HomeMy WebLinkAboutContract 39460-A2 (2)CITY SECRETARY CONTRACT No. q 'i o AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 39460 WHEREAS, the City of Fort Worth (CITY) and Brown or Gay Engineers, Inc., (ENGINEER) made and entered into City Secretary Contract No. 39460, (the CONTRACT) which was authorized by M&C(C-23866) on the 20th day of October, 2009 in the amount of $ 241,287.00, and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $20,390.00 which was administratively authorized on June 24, 2011; and WHEREAS, the following project. West Downtown 01364, and CONTRACT involves engineering services for the Storm Drain Structural Rehabilitation, Project No. WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 8, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $48,240.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $309,917.00. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 OFFICIAL RECORD CITY SECRETARY NORTH, TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: (j * /* APPROVA COMMENDED: ENGINEER Brown & Gay Engineers, Inc. Carl Krogness, P.E. Director, Public Works DATE: Douglas W. Wjersig, P.E. U Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ATTEST: City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 OFFICIAL RECORD CITY RECRETARY WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 39460 Amendment No, 2 Department Fund -Account -Center Amount TPW P227-531200-209280136430 48,240.00 Total. 48,240.00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 BROWN �v F N(:,f�`•IEF:aiS, INC:,GAY April 8, 2014 Mr. Michael Owen, PE Senior Professional Engineer Transportation and Public Works City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 Re; West Downtown Storm Drain Structural Rehabilitation, City Project No. 01364 Amendment No. 02 Dear Mr. Owen: Brown &Gay Engineers, Inc. (BGE) proposes a contract amendment to add engineering design services not included in the original contract scope. The additional design includes the following: develop site specific manhole details for access to the existing storm drain in Lipscomb Street, develop technical specifications for in -situ rehabilitation of storm drains, perform performance based bid phase services for 10"' Street to ensure in -situ method meets design requirements, revise construction plans previously developed for Lipscomb Street from open cut construction to in -situ rehabilitation, prepare as -built drawings at the completion of the construction projects. These additional services identified in this amendment related to itu rehabilitation were unforeseen as the project scope was originally developed to be open cut construction as recommended in the Henderson Street Storm Drain Watershed Planning Study (CP No. 00078). The opinion of probable construction cost for open cut construction was $2.5 million. The anticipated opinion of probable construction cost for the in -situ rehabilitation is approximately $1.4 million. The decision to change the scope of the construction from open cut to in -situ rehabilitation provided value to the City by reducing the capital cost, reducing the impact to adjacent utilities, and reducing the impact to traffic operations in the central business district. The proposed additional services are described in greater detail in the following sections with proposed fees summarized in Attachment A. DevelopSite Specific Manhole Details for Access To The Existing Storm Drain In Lipscomb Street Scope includes developing site specific structural design of manhole detail for construction over the existing 66"x72" arch pipe in Lipscomb Street. Scope includes coordination with the Storm Water Maintenance team to design a manhole that is structurally sound but will not damage the arch pipe constructed in the I920's. This detail will be signed and sealed by a professional engineer licensed in the State of Texas. 500 West 7th Street •Suite 1800 •Fort Worth, Texas 76102 • TEL: 817-887-(i130 •FAX: 817-887-6135 • www.browngay.com Mr. Michael Owen, PE March 20, 2014 Page 2 of 3 Develop Technical Specifications for In -Situ Rehabilitation of Storm Drains BGE proposes to develop up to three technical speciftcations for in -situ rehabilitation. Proposed technical specifications include Spiral Wound PVC Liner Pipe, Structural Geopolymer Lining, and Cured in Place Pipe (CIPP)-Non-Circular Storm Drains. A reprofiling specification is proposed for this project to prepare the pipe for whichever method of in -situ rehabilitation is installed. The technical specifications are proposed to establish performance requirements requiring contractors to meet the City's criteria including (1) 50-year design life, (2) No reduction in capacity, and (3) In -situ installation. Perform Performance Based Bid Phase Services For loth Street to Ensure In -Situ Method Meets Design Requirements The proposed performance based bid services will include prequalification of contractors and in -situ methods. BGE will review the prequalification documents submitted by all contractors. These documents will include financial reports, history of similar work performed including applicability to the proposed projects, resumes of key personnel, and past performance. BGE will recommend contractors for prequalification. Contractors may submit for prequalification of different in -situ installation methods. In that case, BGE will recommend prequalification for each method they submit. BGE will review the prequalification documents submitted by all contractors and/or suppliers regarding the in -situ structural rehabilitation method they propose. BGE will recommend methods for approval based on engineering judgment of their abilities to meet the criteria set forth in the technical specifications. Revise Construction Plans Previously Developed for Lipscomb Street from Onen Cut Construction to In - Situ Rehabilitation BGE will revise the 600Adesign plans for Lipscomb Street from remove &replace to in -situ repair. The in -situ repair will include plan and profiles for the removal of multiple water and sanitary sewer lines crossing through the storm drain. Prepare As -Built Drawings at the Completion of the Construction Proiects BGE will prepare as -built drawings based on inspector and contractor mark-ups during construction for each project. In accordance with our contract, Article V, Section K of the STANDARD AGREEMENT FOR ENGINEERING SERVICES, Brown &Gay Engineers, Inc., requests an equitable adjustment to our contract to account for the additional cost required to perform the City's requested additional services. Attachment A summarizes the proposed man hour breakdown for the additional services. The proposed $48,240 lump sum fee for these services was determined based on the time estimated to complete at the Mr. Michael Owen, PE March 20, 2014 Page 3 of 3 hourly rates outlined in Exhibit B-2, Hourly Rate Schedule from the STANDARD AGREEMENT FOR ENGINEERING SERVICES. CONTRACT SUMMARY Amendment Approval Date Value Total Contract Value Original Contract Amendment 1 Amendment 2 November 5, 2009 June 24, 2011 TBD $241,287.00 $20,390.00 $4 35240600 $241,287.00 $261,677.00 $30%917.00 Please contact me at your earliest convenience, so we can discuss this matter and move to finalizing the project for construction. Scott Scherer, PE Attachments z O r r M m a x w J t � o az4Euwo � �ww 'Z E 4) z L E41 Q J N ❑ E c� z O r z O 0 r CO W 3 p O O O O O O r;f O O O O O O O O O O O 4 O O O O Y o0 m l0 N N N N f0 Q m� m �O O N O O m O O m O` O m N a � ro J w y d9 w w w �N Yif N w w w w w w N N N y y y y w w W a O q tl ADO W OI W 'O m N N Q N N Q N N �{ L C � ro U 7 O N O O Q Q q O Q N N `v o c W o CC; � N 0 v �e Ol •- iV Q � fip try ,C V � yj y rn m o L •O C 7 m Q m m m W N Q m Q W rW M N e N N N N O O� L W ® ro O a, o L V w ri i N i0 q N O O O p C N G V G m N N m L Q ` E a a Q c CL fn ro N w N� A .J 0 Lim °° oC524L ui c � n a z c rz c m J O L w E 3 aci H E¢ c d� L m K a m L ace U s m m E aoi E a m A� a >. o u E3 a° c n m a I- U 0oq o t@Q7 onM c c vo tiu tn a inr S ,� o o mm c o3� w o c �,t o °UJ E !o al ro p d a t m` w i c c a 9 m a.of c u01i c� .rn m� �a L NfD_ c am E :° �'� yvnirnU� Ins° m vo o Z C a1 3 C O v� p O 4J O C C C o 0 0 D CZ I„°, Z) G c 3 c L c o '' m p p w 9�000a a��i a°i 'c '° °� mE 3.. c�0 Cho m 0) o.ma IL to m C O Vd°ro d� Joro J:o9 O j jW ` > NM > > $ > m a N= w m aAU CC IY o nK of ¢ FF F- J 5 O City of Fort Worth, Texas Mayor and Council C �TiiTi unication --- -F _ - . �_- --� COUNCIL ACTION: Approved on 5/13/2014 DATE: Tuesday, May 13, 2014 REFERENCE NO.: **C-26799 LOG NAME: 20SW W DOWNTOWN STORM DRAIN REHAB AMENDMENT #2 SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 39460, an Engineering Agreement with Brown &Gay Engineers, Inc., in the Amount of $48,240.00 for Additional Engineering Design of the West Downtown Storm Drain Structural Rehabilitation Project, Thereby Revising the Total Contract Amount to $309,917.00 (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 2 to City Secretary Contract No. 39460, an Engineering Agreement with Brown &Gay Engineers, Inc., in the amount of $48,240.00 for additional engineering design of the West Downtown Storm Drain Structural Rehabilitation project, thereby revising the total contract amount to $309,917.00. DISCUSSION: The Amendment recommended by this Mayor and Council Communication will provide additional engineering services not included in the original contract scope of work. Brown &Gay Engineers, Inc., identified during its analysis that the best course of action is to perform trenchless rehabilitation, rather than open cut, thus saving construction costs and minimizing disruption. The additional services include: development of revised technical and performance specifications and record drawings. DESCRICPTION AMOUNT NOC APPROVED Engineering design of Initial Contract West Downtown Storm Drain Structural $241,287.00 C-23866 10/20/2009 Rehabilitation Additional 2D modeling Amendment No. 1 and CCTV data $ 20,390.00 N/A 06/24/2011 collection Revised technical and Amendment No. 2 performance specifications; and $ 48,240.00 record drawings Brown &Gay Engineers, Inc., proposes to perform the amendment services for a lump sum fee of $48,240.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Funding for this amendment is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. This project is located in COUNCIL DISTRICT 9, Mapsco 329 F8 and 364 A2. http://apps.cfwnet.org/ecouncil/printmc.asp?id=19717&print=true&DocType=Print 5/14/2014 FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P227 531200 209280136430 Fernando Costa (6122) Douglas W. Wiersig (7801) Michael Owen (8079) ATTACHMENTS 1. 01364 W Downtown Storm Drain Rehab Map.pdf (Public) 2. FAR-01364-00006.pdf (CFW Internal) 3. P227 485248 99901 4-23-2014.pdf (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=19717&print=true&DocType=Print 5/14/2014