HomeMy WebLinkAboutContract 38950-A4CITY SECRETARY
CONTRACTNO* mil
�`�
Amendment No. 4
STATE OF TEXAS § CITY SECRETARY NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering
Corporation (Engineer) made and entered into City Secretary Contract No.
38950 (the Contract) which was authorized by the City Council by M&C C-
23658 on the 13th of August, 2009; and which was subsequently amended by
Amendment #1, administratively authorized on the 12th of May, 20110 and as
amended by Amendment #2 administratively authorized on the 23rd of
September, 2011 and as amended by Amendment #3 administratively
authorized on the 20th of February, 2012 and
WHEREAS, the Contract involves engineering services for the following
project:
2008 Capital Improvements Program Arterial Street Project —
Ray White Road
Project No. 01294
WHEREAS, it has become necessary to execute Amendment No. 4 to
said Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly -authorized representatives, enter into the following agreement which
amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering
services specified in a proposal letter dated NovemberZT; 2012, a copy of
which is attached hereto and incorporated herein. The cost to City for the
additional services to be performed by Engineer total $8,100.00.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all work
and services shall not exceed the sum of $269,467.00.
3.
g:\1210\4463-01\admin\agreement\sa #4\1i-27-2012.cover.amendment 4.doc
Contract Amendment No. 4
Page 1 of 2
OFFIC L RECORD
�C11`Y ��CRETARY
FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Executed on this the �''� day of 1 �b �"`-�` r 2013, in Fort
Worth, Tarrant County, Texas.
ATT
-�-� �f:C �C-�
�Mar�r J. Kayser
City Secretary
APPROVAL RECOMMENDED:
��
Douglas,(�V. Wiersig, P.E.\/
Director 1�
Transportation and Public Works
Dannenbaum Engineering Corporation
ENGINEER
B � 4 � trlcuhe� /'.
Y
Mark C. Lorance, P.E.
North Texas Regional Manager
6421 Camp Bowie Blvd., Suite 400
Fort Worth, Texas 76116
APPROVED AS TO FORM AND LEGALITY:
Assistant City Attorney
APPROVED:
L�r/i..-�
Fernando Costa
Assistant City Manager
g:\1210\4463-01\admin\agreement\sa #4\ii-27-2012.cover.amendment 4.doc
Contract Amendment No. q
E�erj�'�7pf���(��(��L��1'�R�T
lf'�o 4717�11\� �i rlin ��1ri, 4
Page 2 of 2
DANNENBAUM ENGINEERING CORPORATION
6421 CAMP BOWIE BOULEVARD, SUITE 400 FORT WORTH, TEXAS 76116 (811) 1 wwou83
November 27, 2012
Ms. Wilma J. Smith, P.E.
TPW Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 761024311
ItE; Supplemental Agreement No. 4
Ray White Road Paving Improvements
City Project Nos. 01294
Dear Ms. Smith:
We have prepared and are submitting for your review the attachments to Supplemental
Agreement No. 4 to modify the construction plans to convert the single left bound turn lane into a
double turn lane on the south bound approach of Ray White at North Tarrant Parkway. This work
will generally consist of modifying Sheets 12 and 13 of 50, to show the new geometry in plan
view, sheets 20 and 21, to modify the striping, and sheet 27 to modify the luminaires and
corresponding conduit. Traffic signal modification shall also be incorporated and base cad
drawings shall be updated in accordance with an email between Bryan Sherrieb, Wilma Smith,
and Homero Beltran dated Monday, November 19'h, 2012. It does not appear that the traffic
control plan will need to be changed as phasing will not have to change.
If you are in agreement with the attachments for Supplemental Agreement No. 4, our authorized
compensation will increase by.58,100.00. The $216,731.00 original contract amount along with
the amount of $19,676.00 Supplemental Agreement No. 1, and the amount of $21,910.00
Supplemental Agreement No. 2, and the amount of $3,050.00 Supplemental No. 3 all previously
authorized will be increased to $269,467.00. Please do not hesitate to call if you have any
questions or require any additional information.
In this agreement, no principal time is being used in this amendment.
Sincerely,
G
Bryan E. Sherrieb, P.E.
Project Manager
cc: Mark C. Lorance, P.E.
File 4463-OI
G:U 21!)14463-C7IIAdmintAgrecmcntLSA #4tLetter Smiih 11-27-2012.dec