Loading...
HomeMy WebLinkAboutContract 39224-A1AMENDMENT NO. 1 TO COMMUNITY FACILITIES AGREEMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Eagle Mountain — Saginaw LS.D. (Developer) entered into Community Facility Agreement, City Secretary Contract No. 39224 wherein Developer is to make certain improvements to Eagle Mountain — Saginaw I.S.D. High School No. 3 an addition within the City; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to reflect the inclusion of additional drainage improvements at an estimated cost of $450,000.00 and the inclusion of City provided materials for the Traffic Si ng al at an estimated cost of $60,847.63 and as more fully described on Attachment No. 1 NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CFA: A) Summary of Cost Section is amended to be and read: Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 91,500,00 2. Sewer Construction $ 53,000,00 Water and Sewer Construction Total $ 144,500,00 B. TPW Construction 1. Street $ 550,000,00 2. Storm Drain $ 750,000,00 3, Street Lights- Installed by Developer $ 105,000.00 4. Traffic Signal - Construction $ 59,512,37 5. Traffic Signal - Materials (Purchased from City) $ 60,487,63 6. Street Signs $ 1,000.00 TPW Construction Cost Sub -Total $ 11526,000,00 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Ma�rial Testing (2%) G. Street Light Inspsection Cost (4%) H. Traffic Signal Inspection (4%) I. Traffic Signal Materials Cost - Includes Warehouse Fee Sub -Total for TPW Construction Fees 1670500.00 $ ,, $ 2,890.00 $ 2,890.00 $ 51780,00 52,000.00 $ 147,487.63 I OFFICIAL RECORD Total Construction Fees: CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3 Page 1 of 3 153,267.63 $ CITY SECRETARY I+T. WORTH, TX All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and effect. (Remainder of Page Intentionally Left Blank) CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3 Page 2 of 3 EXECUTED on this the Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary 0 M&C REQU12RELM i APPROVED AS TO FORM AND LEGALITY: J. Amy J. Ramsey Assistant City A day of O C306419o4 ,, , 2010, in Fort Worth, CITY OF FORT WORTH: Fernando Costa Assistant City Manager Recommended by: Wr ram A V rkest, P Director Transportation and Public Works Department DEVELOPER Eagle Mountain —Saginaw I.S.D. Dick Elkins Board President OFFICfAL RECORD CITY SECRETARY FT, WORTH, TX CFA AMENDMENT No. 1 —Eagle Mountain -Saginaw ISD High School #3 Page 3 of 3 jzrAK Lw AND PERKINS Civil Engineering Surveying Landscape Architecture Planning OPINION OF PROBABLE CONSTRUCTION COST Offsite Paving and Storin Drain Improvements to serve Eagle PROJECT: DATE: 9/27/2010 Mountain -Saginaw LS.D. New High School No. 3 TNP JOB # VLK08272 ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL II DRAINAGE IMPROVEMENTS 9' x 5' RCB 50 LF $350,00 $177500,00 9' x 4' RCB 813 LF $325,00 $264>225,00 9' x 3' RCB 279 LF $300,00 $83,700,00 8' x 3' RCB 100 LF $280,00 $2800.00 48" RCP Class 11I 931 LF $110,00 $102A10.00 42" RCP Class III 421 LF $100,00 $421100,00 30" RCP Class 11I 20 LF $80.00 $100.00 21" RCP Class 111 149 LF $50.00 $71450,00 Connect 48" RCP to 9'x4' RCB 1 EA $1,200.00 $1,200.00 Connect 21" RCP to 9'x4' RCB 1 EA $750.00 $750,00 9'x5' Slo ed Hdwl 1 EA $200.00 $200.00 9'x3' Sloped Hdwl 1 EA $25000,00 $200.00 2-13arrel 8'x3' Sloped Hdwl 1 EA $27500,00 $2,500.00 21" Type B Headwall 1 EA $23500,00 $2,500.00 Rock Rip -rap 1,265 SY $80.00 $1017200,00 15' Curb Inlet 1 EA $31500.00 $35500.00 10' Curb Inlet 3 EA $21500,00 $7,500.00 5' Drop Inlet w/ Apron 1 EA $53000,00 $500.00 6'x18' Junction Box 1 EA $107000,00 $107000,00 5' S ware SDMH 2 EA $35000.00 $6,000.00 Permanent Asphalt Pavement Repair 307 SY $80.00 $24>560,00 Temporary Asphalt Pavement Repair 307 SY $30.00 K210.00 Remove & Dispose Existing 48" RCP 102 LF $5.00 $510.00 Trench Safety 2,763 LF $1.50 $4J 44.50 Grade to Drain Ditch 85 LF $5.00 $425.00 Erosion Control 1 LS $2000.00 $20,000.00 DRAINAGE SUBTOTAL $7509000.00