HomeMy WebLinkAboutContract 38950-A3Amendment No. 3
STATE OF TEXAS � CITY SECRETARY NO
(No M&C Needed)
COUNTY OF TARRANT §
?�gT� o - A3
WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering
Corporation (Engineer) made and entered into City Secretary Contract No.
38950 (the Contract) which was authorized by the City Council by M&C C-
23658 on the 13th of August, 2009; as amended by Amendment #1 on the
12th of May, 2011; as amended by Amendment #2 on the 23rd of September,
2011 and
WHEREAS, the Contract involves engineering services for the following
project:
2008 Capital Improvements Program Arterial Street Project —
Ray White Road
Project No. 01294
WHEREAS, it has become necessary to execute Amendment No. 3 to
said Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly -authorized representatives, enter into the following agreement which
amends the Contract:
Article I of the Contract is amended to include the additional engineering
services specified in a proposal letter dated December 14, 2011, a copy of
which is attached hereto and incorporated herein. The cost to City for the
additional services to be performed by Engineer total $3,050.00,
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all work
and services shall not exceed the sum of $261,367,00,
3.
All other provisions of the Contract,
herein, shall remain in full force and effect.
which are not expressly amended
FT. WOR�'H, TX
g:\1210\4463-01\admin\agreement\sa #3\4463-01.cover.amendment 2.doc
Contract Amendment No. 2
Pae 1 of 2
g
Executed on this the �r� �'`"
Worth, Tarrant County, Texas.
ATTEST:
APPROVAL RECOMMENDED:
day of - e.b��-c , 201Z, in Fort
,op'4�1�1t1�1
'a+�0�°��A����?�
�AO Q u���
�o �Yd
Douglas �/. Wiersig, P.E.
Director
Transportation and Public Works
Dannenbaum Engineering Corporation
ENGINEER
Mark C. Lorance, P.E.
North Texas Regional Manager
6421 Camp Bowie Blvd., Suite 400
Fort Worth, Texas 76116
AS TO FORM AND LEGALITY:
Doug Black
Assistant City
Attorney
APPROVED:
Fernando Costa
Assistant City Manager
OFFICIAL, RECQRD
CITY SECRETARY
FT. WORTH, TX
g:\1210\4463-OS\admin\agreement\sa #3\4463-Oi.cover.amendment 3.doc
Contract Amendment No. 2
Page2of2
DANNENBAUM ENGINEERING CORPORATION
6421 CAMP BOWIE BOULEVARD, SUITE 400 FORT WORTH, TEXAS 76116 (811) 763-8883
January 10, 2d11
Ms. Wilma J. Smith, P.E.
TPW Department
City of Fort Worth
1000 Throekmorton Street
Fort Worth, Texas 76102-6311
RE: Supplemental Agreement No. 3
Ray White Road Paving Improvements
City Project Nos. 01294
Dear Ms. Smith:
We have prepared and are submitting for your review the attachments to Supplemental
Agreement No. 3 to stake the proposed right-of-way one time at the corners and at 200' intervals
to assist the franchised utility companies in relocating their facilities. I have included some of my
time to provide files and assistance to ANA Consultants, LLC.
if you are in agreement with the attachments for Supplemental Agreement No. 3, our authorized
compensation will increase by $3,050.00. The $216,731.00 original contract amount along with
the amount of $19,676.00 Supplemental Agreement No. 1, and the amount of $21,910.00
Supplemental Agreement No. 2, all previously authorized will be increased to $261,367.00.
Please do not hesitate to call if you have any questions or require any additional information.
In this agreement, no principal time is being used in this amendment. The prices provided
herein consist of the following:
Item Description Price
Bryan Sherrieb -Coordination 4 Hours at $137.50 per hour $550.00
Right of Way Staking by ANA Consultants $2,500 $2,500.00
Sincerely,
ryan E. Sherrieb, P.E.
Project Manager
cc: Mark C. Lorance, P.E.
File 4463-Q1
G\1210\4463-01\Admin�Agreement�SA #3\Letter Smith 12-14-201 l.doc
ATTACHMENT "B"
COMPENSATION AND SCHEDULE
RAY WHITE ROAD
PAVING IMPROVEMENTS
SUPPLEMENTAL AGREEMENT NO.3
CITY PROJECT NO.01294
I. Compensation:
A. The Engineer shall be compensated a total lump sum fee of $3,050.00 as
summarized in Exhibit "B-3B". Payment of the total lump sum fee shall
be considered full compensation for the services described in Exhibit "A-
1" and Exhibit "A-2" for all labor materials, supplies and equipment
necessary to complete the project.
B. The Engineer shall be paid monthly as described in Exhibit "B-1",
Section 1 — Method of Payment.
Each Invoice is to be verified as to its accuracy and compliance with the
terms of this contract by an officer of the Engineer.
II. Schedule:
A. Phases 1 and 2 shall be completed 180 days after the "Notice to Proceed"
letter is issued.
The Scope of Services is outlined in Attachment "A", Exhibit "A-1" and
Exhibit
g:\1210\4463-01\admin\agreement\sa #3\4463-01 attach b 12-14-201 l.doc
EXHIBIT "B-1"
(SUPPLEMENTAL TO ATTACHMENT B)
METHOD OF PAYMENT
RAY WHITE ROAD
PAVING IMPROVEMENTS
SUPPLEMENTAL NO, 3
CITY PROJECT NO.01294
I. Method of Payment
Partial payment shall be made to the Engineer monthly upon City's approval of an
invoice from the Engineer outlining the estimated current percent complete of the
total project.
The aggregate of such monthly partial fee payments shall not exceed the
following.
Until satisfactory completion of Exhibits "A-1" and "A-2", Conceptual
Engineering plan submittal and approval by the City, a sum not to exceed 30
percent of the total lump sum fee.
Until satisfactory completion of Exhibits "A-1" and "A-2", Preliminary
Construction Plan submittal to City, a sum not to exceed 60 percent of the total
lump sum fee, less previous payments.
Until satisfactory completion of Exhibits 44A-1" and 44A-255, Final Construction
plan submittal and approval by the city, a sum not to exceed 90 percent of the
total lump sum fee, less previous payments.
IL Progress Reports
A. The Engineer shall submit to the designated representative of Director of
Department of Engineering monthly progress reports covering all phases
of design by the 15t1i of every month in the format required by the City.
B. If the Engineer determines in the course of making design drawings and
specifications that the construction cost estimate of $ 1,591,010.00 will be
exceeded, whether by change in the scope of the project, increased costs or
other conditions, the Engineer shall immediately report such fact to the
City's Director of the Department of Engineering and, if so instructed by
Director of the Engineering Department, shall suspend all work hereunder,
g:\1210\4463-01\admin\agreement\sa#3\4463-01 exhibitb-1 12-14-2011.doc
EXHIBIT B-2
(SUPPLEMENT TO ATTACHMENT B)
HOURLY RATE SCHEDULE
RAY WHITE ROAD
PAVING IMPROVEMENTS
SUPPLEMENTAL NO.3
CITY PROJECT NO, 01294
Employee Classification Rate/Hour
Principal $350.00
Project Manager/Planner $190.00
Senior Engineer/QA-QC $190.00
RPLS $120.00
Project Engineer $130.00
Design Tech. $95.00
CADD Tech. $ 75.00
Clerical $ 65.00
2-Man Survey Crew $100.00
3-Man Survey Crew $120.00
4-Man Survey Crew $150.00
Reimbursables Cost + 10%
Mileage $0.55 Per Mile
Reproduction la�ork ll�ill be at cua•rei�t cont»ierciad rates. Sa�Ucontractors will Ue paid for at actual
invoice cost plus te�z percent (10%).
g:\1210\4463-01\admin\agreement\sa #3\�163-02 exhibit b-2 12-14-2011.doc
EXHIBIT "15-3A"
SUMMARY OF TOTAL PROJECT FEES
RAY WHITE ROAD
PAVING IMPROVEMENTS
SUPPLEMENTAL NO. 3
CITY PROJECT NO.01294
Exhibit Exhibit Scope of Services Total Fee M/WBE %
A-1 Design Pavement Improvements $ 3,050.00 $ 2,500.00 82.0
A-2 Sanitary Sewer Design $ 0.00 $ 0.00 0.0
A-2 Water Design $ 0.00 $ 0.00 0.0
TOTAL $ 3,050.00 $ 2,500.00 82.0
CITY M/WBE GOAL = 22%
% of
Proposed M/WBE Sub -Consultants Services Fees Total Fee
ANA Consultants
Right -of -Way Staking $ 2,500.00 82.0
TOTAL $ 3,050.00 100.0
Proposed Non-M/WBE Sub -Consultants
None