Highland X Special Conditions 8/31/2016 Tiseo Paving Company P.O.Box270040 Dallas TX 75227-0040 Attn: Janet Kaufman X 8/1/2020 Webber, LLC. 9303 New Trails Dr., Suite 200 The Woodlands, TX 77381 Attn: Todd Jackson X 311/2017 319/2015 Zachry Construction Corp. P.O. Box 33240 San Antonio, TX 78265-3240 Attn: Nancy Lopez X X X 12/31/2016 11/25/2014 Page 3 of 3 0TOT SECTION 00 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box City Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State Zip Code Street Address (required) City State Zip Code Telephone Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 T14ROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 004513-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) ElHas fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR ElDoes not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MANOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPIECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer C1PP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 45,000 square yards) Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0045 13 - 4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT I NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in had: (a) As a General Contractor: construction work has your organization (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CONTRACT AMOUNT CLASS OF WORK DATE COMPLETED LOCATION CITY -COUNTY- STATE NAME AND DETAILED ADDRESS OF OFFICIAL TO WHOM YOU REFER *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract?. If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December20, 2012 City Project No. 02727 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 or8 8. In what other lines of business are you financially 9. Have you ever performed any work for the City? If so, when and to whom do you refer?. 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. I NAME OF FIRM OR COMPANY I DETAILED ADDRESS 11, Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? NAME PRESENT POSITION OR OFFICE YEARS OF EXPERIENCE MAGNITUDE AND TYPE OF WORK IN WHAT CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0045 13 - 6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Secretary Treasurer Limited Partners (if applicable) LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICArFION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 14. Equipment 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 TOTAL ITEM QUANTITY BALANCE SHEET ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment Iist is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Revised December 20, 2012 City Project No. 02727 004513-8 BIDDER PREQUALIFICA'110N APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of _, the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of , Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION! DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page l of I 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 02727. Contractor finther certifies that, pursuant to Texas Labor Code, Section 6 406-096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: 10 11 6 rot- Tex M li CS i_._n_ By: drP1e� �iPA'If 12 Company (Please Print) 13 14 —P.0 ON ,00 Signature_ 15 Address 16 17 Arlindmi !)( f ty { a m Title: �S� MGM ai 18 City/Stu a/Zi (Please Print) . 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME, the undersigned authority, on this day personally appeared 26 11tl � NAt , known to me to be the person whose name is 27 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of ' f� for the purposes and 29 consideration therein expressed and 'n the capacity therein stated. 30 31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of 32 209a, 33 34 35 0 , 36 Notary Pul5lic in aftd for the State of Texas 37 38 END OF SECTION GREG HUGOML, SR- MyNOKYID41281=08 39 ebtll;my CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City project No. 02727 7 ,j 5 7 8 cI J to .0 I� 1j I� l7 1 Il 1� 21 4 25 26 7 2K 9 31. 32 33 34 3s rM'IS io- I 1►iimI-Ik, ' FI4IIIRE.s Fulerlsrr: 4,rec,f 4tknill view. 1 of 9 REC'TiO (10 45 d{) I wr'ity.FRi� in s ant r4s Si)eiEiiicitcicaras f t :ht Ivtrrl -iIoI lrLr Y11jIle of rhr vQnIraO is g;,C:Uter 1h?3rl VS then �i M13E; ,;ijbQrlrrTrkierfrig gQral fLpl)l11Mb1!e 1101.T#:1 :i'I I F."Ml N,F 11 'lit 1l1- F.ur't W01101 trj r! l Ute the -full and egilhable paMicitritlinrt by Miqor'lty i I I tha, 171'il�:urwn&t of itlI gtxid:; and qL-I uc:s. All I`Cr{ral1'0110111N 1iad :tit AuSJnea-iDJ�.pa'�C#} 17. utcrpj'F:ia- i'dCnallwe iippCy #tr tliC5. bi4. ,J1mit Pizt),Iut w—L Th iry.'s N.LBF gr,ej orl t sFs piojact i s+4�f� of tjla tgtEl[ 1aicC v.4-lice .I f' rlre *nvtrnal (Agsv # ! app#0 to _Parka awl Note. If both AIRE and SBE snIsconrraeling l#.l)II Is 1II.L a'sIliilllslant flu. IIlk ltrr,,}ivd: then all 01yerur ulllNiIIpiilii I}IItil a € 13E [ ItiIty j tillu Vr}vm A n J it 13L IJ(iti%:Itic) IN r'A1.111 1(1 be dveIIIC'd rvmpoUsive. C 0 511PLIA N CE TO 13111 sPJ!.4'1 F1CATCNS Oil C1ly C: IiI11.1Lr:J!; {��rl.`'+�� W I I v I C :i i�1C?I€, tia.tls.:a11111filcIIr10 �1:laI h, apIdied. {.ffeeovs aee rCgLJired Its comialy with da.- irilz'r11 1' 11i, u II,r' . k.Iiiv q €)lvox Ity EnterpriLe Or dirinuce by crrr,. of iliv frAWsVIP1g: . �4'iaect (?r' exceed 911tr ;Ihijve ,IitteiI M 14 giwI Ihrtxug h AN113E su1)voiiIracIhag Im Ili pipiition, ur 2. Mein Or euved the ilhrave ofkied W F g0aI Ill YOUg11 ,�1BE ,T0111 r Ver1lrtrrc Pnrticilln(i0n..01. 3, [rood F.Mrh H��1IC11 i cI�1C IixLt3r�lr�{11:, nr; 4: 11ritile IA,n ,ver &L,LItalell tii[ival. lli3MI l-A j, OF RLQUIRIr. [71 DOCUMENTAT10 Thy a,TppJ4;oh1e doct nerim ntu51 lie i'cculy d by dic PoildviNin DivIM4)1% tMIhIn {lac fia€lsxt ifug €1mv.9 'Il1ncoled, -I h rimier Jrelr IhL: entire bid I he i onsiovred trslselrl.,1'n it) tlw t:411c�1 fiop1-., The 0ffelor sh a I I 4jeliaL:r I1ie MBf--', in ist:rwarll [Lr Ilan Kiilxrrll`Iri.rlc r111I)I IYLT Of 1110 I1111-C-aa;ir)g division and. ahiJrri >7 cIatcrl iin{: racoipl. Stich receipt ih:dl be rvidrrlrv- I11Ltr the C ity rciLeived the dycwilenta.do t in tlir rime ;aIl cKlbW, A loud AaId/III- e111ri1Eed COpy will not he aecepled. 1, ,SribccrnWactar lUlillizadDir! Farts, if rccaivrirl no ?titer thws 2,100 p.m.. OTT Ific sKiond Wily bosilless pal 6 ma tlr r.xcr~eded: dtty aflu I- tilt! JAd UI}winy, date, exe I1AiV& Uf lflc b id t'1Rol i119 riju- 2. ('atld Fidth Ffforl Atlil rt`•l vi' ,et4 rin IatEr thaii 2,00 p,m., on Ilse sv!ajid C i I Y htislness SnWon t va ctor U111I n1141a 1#orm, it' dory ;Ifter t.ITe bid opening dive, vxcJwsiw al' l liv Iwid ollt'nir1L4 kLr6jQjV..lriorl i4. [" . Th�1rr 4Mted godi. daw. 3. Goad Faith Effort n.nd r'neivcd no. fate€' than 2-,00 pan.. o:I tho SMOILd dry huAiness ubeo11tractoI. UtiIi t-u.i tau irl,rnI. i 1' 1.10 tiny after IhCI bid op; nir`Ilr date:, exclusive 01,11le 11111 npekljng M11F, Llrliti iatinn: drao, 4. Prtnle canlr i�rtor Walvc! r Form, i'en4ve€1 no Iater tl Lin 2:00 p,In,, ills Lhc staintC C Ity 1iilAilri3S I1'yoll %vial fSCrraJ'ILI aj1 day ati r Ilse hid apit nl•t}g dati . excllJSivc of i he b+ d op41r'liag �- onIrauiIpp flerivsstic: kite. C'fTY (A; F(wr }YUJita1 W ATER ANa 5ANITARY-SEWCK �'lANtIA}tr3rvC]NSrRI.R.'11fINSPLt.'IFK.AlION Drat'L11 EMT:S RL-Pt.ALTF.MT- TC.'Cl4TRACT20fI AQW-}.PART# ReViII dtWIC9,"201ti CilyL'Rula tR 61727. ,7 I]G e1 .69.2 MifIN'li}r RL16111eti EniCprrtie 5 prn: L-WiMN i."b2yr2. racrived.no II'Urf 2:0(') firm„ daw'. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. CITY O F'�}�{7`iVilkTEi SrAN5-)AHP.�'0NSTTWC ?f.l': SrIF.-.C.IFI{ AT7t?N D Ol'iINUNTS L�4:,'ltkfd Iuuc%aljri e Rl (817) 212-26 WATER 6NOSKN MARY8E rM RFPI—%CT-' .NT MN7 RAC- :U I6 ;NSN44, TART 7 Cky J}MjCMM 190 rrzay'J 005243- 1 Agreement Page I of 5 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 5f % ZZo is made by and between the City of Forth Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager., ("City"), and Cara- ri7ex tib.i-L m.%, inc. authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"), City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water and Sanitary Sewer Replacement Contract 2016 WSM-F Part 2 City Project No. 02727 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Dollars Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work will be complete for Final Acceptance within 365 days after the date when the Contract Time commences to run, as provided in Paragraph 2.03 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that thne is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City will stiffer financial loss if the Work, is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred — Thirty & 001100 Dollars ($630.00 for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTt3 WATLR AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICA"I1ON DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised 09/0612019 City Project No. 02727 005243-2 Agreement Pace 2 of 5 Article S. CONTRACT DOCUMENTS 5,1 CONTENTS: A. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Forin 1) Proposal Form 2) Vendor Compliance to State Law NOD -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically [Wade a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda, 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is spceificall intended tooperate _and b e ef_—fective even if it is alleged or proven that all or some of the damages being ----- sought were caused in whole or in part, by any act omission or ne li ence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY Of FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised 09/06/2019 City Project No. 02727 005243-4 Agreement Page 4 of 5 The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Goverlunent Code. By signing this emitract, Contr•crctor certifies that Contractor's signature Provides written verification to the City that Contractor: (1) does not boj1cott Israel; and (2) Ivill not boycott Israel during the term of lire contract. 7.8 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. T9 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.10 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting frorn the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's persormel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work. or any health or safety precautions. SIGNATURE PAGE TO FOLLOW CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised 09/06/2019 City Project No. 02727 00 52 ,43 - 5 Agreement Page 5 of 5 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the (late subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: (ifi a0 TeK U- 11 f 1 eS j1r1C, City of Fort Worth By: Signature (Printed Name) U. Title OL Address By: Uan+n 1M4flJ •-1. MOP` - Dana Burghdoff Assistant City Manager Jun 11, 2020 Date Atte ' l [j j�XL ty Secretary drllA,32�-, ��X- 7G01/ City/Sta /Zip (Seal) Date CITY Or FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 09/06/20I9 M&C: Date: ;3/25120 Form 1295 No.: 20,Z Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting I uirements. Lawrence HaI ilton, P.E. Senior Professional Engineer Approved as to Form and Legality: Douglas W. Black Assistant City Attorney APPROVAL RECOMMENDED: Ch,W.pho Hmd Ws J.n 10. 202012:18 CDT) Chris Harder, P.E., Director Water Departlne FRCPA$ -�TEECORD IrARY sswcR RE 3LCWAj"VWV6 SM-F, PART 2 City I Iroject No. 02727 a 46BCSHP4385 0061 13 - 1 PERFORMANCE BON➢ Page 1 of 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS- 6 COUNTY OF TARRANT § 7 8 That we, Gra-Tex Utilities, Inc. known as 9 "Principal" herein and Hartford Fire Insurance Company a corporate 10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Port Worth, a 12 municipal corporation created pursuant to the laws of Texas, known as `City" herein, in the penal 13 sum of, Four Million Ten Thousand One Hundred Fifty Three 0/100 Dollars 14 4,010,153.00 (_ }, lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind 16 ourselves, our llcirs, executors, administrators, successors and assigns, jointly and severally, 17 firmly by these presents. 1.8 WHEREAS, the Principal has entered into a certain written contract with the City 19 awarded the L day of t Y isi�s.0 , 2Q� which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 21 labor and other accessories defined by law, in the prosecution of the Work, including any Change 22 Orders, as provided for in said Contract designated as Water and Sanitary Sewer Replacement 23 Contract 2016 WSM-F, Pail 2: City Proiect No. 02727 24 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 25 shah faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 27 specifications, and contract documents therein referred to, and as well during any period of 28 extension of the Contract that .may be granted on the part of the City, then this obligation shall be 29 and become null and void, otherwise to remain in full force and effect. 30 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 31 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 32 Worth Division. CITY OF FORT WORTH WATT AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1,2011 City Project No.02727 0061 13-2 PERFORMANCE BOND Page 2 of 2 I This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance With the provisions of said. statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the _ 8th day of May 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 C� 20 20 ATTEST. U0 -.,daqh (Principal) Secretary itness as to PrirleipaI Witness as to SuretfT PRINCIPAL.: Gra-Tex Utilities, Inc, BY: 0 Signature SAeA ^ Jrl�tcrvu i/ Name and Title Address:_ r �G;Io-i� Sl Zurk Z, - -, or/ SURETY: Hartford Fire Insurance Company Signature Rho�Wel1�� Attorney -In -Fact Name and Title Address: 700 Highlander Blvd # 340 Arlington, TX 76015 Telephone Number: 817-226-3710 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. Tile date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTItACT20I6'WSM F, PART2 Revised July 1, 2011 City Project No. 02727 Direct Inquiries/Claims to, THE HARTFORD BOND, T-12 P"10WER OF ATTORNEY HartfOne ord, Connecticut tcu06155 Bond.ClaimsAthehartford.com cak 888-266-3488 orMx: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA IRIS MANAGEMENT NETWORK Agency Code: 4 6- 510 0 6 7 0 Hartford Fire Insurance Company, a corporation duly organized under the laws ofthe State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws ofthe State oflndiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws ofthe State of Connecticut 0 Hartford underwriters Insurance Company, a corporation duly organized under the Iaws ofthe State of Connecticut 0 Twin City Fire Insurance Company, a corporation duly organized under the laws ofthe State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws ofthe State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws ofthe State of Indiana Hartford insurance Company of the Southeast, a corporation duly organized under the laws ofthe State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint up to the amount of Unlimited : JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ie's) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law., In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. UVEN, t1D7 �r:Hi�s�hy��wrt• jiA."•�F�ty • � W'r{iiMaiS• ��4• a 1k.e John Gray, Assistant Secretary STATE OF CONNECTiCUT ss. Hartford COUNTY OF HARTFORD 7 /: - M. Ross Fisher, Senior Vice President On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. �raiitiso G ' * Kathleen T. Maynard Notary Public CERTIFICATE My Commission Expires July 31, 2021 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of g"r W919,/ l Signed and sealed at the City of Hartford. rr' #i 1 • R ra ty D7 e •n.�:as4u ^�c� Ip -* r • "'n, hu�ots' 4wu�-' •�'• Kevin Heckman, Assistant Vice President POA 2019 i 46BCSHP4385 006114-1 PAYMENT BOND Page t of. 2 I SECTION 00 6114 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 Gra-Tex Utilities, Inc. 8 That we, _.......__._..,known as 9 "Principal" herein, and Hartford Fire Insurance Company , a 10 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 13 in the penal sum of Four Million Ten Thousand One Hundred Fifty Three 01100 Dollars 14 ($4,010,153.00 ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 16 ' our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these I7 presents: 18 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 19 _„_day of rY�_, 2(�O , which Contract is hereby :referred to and 20 made a part hereof for ai Tpurposes as if fiilly set forth herein, to furnish all materials, equipment, 21 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 22 said Contract and designated as Water and Sanitary Sewer Replacement Contract 2016 23 WS114:-F, Part 2; City Project No. 02727 24 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 25 Principal shall pay all monies owing to any (and ail) payment bond beneficiary (as defined in 26 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 27 the Contract, them this obligation ,shall be and become null and void; otherwise to remain in full 28 force and effect. 29 This bond is made and execrated in compliance with the provisions of Chapter 2253 of the 30 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 31 accordance with the provisions of said statute. 32 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM--F, PART 2 Revised July I, 2011 City Project No. 02727 5 6 7 8 9 10 11 12 0061 14 - 2 PAYMENT BOND Page 2 a€2 1 IN WITNESS WHERM OF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the — 8th day of 3 May 20 20 4 ATTEST: (Principal) Secretary /Z& ess ds to Principal ATTEST. (Surety) Secretary Witness as to Sa ty PRINCIPAL: Gra-Tex Utilities, Inc. BY: _�/_z h � Signature � T T T JJL! lam_ ffyea�V I Name and Title Address: .6©S— Pk:G_i fie SURETY: Hartford Fire Insurance Rhonda Wells Name and Title Attorney -In Fact Address: 700 E Highlander Blvd $ 340 Arlington, TX 76015 Telephone Number: 817-226-37t0 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT ENT CONTRACT 2016 ISM-1F, PART 2 Revised July I, 2011 City ProjectNa. 02727 ' Direct Inquiries/Clalms to: THE HARTFORD y J�; py 1r1 III' ®FATTORNEY One Hertford Plaza 11 "`��J� !'" ''�VV1 I� / .J� Hartford, Connecticut 06155 Sond.Claims@thehartford.com call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name; INSURICA INS MANAGEMENT NETWORK Agency Code: 46-510067 0 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the Iaws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of Illinois, acorporation duly organized under the laws of the State of Illinois 0 Hartford insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana 0 Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint up to the amount of Unlimited : JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. o 4l5� 5F a' aSAM A efuo- 1037 .�P„ m_' y j�. p r W10 NL+YC`~• l 6 r'-.' � 4 FL. •F"`-.. •. �• 1�F .*FPS � 4i'+lLllalS �~ +PUM!' •�•F,j y�L. 14.e John Gray, Assistant Secretary STATE OF CONNECTICUT ss, Hartford COUNTY OF HARTFORD M. Ross Fisher, Senior Vice Presidont On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Hoards of Directors of said corporations and that he signed his name thereto by like authority. Kathleen T. Maynard Notary Public -CERTIFICATE. My Commission Expires July 31, 2421 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above a d foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of%�aCb�C) Signed and sealed at the City of Hartford.' is 3tr47tiletIy797q$ f_ �f Kevin Heckman, Assistant Vice President PDA 2019 46BCSHP4385 0061 19 -1 MAM'$'PNANCE BOND Page 1 of 3 1 SECTION 00 6119 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Gra-Tex Utilities, Inc. , known as 9 "Principal" herein and Hartford Fire Insurance Company , a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Foil Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 13 in the SLIM of Four Million Ten Thousand One Hundred Fifty Three 0/100 Dollars 14 ($ l,olo,lss.00 ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 16 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 19 WHEREAS, the Principal has entered into a certain written contract with the City awarded 20 the2,;� day of rY , 20r 4C which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 22 materials, equipment labor and other accessories as defined by law, in the prosecution of the 23 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 24 the "Work") as provided for in said contract and designated as Water and SanitarX Sewer 25 Replacement Contract 2016 WSM-F Part 2• City Proicet No. 02727; and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the 'Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMPNTS REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Revised July 1, 2011 City Project No. 07727 006119-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE, the condition of this obligation is such that if Principal shall 3 remedy any defective Work, for wbicb timely notice was provided by City, to a completion 4 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 5 Rill force and effect, 6 7 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 9 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 11 12 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 14 Worth Division; and 15 16 PROVIDED FURTHER, that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. is 19 20 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Revised July 1, 2011 City Project No. 02727 006119-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 8th day of May 3 20 20 5 6 7 8 9 to 11 12 13 14 15 16 17 is 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 ATTEST: M0/nodo-iswi& (Principal Secretary tress as to Principal i ATTEST: (Surety) Secretaryla� rN��D f itness as to SuroV PPJNCIPA1.: BY: Signature ( /� U •O Gil4.1 ts`, d Name and Title Address: 60,;c &,,-, e. V,— s� , nr� d� 0// SY MMY: Hartford Fire insurance Company Sig ature Rhonda Wells Name and Title Address: 700 Highlander Blvd # 340 Arlington, TX 76015 Telephone Number: 817-226-3710 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. if. 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 Direct Inquiries/Claims to: THE HARTFORD POWERC)"F ATTORNEYBONnectic One Hartford Plaza Hartford, Connecticut 06155 Bond.ClaimsPthehartford.com call.888-266-3488 orfax: $60-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: INSURICA INS MANAGEMENT NETWORK Agency Cade: 46-510067 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana 0 Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana 0 Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois 0 Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana 0 Hartford Insurance Company of the Southeast, a corporation duly organized under the Iaws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited JIM BARR, ROGER REDDEN, RHONDA WELLS, RUSSELL BOARD of ARLINGTON, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, sea] and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. TYt tl ►r y ,I Its r4000�sr*Nuct.�t[c_ aTatp9N n o.� j r8a7 �' t ?p� s+ =��' r 7M5_°n Y0 wrlpt�nr[r[+J*4 �•aIY4wi41$i�;e€= ;ova ic = TAfi9 � 4 �+�..._ �y. �t'mr.�' yIp'.*`.sy� • '� �'w'hu•c,y' re•,ar+ Y�� //W e John Gray. Assistant Secretary STATE OF CONNECTICUT Hartford COUNTY OF HARTFORD M. Ross Fisher, Senior Vice President On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. i, the undersigned, Assistant Vice President of the copy of the Power of Attorney executed by said Companies, Signed and sealed at the City of Hartford. ,., P" r�. _ . � m•.a� Kathleen T. Maynard Notary Public CERTIFICATE My Commission Expires July 31, 2021 Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct which is still in full force effective as of y_1[�e..[•.r f� P�'ij+ripdsl=f�l`i�l,�syL*m�p'�- at v &7 Paa-% 207% t��. fis^'_ A mo79ro.? Kevin Heckman, Assistant Vice President MUM 00 61 25 - 1 CERTIFICATE OF INSURANCE Page 1 of 1 I SECTION 00 6125 2 CERTIFICATE OF INSURANCE 3 4 5 6 7 8 9 10 II J2 13 14 15 16 17 18 19 20 21 22 23 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART' 2 Revised July 1, 2011 City Project No. 02727 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmagr 2, 20 ] 6 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 — Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................6 Article2 -- Preliminary Matters..........................................................................................................................7 2.01 Copies of Documents.................................................................................................................... 7 2.02 Commencement of Contract Time; Notice to Proceed................................................................ 7 2.03 Starting the Work.......................................................................................................................... 8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting.............................................................................................................................. 8 2,07 Initial Acceptance of Schedules.................................................................................................... 8 Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent.............................................................................................................................................. 8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................ I I Article 4 —Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points........................................................................................................... 11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers........................................................... ............................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febniary2,2016 6.02 Labor; Working Hours................................................................................................................20 6-03 Services, Materials, and Equipment.................................................................. .............20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals".......................................................................................................21 6,06 Concerning Subcontractors, Suppliers, and Others ....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas.......................................................................................................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6,15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communication Programs.............................................................................................30 6.17 Emergencies and/or Rectification ...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services.............................................................................. 34 6.23 Right to Audit.................................................................................. ................... 34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site...................................................................................................................35 7.01 Related Work at Site................................................................................................................... 35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due............................................................................................................................ 36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals.............................................................................................. 36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition.................................................................... 37 8.09 Compliance with Safety Program..............................................................................................A7 Article 9 -- City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager............................................................................................................ 37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed.......................................................................................... 38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Feh uuy 2, 2016 Article 10 - Changes in the Work; Claims; Extra Work.............................................................. 10.01 Authorized Changes in the Work ................................................ ............................. 10.02 Unauthorized Changes in the Work......................................................................... 10.03 Execution of Changc Orders..................................................................................... 10.04 Extra Work................................................................................................................ 10.05 Notification to Surety................................................................................................ 10.06 Contract Claims Process........................................................................................... Article 11- Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ............... 11.01 Cost of the Work................•-........-----............--------.........................--••-----.......------................ 11.02 AlIowances............................................................................................. .............................. 11.03 Unit Price Work................................................................................................................... 11.04 Plans Quantity Measurement............................................................................................... Article 12 - Change of Contract Price; Change of Contract Time.......... 12.01 Change of Contract Price ..................................................... 12.02 Change of Contract Time ..................................................... 12.03 Delays.................................................................................. ..41 ...41 ... 43 ... 44 ...45 46 46 47 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects ............................... ......................................................................................... 48 13.02 Access to Work........................................................................................................................... 48 13.03 Tests and inspections.................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................ 50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work............................................................................................. 51 Article 14 -- Payments to Contractor and Completion ..................... .............52 .................................................. 14.01 Schedule of Values....................................................................................•--•..............................52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization ................. 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance......................................................................................................................... 55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 14.09 Waiver of Claims ....................................................... ................ 57 ................................................. Article 15 - Suspension of Work and Termination........................................................................................ 57 15.01 City May Suspend Work.............................................................................................................57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience.......................................................................................60 Article 16 Dispute Resolution ........................ 16.01 Methods and Procedures ............... CITY OF FORT WORTH STANDARD CONSTRUC TON SPECIFICATION DOCUMENTS Revision: Fe6mary2,2016 ...................................................................................... 61 ...................................................................................... 61 ArticIc 17 --- Miscellaneous ......................... 17.01 Giving Notice ......................... 17.02 Computation of Times ........... 17.03 Cumulative Remedies ............ 17.04 Survival of Obligations.......... 17.05 Headings ................................. ..................................................................................................... 62 ..................................................................................................... 62 ..................................................................................................... 62 ..................................................................................................... 62 ..................................................................................................... 63 ..................................................................................................... 63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febivary2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terns listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment ---The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. S. Award— Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic document management and collaboration system. 12. Calendar Day A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febawy 2, 2016 00 72 00 - I GENERAL CONDITIONS Page 2 of 63 13. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized udder his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager -- The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 20. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor —The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fehnia y2, 2016 CO7200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services -- The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed. representative, assistant, or agents. 30. Director of Transportation Public Works -- The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work -- Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2,2016 00 72 00 - l GENERAL CONDITIONS Page 4 of 63 38. Final Inspection --- Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements —Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs Polychlorinated biphenyls. 49. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 50. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 5 of 63 51. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project The Work to be performed under the Contract Documents. 53. Project Manager --The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours -- Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnaty2,2016 007200-1 GENERAL CONDITIONS Page 6 of 63 63. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not Iimited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other cominunications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febm" 2, 2016 007200-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fdxuary2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thercof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febni 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and. conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Felnuary2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be Iiable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: I. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 .Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Pehruazy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page I I of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 -- AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability ofLands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the ,Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTI I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnny 2, 20I6 00 72 00 - I GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4,02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fef nmiy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated.• 1. if an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Feb»y 2, 2016 00 72 00 - l GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or Iocations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized.- - Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmary2,2016 00 '72 00 - 1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.I7.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity ,from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORA WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 —BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly Iicensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. .If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUI IIENTS Revision: Febnuy 2, 2016 GO7200-I GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 007200-I GENERAL CONDITIONS Page 18 of 63 Iieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory Iaw, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts, 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnxify2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 19 of63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. if any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit far days not worked pursuant to this section. 5.05 Acceptance of Bonds and .Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fcbrnk9ty2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; WorkingHours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2, for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF, FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febimy 2, 2016 007200-I GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: if in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febivary2, 20I6 007200-I GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 20 16 CO7200-1 GENERAL CONDITIONS Page 23 of 53 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any Iicense fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febakuy2,2016 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6-06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febtwfy2,2016 007200-1 GFNFRAL CONDITIONS Page 25 of 63 shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF .FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febawry2,2016 007200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the I lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febroazy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages {including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febamry2,2016 007200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the perfonmance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .0I If, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxfon-ns/93-forTns.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fcbnoy2, 2016 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 621, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work. During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the cleanup on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnnry2,2016 00 72 00 -1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.1 4.A.2 or 6.1 4.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies andlor Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febuary2,2016 00 72 00 - 1 GENERAL CONDITIONS Pagc 31 o 1' 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. in the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements, 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limitedpurposesrequired by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.1 S.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fdruaiy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction {except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents} or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 619 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmy2, 2016 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: I . observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE FFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR . ME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PRO-'U IS CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmary2,2016 007200-1 GENERAL COMMONS Page 34 of 63 SPECIFICALLY INTENDED_ TO OPERATE AND BE_ EFFECTIY A _EVEIN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT ARE CAUSED IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Felnuary2,2016 007200-1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of'1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7,01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. 1f City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE S -- CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febniary2, 2016 007200- 1 GENERAL COND[TIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4,06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is < insert name here >, or his/her successor pursuant to written notification from the Director of < insert managing department here >. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Februxy2,2016 00 72 00 - I GENERAL CONDITIONS Page 38 of63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations, for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE ] 0 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebrLary2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work, performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2, changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febiuuy 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STAN DARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnury 2, 2016 00 72 00 - ] GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Casts Included.• The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01 A, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no Ionger necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnj-&y2, 2016 00 72 00 - I GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 1.1.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. SaIes, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be Iiable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmy2,20I6 00 72 00 - 1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11,0 LAA, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: it is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUC'r10N SPECIFICATION DOCUMENTS Revision: Febrwy2,2016 007200-I GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11,03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. I. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMLNTS Revision: February2,20I6 00 72 00 - 1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 00 72 00 - I GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0I.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.Q. C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.01.A.1, 11.0l.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph I L01.AA and 11.0I .A.5, the Contractor's fee shall be five percent (50/o); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPE+CIFICA711ON DOCUMENTS Revision: Fdx uuy 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. 1f Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not Iimited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febimy 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume fiill responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnkuy2,2016 00 72 00 - I GENERAL CONDITIONS Page 44 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. K Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. I. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.09 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTI I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febniaty2, 20I6 00 72 00 - 1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnkuy2,2016 CO 72 oo - 1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced larder this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION sPFCIF[CATION DOCUMENTS Revision: February 2, 2C 16 00 72 00 - 1 GENERAL. CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications far Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision- Febmary 2, 20 E 6 00 72 00 - 1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b, the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febivary2,2016 007200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5 %). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment.• 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. 1f City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebrLny2, 2016 00 72 00 - l GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fehrumy 2, 2016 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, Iess previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTI3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fclnuary2,2016 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF PORT W0R'rH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Pebimry2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance 420020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or S. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2, If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. if Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Feb ua y 2, 2016 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. if and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febamy 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF PORT WORTH STATIDARI?CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebrLoy2, 2016 CO7200-I GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION t 6.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUN9,,NTS Revision: February2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to Submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fe1any2,2016 007200- I GENERAL CONDITIONS Page 63 0'63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Feb tmy 2, 2016 00 73 00 - 1 SUPPLEMENTARY CONDITIONS Page 1 0175 I SECTION 00 73 00 2 SUPPLEMENTARY CONDITIONS 3 TO 4 GENERAL CONDITIONS 5 6 7 8 9 10 11 12 13 14 I5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The fallowing are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of January 17, 2020 Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER NUMBER None TARGET DATE OF POSSESSION The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised January 22, 2016 City Project No. 02727 8 9 10 11 12 13 14 IS 16 17 18 19 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 SC-4.01A.2, "Availability of Lands" Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of January 17, 2020 EXPECTED UTILITY AND LOCATION OWNER None TARGET DATE OF ADJUSTMENT The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: A Street Coring Project Report No. 04.41172036, dated May 22, 2017, prepared by Fugro USA Land, Inc.., a consultant of the City, providing additional information on the subsurface conditions of the streets affected in this contract. SEE APPENDIX GC-4.02 Subsurface and Physical Conditions The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None. SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None. SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: None. (3) Other: None. SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A, Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT2016 WSM-F, PART 2 Revised January 22, 2016 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 lI 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 00 73 00 - 3 SUPPLEMENTARY CONDITIONS Page 3 ot'5 SC-5.04B., "Contractor's Insurance" 5.0413. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5,04B., which shall be on a per project basis covering the Contractor with minimum limits o£ $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment— Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks None. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner wbatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: Required for this Contract CITY OF FORT WORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised .Ianuaiy 22, 2016 $Confirm Limits with Railroad $Confirm Limits with Railroad X Not required for this Contract WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 00 73 00 - 4 SUPPLEMENTARY CONDITIONS Page 4 of 5 With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. 1f, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at - grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right•of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: CC-6.07 2013 Prevailing Wage Rates (Heavy & Highway Construction Projects) SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: None. SC-6A9B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised January 22, 2016 City Proj ect No. 02727 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 1 SC-6.09C. "Outstanding permits and licenses" 2 3 The following is a list of known outstanding permits and/or licenses to be acquired, if any as of January 17, 4 2020: 5 6 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION 7 8 9 10 Il 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 None. SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Scope of Work Coordination Authority None r SC-8.01, "Communications to Contractor" None. SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is J. Chris Underwood, or his/her successor pursuant to written notification from the Director of Water Department. SC-13.03C., "Tests and Inspections" None. SC-16.01C.1, "Methods and Procedures" None. END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised 7anuaiy 22, 2016 City Project No. 02727 i 01 ii00-1 SUMMARY OF WORK Page l of 3 f 1 SECTION 011100 2 SUMMARY OF WORK 3 PART1- GENERAL 4 1.1 SUMMARY C S A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification a 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES jNOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights -of -way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 11 00 - 2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided. otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a pant of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the .Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REP11AC1?MC?NT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 11 00-3 SUMMARY OF WORD Pape 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF C14ANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0125 00 SUBSTITUTION PROCEDURES 0 t 25 00 - 1 SUBSTITUTION PROCEDURES Page I of 4 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to I or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 1 I c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division I — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised Juty 1, 2011 City Project No. 02727 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 I b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with I I Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH WATER AND SANITARY SEWER. STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 20 ] 6 WSM-F, PART 2 Revised July I, 2011 City Project No. 02727 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if- 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. 1n the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] I2 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 2I complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 112 WARRANTY [NOT USED] 27 28 29 30 31 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION II Revision Log I DATE NAME SUMMARY GE CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Address Date Telephone For Use by City: Approved City Not recommended Received late By Date _ Remarks Date Rejected CITY Or FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 SECTION 01 31 19 PRECONSTRUCTION MEETING 3 PART 1 - GENERAL 4 1.1 SUMMARY 01 31 19 - 1 PRECONSTRUCTION MEETING Page I of3 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify consttuction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division I — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment l5 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. I7 1.3 REFERENCES [NOT USED] IS 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom. the Contractor may desire to invite or the City may request CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 17, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 01 31 19 - 2 PRECONSTRUCrION MEETINx Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 01 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. S. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 17, 2012 City Project No. 02727 01 31 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] I0 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION IRevision Log I DATE NAME SUA 4MARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised August 17, 2012 City Project No. 02727 9 013120-1 PROJECT MEETINGS Page 1 of 1 SECTION 013120 2 PROJECT MEETINGS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. .Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract I3 2. Division 1 — General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. I7 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified, periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded, tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings, in addition to those specified in this Section, may be held when requested 29 by the City, Engineer or Contractor. 30 B. Pre -Construction Neighborhood Meeting 31 1. After the execution of the Agreement, but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule, including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 31 20 - 2 PROJECT MEETINGS Page 2 of 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general, the neighborhood meeting will occur within the 2 weeks following 5 the pre -construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as - II needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings, prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations, problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off -site fabrication, delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 in. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 01 31 20 - 3 PROJECT MEETINGS Page 3 of 3 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 22 23 END OF SECTION Revision Log I DATE I NAME I SUMMARY OF CHANGE. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 0132 16 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. I2 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be at for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1- No schedule submittal required by contract. Small, brief duration 23 projects 24 b. Tier 2 - No schedule submittal required by contract, but will require some 25 milestone dates. Small, brief duration projects 26 c. Tier 3 - Schedule submittal required by contract as described in the 27 Specification and herein. Majority of City projects, including all bond program 28 projects 29 d. Tier 4 - Schedule submittal required by contract as described in the 30 Specification and herein. Large and/or complex projects with long durations 31 1) Examples: Iarge water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5 - Schedule submittal required by contract as described in the 34 Specification and herein. Large and/or very complex projects with long 35 durations, high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule - Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule - Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0132 16 - 2 CONSTRUCTION PROGRESS SCIIEDULE Page 2 of 5 1 4. Schedule Narrative - Concise narrative of the schedule including schedule 2 changes, expected delays, key schedule issues, critical path items, etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost -loaded baseline Schedule using approved software and the 9 Critical Path Method (CPM) as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost -loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative (Project Scheduler) responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City, make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contractor to increase the level of effort in 43 manpower (trades), equipment and work schedule (overtime, weekend and holiday 44 work, etc.) to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence, make findings of fact and will advise the Contractor, in t0 writing thereof. 11 2) If the City finds that the requested extension of time is entitled, the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data I4 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time, it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions, weather, 27 technical difficulties, strikes, unavoidable delays on the part of the City or its 28 representatives, and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions, the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates, and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0132 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays, affecting paths of activities 2 containing float time, will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts, the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors, the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases, the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera (P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City, no further progress schedules are required. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 i 2 3 4 5 6 7 8 9 10 11 12 13 14 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the construction Progress ,Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meeting the standard of care for the construction industry for similar projects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 15 PART 3 - EXECUTION [NOT USED] 16 17 18 END OF SECTION IRevision Log DATE I NAME SUMMARY OF CHANGE ^� CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised duly 1, 2011 City PrajectNo, 02727 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 01 32 33 - 1 PRECONSTRUCTION VIDEO Page 1 of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: I 1 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 2 4 01 32 33 -2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 33 00 - 1 SUBMITTALS Page i of 8 1 SECTION 0133 00 2 SUBMITTALS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents, 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication t) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WOR `H WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 013300-2 SUBMITTALS Page 2 of S 1 d. Mahe submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. I A=2nd submission, B=3rd submission, C-4th submission, etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission (second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) "By this submittal, 1 hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 '/z inches x 11 inches to 8 1/2 inches x 11 inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items / Table of Contents 44 c. Product Data /Shop Drawings/Samples /Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 013300-3 SUBMITTALS Page 3 of 8 1 2, The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 S. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch. x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 33 00 - 4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 1. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on -site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH WATER AND SANITARY SEWFR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies I1 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 S. Submittals will be returned to the Contractor under I of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTEDIRESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than I resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 33 00 - 7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. I0 M. Qualifications 11 1, 1f specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFT) 14 1, Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information (RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0133CO- 8 SUBMITTALS Page 8 of 8 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 I6 17 18 19 20 21 22 23 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 SECTION 0135 13 SPECIAL PROJECT PROCEDURES A. Section Includes: 1. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 12 25 — Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 A. Measurement and Payment 1. Coordination within Railroad permit areas a. Measurement 1) Measurement for this Item will be by lump sum. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for at the lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) Additional Insurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2. Railroad Flagmen CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 I a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various .Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation (TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage -type of guard about the boom or arm. 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PAR'r 2 Revised December 20, 2012 City Project No. 02727 01 35 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as "AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. if 34 a) Use of motorized equipment is less than I hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives, Drop Weight, Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 0131 13 46 G. Water Department Coordination CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 I I . During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on I to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. I4 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 c) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 1. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 013513-5 SPECIAL PROTECT PROCEDURES Page 5 of 8 I b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will tape place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. IS £ Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers (USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USAGE permits are required, meet all requirements set forth in each designated 20 permit. 2I K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e, Insurance certificates 30 f, Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 35 13 - 6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 19 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 10 1t 12 13 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.4.13 — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'Ts REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised Decemher 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 I0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 013513-7 SPECIAL PROJECT PROCEDURES Pagc7of8 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No,: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO> OR Mr. [CITY INSPECTORS AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 4 013513-8 SPECIAL, PROJECT PROCEDURES Page 8 of 8 EXHIBIT B FORTWORTH DOE NO. Xl= )E mr-et Iwo: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF _ _ AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORT1-1 WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 45 23 - l TESTING AND INSPECTION SERVICES Page I of 2 I SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I — General Requirements l2 1.2 PRICE AND PAYMENT PROCEDURES I3 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. I5 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 014523-2 TESTING AND INSPECTION SERVICES Page 2 o f 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b, Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute I hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of I I Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work, in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1,12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WAT1'R AND SANITARY SEWER STANDARD CONSTRUCTION ,SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 015000-1 TEMPORARY FACILITIES AND CONTROLS Page I of 4 1 SECTION 0150 00 2 TEMPORARY .FACILITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 1 I d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: I6 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City I week before water for construction is desired CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 015000-2 TEMPORARY FACILITIES AND CONTROLS Pagc 2 of4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] N 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD IoR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 1 2 3 4 5 r� M 8 0t 5000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION IRevision Log DATE NAME SUMMARY QE CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 O 1 55 26 - 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 I SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Port Worth Standard Specification 1 I I . None. I2 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 I. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control, 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 I 12 13 14 15 16 17 18 19 20 21 22 23 24 25 015526-2 STREET USE. PERM [T AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1.. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City ProjectNo. 02727 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 57 13 - 1 STORM WATER POLLUTION PREVENTION Page I of 3 1 SECTION 015713 2 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMMARY f 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans r 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 1 i Contract 12 2. Division 1 — General Requirements 13 3. Section 31 25 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than I acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 01 57 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows. 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. 1f the S WPPP is revised during construction, resubmit modified S WPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] S 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 111 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July I, 2011 City Project No. 02727 0158 13- 1 TEMPORARY PROJECT SIGNAGE Page I of 3 1 SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 -- General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS 27 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 58 13-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART' 2 Revised Juty 1, 2011 City Project No. 02727 2 01 S8 13 - 3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No, 02727 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0160 00 PRODUCT REQUIREMENTS 016000-1 PRODUCT REQUIREMENTS Page 1 of 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily Iimited to: 10 1. Division 0 --- Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A Iist of City approved products for use is located on Buzzsaw as follows: 16 1. Resources102 - Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 13 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION VA 01 60 00 - 2 PRODUCT REQUIREMENTS Page 2 of 2 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 66 00 - l PRODUCT STORAGE AND HANDLING REQUIREMENTS Page I of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments I 1 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. I3 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIMCATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 66 00 - 3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 I12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 33 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [oR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 314 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 6600-4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Lag DATE NAME SUNEVIARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 3 I SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 5i1 E.Y111i 10 F1:114 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment, supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised November 22, 2016 City Project No. 02727 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 3 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establislunent of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order I 1 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4, Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment [Consult City Department/Division for direction on if 26 Mobilization pay item to be included or the item should be subsidiary. Include the 27 appropriate Section 1.2 A. 1.] 28 1. Mobilization and Demobilization 29 a. Measure 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 2) The work performed and materials furnished for demobilization in 36 accordance with this Item are subsidiary to the various Items bid and no other 37 compensation will be allowed. 38 1.3 REFERENCES [NOT USED] 39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 40 1.5 SUBMITTALS [NOT USED] 41 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 42 1.7 CLOSEOUT SUBMITTALS [NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised November 22, 2016 City Project No. 02727 01 7000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 3 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2 - PRODUCTS [NOT USED] 6 PART 3 - EXECUTION [NOT USED] 7 9 9 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE I 1/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-;~, PART 2 Revised November 22, 2016 City Project No. 02727 i 01 71 23 - 1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 1 SECTION 017123 2 CONSTRUCTION STAKING AND SURVEY 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. 1.9 Qua_ lkty Assurance — B. Construction Survey 3. General —Construction 9 Survey shall determine existing grades and cross sections of unimproved 10 alleys to ensure grades are returned to pre -construction conditions. I I C. Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the 13 Contract 14 2. Division I —General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Construction Staking 18 a. Measurement 19 1) Measurement for this Item shall be by lump sum. 20 b. Payment 21 1) The work performed and the materials furnished in accordance with this 22 Item shall be paid for at the lump sum price bid for "Construction Staking". 23 2) Payment for "Construction Staking" shall be made in partial payments 24 prorated by work completed compared to total work included in the lump 25 sum item. 26 c. The price bid shall include, but not be limited to the following: 27 1) Verification of control data provided by City. 28 2) Placement, maintenance and replacement of required stakes and markings 29 in the field. 30 3) Preparation and submittal of construction staking documentation in the 31 form of "cut sheets" using the City's standard template. 32 2. Construction Survey 33 a. Measurement 34 1) This Item is considered subsidiary to the various Items bid. 35 b. Payment 36 1) The work performed and the materials furnished in accordance with this 37 Item are subsidiary to the various Items bid and no other compensation will be 38 allowed. 39 3. As -Built Survey 40 a. Measurement 41 1) Measurement for this Item shall be by lump sum. 42 b. Payment CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 01 71 23-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 1 1) The work performed and the materials furnished in accordance with this 2 Item shall be paid for at the lump sum price bid for "As -Built Survey". 3 2) Payment for "Construction Staking" shall be made in partial payments 4 prorated by work completed compared to total work included in the lump sum 5 item. 6 c. The price bid shall include, but not be limited to the following;: 7 1) Field measurements and survey shots to identify location of completed 8 facilities. 9 2) Documentation and submittal of as -built survey data onto contractor redline 10 plans and digital survey files. 12 11.3 REFERENCES 13 A. Definitions 14 1. _Construction Survey - The survey measurements made prior to or while 15 construction is in progress to control elevation, horizontal position, dimensions 16 and configuration of structures/improvements included in the Project Drawings. 17 2. As -built Survey —The measurements made after the construction of the 18 improvement features are complete to provide position coordinates for the 19 features of a project. 20 3. Construction Staking — The placement of stakes and markings to provide offsets 21 and elevations to cut and fill in order to locate on the ground the designed 22 structures/improvements included in the Project Drawings. Construction staking 23 shall include staking easements and/or right of way if indicated on the plans. 24 4. Survey "Field Checks" — Measurements made after construction staking is 25 completed and before construction work begins to ensure that structures marked 26 on the ground are accurately located per Project Drawings. 27 B. Technical References 28 1. City of Fort Worth — Construction Staking Standards (available on City's 29 Buzzsaw website) — 01 7I 23.16.01— Attachment A_Suivey Staking Standards 30 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files 31 (available on City's Buzzsaw website). 32 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 33 4. Texas Society of Professional land Surveyors (TSPS), Manual of Practice for 34 Land Surveying in the State of Texas, Category 5 35 36 1.4 ADMINISTRATIVE REQUIREMENTS 37 A. The Contractor's selection of a surveyor must comply with Texas Government 38 Code 2254 (qualifications based selection) for this project. 39 1.5 SUBMITTALS 40 A. Submittals, if required, shall be in accordance with Section 0133 00. 41 B. All submittals shall be received and reviewed by the City prior to delivery of work. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 2 A. Field Quality Control Submittals 3 1. Documentation verifying accuracy of field engineering work, including 4 coordinate conversions if plans do not indicate grid or ground coordinates. 5 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 6 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 7 1.7 CLOSEOUT SUBMITTALS 8 B. As -built Redline Drawing Submittal 9 1. Submit As -Built Survey Redline Drawings documenting the Iocations/elevations 10 of constructed improvements signed and sealed by Registered Professional Land I I Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — 12 Attachment A -- Survey Staking Standards) . 13 2. Contractor shall submit the proposed as -built and completed redline drawing 14 submittal one (1) week prior to scheduling the project final inspection for City 15 review and comment. Revisions, if necessary, shall be made to the as -built 16 redline drawings and resubmitted to the City prior to scheduling the construction I7 final inspection. 18 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.9 QUALITY ASSURANCE 20 A. Construction Staking 21 1. Construction staking will be performed by the Contractor. 22 2. Coordination 23 a. Contact City's Project Representative at least one week in advance notifying 24 the City of when Construction Staking is scheduled. 25 b. It is the Contractor's responsibility to coordinate staking such that 26 construction activities are not delayed or negatively impacted. 27 3. General 28 a. Contractor is responsible for preserving and maintaining stakes. If City 29 surveyors are required to re -stake for any reason, the Contractor will be 30 responsible for costs to perform staking. If in the opinion of the City, a 31 sufficient number of stakes or markings have been lost, destroyed disturbed or 32 omitted that the contracted Work cannot take place then the Contractor will be 33 required to stake or re -stake the deficient areas. 34 B. Construction Survey 35 1. Construction Survey will be performed by the Contractor. 36 2. Coordination 37 a. Contractor to verify that horizontal and vertical control data established in the 38 design survey and required for construction survey is available and in place. 39 3. General 40 a. Construction survey will be performed in order to construct the work shown 41 on the Construction Drawings and specified in the Contract Documents. 42 b. For construction methods other than open cut, the Contractor shall perform 43 construction survey and verify control data including, but not limited to, the 44 following: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 1 1) Verification that established benchmarks and control are accurate. 2 2) Use of Benchmarks to furnish and maintain all reference lines and grades 3 for tunneling. 4 3) Use of line and grades to establish the location of the pipe. 5 4) Submit to the City copies of field notesused to establish all lines and 6 grades, if requested, and allow the City to check guidance system setup prior 7 to beginning each tunneling drive. 8 5) Provide access for the City, if requested, to verify the guidance system and 9 the line and grade of the carrier pipe. 10 6) The Contractor remains fully responsible for the accuracy of the work and 11 correction of it, as required. 12 7) Monitor line and grade continuously during construction. 1.3 8) Record deviation with respect to design line and grade once at each pipe 14 joint and submit daily records to the City. 15 9) if the installation does not meet the specified tolerances (as outlined in 16 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct 17 the installation in accordance with the Contract Documents. 18 C. As -Built Survey 19 1. Required As -Built Survey will be performed by the Contractor. 20 2. Coordination 21 a. Contractor is to coordinate with City to confirm which features require as- 22 built surveying. 23 b. It is the Contractor's responsibility to coordinate the as -built survey and 24 required measurements for items that are to be buried such that construction 25 activities are not delayed or negatively impacted. 26 c. For sewer mains and water mains 12" and under in diameter, it is acceptable 27 to physically measure depth and mark the location during the progress of 28 construction and take as -built survey after the facility has been buried. The 29 Contractor is responsible for the quality control needed to ensure accuracy. 30 3. General 31 a. The Contractor shall provide as -built survey including the elevation and 32 location (and provide written documentation to the City) of construction 33 features during the progress of the construction including the following: 34 1) Water Lines 35 a) Top of pipe elevations and coordinates for waterlines at the following 36 locations: 37 (1) Minimum every 250 linear feet, including 38 (2) Horizontal and vertical points of inflection, curvature, 39 etc. 40 (3) Fire line tee 41 (4) Plugs, stub -outs, dead-end lines 42 (5) Casing pipe (each end) and all buried fittings 43 2) Sanitary Sewer 44 a) Top of pipe elevations and coordinates for force mains and siphon 45 sanitary sewer lines (non -gravity facilities) at the following locations: 46 (1) Minimum every 250 linear feet and any buried fittings 47 (2) Horizontal and vertical points of inflection, curvature, 48 etc. 49 3) Stormwater—Not Applicable CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 I b. The Contractor shall provide as -built survey including the elevation and 2 location (and provide written documentation to the City) of construction 3 features after the construction is completed including the following: 4 1) Manholes 5 a) Rim and flowline elevations and coordinates for each manhole 6 2) Water Lines 7 a) Cathodic protection test stations 8 b) Sampling stations 9 c) Meter boxes/vaults (All sizes) 10 d) Fire hydrants 11 e) Valves (gate, butterfly, etc.) 12 f) Air Release valves (Manhole rim and vent pipe) 13 g) Blow off valves (Manhole rim and valve lid) 14 h) Pressure plane valves 15 i) Underground Vaults 16 (1) Rim and flowline elevations and coordinates for each 17 Underground Vault. 18 3) Sanitary Sewer 19 a) CIeanouts 20 (1) Rim and flowline elevations and coordinates for each 21 b) Manholes and Junction Structures 22 (1) Rim and flowline elevations and coordinates for each 23 manhole and junction structure. 24 4) Stormwater — Not Applicable 25 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 27 1.12 WARRANTY 28 PART 2 - PRODUCTS 29 A. A construction survey will produce, but will not be limited to: 30 1. Recovery of relevant control points, points of curvature and points of 31 intersection. 32 33 34 35 36 37 38 39 40 41 42 43 44 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392- 7925). CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 01 71 23 - 6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 5. Digital survey files in the following formats shall be acceptable: 2 a. AutoCAD (.dwg) 3 b. ESRI Shapefile (.shp) 4 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 5 standard templates, if available) 6 6. Survey files shall include vertical and horizontal data tied to original project 7 control and benchmarks, and shall include feature descriptions 8 PART 3 - EXECUTION 9 3.1 INSTALLERS 10 A. Tolerances: 11 1. The staked location of any improvement or facility should be as accurate as 12 practical and necessary. The degree of precision required is dependent on many 13 factors all of which must remain judgmental. The tolerances listed hereafter are 14 based on generalities and, under certain circumstances, shall yield to specific 15 requirements. The surveyor shall assess any situation by review of the overall plans 16 and through consultation with responsible parties as to the need for specific 17 tolerances. 18 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 19 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 20 1.0 ft. tolerance. 21 b. Horizontal alignment on a structure shall be within .0.Ift tolerance. 22 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 23 walkways shall be located within the confines of the site boundaries and, 24 occasionally, along a boundary or any other restrictive line. Away from any 25 restrictive line, these facilities should be staked with an accuracy producing no 26 more than 0.05ft. tolerance from their specified locations. 27 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 28 electric lines, shall be located horizontally within their prescribed areas or 29 easements. Within assigned areas, these utilities should be staked with an 30 accuracy producing no more than 0.1 ft tolerance from a specified location. 31 e. The accuracy required for the vertical location of utilities varies widely. Many 32 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 33 should be maintained. Underground and overhead utilities on planned profile, 34 but not depending on gravity flow for performance, should not exceed 0.1 ft. 35 tolerance. 36 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 37 specifications or in compliance to standards. The City reserves the right to request a 38 calibration report at any time and recommends regular maintenance schedule be 39 performed by a certified technician every 6 months. 40 1. Field measurements of angles and distances shall be done in such fashion as to 41 satisfy the closures and tolerances expressed in Part 3.1.A, 42 2. Vertical locations shall be established from a pre -established benchmark and 43 checked by closing to a different bench mark on the same datum. 44 3. Construction survey fieldwork shaII correspond to the client's plans. 45 irregularities or conflicts found shall be reported promptly to the City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMFNr CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 4. Revisions, corrections and other pertinent data shall be logged for future 2 reference. 3 4 3.2 EXAMINATION [NOT USED] 5 3.3 PREPARATION [NOT USED] 6 3.4 APPLICATION 7 3.5 REPAIR 1 RESTORATION 8 A. If the Contractor's work damages or destroys one or more of the control 9 monuments/points set by the City, the monuments shall be adequately referenced for 10 expedient restoration. I 1. Notify City if any control data needs to be restored or replaced due to damage 12 caused during construction operations. 13 a. Contractor shall perform replacements and/or restorations. 14 b. The City may require at any time a survey "Field Check" of any monument 15 or benchmarks that are set be verified by the City surveyors before further 16 associated work can move forward. 17 3.6 RE -INSTALLATION [NOT USED] 18 3.7 FIELD [OR] SITE QUALITY CONTROL 19 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 20 City in accordance with this Specification. This includes easements and right of way, if 21 noted on the plans. 22 B. Do not change or relocate stakes or control data without approval from the City. 23 3.8 SYSTEM STARTUP 24 A. Survey Checks 25 1. The City reserves the right to perform a Survey Check at any time deemed 26 necessary. 27 2. Checks by City personnel or T'l party contracted surveyor are not intended to 28 relieve the contractor of his/her responsibility for accuracy. 29 30 3.9 ADJUSTING [NOT USED] 31 3.10 CLEANING [NOT USED] 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 01 71 23 - 8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal 8/31/2017 M. Owen requirements; modified 1.9 Quality Assurance; added PART 2 --PRODUCTS ; Added 3.1 Tnstallers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text'; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised February 14, 2018 City Project No. 02727 017423-1 CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: I 1 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 017423-2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 21 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3, For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR 1 RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. Genera[ 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn. on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of I 1 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. I8 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other 23 foreign materials from sight -exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts, blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 S. Mop office and control room floors. 35 D. Exterior (Site or Right of Way) Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re -seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 42 junction boxes and inlets. CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION IRevision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACE ENT CONTRACT 2016 WSM-F, PART 2 Revised.luly 1, 2011 City ProjectNo. 02727 SECTION 0177 19 CLOSEOUT REQUIREMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 017119-1 CLOSEOUT REQUIREMENTS Page[ of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Port Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. I5 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED) 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or CIaims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0177I9-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 0178 39 1 J 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 7423. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 01 77 19-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report (if required) 11 £ Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR / RESTORATION [NOT USED] 18 3.6 REINSTALLATION [NOT USED] 19 3.7 FIELD loa] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 313 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 29 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 1 2 3 PARTI- GENERAL 4 1.1 SUMMARY 01 78 23 - 1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 --- Bidding Requirements, Contract Forms and Conditions of the Contract 16 2, Division I — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 31 32 33 34 35 36 37 A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: S %Z inches x 1 I inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS", 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products I9 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 I) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As instaIIed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 017823-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING INOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 7 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page I of 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division I — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. I3 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [oRl OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, I complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT2016 WSM-F, PART2 Revised July 1, 2011 City Project No. 02727 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes, use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 23 ducts, and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch, the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor, subject to the 33 City's approval. 34 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where, in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 4I by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents, coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction, and the actual location of items. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 017839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. if the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR I RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oRl SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision log DATE NAME I SUNT ARY OF CHANGE CITY OF FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 0241 14-1 UTILITY REMOVAL/ABANDONMENT Page 1 of 17 I OSECTION 02 4114 2 UTILITY REMOVAL/ABANDONMENT 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Direction for the removal, abandonment or salvaging of the following utilities: 7 a. Cathodic Protection Test Stations 8 b. Water Lines 9 c. Gate Valves 10 d. Water Valves 11 e. Fire Hydrants 12 f. Water Meters and Meter Box 13 g. Water Sampling Station 14 h. Concrete Water Vaults 15 i. Sanitary Sewer Lines 16 j. Sanitary Sewer Manholes 17 k. Sanitary Sewer Junction Boxes 18 1. Storm Sewer Lines 19 m. Storm Sewer Manhole Risers 20 n. Storm Sewer Junction Boxes 21 o. Storm Sewer Inlets 22 p. Box Culverts 23 q. Headwalls and Safety End Treatments 24 r. Trench Drains 25 B. Deviations from this City of Fort Worth Standard Specification 26 1. Removal of Existing Lead Services — The work for removal and disposal of the 27 existing lead water services to be replaced shall be considered subsidiary to the 28 bid price for the appropriate water service. The lead service lines shall be 29 disposed of at a certified metal recycling center with receipts of said recycling 30 and submitted for verification to the City of Fort Worth Water Department 31 staff. 32 C. Related Specification Sections include, but are not necessarily limited to: 33 1. Division 0 --- Bidding Requirements, Contract Forms and Conditions of the Contract 34 2. Division 1 -- General Requirements 35 3. Section 03 34 13 — Controlled Low Strength Material (CLSM) 36 4. Section 33 05 10 --- Utility Trench Excavation, Embedment and Backfill 37 S. Section 33 05 24 — Installation of Carrier Pipe in Casing or Tunnel Liner Plate 38 6, Section 33 11 11 —Ductile Iron Fittings 39 7. Section 33 11 13 — Concrete Pressure Pipe, Bar -wrapped, Steel Cylinder Type 40 8. Section 33 11 14 —Buried Steel Pipe and Fittings 41 9. Section 33 12 25 — Connection to Existing Water Mains CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0241 14-2 UTILITY REMOVAL/ABANDONMENT Page 2 of 17 L2 PRICE AND PAYMENT PROCEDURES A. Utility Lines 1. Abandonment of Utility Line by Grouting a. Measurement 1) Measurement for this Item shall be per cubic yard of existing utility line to be grouted. Measure by tickets showing cubic yards of grout applied. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price per cubic yard of "Line Grouting" for- a) Various types of utility line c. The price bid Shall include: 1) Low density cellular grout or CLSM 2) Water 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill S) Clean-up 2. Utility Line Removal, Separate Trench a. Measurement 1) Measurement for this Item shall be per Iinear foot of existing utility line to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Line" for: a) Various types of existing utility line b) Various sizes c. The price hid shall include: 1) Removal and disposal of existing utility pipe 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 3. Utility Line Removal, Same Trench a. Measurement 1) This Item is considered subsidiary the proposed utility line being installed. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the installation of proposed utility pipe and shall be subsidiary to the unit price bid per linear foot of pipe complete in place, and no other compensation will be allowed. 4. Manhole Abandonment a. Measurement CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14-3 UTILITY REMOVALIABANDONMENT Page 3 of 17 1 1) Measurement for this Item will be per each manhole to be abandoned. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 and measured as provided under "Measurement" shall be paid for at the 5 unit price bid per each "Abandon Manhole" for: 6 a) Various diameters 7 b) Various types 8 c. The price bid shall include: 9 1) Removal and disposal of manhole cone I0 2) Removal, salvage and delivery of frame and cover to City, if applicable 11 3) Cutting and plugging of existing sewer lines 12 4) Concrete 13 5) Acceptable material for backfilling manhole void 14 6) Pavement removal IS 7) Excavation 16 8) Hauling 17 9) Disposal of excess materials 18 10) Furnishing, placement and compaction of backfll 19 11) Surface restoration 20 12) Clean-up 21 5. Cathodic Test Station Abandonment 22 a. Measurement 23 1) Measurement for this Item will be per each cathodic test station to be 24 abandoned. 25 b. Payment 26 1) The work performed and materials furnished in accordance with this Item 27 and measured as provided under "Measurement" shall be paid for at the 28 unit price bid per each "Abandon Cathodic Test Station". 29 c. The price bid shall include: 30 1) Abandon cathodic test station 31 2) CLSM 32 3) Pavement removal 33 4) Excavation 34 5) Hauling 35 6) Disposal of excess materials 36 7) Furnishing, placement and compaction of backftll 37 8) Clean-up 38 B. Water Lines and Appurtenances 39 1. Installation of a Water Line Pressure Plug 40 a. Measurement 41 1) Measurement for this Item shall be per each pressure plug to be installed. 42 b. Payment 43 1) The work performed and materials furnished in accordance with this Item 44 and measured as provided under "Measurement" shall be paid for at the 45 unit price bid for each "Pressure Plug" installed for: 46 a) Various sizes 47 c. The price bid shall include: 48 1) Furnishing and installing pressure plug 49 2) Pavement removal CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14-4 UTILITY REMOVAL/ABANDONMENT Page 4 of I7 3) Excavation 4) Hauling 5) Disposal of excess material 6) Gaskets 7) Bolts and Nuts 8) Furnishing, placement and compaction of embedment 9) Furnishing, placement and compaction of backfill 10) Disinfection 11) Testing 12) Clean-up 2. Abandonment of Water Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this item shall be per each cut and abandonment plug installed. h. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Water Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 3. Water Valve Removal a. Measurement 1) Measurement for this Item will be per each water valve to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Water Valve" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backf I I 8) Clean-up 4. Water Valve Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water valve to be removed and salvaged. CITY OF FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 024114-5 UTILITY REMOVAL/ABANDONMENT Page 5 of 17 I b. Payment 2 1) The work performed and materials furnished in accordance with this Item 3 and measured as provided under "Measurement" shall be paid for at the 4 unit price bid per each "Salvage Water Valve" for: 5 a) Various sizes 6 c. The price bid shall include: 7 1) Removal and Salvage of valve 8 2) CLSM 9 3) Delivery to City 10 4) Pavement removal 11 5) Excavation 12 6) Hauling 13 7) Disposal of excess materials 14 8) Furnishing, placement and compaction of backfill 15 9) Clean-up 16 5. Water Valve Abandonment 17 a. Measurement 18 1) Measurement for this Item will be per each water valve to be abandoned. 19 b. Payment 20 1) The work performed and materials furnished in accordance with this Item 21 and measured as provided under "Measurement" shall be paid for at the 22 unit price bid per each "Abandon Water Valve" for: 23 a) Various Sizes 24 c. The price bid shall include: 25 1) Abandonment of valve 26 2) CLSM 27 3) Pavement removal 28 4) Excavation 29 5) Hauling 30 6) Disposal of excess materials 31 7) Furnishing, placement and compaction of backfill 32 8) Clean-up 33 6. Fire Hydrant Removal and Salvage 34 a. Measurement 35 1) Measurement for this Item will be per each fire hydrant to be removed. 36 b. Payment 37 1) The work performed and materials furnished in accordance with this Item 38 and measured as provided under "Measurement" shall be paid for at the 39 unit price bid per each "Salvage Fire Hydrant". 40 c. The price bid shall include: 41 1) Removal and salvage of fire hydrant 42 2) Delivery to City 43 3) Pavement removal 44 4) Excavation 45 5) Hauling 46 6) Disposal of excess materials 47 7) Furnishing, placement and compaction of backfill 48 8) Clean-up 49 7. Water Meter Removal and Salvage CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECCIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14-6 UTILITY REMOVAL/ABANDONMENT Page 6 of 17 a. Measurement 1) Measurement for this Item will be per each water meter to be removed and salvaged. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Meter" for: a) Various sizes 2) If a "Water Meter ,Service Relocate" is performed in accordance with Section 33 12 10, removal and salvage or disposal of the existing (2-inch or smaller) water meter shall be subsidiary to the cost of the "Water Meter Service Relocate", no other compensation will be allowed. c. The price bid shall include: 1) Removal and salvage of water meter 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfrll 8) Clean-up 8. Water Sampling Station Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water sampling station to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Sampling Station". c. The price bid shall include: 1) Removal and salvage of water sampling station 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfrll 8) Clean-up 9, Concrete Water Vault Removal a. Measurement 1) Measurement for this Item will be per each concrete water vault to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Concrete Water Vault". c. The price bid shall include: 1) Removal and disposal of concrete water vault 2) Removal, salvage and delivery of frame and cover to City, if applicable CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPL.ACF.MI NT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 I4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0241 14-7 UTILITY REMOVALlABANDONMENT Page 7 of 17 3) Removal, salvage and delivery of any valves to City, if applicable 4) Removal, salvage and delivery of any water meters to City, if applicable 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess materials 9) Furnishing, placement and compaction of backfill 10) Clean-up C. Sanitary Sewer Lines and Appurtenances 1. Abandonment of Sanitary Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Sewer Abandonment Plug" for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Sanitary Sewer Manhole Removal a. Measurement 1) Measurement for this .Item will be per each sanitary sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Sewer Manhole" for: a) Various diameters c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Pavement removal 5) Excavation 6) Hauling 7) DisposaI of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 3. Sanitary Sewer Junction Structure Removal a. Measurement CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 I2 13 14 1S 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 8 UTILITY REMOVAIJABANDONMENT Page 8 of 17 1) Measurement for this Item will be per each sanitary sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Sewer Junction Box" location. c. The price bid shall include: 1) Removal and disposal of junction box 2) Removal, salvage and delivery of frame and cover to City. 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up D. Storm Sewer Lines and Appurtenances 1. Abandonment of Storm Sewer Line by Cut and installation of Abandonment Plug a. Measurement l) Measurement for this Item shall be per each cut and abandonment plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Storm Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Storm Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each storm sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Manhole Riser" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation 5) Hauling CITY OF FORT WORTII WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14-9 UTILITY REMOVAL/ABANDONMENT Page 9 of 17 1 6) Disposal of excess materials 2 7) Furnishing, placement and compaction of backfill 3 8) Clean-up 4 3. Storm Sewer Junction Box Removal 5 a. Measurement 6 1) Measurement for this Item will be per each storm sewer junction structure 7 to be removed. 8 b. Payment 9 1) The work performed and materials furnished in accordance with this Item 10 and measured as provided under "Measurement" shall be paid for at the 11 unit price bid per each "Remove Storm Junction Box" for: 12 a) Various sizes 13 c. The price bid shall include: 14 1) Removal and disposal of junction box 15 2) Removal, salvage and delivery of frame and cover to City, if applicable 16 3) Pavement removal 17 4) Excavation 18 5) Hauling 19 6) Disposal of excess materials 20 7) Furnishing, placement and compaction of backfill 21 8) Clean-up 22 4. Storm Sewer Junction Structure Removal 23 a. Measurement 24 1) Measurement for this Item will be per each storm sewer junction structure 25 being removed. 26 b. Payment 27 1) The work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" shall be paid for at the 29 lump sum bid per each "Remove Storm Junction Structure" location. 30 c. The price bid shall include: 31 1) Removal and disposal of junction structure 32 2) Removal, salvage and delivery of frame and cover to City, if applicable 33 3) Pavement removal 34 4) Excavation 35 5) Hauling 36 6) Disposal of excess materials 37 7) Furnishing, placement and compaction of backfill 38 8) Clean-up 39 5. Storm Sewer Inlet Removal 40 a. Measurement 41 1) Measurement for this Item will be per each storm sewer inlet to be 42 removed. 43 b. Payment 44 1) The work performed and materials furnished in accordance with this Item 45 and measured as provided under "Measurement" shall be paid for at the 46 unit price bid per each "Remove Storm Inlet" for: 47 a) Various types 48 b) Various sizes 49 c. The price bid shall include: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14- 10 UTILITY REMOVAI JABANDONMF,NT Page 10 of 17 1 1) Removal and disposal of inlet 2 2) Pavement removal 3 3) Excavation 4 4) Hauling 5 5) Disposal of excess materials 6 6) Furnishing, placement and compaction of backfill 7 7) Cleanup 8 6. Storm Sewer Junction Box Removal 9 a. Measurement 10 1) Measurement for this Item shall be per linear foot of existing storm sewer 11 box to be removed. 12 b. Payment 13 1) The work performed and materials furnished in accordance with this Item 14 and measured as provided under "Measurement" shall be paid for at the 15 unit price bid per linear foot of "Remove Storm Junction Box" for all sizes. 16 c. The price bid shall include: 17 1) Removal and disposal of Storm Sewer Box 18 2) Pavement removal 19 3) Excavation 20 4) Hauling 21 5) Disposal of excess materials 22 6) Furnishing, placement and compaction of backfill 23 7) Clean-up 24 7. Headwall/SET Removal 25 a. Measurement 26 1) Measurement for this Item will be per each headwall or safety end 27 treatment (SET) to be removed. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" shall be paid for at the 31 unit price bid per each "Remove Headwall/SET". 32 c. The price bid shall include: 33 1) Removal and disposal of Headwall/SET 34 2) Pavement removal 35 3) Excavation 36 4) Hauling 37 5) Disposal of excess materials 38 6) Furnishing, placement and compaction of backfill 39 7) Cleanup 40 8. Trench Drain Removal 41 a. Measurement 42 1) Measurement for this Item shall be per linear foot of storm sewer trench 43 drain to be removed. 44 b. Payment 45 1) The work performed and materials furnished in accordance with this Item 46 and measured as provided under "Measurement" shall be paid for at the 47 unit price bid per linear foot of "Remove Trench Drain" for: 48 a) Various sizes 49 c. The price bid shall include: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 0241 14- 11 UTILITY REMOVAL/ABANDONMENT Page I I of 17 1) Removal and disposal of storm sewer Iine 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A, Coordination 1. Contact Inspector and the Water Depailment Field Operation Storage Yard for coordination of salvage material return. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS jNOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect and salvage all materials such that no damage occurs during delivery to the City. CITY OF FORT WOR'I'II WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14- 12 UTILITY REMOVAL/ABANDONMENT Page 12 of 17 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED loci] OWNER -SUPPLIED PRODUCTS [NOT USED] 5 2.2 MATERIALS 6 2.3 ACCESSORIES [NOT USED] 7 2.4 SOURCE QUALITY CONTROL [NOT USED] 8 PART 3 - EXECUTION 9 3.1 INSTALLERS [NOT USED] 10 3.2 EXAMINATION [NOT USED] 11 3.3 PREPARATION [NOT USED] 12 3.4 REMOVAL, SALVAGE, AND ABANDONMENT 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. General 1. Manhole Abandonment a. All manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover as coordinated with City. d. Deliver salvaged material to the City. e. Cut and plug sewer- lines to be abandoned. f. Backfill manhole void in accordance with City Standard Details. B. Water Lines and Appurtenances 1. Water Line Pressure Plugs a. Ductile Iron Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10, 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. b. PVC C900 and C905 Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10 2) Plug using: a) A fabricated plug restrained by welding or by a Snap Ring in accordance with Section 33 11 13; or CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14- 13 UTILITY REMOVALIABANDONMENT Page 13 of 17 1 b) A blind flange in accordance with Section 33 11 13 2 3) Perform Cut and Plug in accordance with Section 33 12 25. 3 d. Buried Steel Water Lines 4 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 5 2) Plug using: 6 a) A fabricated plug restrained by welding in accordance with Section 33 7 11 14; or 8 b) A blind flange in accordance with Section 33 11 14 9 3) Perform Cut and Plug in accordance with Section 33 12 25. 10 2. Water Line Abandonment Plug I 1 a. Excavate and backfill in accordance with Section 33 05 10. 12 b. Plug with CLSM in accordance with Section 03 34 13. 13 3. Water Line Abandonment by Grouting 14 a. Excavate and backfill in accordance with Section 33 05 10. 15 b. Dewater from existing Iine to be grouted. 16 c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 17 or CLSM in accordance with 03 34 13, 18 d. Dispose of any excess material. 19 4. Water Line Removal 20 a. Excavate and backfill in accordance with Section 33 05 10. 21 b. Cut existing line from the utility system prior to removal. 22 c. Cut any services prior to removal. 23 d. Remove existing pipe line and properly dispose as approved by City. 24 5. Water Valve Removal 25 a. Excavate and backfill in accordance with Section 33 05 10. 26 b. Remove and dispose of valve bonnet, wedge and stem. 27 c. hill valve body with CLSM in accordance with Section 03 34 13. 28 6. Water Valve Removal and Salvage 29 a. Excavate and backfill in accordance with Section 33 05 10. 30 b. Remove valve bonnet, wedge and stem. 31 c. Deliver salvaged material to the Water Department Field Operation Storage 32 Yard. 33 d. Protect salvaged materials from damage. 34 e. Fill valve body with CLSM in accordance with Section 03 34 13. 35 7. Water Valve Abandonment 36 a. Excavate and backfill in accordance with Section 33 05 10. 37 b. Remove the top 2 feet of the valve stack and any valve extensions. 38 c. Fill the remaining valve stack with CLSM in accordance with Section 03 34 13. 39 8. Fire Hydrant Removal and Salvage 40 a. Excavate and backfill in accordance with Section 33 05 10. 41 b. Remove Fire Hydrant. 42 c. PIace abandonment plug on fire hydrant lead line. 43 d. Deliver salvaged fire hydrant to the Water Department Field Operation Storage 44 Yard. 45 e. Protect salvaged materials from damage. 46 9. Water Meter Removal and Salvage 47 a. Remove and salvage water meter. 48 b. Return salvaged meter to Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 09727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 I9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0241 14-14 UTILITY REMO'VALIABANDONM8NT Page 14 of 17 c. City will provide replacement meter for installation. d. Meter Box and Lid 1) Remove and salvage cast iron meter box lid. 2) Remove and dispose of any non -cast iron meter box lid. 3) Return salvaged material to the Water Department Field Operation Storage Yard. 4) Remove and dispose of meter box. 10. Water Sample Station Removal and Salvage a. Remove and salvage existing water sample station. b. Deliver salvaged material to the Water Department Field Operation Storage Yard. 11. Concrete Water Vault Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage vault lid. c. Remove and salvage valves. d. Remove and salvage meters. e. Deliver salvaged material to the Water Department Field Operation Storage Yard. f. Remove and dispose of any piping or other appurtenances. g. Demolish and remove entire concrete vault. h. Dispose of all excess materials. 12. Cathodic Test Station Abandonment a. Excavate and backfill in accordance with Section 33 05 10 b. Remove the top 2 feet of the cathodic test station stack and contents. c. Fill any remaining voids with CLSM in accordance with Section 03 34 13. C. Sanitary Sewer Lines and Appurtenances Sanitary Sewer Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of any sewage. c. Plug with CLSM in accordance with Section 03 34 13. 2. Sanitary Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10, b. Dewater and dispose of any sewage from the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Sanitary Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 4. Sanitary Sewer Manholes Removal a. All sanitary sewer manholes that are to be taken out of set -vice are to be removed unless specifically requested and/or approved by City. b. Excavate and backfiII in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover. d. Deliver salvaged material to the Water Department Field Operation Storage. e. Demolish and remove entire concrete manhole. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14 - 15 UTILITY REMOVAL/ABANDONMENT Page 15 of 17 I f. Cut and plug sewer lines to be abandoned. 2 5. Sanitary Sewer Junction Structure Removal 3 a. Excavate and backfill in accordance with Section 33 05 10. 4 b. Remove and salvage manhole frame and cover. 5 c. Deliver salvaged material to the Water Department Field Operation Storage. 6 d. Demolish and remove entire concrete manhole. 7 e. Cut and plug sewer lines to be abandoned. 8 D. Storm Sewer Lines and Appurtenances 9 1. Storm Sewer Abandonment Plug 10 a. Excavate and backfill in accordance with Section 33 05 10. 1 I b. Dewater line. 12 c. Plug with CLSM in accordance with Section 03 34 I3. 13 2. Storm Sewer Line Abandonment by Grouting 14 a. Excavate and backfill. in accordance with Section 33 05 10. 15 b. Dewater the existing line to be grouted. 16 c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 17 or CLSM in accordance with 03 34 13. 18 d. Dispose of any excess material. 19 3. Storm Sewer Line Removal 20 a. Excavate and backfill in accordance with Section 33 05 10. 21 b. Remove existing pipe line and properly dispose as approved by City. 22 4. Storm Sewer Manhole Removal 23 a. All storm sewer manholes that are to be taken out of service are to be removed 24 unless specifically requested and/or approved by City. 25 b. Excavate and backfill in accordance with Section 33 05 10. 26 c. Demolish and remove entire concrete manhole. 27 d. Cut and plug storm sewer lines to be abandoned. 28 S. Storm Sewer Junction Box and/or Junction Structure Removal 29 a. Excavate and backfill in accordance with Section 33 05 I0. 30 b. Demolish and remove entire concrete structure. 31 c. Cut and plug storm sewer lines to be abandoned. 32 6. Storm Sewer Inlet Removal 33 a. Excavate and backfill in accordance with Section 33 05 10, 34 b. Demolish and remove entire concrete inlet. 35 c. Cut and plug storm sewer lines to be abandoned. 36 7. Storm Sewer Box Removal 37 a. Excavate and backfill in accordance with Section 33 05 10. 38 b. Cut existing line from the utility system prior to removal. 39 c. Cut any services prior to removal. 40 d. Remove existing pipe line and properly dispose as approved by City. 41 8. Headwall/SET Removal 42 a. Excavate and backfill in accordance with Section 33 05 I0. 43 b. Demolish and remove entire concrete inlet. 44 c. Cut and plug storm sewer lines to be abandoned. 45 9. Storm Sewer `french Drain Removal 46 a. Excavate and backfill in accordance with Section 33 05 10. 47 b. Remove existing pipe line and dispose as approved by City. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 II 0241 14 - 16 OT1LITY REMOVALIABANDONMENT Page 16 of 17 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPT.ACEMENT CONTRACT 2016 WSM-F, PART 2 Revised December 20, 2012 City Project No. 02727 0241 14 - 17 UTILITY REMOVAL/ABANDONMENT Page 17 of 17 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/12 D. lolmson 1.2.C.3.c. — Include Frame and Cover in Payment description T11roughout— added abandonment of storm and sewer manholes when requested and/or approved by City CITY OF FORT WORTH ' STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 33 12 10 - 1 WATER SERVICES I -INCH TO 2-INCH Page 1 of 17 1 SECTION 33 12 10 2 WATER SERVICES 1-INCH TO 2-INCH 3 PART1- GENERAL 4 11 SUMMARY 5 A. Section Includes: 6 1. Lead-free 1-inch to 2-inch water service lines from the water main to the right-of- 7 way, fittings and water meter boxes complete in place, as shown on the Drawings, 8 directed by the Engineer, and specified herein for: 9 a. New Water Service 10 b. New Water Service (Bored) 11 c. Water Meter Service Relocate 12 d. Private Water Service 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. PART 3- EXECUTION 15 3.4 INSTALLATION 16 E. Removal of Existing Lead Service Lines l7 1. All lead service lines encountered by the Contractor either discovered 18 during construction or as indicated on the drawings shall be removed from 19 the water main to the meter. 20 2. The Contractor shall notify the Project Manager and Inspector of any 21 lead service lines encountered that are not indicated on the drawings. 22 3. All lead service lines shall be disposed of at a certified metal recycling 23 center as specified in the deviations of the Utility Removal/Abandonment 24 Specification (02 4114). 25 4. Lead Service Line removal shall be considered subsidiary to the 26 installation of the new water service and/or service reconnection. No 27 additional payment will be made. 28 C. Products Installed but not Furnished Under this Section 29 1. Water meters for various sizes 30 D. Related Specification Sections include, but are not necessarily limited to: 31 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 32 2. Division 1 —General Requirements 33 3. Section 33 04 40 — Cleaning and Acceptance Testing of Water Mains 34 4. Section 33 05 10 — Utility Trench Excavation, Embedment and Backfill 35 5. Section 33 12 25 — Connection to Existing Water Mains 36 1.2 PRICE AND PAYMENT PROCEDURES 37 A. Measurement and Payment 38 1. New Water Service 39 a. Measurement CITY OF FORT' WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 33 12 10-2 WATER SERVICES 1-INCH TO 2-INCH Page 2 of 17 1) Measurement for this Item shall be per each new "Water Service" complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by open cut construction. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Water Service" installed for: a) Various sizes c. The price bid shall include: I ) Furnishing and installing New Service Line as specified by the Drawings 2) Submitting product data 3) Tapping saddle 4) Corporation stop 5) Curb stop 6) Fittings 7) Service line installed by open cut 8) Connection to meter 9) Meter Box and Lid 10) Pavement removal 11) Excavation 12) Hauling 13) Disposal of excess material 14) Surface Restoration associated with Meter Box installation and connection, excluding grass (seeding, sodding or hydro -mulch paid separately) 15) Clean-up 16) Disinfection 17) Testing 2. New Bored Water Service a. Measurement 1) Measurement for this Item shall be per each new Water Service complete in place from the tap of the main to the installation of the meter box and associated appurtenances where the service line is installed by trenchiess method. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Bored Water Service" installed for: a) Various sizes c. The price bid shall include: 1) Submitting product data 2) Tapping saddle 3) Corporation stop 4) Curb stop 5) Fittings 6) Service line installed by trenchless method 7) Connection to meter 8) Meter Box and Lid 9) Pavement removal 10) Excavation CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June I9, 2013 City Project No. 02727 33 12 10-3 WATER SERVICES 1-INCH TO 2-INCII Page 3of17 1 11) Hauling 2 12) Disposal of excess material 3 13) Surface restoration associated with Meter Box installation and connection, 4 excluding grass (seeding, sodding or hydro -mulch paid separately) 5 14) Clean-up 6 15) Disinfection 7 16) Testing 8 3. Water Meter Service Reconnect 9 a. Measurement 10 1) Measurement for this Item shall be per each Water Meter Service 11 Reconnect complete in place from public service Iine connection to private 12 service line connection. 13 b. Payment 14 1) The work performed in conjunction with relocation of the meter, associated 15 private service line, fittings and meter box 5 feet or less in any direction 16 from centerline of existing meter location and the materials furnished in 17 accordance with this Item will be paid for at the unit price bid per each 18 "Water Meter Service, Reconnection" installed for: 19 a) Various size of services 20 c. The price bid shall include: 21 1) Private service line 22 2) Fittings 23 3) Private connection to water meter 24 4) Connection to existing private service line 25 5) Cut and crimp of existing service 26 6) Removal and Disposal or Salvage of existing 2-inch or smaller water meter, 27 as directed by City 28 7) Pavement removal 29 8) Excavation 30 9) Hauling 31 10) Disposal of excess material 32 11) Surface restoration for area disturbed for installation of meter box, 33 excluding grass (seeding, sodding or hydro -mulch paid separately) 34 12) Clean-up 35 13) Cleaning 36 14) Disinfection 37 15) Testing 38 4. Private Water Service Relocation 39 a. Measurement 40 1) Measurement for this Item shall be per linear foot of Private Service 41 relocation complete in place from the meter box to a connection to the 42 existing service line on private property. 43 b. Payment 44 1) The work performed in conjunction with Private Service Line installation 45 where the meter and meter boxes are moved more than 5 feet in any 46 direction from centerline of existing meter location and materials furnished 47 in accordance with the Item and measured as provided under 48 "Measurement" will be paid for at the unit price bid per linear foot of 49 "Private Water Service" performed for: CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 33 12 10-4 WATER SERVICES I -INCH TO 2-INCH Page 4 of 17 a) Various service sizes c. The price bid shall include: 1) Obtaining appropriate permit 2) Obtaining Right of Entry 3) Subinitting product data 4) Private service line 5) Fittings 6) Backflow preventer, check valve, and isolation valve relocation, if applicable 7) Connection to existing private service line 8) Pavement removal and replacement 9) Excavation 10) Hauling 11) Disposal of excess material 12) Surface restoration, excluding grass (seeding, sodding or hydro -mulch paid separately) 13) Clean-up 14) Cleaning 15) Disinfection 16) Testing 21 1.3 REFERENCES 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A. Definitions 1. New Service a. Installation of new 1-inch to 2-inch Water Service Line by open cut construction from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 2. New Service (Bored) a. Installation of new 1-inch to 2-inch Water Service Line by trenchless construction method from the water main to the right-of-way, including corporation stop, curb stop, fittings and water meter boxes complete in place, as shown on the Drawings. 3. Meter Service Reconnection a. Relocation and reconnection of the private service line from an existing meter to be abandoned and a new meter installed that lies within 5 feet of the existing meter. 4. Private Service Relocation a. Relocation and reconnection of private ,service line behind the water meter where the existing meter to be abandoned and the new meter installed is greater than 5 feet of the existing meter. A licensed plumber is required to relocate the private service. 5. Lead-free a. Lead-free pipes and plumbing fittings and fixtures shall contain less than 0.25 percent lead in accordance with the reduction of Lead in Drinking Water Act (P.L. 111-380). B. Reference Standards CITY OF PORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 I0 - 5 WATER SERVICES 14NCH TO 2-INCH Page 5 of 17 I I . Reference standards cited in this Specification refer to the current reference 2 standard published at the time of the Iatest revision date logged at the end of this 3 Specification, unless a date is specifically cited. 4 2. ASTM International (ASTM): 5 a. A48, Standard Specification for Gray Iron Castings. 6 b. A536, Standard Specification for Ductile Iron Castings. 7 c. B88, Standard Specification for Seamless Copper Water Tube. 8 d. B98, Standard Specification for Copper -Silicon Alloy Rod, Bar and Shapes. 9 e. C 131, Standard Specification for Resistance to Degradation of Small -Size 10 Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. 1 I f. C150, Standard Specification for Portland Cement. 12 g. C330, Standard Specification for Lightweight Aggregates for Structural I3 Concrete. 14 h. D883, Standard Terminology Relating to Plastics. 15 3. American Water Works Association (AWWA): 16 a. C700, Cold -Water Meters - Displacement Type, Bronze Main Case. 17 b. C800, Underground Service Line Valves and Fittings. 18 4. NSF International (NSF): 19 a. 61, Drinking Water System Components -Health Effects. 20 5. Reduction of Lead in Drinking Water Act 21 a. Public Law 111-380 (P.L. 111-380) 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Scheduling 24 1. Provide advance notice for service interruptions and meet requirements of Division 25 0 and Division 1. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 0133 00. 28 B. All submittals shall be approved by the City prior to delivery. 29 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 30 A. Product Data, if applicable: 3I 1. Tapping Saddle 32 2. Corporation stop 33 3. Curb Stop 34 4. Service Line 35 5. Meter Box 36 6. Meter Box Lid 37 B. Certificates and Test Reports 38 1. Prior to shipment of any Water Service components, the manufacturer shall submit 39 the following: 40 a. A Certificate of Adequacy of Design stating that the components to be 41 furnished comply with all regulatory requirements identified in this Section 42 including: 43 1) The Reduction of Lead in Drinking Water Act (P.L. 11 1-380) CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 6 WATER SERVICES 1-INCIT TO 2-INCI-I Page 6 of 17 1 2) AWWA C800 2 3) NSF 61 3 L7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Qualifications 7 1. Manufacturers 8 a. Water Services shall meet or exceed the latest revisions of AWWA C800, NSF 9 61, the Reduction of Lead in Drinking Water Act and shall meet or exceed the 10 requirements of this Specification. 11 1.10 DELIVERY, STORAGE, AND HANDLING 12 A. Storage and Handling Requirements 13 1. Protect all parts such that no damage or deterioration will occur during a prolonged 14 delay from the time of shipment until installation is completed and the units and 15 equipment are ready for operation. 16 2. Protect all equipment and parts against any damage during a prolonged period at the 17 site. 18 3. Prevent plastic and similar brittle items from being directly exposed to sunlight or 19 extremes in temperature. 20 4. Secure and maintain a location to store the material in accordance with Section 01 21 6600. 22 111 FIELD [SITE] CONDITIONS [NOT USED] 23 1.12 WARRANTY [NOT USED] 24 PART 2 - PRODUCTS 25 2.1 OWNER -FURNISHED PRODUCTS 26 A. Water meters for various sizes 27 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 28 A. Manufacturers 29 1. Only the manufacturers as listed on the City's Standard Products List will be 30 considered as shown in Section 01 60 00. 31 a. The manufacturer must comply with this Specification and related Sections. 32 2. Any product that is not listed on the Standard Products List is considered a 33 substitution and shall be submitted in accordance with Section 01 25 00. 34 3. The Water Services and appurtenances shall be new and the product of a 35 manufacturer regularly engaged in the manufacturing of Water Services and 36 appurtenances having similar service and size. 37 B. Description 38 1. Regulatory Requirements CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 7 WATER SERVICES 14NCII TO 2-INCII Page 7 of 17 1 a. All materials shall conform to the Reduction of Lead in Drinking Water 2 Act (P.L. 111-380). This Act defines "Lead-free" for pipes and other 3 appurtenances to be less than 0.25 percent lead. 4 b. Water Services shall meet or exceed the latest revisions of AWWA C800 and 5 shall meet or exceed the requirements of this Specification. 6 c. All Water Services components in contact with potable water shall conform to 7 the requirements of NSF 61. 8 C. Materials/Design Criteria 9 1. Service Lines 10 a. Provide Type K Copper Tubing per ASTM B88. 11 b. Furnish in the annealed conditions, unless otherwise specified in the Contract 12 Documents. 13 2. Service Couplings 14 a. Fitting Ends 15 1) Flared Copper Tubing with thread dimensions per AWWA C800 16 2) Provide coupling nuts with a machined bearing skirt of a length equal to the 17 tubing outer diameter (O.D.). 18 b. Provide with hexagonal wrench grip compatible with the coupling size. 19 c. Provide lead-free service couplings in accordance with the Reduction of Lead 20 in Drinking Water Act. 21 3. Corporation stops 22 a. Provide brass castings per AWWA C800 for: 23 1) Bodies 24 2) Plugs 25 3) D washers 26 4) Bottom nuts 27 b. Machining and Finishing of Surfaces 28 1) Provide 1 3/ inch per foot or 0.1458 inch per inch ± 0.007 inch per inch 29 taper of the seating surfaces for the key and body. 30 2) Reduce large end of the tapered surface of the key in diameter by chamfer 31 or turning for a distance that will bring the largest end of the seating surface 32 of the key into the largest diameter of the seating surface of the body. 33 3) Relieve taper seat in the body on the small end. 34 4) Extend small end of the key there -through to prevent the wearing of a 35 shoulder and facilitate proper seating of key. 36 5) Design key, key nut and washer such that if the key nut is tightened to 37 failure point, the stem end of the key shall not fracture. 38 6) Design nut and stem to withstand a turning force on the nut of at least 3 39 times the necessary effort to properly seat the key without failure in any 40 manner. 41 7) Port through corporation stop shall be full size to eliminate turbulence in 42 the flow way. 43 8) Design stop for rotation about the axis of the flow passageway inside the 44 following minimum circles in order to properly clear the tapping machine: 45 a) Two 7/8-inch for 1-inch corporation stops 46 b) Four 15/ 16-inch for 1 % -inch and 2-inch corporation stops 47 c. Provide lead-free corporation stops in accordance with the Reduction of Lead in 48 Drinking Water Act. CITY OF PORT WORTI3 WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised dune 19, 2013 City Project No. 02727 33 12 10-8 WATER SERVICES t-INCH TO 2-INCH Page 8 or l7 1 4. Curb Stops 2 a. Provide brass castings per AWWA C800. 3 b. Valve plugs shall be: 4 1) Cylinder type 5 2) Plug type, or 6 3) Ball type 7 c. Incorporate full flow porting. 8 d. Provide for full 360 degree plug rotation clockwise or counter -clockwise. 9 e. Overall Length 10 1) 3-5/16 inch} 1/9 inch for finch diameter 11 2) 4- 1/32 inch + 9.32 for 1-inch diameter 12 f, Cylindrical Plug Type 13 1) Provide O-ring seal at top and bottom. 14 a) 0-ring at top only is acceptable if bottom of curb stop body is closed. 15 2) Seals shall be Buna N. 16 3) 1 0-ring seal shall surround the outlet port of the curb stop and act to 17 effectively seal in the closed position. 18 4) The port in the plug shall provide a straight through, full size flow way, so 19 shaped as to eliminate turbulence. 20 5) All waterways shall be smooth and free of burrs or rough areas. 21 6) Design the curb stop to provide ease and accuracy of operation and positive 22 shut-off of water. 23 g. Tapered Plug Type 24 1) Provide O-ring seal at top and bottom. 25 2) The tapered plug and cylindrical recess in the valve body shall be machined 26 to match within approved manufacturing tolerances. 27 3) Inlet and outlet ports shall be sealed by O-rings or combination Teflon U- 28 shaped seal rings backed with 0-rings. 29 4) The port in the plug shall provide a straight through, full size flow way, so 30 shaped as to eliminate turbulence. 31 5) All waterways shall be smooth and free of burrs or rough areas. 32 6) Design the curb stop to provide ease and accuracy of operation and positive 33 shut-off of water. 34 h. Ball Plug Type 35 1) Provide double O-ring seals on the stem, 36 2) The ball shall seal against rubber rings mounted in the valve body at the 37 inlet and outlet ports. 38 3) The ball shall be bronze with a smooth Teflon coating. 39 4) The port in the plug shall provide a straight through, full size flow way, so 40 shaped as to eliminate turbulence. 41 5) All waterways shall be smooth and free of burrs or rough areas. 42 i. Provide lead-free curb stops in accordance with the Reduction of Lead in 43 Drinking Water Act. 44 5. Straight Adapters 45 a. Brass castings and threads per AWWA C800 46 b. Provide lead-free straight adapters in accordance with the Reduction of Lead in 47 Drinking Water Act. 48 6, Three Part Copper Unions 49 a. Brass castings and threads per AWWA C800 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 9 WATER SERVICES 14NCH TO 2-INCH Page 9 of 17 1 b. Provide lead-free Three Part Copper Unions in accordance with the Reduction 2 of Lead in Drinking Water Act. 3 7. Straight Meter Couplings 4 a. Brass castings per AWWA C800 5 b. Threads per AWWA C700 6 c. Tailpiece with outside iron pipe thread 7 d. Chamfer corners on threaded end of meter nut. 8 e. Machine inside and outside of tailpiece. 9 f. Provide lead-free Straight Meter Couplings in accordance with the Reduction of I0 Lead in Drinking Water Act, 11 8. Branch Connections 12 a. Brass castings per AWWA C800 13 b. Inlet and outlet connections per AWWA C800 14 c. Provide lead-free branch connections in accordance with the Reduction of Lead 15 in Drinking Water Act. 16 9. Service Saddles 17 a. Castings 18 1) Brass or Nylon coated ductile iron castings per AWWA C800 19 2) Free of porosity with sharp edges removed 20 3) Fit contour of pipe as follows: 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Nominal Pipe Size inches Minimum Outside Diameter of Pipe inches I Maximum Outside Diameter of Pipe inches 1.50 1.900 2,000 2.00 2.375 2.500 2.25 2.875 3.000 4.00 4900 5.000 6.00 6.900 7.100 8.00 9.050 9.300 10.00 11.100 11.400 4) Saddle a) Form to fit firmly against side of maximum diameter of water main with approximately 180 degrees wrap around. 5) Outlet a) Design outlet boss for no thread distortion by bending moments. b) Tapped for taper threaded corporation stop conforming to AWWA C800. b. Straps I ) Conform to ASTM B98. 2) Form flat to fit uniformly against the wall of the water main. 3) Rod diameter not less than 5/8 inch flattened to 1 inch on one side. 4) Straps shall be threaded 5/8 inch (11-NC-2A) for a distance such that inch remains after clamp is fully tightened on the pipe. 5) Chamfer strap ends to protect the starting threads. 6) The threads shall he full and free from shear. 7) 4-inch and larger pipe shall be in accordance with Section 33 12 25, CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 10 I1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 33 12 10- 10 WATER SERVICES 1-INCH TO 2-INCH Page 10 of 17 8) Single straps are allowed for Saddles for pipe 2-inches in diameter and smaller. c. Nuts 1) Bronze material a) Same ,material as straps 2) Dimensions equal to or larger than heavy hexagon nuts 3) Tapped 5/8 inch (I I-NC-2B) d. Gaskets 1) Neoprene rubber material 2) Cemented to saddle and positioned to facilitate installation 10. Brass Flanged Angle Valve a. For 1 1/2-inch and 2-inch services b. Brass castings per AWWA C800 c. Valve Body with integral outlet flange and inlet wrenching flat d. Fit together key and body by turning key and reaming body 1) Key with 0-ring seal seat at the upper end 2) Lap key and body seat are to conform to corporation stop requiremcnts of this Specification. 3) The outlet flange shall contain an 0-ring seat or a uniform flat drop -in flange gasket surface. 4) Drop -in flange gasket surface shall contain gasket retaining grooves milled circular about the axis of the flange. 5) The size of the outlet flange and the diameter and spacing of the bolt holes shall conform to AWWA C700. 6) The flange on 2-inch angle valves shall be double drilled to permit connection to 1 %a -inch meters. 7) The inlet port of the valve shall be tapered to conform to AWWA C900 taper pipe thread. 8) The key cap shall include a wrenching tee marked with a raised or recessed arrow to show whether the valve is open or closed. 9) Valve Assembly (main body, key, key cap) a) Brass material per AWWA C800 b) 0-ring seal on the top of the key between the key and body seat c) Key cap shall complete the assembly by attaching to the key by means of a strong bronze pin with phosphor bronze spring washer(s) depressed between the key cap and the top of the valve main body. d) Provide with padlock wings for locking the valve in the closed position. e) There shall be a uniform application of cold water valve grease between the body and the key. f) The valve shall be capable of being easily opened and stopping lugs. g) The waterway through the valve shall be smooth and rounded for minimum pressure loss, and shall be free of burrs or fins. h) The valve shall be strong, well designed, neat in appearance, water- tight and entirely adequate for the intended purpose. i) Provide with either a high quality rubber drop -in gasket or an 0-ring seal depending on the manufacturer's flange seal surface design choice. e. Provide lead-free brass flanged angle valves in accordance with the Reduction of Lead in Drinking Water Act. 11. Meter Boxes shall: CITY OF FOR'I' WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10- 11 WATER SERVICES 1-INCH TO 2-INCH Page 11 of 17 I a. Be constructed of- 2 1) Linear Medium Density Polyethylene (LMDPE) as defined in 3 ASTM D883. 4 a) Minimum wall thickness of 3/8-inch throughout with no blowing 5 agents or foaming plastics 6 b) Polymer body shall be black throughout and shall have a molded 7 recycled emblem with a minimum of 35 percent Post Industrial/ Pre 8 Consumer Recycled Content- verified with a Leed Product 9 Documentation. 10 c) Smooth edges and corners and be free from sharp edges so the unit can 1 I be handled safely without gloves. 12 d) Exterior free from seams or parting lines 13 e) Not to be installed in roadway — designed to withstand loading in non- 14 deliberate and incidental traffic only. 15 2) Concrete 16 a) Frame of No. 6 gauge wire welded closed 17 b) Type I or Type)] Portland cement, in accordance with ASTM C150, 18 portioned with lightweight aggregate, in accordance with ASTM C330 19 (1) Percentage of wear not to exceed 40 per ASTM C 131 20 (2) Minimum 28 day compressive strength of 3,000 psi 21 b. Be able to withstand a minimum 15,000 pounds vertical load 22 c. Withstand a minimum 400 pounds sidewalI load. 23 d. 1-inch Standard Meter Box 24 1) For use with services utilizing 5/8-inch x 3/-inch, 3/-inch or 1-inch meter 25 Single or .Dual service meter: DFW38CIPS-14-BODY or approved equal. 26 2) Polymer 27 a) Size. 21-1/2-inch x 20-1/2-inch Box, 14 inches high 28 b) Minimum inside working room. 19-1/2-inch x 16-1/2-inch 29 c) Pipe slots 30 (1) One pipe slot molded on the inlet end of the body that measures 2- 31 1/4-inch x 3-1/4-inch and one pipe slot on the outlet end of the 32 body that measures for 7-1/2-inch center "U" Branch. 33 d) Polymer body shall have a 1-inch bottom flange to resist settling of box 34 after installation. 35 3) Concrete 36 a) Size: 11-inch x 18-inch Box, 12 inches high 37 e. 2-inch Standard Meter Box 38 1) For use with services utilizing 1-1/2-inch or 2-inch Single service meter: 39 DFW1730C-12-BODY or approved equal. 40 2) Polymer 41 a) Size. 34-1/8-inch x 21-1/4-inch Box, 12 inches high 42 b) Minimum inside working room: 31-3/4-inch x 16-5/16-inch 43 c) Pipe Slots 44 (1) One pipe slot molded on each end of body that measures 3-inch x 45 4-inch with optional molded 4-inch x 9-inch cut out. 46 d) Polymer body shaII have a molded '/2-inch bow centered on sidewalI to 47 resist backfilling per Drawings. 48 e) Polymer body shall have a 2-1/2-inch bottom flange to resist settling of 49 box after installation. 50 3) Concrete CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised dune 19, 2013 City Project No. 02727 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4I 42 43 44 45 46 47 48 49 50 33 12 10 - 12 WATER SER'UICES 1-INCH TO 2-INCH Page 12 of 17 a) Size: 15-1/4-inch x 26-7/8-inch Box, 12 inches high f. Bullhead Standard Meter Box 1) For use with services utilizing two 5/8-inch x'/4-inch or'/a-inch or I -inch Single service meter: DI{ W37C-12-BODY or approved equal 2) Polymer a) Size: 21-inch x 14-3/4-inch, 12 inches high b) Minimum inside working room: 19-1/8-inch x 10-7/16-inch c) Pipe Slots (1) One pipe slot molded on each end of body that measures 2-1/4-inch x 3-1/4-inch. d) Polymer body shall have a 1-inch bottom flange to resist settling of box after installation. 3) Concrete a) Size: 15-5/8-inch x 15-5/8-inch Box, 12 inches high 12. Meter Box Lid a. Cast Iron or Ductile Iron 1) Per ASTM A48, Class 30B or ductile iron per ASTM A 5 3 6 2) Shall withstand a minimum vertical load of 15,000 pounds 3) Coat castings with a bituminous emulsified asphalt unless otherwise specified in the Contract Documents, ground smooth, and cleaned with shot blasting, to get a uniform quality free from strength defects and distortions. 4) Dimensions shall be within industry standards of+l/16 inch per foot. 5) All castings will bear the Manufacturer's IS (name or logo) and Country of Origin. 6) Casting weights may vary f5 percent from drawing weight per industry standards. b. Plastic 1) The lid shall be: a) Constructed of Engineered Plastic as defined in ASTM D883 (1) Polymer Lid shall be black throughout and shall have a molded recycled emblem with a minimum of 50 percent Post Consumer Recycled and 50 percent Post Industrial/ Pre Consumer Recycled Content- verified with a Leed Product Documentation. (2) Polymer Lid shall be black throughout with no blowing agents or foaming plastics (3) Smooth edges and corners and be free from sharp edges so the unit can be handled safely without gloves. (4) Exterior free from seams or parting lines. (5) Polymer lid shall have a molded tread -pattern- tread dimensions shall be. 188-inch x .938-inch x. 150-inch deep. (6) Polymer Lid shall have "City of Fort Worth" molded into the lid. (7) Polymer lid shall have "Water Meter" molded into the lid- Font shall be Ad Fadal CNC font with 1-inch characters x .150-inch deep. (8) Polymer Lid shall have a molded pick hole pocket- dimensions shall be 3-inch x 9/16-inch x Thru Hole with 3/16-inch 304 stainless steel rod. (9) Polymer lid shall have 2 pieces of %-inch rebar located in lid pockets for locatability as shown in Drawings. b) Domestic Manufacture Only -Made in USA molded on Lid. CITY OF FORT' WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 13 WATER SERVICES 1-INCH TO 2-INCH Page 13 of 17 1 c) Not to be installed in roadway -designed to withstand loading in non- 2 deliberate and incidental traffic only. 3 d) Able to withstand a minimum 15,000 pounds vertical load 4 e) Engineered Plastic with ultraviolet protection. 5 2) 1-inch Standard Plastic Meter Box Lid 6 a) For use with services utilizing 5/8-inch x 3/4-inch, %-inch or I -inch 7 meter Single or Dual service meter. DFW38C-IEPA FTW-LID or 8 approved equal. 9 b) Size: 18-inch x 17-inch, 2 inches high 10 c) For use with Class A Standard Meter Box DFW38CI PS-14-BODY or 11 approved equal. 12 d) Polymer lid shall seat evenly inside meter box and shall not overlap the 13 top edge of the meter box. 14 3) 2-inch Standard Plastic Meter Box Lid 15 a) For use with services utilizing 1-1/2-inch or 2-inch Single service 16 meter: DFWI730C-IEPA FTW-LID or approved equal. 17 b) Size: 34-1/8-inch x 21-1/4-inch, 12 inches high 18 c) For use with Class B Standard Meter Box DFW1730C-12-BODY or 19 approved. 20 d) Polymer lid shall seat evenly inside meter box and shall not overlap the 21 top edge of the meter box. 22 4) Bullhead Standard Plastic Meter Box Lid 23 a) For use with services utilizing two 5/8-inch x'/4-inch or/4-inch or I - 24 inch Single service meter: DFW37C-IEPA FTW-LID or approved 25 equal. 26 b) Size: 17-3/4-inch x l I -inch, 1-3/4 inches high 27 c) For use with Class C Standard Meter Box DFW37C-12-BODY or 28 approved equal. 29 d) Polymer lid shall seat evenly inside meter box and shall not overlap the 30 top edge of the meter box. 31 13. Horizontal Check Valve 32 a. Equip I '/z-inch and 2-inch Water Services with a horizontal check valve, with 33 pipe plug, only if specified in the Drawings. 34 b. If an existing backflow preventer is present, the Contractor is to leave it, and is 35 not required to provide an additional horizontal check valve. 36 c. Provide lead-free horizontal check valves in accordance with the Reduction of 37 Lead in Drinking Water Act. 38 14. Service Marker 39 a. 3 inch wide, 5 mil blue vinyl tape 40 2.3 ACCESSORIES [NOT USED] 41 2.4 SOURCE QUALITY CONTROL 42 A. Tests and Inspections 43 1. At the City's option, the manufacturer shall be required to provide certification 44 records showing conformance of materials, design and testing to these 45 Specifications. 46 2. The test procedures shall conform to AWWA C800. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No, 02727 33 12 10- 14 WATER SERVICES 14NCII TO 2-INCII Page 14 of 17 1 a. In the event that a chosen valve fails the City's hydrostatic test, the cost of the 2 test shall be at the expense of the supplier. 3 b. Proof testing of the remainder of the valves shall be at the cost and 4 responsibility of the supplier. 5 c. These tests will be the basis of acceptance or rejection of the remainder of the 6 shipment by the City. 7 3. The City reserves the right to select products at random for testing. The failure of 8 materials to conform to the applicable Specification may result in the rejection of 9 the entire shipment. 10 B. Marking 11 1. Service saddle castings shall be clearly marked by letters and numerals cast thereon 12 showing: 13 a. Manufacturer's name 14 b. Type 15 C. Size of Pipe 16 PART 3 - EXECUTION 17 3.1 INSTALLERS 18 A. A licensed plumber is required for installations on the outlet side of the service meter. 19 3.2 EXAMINATION [NOT USED] 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install Water Services and appurtenances in accordance with AWWA C800. 2. Install Water Service Lines 5 feet north or east of center of lot frontage on lots 75 feet or wider, or where shown on Drawings. 3. Install Water Service Lines on lot center line on lots less than 75 feet wide, unless otherwise shown on the Drawings. 4. Install services at a minimum depth of 36 inches below final grade/proposed top of curb, unless otherwise specified in the Contract Documents. 5. Perform leak tests in accordance with Section 33 04 40. 6. Replace existing'/4-inch Service Lines with I -inch new Service Line, tap, and corporation. 7. Install replaced or relocated services with the service main tap and service line being in line with the service meter, unless otherwise directed by the City. 8. Excavate, embed and backfill trenches in accordance with Section 33 05 10. B. Handling 1. Haul and distribute Service Lines fittings at the project site and handle with care to avoid damage. a. Inspect each segment of Service Line and reject or repair any damaged pipe prior to lowering into the trench. b. Do not handle the pipe in such a way that will damage the pipe. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 15 WATER SERVICES 1-INCH TO 2-INCH Page 15 of 17 1 2. At the close of each operating day: 2 a. Keep the pipe clean and free of debris, dirt, animals and trash— during and after 3 the laying operation. 4 b. Effectively seal the open end of the pipe using a gasketed night cap. S C. Service Line Installation 6 1. Service Taps 7 a. Only ductile iron pipe may be directly tapped. 8 b. Install service taps and/or tap assemblies of the specified size as indicated on 9 the Drawings, or as specified by the Engineer. 10 c. Perform taps on a water system that is either uncharged or under pressure. I 1 d. Taps consist of: 12 1) For Concrete Pressure Pipe or Steel Pipe 13 a) Standard internal pipe threaded holes in the pipe walls I4 (1) Made during pipe fabrication 15 (2) Provide tapered threaded outlet with nylon sleeved inserts for up to 16 2-inch. 17 (3) Provide flange outlet with flange to thread insulator adaptor kits for 18 4-inch and larger taps. 19 2) Other pipe materials 20 a) Bronze service clamp with a sealed, threaded port through which the 21 pipe wall is drilled to complete a service port 22 e. Tap Assemblies 23 1) Consist of corporation stop with iron to copper connection attached to: 24 a) Copper tubing terminating as shown on the City's Standard Detail 25 b) May be required adjacent to gate valves 26 c) Install as shown on the Drawings, or as directed by the Engineer. 27 d) When required, shall be included in the unit price bid for installing gate 28 valve. 29 2) Chlorination and testing purposes 30 a) No separate payment will be made for taps required for testing and 31 chlorination. 32 2. Installation of Water Services 33 a. Install tap and Service Line in accordance with City Details. 34 b. Install meter box in accordance with City Details. 35 1) Adjustment of the Service Line to proper meter placement height shall be 36 considered as part of the Meter Box installation. 37 3. Trenching 38 a. Provide a trench width sufficiently wide to allow for 2 inches of granular 39 embedment on either side of the Service Line. 40 4. Bored Services 41 a. Services shall be bored utilizing a pilot hole having a diameter %2 inch to 3/4 42 inches Iarger than the Service Line. 43 5. Arrangement 44 a. Arrange corporation stops, branches, curb stops, meter spuds, meter boxes and 45 other associate appurtenances as shown in the City Detail, and to the approval 46 of the Engineer. 47 6. Service Marker 48 a. When Meter Box is not installed immediately subsequent to service installation: CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 16 WATER SERVICES I -INC H TO 2-INCH Page 16 of 17 1 1) Mark Curb Stop with a strip of blue vinyl tape fastened to the end of the 2 service and extending through the backfill approximately 6 inches above 3 ground at the Meter Box location. 4 b. Installation of service taps only: 5 1) Attach service marker tape to the corporation stop or plug and extend 6 upward and normal to the main through the backfill at the adjacent trench 7 edge to at least 6 inches above ground to flag the tap location. 8 7. Corporation stops 9 a. Fully open corporation stop prior to backfill. 10 D. Removal of Existing Water Meters 11 1. Remove, tag and collect existing Water Service meter for pickup by the City for 12 reconditioning or replacement. 13 2. After installation of the Water Service in the proposed location and receipt of a 14 meter from the City inspector, install the meter. 15 3. Reset the meter box as necessary to be flush with existing ground or as otherwise 16 directed by the City. 17 4. All such work on the outlet side of the service meter shall be performed by a 18 licensed plumber. 19 3.5 REPAIR 1 RESTORATION [NOT USED] 20 3.6 RE -INSTALLATION [NOT USED] 21 3.7 FIELD [oR] SITE QUALITY CONTROL 22 A. Field Tests and Inspections 23 1. Check each Water Service installation for leaks and full flow through the curb stop 24 at the time the main is tested in accordance with Section 33 04 40. 25 3.8 SYSTEM STARTUP [NOT USED] 26 3.9 ADJUSTING [NOT USED] 27 3.10 CLEANING [NOT USED] 28 3.11 CLOSEOUT ACTIVITIES [NOT USED] 29 3.12 PROTECTION [NOT USED] 30 3.13 MAINTENANCE [NOT USED] 31 3.14 ATTACHMENTS [NOT USED] 32 END OF SECTION 33 CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised June 19, 2013 City Project No. 02727 33 12 10 - 17 WATER SERVICES l-INCH TO 2-INCH Page 17 of 17 Revision Log DATE NAME SUMMARY OF CHANGE Added Blue Text for clarification 1.2 A. — Revision to items included in price hid Specification modified to be in accordance with the Reduction of Lead in Drinking 12/20/2012 D. Johnson Water Act— All materials shall be lead free in accordance with this Act. 1.2.A.3 — Water Meter Service Relocate was renamed Water Meter Service Reconnect 1.6.13. — added certification submittals for compliance with regulatory requirements Added the phrase ', including grass' to lines; Part 1, 1.2.A.1.04, Partl, 1.2.A.2.c.13, Part 1, 1.2.A.2.c.13, Part I,1.2.A.3.c.11, 2/13/2013 F. Griffin Partl, 1.2.A.4.c.11 Added the phrase -and replacement' to line Part 1,1.2.A.4.c.7 Revised lines with `including grass' replacing with `excluding grass (seeding, 4/26/2013 F. Griffin sodding or hydromulching paid separately)' Included in Part 1, 1.2, A, 1, c, 14; Part 1, 1.2, A, 2, c, 13; Pant I, 1.2, A, 3, c, 11; Part 1, 1.2, A, 4, 2, 11 6/19/2013 D. Johnson 1.2.A.4.c —Addition of private water service appurtenances relocation to being included in the linear foot price of private water services CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised June 19, 2013 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 APPENDIX GC-4.0I Availability of Lands - None GC-4.02 Subsurface and Physical Conditions Street Coring Project Report 04.41172036 by Fugro USA Land, Inc. GC-4.04 Underground Facilities - None GC-4.06 Hazardous Environmental Condition at Site - None GC-6.06.13 Minority and Women Owned Business Enterprise Compliance MBE Specifications — Special Instructions for Bidders MBE — Subcontractors/Suppliers Utilization Form MBE — Prime Contractor Waiver Form MBE — Good Faith Effort Form MBE — Joint Venture Eligibility Form GC-6.07 Wage Rates 2013 Prevailing Wage Rates (Heavy & Highway Construction Projects) GC-6.09 Permits and Utilities - None GC-6.24 Nondiscrimination - None GR-01 60 00 Product Requirements -None CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 GC-4.01 Availability ®f Lands THIS PAGE LEFT INT1LNTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 GC-4a®2 Subsurface and Physical Conditions Street Coping Project Deport 04.41172036 by Fugpo USA Land, Inc. CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July I, 2011 City Project No. 02727 Fugr'o USA land, Inc. F. ` 2517 East Loop 820 North Fort Worth, TX 76118 Phone (817) 284-9595, Fax (817) 284-4480 TRANSMITTAL Project, CPN #100420, Lead Services Replacement, HMAC Street Service ®ate: 05/04/2017 Coring Report ®ate: 05/22/2017 Client: City of Fort Worth Project No.: 04.41172036 8851 Camp Bowie Fort Worth, TX 76116 Lab I Report No.: 25944-2 / 0005 Page 1 of 1 Transmittal Cover Fetter Please see attached documentation for your review. LABORATORY TEST RESULTS Performed on 05/04/17 (See Attached) Attached are the pavement depths, compressive strength of concrete, and sail classification results for the samples indicated. Fugro Representative: Jarad Souders Fugro USA Land, Inc. T13PE Firm Registration No. F-Z88 Z- Roy RAnt, P . CMET Manager THE ABOVE TESTMSULTS APPLY 0NLYTo THE ITEMS TESTED. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL WITHOUT THt APPROVAL OF FUGRO USA LAND, INC. FUGRO 2517 Fast t_oap 820 North Part Worth, Texas 78118 T +1 817 284 9595 F +1 817 284 4480 CITE' OF FORT WOMM LABORATORY RESULTS FOR LEAD SERVICES REPLACCMrNT, HMAC STREET COI` IXG FORT WORTH, TEXAS PROJECT NO: 04.41 `772036 TEST HOLE AND PLASTICITY INDEX CPM #100420 LEAD SERVIMS REPLACEMENT, HIWAG CORING PROJECT NO: 04.41172030 LEAO SERVICES REPLACEMENT, HUM CORING PROJECT MO: 04.41172030 FLoat €on: 35Q4 Ave G vement Depths: Asphalt = 5.4", Concrete 6.9 - Concrete Compressive Stren_ th_psi = 5,10 Atierburg limits: 1- 38 p1:18 pi: 20 Soil classification: Brown sandy lean clay Hole 11 Location: 3636 Ave G Pavement Depths: Asphalt = 4.4", Concrete 8.0" - - Concrete Compressive Strength, psi = 5,930 Atterburg limits: 11: NIP pl: N/P pl: NIP Soil classification: Red silty sand Dole 12 Location: 3530 Mt Vernon i Pavement Depths., Asphalt m 3.6", Concrete = 6.0" ivo comEresswe sirengtn as core less tnan zv:7 H Atterburg limits: II: pl: p€: Hole 13 Pavement Depths, Asphalt = 0.8", Concrete = 6.3" Atterburg Urn Its: II: pl: pi: Hole 14 Location: 3958 Mt Vernon Pavement Depths: Asphalt = 3.8", Concrete % 5.7" No compressive strength as core less than 2V:114 Atterburg limits: 11: pl: pi: Hole 15 .Location: 3700 Mt Vernon Pavement Depths: Asphalt = 4.9", Concrete =9.3 nnnnrPtP m! = d d)Rn Atterburg limits: II: pl: pl: r.'niI nlaaciFin�6enn• r � MP?J0-a'iX' 3 PROJECT NO: 04.Al 172030 LIYAU SERVICES REPALACE N r, HJWAC Compia PROJUCT NO: 04.41179036 BRO r LEAD SERVICE-8 REPLAMMM d, "MAC CORING PROJECT NO: 04.41172036 Hole 28 Pavement Depths: Asphalt = 5.1", Concrete a 6X Concrete Compressive Strength, psi = 5,060 Atterburg limits: il: 34 pl:17 pl: 17 Soil classification: grown sandy lean clay = Hole 29 Pavement Depths: Asphalt = 33', Concrete = 6.9" No compressive strength as core less than 2_V:1H Atterburg limits; il: pl. pi: Soil classification: Hole 30 Location: 3137 Purin ton Pavement Depths: Asphalt = 2.8", Concrete = 5.6" No compressive strength as care less than 2V:1 H Atterburg limits; If: 55 pl: 22 pi: 33 Soil classification: Dark brown sandy fat clay Hole 31 Pavement Depths: Asphalt =1.0", Concrete = 5.0" No com ressive strength as core less than 2V:1 H Atterburg limits: II: 38 111:16 pl: 22 Soil classiticatlon: Pale brown lean clay with sand Hole 32 Locatlon: 2737 Purin tg on _ Pavement Depths: Asphalt g 0.8", Concrete = e.5" No compressive strength as care broken Atterburg limits: 11: pl: pi: Soil classification: Hole 33 Locafion: 3610 Mt Vernon -- Pavement Depths: Asphalt= 1.1", Concrete =6.1° �oMresslve strength as care less than 2V:1H Atterburg limits: If: 21 pl: 14 pl: 7 �.i Qfl OuM 10 6 11 FAD SERVICIR8 UEPILACE1 ilENT, MAG CORING Hole 34 Pavement Depths, Asphalt = 2.6", Concrete = 5.2" Nowressive strength as core less than 2V:1H Atterburg limits: h. 34 pl: 17 pi: 17 Sail classification: Olive brown sandv lean clav ole 35 Location: 2905 Mt Vernon Pavement Depths. Asphalt = 2.3", Concrete = 5.0" No compressive strength as core less than 2V:1 H Atterburg limits: If. 38 pl: 19 pi:1$ A Soil classification: Brown lean clan with sand Hole 36 Location: 3536 Mr Vernon - a - Pavement Depths. Asphalt = 3.8", Concrete = 6.9" No compressive strength as core broken Atterburg limits: If: pl: pi: Hole 37 Pavement Depths: Asphalt = 3.1", Concrete = 5.4" No compressive sfrentth as core less than 2V:I H Atterburg limits: If. 32 pl: 17 pl: 15 Soil classification: Olive brown lean clay with sand Hole So Location: 2201 Crestview Pavement Depths: Asphalt = 7.8, Concrete = 0.0 No compressive stren-cith as no concrete Atterburg limits: If: 24 pl: 13 pi: 11 Soil classification: Brown clavev sand Hole 39 Location: 4121 Crestview Pavement Depths: Asphalt = 2,8", Concrete = 0.0� No cam ressive siren th as no concrete _ Atterburg limits. II: 44 pi: 21 pl: 23 ,Soil classification: Pale brown sandv lean clav -("Urivj 7 l,r-,AD SERVICES RRPLACEMENT, MAC CORING PROJECT NO. 04.41172036 - f ira�a r LEAD SERVICES REPLACEMENT, MAC CORING PROJECT NO; 04.41172 }36 Hole 45 Location: 3113 Puj ton Pavement Depths: Asphalt =1.8", Concrete = 6.3 No compressive strength as core less than 2V:1H Atterburg limits: ll: pl: pi: i"ugro USA Land, Inc. TBPE Firm Registration No. F-299 CMET Manager GC-4a04 Underground Facilities THIS PAGE LEFT INTEN`I'IONAlLLY BLAND CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 Cily Project No. 02727 GC-4o06 Hazardous Environmental Condition at Site THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project Na 02727 1 GC-6.06.D Minority and women Owned Business Enterprise Compliance 1 MBE Specifications — Special Instructions for Bidders MBE ® Subcontractors/Suppliers Utilization Form l BE e Prime Contractor waiver Foram l t MBE — Good Faith Effort ]dorm 1 MBE — Joint Venture Eligibility Form CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR OFFERORS APPLICATION OF POLICY If the total doilar valtie of thp contrast is $60,900.01 or ir~.M1.re, then a MOE subcontracting goal is applicable. POLICY STATEMENT It iw, thq p(Acy of the €;Ity trf Fort �Nortfr to artmire tho full onml rmplltable pgTtiripatlon by Minority UuQlnQ�as Entprpusr#q {MRF—) in ftrn pmr.kiremcrlt �-jf all ni)ods and servire� All raequIremants and r@grtlatio,.ts s#Eitn4 01 tho Uty's mArrent bgsinaS& IAvemIly f-nlarprlee 0 rdinance apliIlfls To thlo 01 id, MBE PROJECT COALS TIIl. f lit -.. 11-IBE ut,.d - ,I, !II . w . -,I , 14 40. 1d iI$i- bA5c bIA VAIIJr, of Ilii: (:urlINH 1, NoIkp H bcpIii MBE a id 459E auGcoliInarUrig gasi3� AI%- 6staLrlligUdd Ior Ihie pro)"1L "$a11 " CJito#bf rnUNt aobmlt butts a MBE UllliZidlOrti FQFiTi and d 513E Utitl?avian ForrTI to lit` dwimod ras4r6mnyo- COMPLIAN E TO BID PEI JFJ A_T1QN On .Glty corwlracts $5f1,(JGQ 6't or mure whsre a MUL eul5ccln1rac1J1gI goal 1s applled, OfFeram, ark: rr�quired to cDmply wJfh 1,ho Il7terrl OF II'l+f [.iiy'% Bif;3itku$SA 0iVern b EninrpiJ15e QrdIrlancta by uric f i F the fnllowlrlg, 1, neuter excoQd the iftvo 5UtqPd MSE gaill through MBE $ijhcorrtracting participation, or 2. Meat or oxi need tho abovo atatod M BE goal Ihraugh MBE JoinI Von tvro particlpWIa", or; 3. Goad FMth Effort dociimaritatlran, nr; 4. PriTne WaIva r dacumonirition, SUBMITTAL OF REQUIRED DOCUMENTATION The afrf.rllcal 10 dOLUMOnls Inuit IDG recelved by the Purf♦hasinq Divlgiorl, v i'tlirl il'le foJl13wjnp tlnii3f etledaled. in ardor' F .Ih0p.R4 I I;e ! I:rsll;1r sd'1all ,J�llyar illr 1`01U = d,1s;LIm�ntatio11 111, verscur Io Ike pp ip�ia ripli y al the pUrchalinU dwiel"'*d obtain A dateltirne ieco-ipl Such receipt s#1atC be !.evl&nce that Ihe-Cit oelved the da=Me11t6!k-11I III I -le tinlia allcmated. A faxed aiww ewnaw.&�l copy will not Ire'' .. :accepted - 1. Subcawitractor Utilisation Fora, If9val is rrrRl QT exr.ri rjW' 2, -Good F;tiith Efforl grid Sritrcuotmelor Utilization Form, if purili-4 r.ilun is rli$Fi Ruin stab Ll eat - _ _----_ -- 3. Goad Faith ERort and Subeontraelter UtllJzetlon Form If nA LU PEc,F - linn- T. P-r7-M ! 6oiilraGtor iil:aivipr Forfn, If yX,il VdI5 -perlwiri ni11 wpik 5, Joint Ventrrre Form. if goal rs mat or exceoded- rnroJvnd nv lat+3f Itian 2:01) p-m , rn thu !ienond City btii*1nfg�s day after ttie girl opeiiInq �IatD, exr)uaive_ott_hfl bld opening dal Ls fer olved nis Iatwr ihrin 2:00 pail , on Ihis - ioi mPrlrf I,ity biI sln*b Ls day. after the bld c+t umplig chic, +jx4:Ws1ve of tho hart opening d.ala. rvcalved no tatvr IhQD 400 p.m., on the Me orld City busln�ss 6&y 8fter ihp Gid_n 9nlri dal% nxglusiyo_of the turf oRanlT19_dAto, _ y receiver, 110 Ird16r 1har12_130 p.m., un.ihe �;epoijd G1ty husInessxjay ,after 11lu bid openlnq j4te, exclua Iye of the W na.iel Iin+d d2m —. receivad ire 1;�ter,Iran ZC0 p-m..-ort the second C:Jy businoss day atlBr the brtl opening date, excLisive of the bid i3peniryg cate FAILURE TO COMPLY WITH Till" C:i'j'Y'S BUSINESS DfVERSJTY ENTERPRISE GRI03iiti.i NCE, WILL RESULT JN THE BID BEING CONSMEREf] NON -RESPONSIVE TO SPECIFICATIONS. r-AILi. RE TO y LJSFYIJT THF; REQUIRED ML DOCUMENTATION WILL RESULT IN 1-11F Bii<} BEING CONSIDERED NON-RESPONSWE, A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFiEiD FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAit PERIOD WILL RESULT IN A DISQUALIFICATION PERioD OF THREE YEARS. Arty gijastluns, plea ao coil tact. the Office of Business Diversity at (1317) 392.267 4, Office of Business Di1lr Ity Email. rnVubeoffice foi,rwDi,lJ7texas-i,46v Rev. 511ilF) PhDni~. (817) ; 92-2874 hw ATFAC j11-.N1 M FORT WORTH City of i= o rt Worth Office of Business Diversity MBE SubcontractorsiSuppliers Utilization Form Miter atld'Sg.-nitary E,pwer Rep] acemanI COMFOcl. 2016 WSM-l`, Parl Pro}act {3sxnli 1 % QFrcFor'5 MUE "A Qhack rapp[If vrWL beak to de G#feror's EerrifreaN;rr Fflbruary 27. 2020 -- PRareVI" r-140- ielEia� 02 Identify it subcontractors1supp]iers you will use on this project Failure to complete tliis lorm, in its entirety with requested documentation, and received by the Purchasing Division no laW than 2'00 p-m. on the second City business dap after bid opening, exclusive, of bid opening deter will result in the bid being considered non -responsive to bird specification. The undersigned Offeror agrees to enter into a formal agreement with the IMBE firm(s) listed in this utilization schedule, conditioned upon execu'ian el a contract with the Oity of Fart Worth. The intentional and/or Knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered nary -responsive to bid specificationS. MBEs Itsted tolr ud nieedrrg the project goal must be located ivy the ;six (6) county malrketplw e. at the. V m a of bid or the bushless his u SIgniflcarlt Business Presence in the Marketplace. Marketplace is tht geographic area of Tarrant, Dallm-Denton. Johnson, Parker, and Wise counties, Prime contractors must identify by tier level of all subcAantractorslsuppliars. Tier: means the- level of subcontracting below the prime contmcto dconsurtant i.e- a dlred payment from the prime contractor to a subcon(ractor is considered 15r tier, a payment by a subcontract -Or to its supplier is considered "" Her. The prime contractor is responsible to provide proof of payment of all tieraud subCantrautcrs Identiified as a MBE and Counting those dollars towards meetirry the CUntrdCt corimi"tted go11, ALL IVIBEs MUST BE CERTIF180 B9FQRE CONTRACT AWARD. Cortiflcatfan means those frrms, localekd will10 the Markolplac:e, that have peen determinood to be a brinafide. minr3rity biisioe§s enterprise by tht Morth Central Texas Regictiol Ctar1 cation Agpnq (h1OTRCA) and the l iAas.Wori Worftq' MInorlty 3uppiii3r 1)i tivalopr leN COLIndl (DiFVV SOC), If hauling services are utilized, the Offeror will be given credit as Iong as the k%ABE listed owns drips -- operates at least ore fully licensed and operational truck to be used on the contrarA. The MBE may lease tracks from another MICE frrm, including NITI E owner -operated. and receive full MBE credit. The MBE may lease trucks from non-iviBEs, including owner -operated, but wilt only receiVC- credit for the fees arld cornniissions earned by the MBE as outlined in the lease agreement - Rev n'[ :y-1 II FORTWoRm ATTACI-Vj1�:-NT 1A Damp 2 ril 4 OJTBr4rs,@e@, r;3glr±r&J w IdeF illy ALL regarfllJvss of 5iE11U9; I_e:, Mlm3rity arld rim-t- BEs. MBE flrrns are to bti %ted IIrsI-, i15e addilJanal sriElFlts IFriry t='I$uar+ poto t ,,,t nrl[y,rr„epifjeE d M DEli W.Ilt f rj roilrltod.to moot an MU goaSUBCONTRACTOWSUPPLIER hJ Campnny Nime 1' ..n W bolail Bataia J CIdP s I g El ubc-011tractIng Sltpplli P F m u Grk FkWrclinedl ` lIarArn*Ullt ErnQFI r S I contact Person E E] I ❑ ■"go- kav, 1511 Fal(i r't,R„ ATTgCHhSEN'I AIL Pap 301+f Offeiins arrm lalm-red tG mlPrrllry ALL irbcnrilr�utors�str�a li rs, re.pardlf s".tnf mAILlij; I,e,. Nlli%oriry and �JBE lrrrrok ana to to IW5d JiF-fl, 1se-A8s!6Ikkrariil Nhirrtn,I 115-,res3a1-� Plort.SD nnre that urdy cRrWrad MBee -voll 69 raunhM W-movT irrt MAE gcrW S U RC ONTRA C TORISUNRLIER cl Ccrnl}any MaIII v T M w " 01 taH Detail Address - r B k3 Subcontracting Supplies Teliaphone)Fax a F m Work Purohanecl be]far Aniaur�# Email r LI Cantam parnorr E ❑�n uo mm r ��T FORT 1 ORTH �►rtAr�1-'IMENT SA FS�pa •} of 4 Total Dblli�r-Ajncvnr of'I SE' SLibr- ntroctorst uppliers •1' atal Dollar Amouni .oi Non -MBA �uf�c:�na�aC1.4r5{ iappllt3r� + TOTAL, DOLLAR AMOUNT OF ALL. SUSCONTRACTORSISUPPUIERS The Offeresr will not make additions, deletions, or substitutions to this r-ettified list withoult the prior approval of the. Office of Business Diversity through the submittal of a Request tvir Approval of ChangeiAddidan fora;. Any unjustified charge or deletion stall be a materiat breach of Contraot and m--y result in dubarlTtertt in accord with ihe. procedures outlined in the ordinance_ The Offemr shall submit a detailed eyplanation of hot-+ the requested changer<acicition or deiei;on Mill affect tkxe oorrrritted NEesE foal_ ff the tivtait cF,iana4ion is hot submitted. it will affect the tirr,al compkance determination By affixing a slgriawre to this fwn-i. 111E CXfeFnF i'Wher agre- s to prraWe, directly fo the City upiWn I'el:iuest, complirte grid aoc,ur'at 1nf0r111�3titjrl regardIng a(:tlalt#I wnrlc performed by all subcon1factors, riicli,lding MBE(s) pnd an.y sµeoJal a rarlcgcrnents with F+1,BGs The Offerrar aJs.0 agrees to ail6w an audit alyd/o.r exarnlnation of any hooks, ret prda and f'Iles held by their cornparty The Dffcror 301­rea to allow the trap finis-slort of Interviews with pmers, pr�ncipa:s, offir rr% crnployees and applicabJ$ sarbuc--niractuF,51$LapplJer4 partirFipating an the carttract that i11 suWan tiafe the 'La otUaI work performed by tha MSE(t�} on Ihr� contract• by 8n authorizL rd oil ic rw or ernp10yea ut the .City-. Tiny Irrientlonai andtor 0 0wirrg rnisr apresenWfori of Facts wiII be grounds for t8rrrlfrlav[ng Ij'te co11trw fir dobarn�enf front City wvr> foa' A period of riot less Viati three (a Vrr ai's and fet Irllkktir1U'ai~ki0J1 under Federal, State of Loral laws corrceming falt,e stMemerrls. Any failure to corTiply v4111 I.hr�; ari;iinance creates n materlal breach at the cunfmci and may result ii-i a determination of an Irri,sponslble Gfferor and debarmaht from parlfcipatlrlg In Qy work ror a period of #Imo not less than one (1) year Ai Pih4ri7ed Slanmura Pei nttid SignUt+irn 7iflff L.QMPM19 MOMS Acld rf Bfl el�y�ar�t��t� Qrflce [if 81J15111e5$ 01Qersttyt E-mail; +�swLrffr�rrlwwiarl�4x��s.�,t,u Ptiarrie: (817) ai)2.2674 HIAV UTWIV �I P FORTWORTH City of Fort Worth Minarityr Business Enterprise Specifications Prime Contractor Waiver Form { Fr-rtR R Cb?.7pANY NAMP, VVater anc.1 S aniIary 8 eYrer ReplaceirvenI Cantrec[ 2016 VVSM-F. Pert 2 Cdy'aMBE PmjuctGull; FProtoerCOrTMUrpion1: 14 % "Ia ATITACH10ENT iR PROP 1 OF 1 Sin DATA R.-hruary 27, 2020 027'27 If both rfr,s:v rs.to thlrs form are YES, cLrj1oj ci aimplete A"I'7 ACJ-14 ENT IC (Go. faith Effort Form), All'.gv0stionfs on this form miji�t he comoloted slid a dt6aued wplanation provldod, .IF applicable It the answjr to ekhor quewior� is NO, Ihan yotl moat comp It-1a ATTACFift+ FN T 1 C. ThIs fQM-i is on IV eppli,010 If b.Qtti answeFs are yals. Failtire to romplete this Form in its entir(Ay acid b4? r#foeived by the PurchasIfiq pivIsiorr no later than 2',00 p-m_, ark. the second _CRY _business daY..after bid olpenin.g, exclusive of the bid opening rate, will result in the hid being considered non-respon-5ilve to bid Fperifiratiorls_ Will YOU perfnrrrt this entire c011traet withOUt s.ubcontracto.rs? YES IIf M, pi a provide a daGailed nxplanatinn rhal pravas IaaBed o1i hhe sFze and sFnpe. of Ihis NO pro eel. Iitls is { our normal buslrle�q pi'.�Oiep- anti provide an opera] lanal roMp of our business. Will you perform this entire contract without supp]lers7 YES I f yel, pie gig provida a delailed. 6xplanot ion that proves b-gsad on the site and scope of this prolecrt, II'lis is youf- norinal husine>" prarbroe and provide $:I Inventory profile cf your bCIsrnes5, NO The Offeror further agree to provide, directly !o the City upon request, complt-te and aczurate inforrnailnn rtgiiWing actual work performed by all siabcoritreckors, Including MSE(si oil INS the payment theraslf and any proposad changes to the arigirial M@E='s) arranprnffnls:submttt$d wltb thin txid, Tho Q[farot Wr�o agrees Fa a4low an audli aridloi exarrilrlrfk[on of awry Lji oka. records and tiles ]serf by tileIr conipany that will subs tail tlatathe actual work performed by the IVIBEs on this tantraifk, by an auftritatl dffirw or ornpKiyee or ilia City Any intenHonal andfor knowing nilarepresentotion of Facts uvill be grounds Far-terrnknafliig the contract or debarrnenl from City worX foi, a period of not less tharl three, (3) years and for mlllating action Qiider f=edeml. State or I-ccal laws conc�mTrJnrg false statomenta, Any fakro to cvfnply wFth this ordinance creates a malarial breech 0 f,;orilraCt and iver rasull w a dr;Pfaiinatiorr of an Irresponsible Offeror and hPrre.-J fr*rn parkigi EiI:Ing in City work for a period Qf time not loss than onq 11 ye af, rAloIwrxwr! t �Iimi,rr4 Tula Company 14wv Addrev,% -C lwstate�7;p urfl+.:eo i�t rKpOkox Dlviaralb FF>'IAit; 131tiGbmailicE(fnr�x+,u��inaxma,�oi+ Phriale: {Hi!] M2-2b-?4 pnntud 5411sdlOrik C onleci Na". jrr &Nmif} Puna Nklmbes F&x Rumb$F Erriml Adfirasrs Date Raw. &I fioqs F'O RT WO RT° iHr City of Fort Worth Minority Business Enterprise MBE Good Faith Effort Form ATTACH N1ENT I C Page i of 4 app!]ce#fe bfpm W derurlbo — QFfIFror'F. CertFfilfatf411 I-RUJL{ "r NAME, � J--I 11....J Wstor and San I t ary- Sewof Rap Iace menI GonIrocl 20.16 VVSM. -F. Part 21 sla c��� Fel�ruQry �.7, 2CI20 Clty's MBE Pr4jnpt CoW; I affuroYa IIIASE r'mJUVt cammltmnra. OJECT NUI`dJafrR 02727 If the Offeror did not ineat or exceed the hirer= subcontracting �jac�l for tf�:3 project, ti:a Gitea'oF Riust compieta this farm. If the Offeror's method of complizince with the MBE goal is based upop deinofislration of a `"good faith effort", the Offeror will have the burden of correctly ailed accurately preparing and sublinitting the doctimentation required by the City.. Compliance with each Item. I thru Vl below, shall satisfy. Ilie Good Faith Effort requirement ab8efit proof of freuld, Intifrtitlonal andfor }snowing misrepresentation of the facts or Intenfivrial diiscrimInation by the Offeror. Failare to u0mriplete this form. Ifl firs entirety with supporting documentation, and received by the Purchasing DivisPon ra later than 2,00 p.m, on the second City business day alter bid opening, okclusivcq of bid opening date, wifi result in the bid being considered Alan -responsive to bid specifications. t.) Please list each and every subcontracting andfor supplier opportunity for the completlon of this project, rogordless of wFietlior 11 is to be pfovided by R WIRE or iron -MBE. (OE} NOTLI T NAMES OF FIRS) On all projects, tho Offeror must list each subcontracting and nr suppfior opportunity regardigss of tier, ruse saaort onar sneers, rr necessnir List of Subcantracting Oppndunities I List of Supplier opportunities RAV. 5+15r1$ A tTACHM ENT f C Page 2 of 4 2.) 0I3tahi a current knot more than two (21 months old from the bid opera clatel llsl of MBE, subcontralAors ancl(or sul)lAiUS fenPu (he Qty's Off!ne of 13usirtess Diversity. DAlc.of Lifting .j Dirl yotl s6J3clt bids from M13E firths, within the iiubco h t rac ling anr#Ipr tAipp Her areas pro +r oUsly listed, 'at least ten calenclar days briar to bid opening by rna€I, exclusive of the day the bids are operted7 _I! Yes {It y4�x, all 11Ch J1d1 1Full 1 IJatirl$ to Inoutit) nnr11q ni farm nad nxidrwsi nnrl n g!ati gopy of larrctr rnRFCRiI.� J No :I,} old you solicit wds Imm MDe Firms. vulthin Ilia subtonlractirlg UIidlar supplier areas prov[OLlsly Jist"'r aL least tell callaridar days prior to bid opening by tolephone, exclusJve of (lie clay the bids are-opefied ? —IY05 yap, nt6pnl, Ilat 4c] liLclprW n a nl N19r-- titan, rp rson curstMcloti. Jshpilu tiLip Iij4 imnd d2j�u and ilk of �rirrrunk.} No 5.j D3 d you solicit bids from MBE firms, within the subcontracting andlor supplier areas previously listed. at Joist ten calendar days prlof to bid ope11in9 by facsimile (fax), e1CCI4Fsitre of the day the bids aro opr_ried7 YES (JI "R, a1MclI Ilst tO J11I'lIJdO Home eI ld1� r= IJJM, fml numbat exld clate nrid IIme of r.01ARrt_ JIB Oil dltlorl, If tltie folk I5 Fik"FljFld 09 ualriallv+?.rahie, irlari thdit "ilnflalCVerRbra GPn1ir. ali,, ,r, reCalYLld {FLIJUt bU f3rjnteli 014-EPtly 14-UM r#1e taludJanllrr Inr ijri)pLo ol0i=irollr,;li,JIoil. F741Lllr{ 1(j 61Llarrill can#[fmarign .9FuN jr " iiii doll wmalfle aoolIrnn0on" No domimentallgn array rersder V1e 0Flm 11Ori•a'eaporl91%re,l S.) Did you solicit bids frain MB E firms, within the subcontrac#ing anWor supplier areas prev iotrely listed. at least ton calendar Mays prior to tild opurl Ing by errrtlii, exctusive of the day the bids are opened? 7UL#rh anlall corlrlr,r,aallan ra �rla[L+de aoaa�rL� of N1 1 ICrm, lJ tr3 +ld t n�, In ectdltl n, It art rraall I rpturrlL d Yes JO yes, irk Lill lilrlaw(fMi,lla, Ihe#1 I404 "11;1 Qllvar ra[e tt!!7r:Sq@" MCM;3o. must be l awi;ll difagtly Imm the em;r1I zV9ti rr fa>' proper do&.umentellan. Pallure 10 RuhniII can Piti sFE11on andlor "urrtrellvurat,la rrtensilue, dnrumbntatban roL1y rerorCar the OrrE nip fF•respoo7 :luo,) �._ No NOTE_ The four ineihod, ir#entified above are acceptabie for solicitcrig bids, and each selected method must be appiied to the applicable canuact. The Offeror roust document that sither at least two aldeiripts were made using two of the four methods or that at least one successful ConlaCt was inade using one of the four inethods in order to deenied responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire PASE list specific to each subcontracting) and supplier f oppor tunit r to be in compliance with questions 3 thru 6. 7.) Did you provide pietas and specilicattons to potential MGEs7 fj Yes 17 No S.� Did you provide the Jnformatlen regarding the tocaticn of plans and spec [tic ations in order 0 assist the MBEs? Rev. MV11i ATTACHMENT IC Page 3 of Al 9.) Oid you prepare a quota ticn for thy± MBEs to bid on 90%151sery le vs sper IFIr io t.halr skIII sut7 1 YC5 (if yea. atkgch on caple. s (1l gwpiinrionri.l �+ No 10,1 WrJ s the contact information on any Df UIO listin€fs riot Valid? sit yEs, a1rndI Itie IINariuRHcjr1 tliFEI wzQ r304 valid iII' prd4r for IIje:Offlae cif Hlksaiiesg Dldeksl#y to addrasr, Yee V1n careourIar7.i nanircj l—f No 11.)Submit doctimentation it MSE gLiOtes were rejected, The dorOrnonlatlon :womitted sboutd bo Itf the forms of aIn affidavit, Ilni:lode a detailed explanatlon of why the MBE was rojeeted and any supporting documentitton the Offeror wishes to he consiclerad by ilia City. in the avorll of a hoila fitly, disprrfrx concerrlinq quotes, the Oftoror will pruvfde for confIdontial 1p-gaMpro gccess to art In5Pectlon of any ralawi*1 dortrmerilalion by City liereorinol. Pit, a x#fie add)Vonaf shevfrt_ it necessary- un0 attach.) Crinivany Nafnv Told polio contact Person See Pe of Work Reasori for Rejection ADDITIONAL INFORMATION: Please prouldeAdditlonal Infortiialloii yaii real will Itirthor explain yotir 4aad and #sanest efforts to obtain MBE Participation on this project. The Offoror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performad on this contract, the payment thereof and ally proposed changes to the original arran ennents submitted with Uli i ld. The Offeror also agrees to allow an audit andrtor examination of any books, records anti files hold by their company that will substantiate the actual work performed oil this CQIltraGtr by art authorized officer or employee of the City. Any Intentional andlor knowing misrepresentation of facts will be grOLInds for terminating the contract or debarment from City work for a period of not less than three (3) years find for initiating action under Federal, State or Local laws ooncerning false statements. Any failure to comply with this ordinance shall create a material breach of contract and may result In a determination of an irresponsible Offeror and debarment from paOlclpating in City work for a period of time not less than one (9) year. rinv_ 511fill J ATTACHMENT7C Paqe 4/4 The under 19ned coRirlosthat theinform at|Dn provided and the M BE(s�listed was/were contacted i n good faith. R R understood ta|any MBE(s)HstedIn Attachment 1C will be contacted and the reasons for not using them will he verified by the Cif % Office of Business Diversity. m parizud Sigf3atUre TmB Comps Y Nam Address C!| SWOOP Om « Rmmness DI + R Emq�mw�m�|�2�D «oR\pp&�v Phon« /12]92-20 m(g kuru COMM N mu and Title §|dff�e,0 PhpnQNumh@r Fax Number Email Address Date ma Jr%h[ VnnflIrF1 PB01 Df:J FORTWORTH —W— CITY Cyr FORT WO RT.f1 MB.E J4)int Nrenture I'IigRb ity Form rfff ilff , lr+aT�s +r�arr�.f,rr rrr�xlliervel' �rsG� "J1rrrJ"rJrrrr rrpplf[�rf,frr .Na-nMe oV C.il}T ,.."V ial9r ann Son 11ary Sewsr -RftP14 com ar i I Co>31r. 0 A I H•VVSM-€, Pat A j(in1 y 7dvir fUTnl'rinvii a,r euTn,vFr.'rcl mi Krrt prgm J-tWRid(h eot Numb.vr _g3,z:7 I..raf f VVIIFUJ•e 123- ceDI-111 iFIR! .1rtJd7t �'eI�C1sl'� 1�1fE1]:r_ ,NaaGrtil 11*n�k.u'c rla�fll'�'ss: `1'1~keltkauiac, r�r��s�larailc' J=-n��ikl c'�kl{slur; Identify Iht 61,ros IIiW comprise Ell joJnt wntw-E: Flogs afedich lfzidi i�wral erjlk0i?.ls fofFj?hbd f6pmviUa► ojzjk d n. !l _: iOielra of ,wjeli fo Ay coda &.-31 cjrrrpo' Ag uil6 ni�rf t�rrfilr:; N113E Arm Fu+�fr: Nr«n-AI10- Ihm nil M. : Es, - -. i--':,� J. ddrd46: 6IL},,�Inlf,zip: 9MBi1M i rka"; .City,SWYI Zip: Sal.rphsnt j�•411haR �a'aelSflMm r-Ifilllf l Uf�tdru. 1 ILehhbile C'{�rllRr�ftf�r» �infiiv; — rl -Wp 116 'Yams or CcxciryiRg Agrnkrr Z. Neoeg elf war k Wrl`Orr 1VLI 1�y Ihe-1(11riI Yen ture: Do-wriba tho maj)Q or worlc or iim 119 un I Des l ibc Iho 8caae a wQrlc eel• Itke umi-MDC: I� JOIrtt U61rllrli9P Fs.je 2 ar 9 3. Wlmf is the percrnI1igc of 1TBE pil3.1ltil1111#un w11 tlllu.14A111 vrl1ttxs'V IIk111 YOli wkil bI 11e coil Ptted I(ma rd sneel Ing Ihv p1'rlavcI go211? 4. AIIII411 it crtpy P r I h 0 j91nt vent0-1'e agreement. 5. L€1tt corn;,(,rkar,ts-or mi, 6evdflP of 1111nt V4L11WIFE: (I-r, rlri•1 C! nyrfele. ii'dii3 irtforuurfirxr i.r.4F�Kn�)"RFr. liFF jOr rrt W. PJYD01.0PEOMilde) Pro F11 Li [id E )SS sIIIIH71v: {'hP11Ltl LiLlkitl'iG1�t�+latti, 111c:Iilk it* liquipilwilt; Oilwr Hl+pii� 1�lsla uxwkkrrSkkij� 1�1t r�' iw. fir. 1du11tify by 1111rnr, rucr, srs itild firth rhFi.sv in(Iividitnb I,wii11 tiH: -,) ►vlklr ;ire resIPon d I k I e Im- the day-1L)-duy manngomen I Anrl duvKion ma ItIng +7f t11e jrlint VenNrr: 'Filin11o1r1i deTixialls f 1h 1116,113110 AFCi mill PgFil l I, n1s.I %n.. Brill iv MHrllge�111 ml.d4uESi#r.119 a;s#irnrlin c. NfrinM MW f1r1vR of rluiimgo aiNrl peraoallc€ ..,.drPurc}1oOngoFmnjorc ulilriient i� kfcUo r�u}1p.1 ie.� El opL vadwiti Tho cit 's off ic._of Misinel, s ri iversity will rev le w Ypur Joint venture slib tissiort and will have fmaI apprQvaI of the MBE parntag>W applled toward the goal for th& project listed on this form. NOTE: From and after the date & pr enl awsird, if any of iha WOOS r?l9r the irrdI+ridUelIV derined-scopos or 4+1Cirk ear the dollar arnourkte"rcentagos change Frum the orlglrtally approved Irif canon, then the participants must Irkforni the City's Qf e of Business D1vi°fslty trnimadiately for appmvd. Any unjustified -change or delellon shall be a ma€arlal brrea i of conk- el and m8y rust4h in OeNifmuol in accord with ffie p=9dures out€Irked in the C�liy`s lei}. Ordirlr;nce. R;IVL fiti rl' ID Jolr1VirHUIc' Pia 3 br 3 A,FF11DA Y I'4 Thr, 1.1rrt vriiipi0 rrf tuns t11111 r1-lt fa3ragoirig sWtemcwry ITQC-alld �sirractall d inL�lnti1� all rrl:Jt Mnl iPfOFT11lit in,I note :ry t-L) idenIiFy r id--txpfiAiit.the terms rind rxparatlorl oI'ihu.j*iw veottrre. TurthE:rnrure. I.Ite iimiYrEdpnted sh1r11 80.kae to E'1.1m,lL: to I110 joint venr.11:'L! I1w Sl'tWA Scope 0r work. dlu-jiaic►n-naAq'I re?,jxamibiIitius mW pte}+muti1 lici'On. t}IL�.cs rtsstl�'vcs lIIQ J.[ frl ill I 4}til'.hj arty JjC[dj(IC$1Jli Irt1a1ILI13rtjit)11 &jc aiud tiv rOklt;Wi-rrlihu Jftlit! juirll veraI,Iru i?'; ciif;]bFo. Fal1l,rr Lo ll ,QOF)MAIr BI'L 01' 111'9>vldo reqlwm 0d 111V41-ina l IolI will IiIr ,lie I Iiui '�Jp u 0 1 FsLd i.w grouI"Ir.1 Jor [u1,1lliIwlI sit t1'1'thL!-~lo. 111i1ITY f,l 1 Ile trlIdiCN P-1I!d 51�;1'�µ tr.l fi1r<1 lIIII aSIdtli, hiv!rv.{qW+ uwiLb pgv'rtt~rs t�lizl cx:ItlIil7ufiQlk irf IhV Inc pk-,, r&r TAT i1t1d fiat, ni The j+7inj YentUM ITV any alrthoi-17ed rp^ c,eezurlyat . rat' the City of F.pil 1' ortli. I7ni1'ure to cnnnpl) -%yith tE:is proYision shrll I Y45LIJt Ill Tke. tenn't lull i on of nily c011ti'Eict. which iu Ly h-e rdted wider the pmv-15E0rts of this �o[m +arlturt:'s rliLil?i.l.ity and in ay inrIIate acriicni under rrderiLl, S LB I,-- undlor LocaI trLwgYardirinaces c0nuerning fidse 5taster11arlIS 0L Willtul rnit;sUl>rLasertti.ttJclri Of 1'itOBL. Nil wo ar NPI.L F;II — - t+lil n'4' {I trorltih7flE : u, 11 llnrilcd No ie nr(}'ATKf 1;w1 la, W, fA mUr Mriw,l Ndihw. rifOiwprr �1g11Itl 111 p o r Q%1101 Px4: stkite of OTT 11fir. Nnrrtrization �. County of diil� of , ?0 , before me appeaucd Mid to me p.�eytrrit4l�y.icnc�w�� and who, being duly myorn, did cNeckite the foregoing affidavit and dial Watc that they were properly. auI:rMorkzccf to exeeutc 1111s a 111idiiviI and slid so 138 rheir free ul ind daed. Notary Public t'I lilt IWnm Not -airy Public ftlifil le (.'wnmi9Ni{}te Expi.rew. (SWIP 0111ce; of Bi.isinen Divcmdty. F:ittn�L• r><i�v�.1�'�al�icc.#'tsrtwvnt•�i'rlai�tas.�cs� Phone, (8171392-2674 Ruv.511I)MI "C®6.07 Wage Rates 2013 Prevailing wage Dates (Heavy & Highway Construction projects) CITY OF FORT WORTIi WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S REPLACEMENT CONTRACT 2016 WSM-P, PART 2 Revised July 1, 2011 City Project No. 02727 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and industrial Construction in Texas. Page 1 of 1 GC-6o09 Permits and Utilities THIS PAGE LEFT INTENTIONALLY B LAN, K CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 2011 City Project No. 02727 GC-f e24 Nondiscrimination THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2016 WSM-F, PART 2 City Project No. 02727 GR-01 60 ®® Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS REPLACEMENT CONTRACT 2016 WSM-F, PART 2 Revised July 1, 201 1 City Project No. 02727