Loading...
HomeMy WebLinkAboutContract 39313-A1AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. �1 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City} and Jacobs Engineering Group, Inc. (Engineer) made and entered into City Secretary Contract No. 39313, (the Contract) which was authorized by the City Council by M&C C-23768 on the 15th day of October 2009, and WHEREAS, the Contract involves engineering services for the following project: Design, Fill and Regrade of Noise Properties, Project No. 1399 WHEREAS, it has become necessary to execute Amendment No. 1 to said contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 5, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10,568,68, 2. Article TI of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City of all work and services shall not exceed the sum of $2391905.80. OFFICIAL RECORD CITY SECRETARY T. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this Worth, Tarrant County, APPROVAL RECOMMENDED: > day of Texas. Kenneth L. Penney, Jr., A,A.E. Airport Systems Director Assistant City Attorney C,S, 20L1 in Fort APPROVED: E400 iw� 4;"= Fernando Costa Assistant City Manager OFFICIAL RECORD CITY SECRETARY FTa WORTH, TX Prepare final construction plans including engineering, design and drafting for the relocation of approximately 1200 linear feet of 24" water line. The plans will be prepared in accordance with the City of Fort Worth criteria. This scope will include (2) coordination meetings with the City of Fort Worth Water Department. Detailed design shall be provided each of the water plan, profile, and details for the relocation of the proposed 24" waterline that is to extend from Lincoln Ave. along NW 34th St. to the existing line extending from Loving Ave. Prepare construction specifications and quantities for the 24" waterline. If we are requested to become involved with any of the following items, we will be pleased to provide them for additional fees to be determined at that time. • Construction staking or any other surveying services. • Preparation of separate instrument easement documents or vacation Instruments. • Modeling of the water system(or waterline) • Geotechnical investigations shall be provided by other's. • As -Built surveys. • Periodic Site Visits. • Construction Management or Administration (including RR's FEE PROPOSAL Project Airport: Project Manager: Consultant: HOURLY RATES RELOCATE 24" WATER MAIN Meacham International Airport Jeffery Peterman Jacobs Engineering Group Inc Project Senior Design Manaaer Enaineer Enaineer EIT SUMMARY SHEET CADD Clerical $66.61 $51.15 $40.22 $29.29 $27.94 $19.48 Consultant's G&A 1.2685 Consultant's Profit 0.15 Consultant's Multiplierj— 2.6088 LABOR HOURS BY PHASE Project Senior Design Manager Engineer Engineer EIT CADD Clerical Preliminary Design 1 0 2 0 0 2 Final Design 15 8 21 8 26 4 Bid 0.5 0 0 0 0 5 Buzz 2 0 0 1.5 8 0 Total Hours 18.5 8 23 9.5 34 11 TOTAL PAYROLL COSTS $10,458.68 TOTAL MISC. EXPENSES $110.00 SUBCONTRACT SERVICES Ramp survey Rodriquez Engineering Subcontract Markup 10.0°10 $0.00 Total Subcontract Services $0.00 TOTAL BASIC SERVICES CONTRACT COSTS $10,568.68 ADDITIONAL SERVICES Total Additional Services $0.00 TOTAL ENGINEERING COST $10,568.68 11/15/2010 FEE PROPOSAL PRELIMINARY DESIGN PHASE Project RELOCATE 2At WATER MAIN Airport: Meacham International Airport Consultant: Jacobs Engineering Group Inc Estimated Personnel Hours Project Senior Design Anticipated Task Manager Engineer Engineer EIT CADD Clerical Refine Scope Drawings (from attachment) Q/C Meetings Calculations Cost Estimates Estimated Hours Subtotal Labor MISCELLANEOUS COSTS Reproduction Travel FedEx / Courier Subtotal Miscellaneous Casts SUCONTRACT SERVICES Ramp survey Rodriquez Engineering Subtotal Subcontract Services TOTAL COSTS THIS PHASE $485.26 $173.77 $0.00 $209.85 $0.00 $0.00 $485.26 $0.00 $101.64 1 U15/2010 FEE PROPOSAL Project AIP Project No: Airport: Project Manager: Consultant: LABOR RELOCATE 24" WATER MAIN Meacham International Airport Jeffery Peterman Jacobs Engineering Group Inc BIDDING PHASE Project Senior Design Anticipated Task Manager Engineer Engineer EIT CADD Clerical Prebid Conference Issue Addenda Bid Opening Tabulate Bids Coordination Bid Recommendation Estimated Hours 5.5 0.5 0 0 0 0 5 Subtotal Labor $340498 $86.89 $0.00 $0.00 $0.00 $0.00 $254.09 MISCELLANEOUS COSTS Reproduction Travel (2 trips total) 20.00 Misc. - Mail, etc. Total Miscellaneous Costs $20.00 SUBCONTRACT SERVICES Total Subcontract Services $0.00 TOTAL COSTS THIS PHASE $360.98 FEE PROPOSAL Project AIP Project No: Airport: Project Manager: Consultant: RELOCATE 2d" WATER MAIN Meacham International Airport Jeffery Peterman Jacobs Engineering Group Inc BUZZ SAW / CD LABOR Project Senior Design Anticipated Task Manager Engineer Engineer EIT CADD Clerical Record Drawings Warranty Inspection Assist Agent PDF/CD Dev, Buzz Saw Estimated Hours Subtotal Labar $1,045.27 MISCELLANEOUS COSTS Reproduction Travel (1 trip total) Misc. - Mail, etc. Total Miscellaneous Costs SUCONTRACT SERVICES Totat Subcontract Services 1 $347.54 $0.00 $0.00 $114.62 S.OQ Mylar prints of plans/ DVD $5.00 Q.00 0.00 $0.00 TOTAL COSTS THIS PHASE $1,050.27 $583.11 $0.00 FEE PROPOSAL Project Airport: Consultant: RELOCATE 24" WATER MAIN Meacham International Airport Jacobs Engineering Group Inc FINAL DESIGN PHASE Estimated Personnel Hours LABOR Project Senior Design Anticipated Task Manager Engineer Engineer EIT CADD Clerical Drawings (from attachment} Bid Proposal Technical Specifications QualityControl Opinion of Probable Cost Construction Mgmt, Plan Final Design Review Meeting Estimated Hours Subtotal Labar MISCELLANEOUS COSTS Reproduction Travel Mail Total Miscellaneous Costs SUCONTRACT SERVICES Total Subcontract Services m $8,587.17 TOTAL COSTS THIS PHASE _i 15 $2,6Q6.56 $100.00 1 Q.00 $110.00 $o.00 $8,697.17 $1,067.51 21 $2,203.42 8 26 $611.29 $1,895.12 0 $203.28 11115/2010 FEE PROPOSAL Project Airport: Consultant: RELOCATE 24 WATER MAIN Meacham International Airport Jacobs Engineering Group Inc LABOR No. of Drawing Sheets Scale AREA 3 0 0 0 Cover Sheet 1 1:50 Index of drawings / Abreviations 1 1:50 Water Plan & Profile 1 1:50 Water Plan & Profile 1 1:50 Utility Details 1 1:50 COFW Gen Notes 1 0 General Construction Notes 1 0 0 0 0 O/C Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 7 Project RRELIMINARY DESIGN DRAWINGS Estimated Personnel Hours Senior Design 0 0 0 0 0 11/15/2010 FEE PROPOSAL Project Airport: Consultant: RELOCATE 24" WATER MAIN Meacham international Airport Jacobs Engineering Group Inc Estimated Personnel Hours FINAL DESIGN pRAWmGS No. of Drawing Sheets Project Scale Manager Senor Engineer Design Engineer EIT CADD Clerical Cover Sheet Index of drawings / Abreviations Water Plan & Profile Water Plan & Profile Utility Details COFW Gen Notes General Construction Notes Q/G Plans Tota! 1:50 1:50 1:50 1:50 1:50 1 1 2 2 1 3 4 2 $ 1 4 1 24 2 2 2 1 0.5 21 1 0.5 6 4 7 9 $ 19 8 26 11/15(2010 a � a! , / - \ 2 \ d ,tIt .K��� �. ,. . «. «: - � ■ ■ AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.1�- (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Jacobs Engineering Group, Inc. (Engineer) made and entered into City Secretary Contract No. 39313, (the Contract) which was authorized by the City Council. by M&C C-23768 on the 8th day of August 2009; and WHEREAS, the Contract involves engineering services for the following project: Design, Fill and Regrade of Noise Properties (Storm Drainage Improvements), Project No. 1399 WHEREAS, it has become necessary to execute Amendment No. 2 to said contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 21, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10,500.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by City of Fort Worth, Texas Amendment to Engineering Agreement Page I of 2 the City of all work and services shall not exceed the sum of $250,4050870 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this Worth, Tarrant County, Z� Texas. �rb s'V� 11) it City Secretary APPROVAL RECOMMENDED: Kent Penney, Director Aviation Department Jacobs Engineering Gro Engine� By: er Michael Bauer Operations Manager 777 Main Street Fort Worth, Texas 76102 Inc. APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney NO Mt&C REQUIRED City of Fort Worth, Tex Amendment to Engineering Agreement Page 2 of 2 APPROVED: Fernando Costa Assistant City Manager OFFICIAL RECORD CITY SECRETARY T. WORTH, TX 777 tvtan Street Fprt Worth, TX 76102 U.SA 1.817,735-6000 Fax`,, t.817.735-6148 SeptembI= I2011 As. Ruseena Johnson AVIATION DEPARTMENT Fort Worth Meacham International Airport City of Fort Worth 4201 North Main Street, Suite 200 Fort Worth, Texas 76106-2749 Re: Scope or Work and Fee Proposal for Construction Phase Services Storm Drainage Improvements — Meacham International Airport City Contract No. 1399-1 Dear Ruseena: Per your request, we are providing a scope of work and a fee proposal fior limited review of RF1's, shop drawings and site visits up to the limit of this contract. This contract is a cost plus contract with rates as shown below. The enclosed fee shows a not to exceed an amount of $10,500.00 unless authorized with hourly billing rates of; Project manager "$197.751 Hour Senior Engineer 184.611 Hour Design Engineer 145.791 Hour Clerical 66.62 /Hour Cost for reproduction and trip expenses are a reimbursable at cost. Thank you for your consideration. P.E. Project Manager Jacobs Engineering Group Inc. JLP/ cc: Bill Weistead, Gity of Fort Worth Correspondence JacpGs Engineering Group trtc, Construction Phase Services Storm Drainage Improvements Meacham International Airport City Contract No. 1399-1 Scone of Work September 2l, 2011 • The scope of work for construction phase services is summarized below. We anticipate that the construction phase services contract for engineering services will be a not to exceed reimbursable agreement. The following work items are estimated assuming a one -hundred -twenty (150) calendar day construction period. I. Construction Phase Services • Site 'Visits — As requested Respond to ItFI's Review of shop drawings and submittals The following elements are not included for the Construction Phase Services. + Surveying to verify contractors work Attend Weekly Construction Meetings Review/Approve Applications for Payment • Estimate Interim Embankment Quantities ® Substantial Completion Inspection and Punch List Final Inspection ® Prepare As -Built Plans These items as well as others, which are deemed necessary, may added at a later date. FEE PROPOSAL Project Storm Drainage Improvements City Project Number 13994 Airport: Meacham International Airport Project Manager: Ruseena Johnson Consultant: Jacobs Engineering Inc SALARY RATES Project Senior Manager Fnnineer Design Fnninaar FIT SUMMARY SHEET 9121t2011 r�Trl��iirSl: 'Tl $7 .18 $72.05 $5B.90 $46.80 $33.35 26.00 Consultant's G8A 1.228 Consultants Profi 15.00° Consultant's MulUplfe 2.5622 LABOR HOURS BY PHASE Project Senior Design Preliminary Design Final Design Bidding Construction Total Hours TOTAL PAYROLL COSTS TOTAL MISC. EXPENSES TOTAL BASIC SERVICES CONTRACT COSTS TOTALSUBCONSULTANT Geotechnicai survey Subcontract Ccord. 10.09'0 Total Subcontract Services TOTAL ENGINEERING COST Manager Engineer Engineer EIT CADD Clerical $199.90 $1 Q,454.03 $Q.00 $0.00 $0.00 $0.00 510,454.03 CSJ No 0502MECH Page 1 of 1 9/21/2011 FEE PROPOSAL Project TxDOT Project No: Airport, Project Manager, Consultant: Storm Drainage improvements 0 Meacham International Airport Ruseena Johnson Jacobs Engineering Inc CONSTRUCTION PHA: Estimated Personnel Hrs 21.5 weeks LABOR Project Senior Design Anticipated Task Manager En ineer Engineer EIT CADD Clerical Preconst. Conf. 11 total) Meetings (3 meetings) Site visits (Outside of mtgs, 3 total) Pre -activity Meetings (1 total) Final Inspection (1 total) Address Submittals (8@2hr/ea), Coordination with Agent, Contractor Testing revlew(10@0Ahr) Pay Estimates (6 total) Estimated Hours MISCEt_tANEOUS COSTS Reproduction Travel (3 trips total) Misc. - Mail, etc. Total Miscellaneous Costs StlBCONSULTANT COSTS 46 $9,096.53 $10,254.13 150,00 45.90 4.00 $199490 Geotechnical $0.00 Survey $0.00 Subcontract Coord. 10.00/0 $0,00 Total Subconsultant Costs $0.00 TOTAL COSTS THIS PHASE $10,454.fl3 0 2 0 0 $0,00 $291,58 $0,00 $0,00 $10,454.03 CB No. 0143d4 2 of 3 9/2112011