HomeMy WebLinkAboutContract 39224-A1AMENDMENT NO. 1 TO
COMMUNITY FACILITIES AGREEMENT
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Eagle Mountain — Saginaw LS.D. (Developer)
entered into Community Facility Agreement, City Secretary Contract No. 39224 wherein Developer is to
make certain improvements to Eagle Mountain — Saginaw I.S.D. High School No. 3 an addition within
the City; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to reflect the
inclusion of additional drainage improvements at an estimated cost of $450,000.00 and the inclusion of
City provided materials for the Traffic Si ng al at an estimated cost of $60,847.63 and as more fully
described on Attachment No. 1
NOW THEREFORE, City and Developer, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the CFA:
A) Summary of Cost Section is amended to be and read:
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 91,500,00
2. Sewer Construction $ 53,000,00
Water and Sewer Construction Total $ 144,500,00
B. TPW Construction
1. Street $ 550,000,00
2. Storm Drain $ 750,000,00
3, Street Lights- Installed by Developer $ 105,000.00
4. Traffic Signal - Construction $ 59,512,37
5. Traffic Signal - Materials (Purchased from City) $ 60,487,63
6. Street Signs $ 1,000.00
TPW Construction Cost Sub -Total $ 11526,000,00
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Ma�rial Testing (2%)
G. Street Light Inspsection Cost (4%)
H. Traffic Signal Inspection (4%)
I. Traffic Signal Materials Cost - Includes Warehouse Fee
Sub -Total for TPW Construction Fees
1670500.00
$ ,,
$ 2,890.00
$ 2,890.00
$ 51780,00
52,000.00
$ 147,487.63 I OFFICIAL RECORD
Total Construction Fees:
CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3
Page 1 of 3
153,267.63
$
CITY SECRETARY
I+T. WORTH, TX
All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and
effect.
(Remainder of Page Intentionally Left Blank)
CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3
Page 2 of 3
EXECUTED on this the
Tarrant County, Texas.
ATTEST:
Marty Hendrix
City Secretary
0 M&C REQU12RELM i
APPROVED AS TO FORM
AND LEGALITY: J.
Amy J. Ramsey
Assistant City A
day of O C306419o4 ,, , 2010, in Fort Worth,
CITY OF FORT WORTH:
Fernando Costa
Assistant City Manager
Recommended by:
Wr ram A V rkest, P
Director
Transportation and Public Works Department
DEVELOPER
Eagle Mountain —Saginaw I.S.D.
Dick Elkins
Board President
OFFICfAL RECORD
CITY SECRETARY
FT, WORTH, TX
CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3
Page 3 of 3
jzrAK Lw AND PERKINS
Civil Engineering Surveying Landscape Architecture Planning
OPINION OF PROBABLE CONSTRUCTION COST
Offsite Paving and Storin Drain Improvements to serve Eagle
PROJECT: DATE: 9/27/2010
Mountain -Saginaw LS.D. New High School No. 3
TNP JOB # VLK08272
ITEM
DESCRIPTION
QTY.
UNIT
UNIT COST
TOTAL
II
DRAINAGE IMPROVEMENTS
9' x 5' RCB
50
LF
$350,00
$177500,00
9' x 4' RCB
813
LF
$325,00
$264>225,00
9' x 3' RCB
279
LF
$300,00
$83,700,00
8' x 3' RCB
100
LF
$280,00
$2800.00
48" RCP Class 11I
931
LF
$110,00
$102A10.00
42" RCP Class III
421
LF
$100,00
$421100,00
30" RCP Class 11I
20
LF
$80.00
$100.00
21" RCP Class 111
149
LF
$50.00
$71450,00
Connect 48" RCP to 9'x4' RCB
1
EA
$1,200.00
$1,200.00
Connect 21" RCP to 9'x4' RCB
1
EA
$750.00
$750,00
9'x5' Slo ed Hdwl
1
EA
$200.00
$200.00
9'x3' Sloped
Hdwl
1
EA
$25000,00
$200.00
2-13arrel 8'x3' Sloped Hdwl
1
EA
$27500,00
$2,500.00
21" Type B Headwall
1
EA
$23500,00
$2,500.00
Rock Rip -rap
1,265
SY
$80.00
$1017200,00
15' Curb Inlet
1
EA
$31500.00
$35500.00
10' Curb Inlet
3
EA
$21500,00
$7,500.00
5' Drop Inlet w/ Apron
1
EA
$53000,00
$500.00
6'x18' Junction Box
1
EA
$107000,00
$107000,00
5' S ware SDMH
2
EA
$35000.00
$6,000.00
Permanent Asphalt Pavement Repair
307
SY
$80.00
$24>560,00
Temporary Asphalt Pavement Repair
307
SY
$30.00
K210.00
Remove & Dispose Existing 48" RCP
102
LF
$5.00
$510.00
Trench Safety
2,763
LF
$1.50
$4J 44.50
Grade to Drain Ditch
85
LF
$5.00
$425.00
Erosion Control
1
LS
$2000.00
$20,000.00
DRAINAGE SUBTOTAL
$7509000.00