WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group,
Inc, (ENGINEER) made and entered into City Secretary Contract No. 39313,
(the CONTRACT) which was authorized by M&C C-23768 on the 8th day of
September, 2009 in the amount of $ 229,317.19; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $10,568.68 which was administratively authorized on
December 27, 2010, Amendment Number 2 in the amount of $10,500.00 which
was administratively authorized on January 1, 2012, Amendment Number 3 in
the amount of $31,719.65 which was administratively authorized on
February 27, 2013; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Design and Fi11 near Lincoln Road (CPN 1399); and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an decreased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to remove engineering services
specified in a proposal dated 20 March 2014, a copy of which is attached
hereto and incorporated herein. The cost to City for the removal of said
services to be performed by Engineer totals-$5000.00.
2.
Article II of the CONTRACT is amended to provide for an decrease in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $277,105.52.
3.
All other provisions of the Contract, which are not expressly
City of Fort Worth
Professional Services AgreementAmendment Template
PMO Official Release 8/1/2012
Page 1 of 3
OFFICIAL RECORD
CIYY SECRETARY
f Tit WORTHl TX
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by Cl signatory,
below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE:
APPROVAL RECOMMENDED:
Bi11 Welstead
Director, Aviation Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
o°
0
_/*ftod
P
Mary J. Kayser 00
'City Secretary �000OO00000d
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Re]ease 8/1/2012
Page 2 of 3
ENGINEER
Ja cobs E
ing Group Inc.
Scott Busse3l
Operations Manager
Date:
777 Main Street
Fort Worth, TX 76102 U.S.A.
1.817.735-6000 Fax:1.817.735-6148
March 20, 2014
Ms. Ruseena Johnson
AVIATION DEPARTMENT .
Fort Worth Meacham International Airport
City of Fort Worth
4201 North Main Street, Suite 200
Fort Worth, Texas 76106-2749
Re: Proposal for 24" water Mains
Grading and Storm Drainage Improvements
City Contract No.: 1399-2
Airfield Improvements, Meacham International Airport
Dear Ruseena:
Per your request, enclosed is the Attachment "A" reduction in scope and fees for the subject
project:
SCOPE: The scope has been reduced to remove all construction phase services including the
easement survey which was to be conducted after construction of the project (Task 4 & 5). The
work to be performed by the ENGINEER in updating this project back to the 90% design
completion as they were prior to the project delay, then completing this project with additional
direction. The complete design will include completion of the grading and drainage project, the
lowering of the existing 24" water main and complete the tree removal required for this project.
Under this scope, "ENGINEER" is expanded to include any sub -consultant, including surveyor,
employed or contracted by the ENGINEER.
Task 4&5. Prepare 90% Submittal and Final Construction Documents
Task 4&5 ($5,000 reduction)
Thank for your consideration.
�� ���
e ery L. Peterman, P.E.
Project Manager
Jacobs Engineering Group Inc.
$-5,000.00
Jacobs Engineering Group lnc.
FUNDING BREAKDOWN SHEET
City Secretary No.
Department
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release S/1/2012
Page 3 of 3
Amendment No.
Fund -Account -Center
Total:
Amount