HomeMy WebLinkAboutContract 39460 (2)GfTY S'CRETAmy NTRACT Nor CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and Brown & Gay Engineers, Inc., (the "ENGINEER"), for a PROJECT generally described as: West Downtown Storm Drain Structural Rehabilitation Project (City No. 01364)0 Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Article II Compensation A. The ENGINEER's compensation is set forth in Attachment B. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 1 of 15 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 3 of 15 current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions, time or quality of performance by third parties; quality, type, management, or direction of operating personnel, and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents, that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for*what purpose i the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (M/VNBE) Participation In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority business enterprises and woman business City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 4 of 15 enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability -the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 5 of 15 Y i. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b. Business Auto —the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non -owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non -owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability the ENGINEER shall maintain professional liability, a claims -made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 6 of 15 the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first -dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 7 of 15 to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion, the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims -made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. I�. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 8 of 15 O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. L� City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. Access to Facilities and Property The CITY will make its facilities accessible tc the ENGINEER's performance of its service: cost to the ENGINEER, such tests of equip other components of the CITY's facilities as with the ENGINEER's services. The CITY will CITY's personnel. Advertisements, Permits, and Access the ENGINEER as required for The CITY will perform, at no Went, machinery, pipelines, and may be required in connection be responsible for all acts of the Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of --way, and access necessary for the ENGINEER's services or PROJECT construction. Ciry of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 9 of 15 D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 10 of 15 with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 11 of 15 Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 12 of 15 work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 13 of 15 J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 14 of 15 Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A -Scope of Services Attachment B — Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Executed this the day of h Y , , 20y]. ATTEST: Marty Hendr(� City Secretary contr_ac.t pl.tthorzzatioa t C) o� - DatO APPROVED AS Assistant City A ATTEST: AND LEGALITY City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 15 of 15 CITY OF FORT WORTH Assistant City Manager APPROVAL RECOMMENDED n and Public Works Department Brown & Gav Engineers, Inc. ENGINEER Name: �/tntiES C- • '6fZotrlrl, TR , AE Title:ylcE PRksID EM7 By: a WORTH, TX Attachment A SCOPE OF SERVICES DESIGN SERVICES: SWU PROJECT -DRAINAGE IMPROVEMENTS West Downtown Storm Drain Structural Rehabilitation City Project No. 01364 The following is a clarification of the tasks that the ENGINEER will perform under ATTACHMENT "A". Work under this attachment includes engineering services for paving and/or storm drain improvements for the following: 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: PART A —PRE-ENGINEERING 1. Initial Data Collection a. Pre -Design Coordination Meetings ENGINEER will attend and prepare/distribute meeting "minutes" documenting the discussions and decisions from the meeting, as required, to discuss and coordinate various aspects of the project and to ensure that the project stays on schedule. Three (3) meetings are anticipated. These include the following: One (1) pre -design kick-off meeting, (including ALL departments that are impacted by the project). One (1) review meeting with Storm Water Department at completion of the City's review of the conceptual engineering plans. One (1) separate review meeting at completion of the City's review of the conceptual engineering plans with the Water Department. EA2-1 Rev 04/17/09 b. Data Collection In addition to data obtained from the City, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, City Master plans, CITY drainage complaint files, existing applicable drainage studies and property ownership as available from the Tax Assessor's office. 2. Schedule Submittal and Monthly Progress Report The ENGINEER shall submit a project schedule (schedule shall be provided in Primavera or Microsoft Project) after the design contract is fully executed. The schedule shall be updated and submitted to the CITY along with monthly progress reports as required under Attachment B of the contract. PART B -CONSTRUCTION PLANS AND SPECIFICATIONS 1. Conceptual Engineering i. Surveys for Design a. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. The minimum survey information to be provided on the plans shall include the following: EA2-2 Rev 04/17/09 1. A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. 2. The following information about each Control Point; a. Identified (Existing. City Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). 3. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. 4. No less than two horizontal bench marks, per line or location. 5. Bearings given on all proposed centerlines, or baselines. 6. Station equations relating utilities to paving, when appropriate. 7. Engineer shall perform Subsurface Utility Engineering including tasks for Level D, C and B as described below: Level D • Conduct appropriate investigations (e.g., owner records, County/City records, personal interviews, visual inspections, etc.), to help identify utility owners that may have facilities within the project limits or that may be affected by the project. • Collect applicable records (e.g., utility owner base maps, "as built" or record drawings, permit records, field notes, Rev 09/17/09 geographic information system data, oral histories, etc.) on the existence and approximate location of existing involved utilities. • Review records for: evidence or indication of additional available records; duplicate or conflicting information; need for clarification. • Transfer information on all involved utilities to appropriate plan sheets, electronic files, and/or other documents as required. Exercise professional judgment to resolve conflicting information. For information depicted, indicate: utility type and ownership; date of depiction; quality level(s); end points of any utility data; line status (e.g., active, abandoned, out of service); line size and condition; number of jointly buried cables, and encasement. Level C • Identify surface features, from project topographic data and from field observations, that are surface appurtenances of subsurface utilities. • Include survey and correlation of aerial or ground -mounted utility facilities in QL C tasks. • Survey surface features of subsurface utility facilities or systems, if such features have not already been surveyed by a registered professional. If previously surveyed, check survey data for accuracy and completeness. • The survey shall also include (in addition to subsurface utility features visible at the ground surface): determination of invert elevations of any manholes and vaults; sketches showing interior dimensions and line connections of such manholes and vaults; any surface markings denoting subsurface utilities, furnished by utility owners for design purposes. • Exercise professional judgment to correlate data from different sources, and to resolve conflicting information. • Update (or prepare) plan sheets, electronic files, and/or other documents to reflect the integration of QL D and QL C information. • Recommend follow-up investigations (e.g., additional surveys, consultation with utility owners, etc.) as may be needed to further resolve discrepancies. Rev 04/17/09 Level B • Select and apply appropriate surface geophysical method(s) to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. • Based on an interpretation of data, mark the indications of utilities on the ground surface, for subsequent survey. Utilize paint or other method acceptable for marking of lines. • Unless otherwise directed, mark centerline of single - conduit lines, and outside edges of multi -conduit systems. • Unless otherwise approved, maintain horizontal accuracy of +/- 1 in the marking of lines. • As an alternative to the physical marking of lines, the Consultant may, with City's approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project's survey control. ii. Public Notification and PersonnelNehicle Identification a. Residential notification is required for field surveys in public ROW on this project, mail -outs will be prepared for approval by CITY T/PW staff.. The mail out shall be on company letter head and shall include the project name, study limits, City Project No., brief description of the .project, and consultant's project manager name and telephone number. Right of Entry acquisition is required for field surveys or other work on this project located on private property, mail -outs will be prepared for approval by CITY T/PW staff. The mail out shall be on company letter head and shall include the project name, study limits, City Project No., brief description of the project, and consultant's project manager name and telephone number and a place for the property owner to sign giving permission to access the property. b. When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. Drainage Computations ENGINEER will review and document the storm water watershed drainage runoff Fn2-5 Rav 04/17/09 aI ea and existing street, right-of-way and storm sewer capacities for the subject site. A drainage area map will be drawn at 1" = 200' scale from available contour maps. Calculations regarding street and right-of-way capacities and design discharges (&year and 100-year frequencies) at selected critical locations will be provided. Capacities of existing storm drain will be calculated and shown. The ENGINEER's responsibility includes recommendations for improvements of the existing system as deemed reasonable and consistent with City standards. All calculations and design shall conform to the City of Fort Worth Storm Water Management Design Manual, March 2006. iv. Storm Drain Alignment and Routing Study N/A v. Channel Study and Improvement Alternatives N/A vi. Environmental Services N/A vii. Floodplain Services N/A viii. TxDOT Coordination Coordonate with TxDOT for crossing at 10`h Street and Henderson Street including preparation of TxDOT Utty Permit. Railroad Coordination N/A x. Right-of-way Research The ENGINEER will conduct preliminary research for availability of existing Rev 04/17/09 easements where open -cut construction or relocation of existing alignments is probable. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the City. xi. Study and Provide Engineering Recommendation for In -situ Structural Rehabilitation of Storm Drain — The study shall include the following: a. ENGINEER and CITY staff develop matrix of critical evaluation criteria including items such as products, methods, project history, design life, cost and other parameters as deemed relevant. b. Meet with up to six (6) different structural rehabilitation vendors at the ENGINEER's Fort Worth office to review vendors' services. c. Provide structural rehabilitation vendors a sample scope of work and request review and proposal based on sample scope of work d. ENGINEER review proposals and follow-up with structural rehabilitation vendor for any clarifications. e. ENGINEER evaluate each method, complete evaluation matrix and submit draft to CITY for review. f. ENGINEER and CITY meet to review draft recommendations. g. ENGINEER finalize Study and Engineering Recommendation for In -situ Structural Rehabilitation of Storm Drain. xii. Television inspection of existing Storm Drain from Cherry Street to Lamar Street — TV Inspection along 10th Street from Cherry Street to Lamar Street including review of inspection footage and develop scope for necessary improvements. xiii. Review of Engineering Recommendations for all lines identified as fair in Henderson Street Storm Drain Watershed Planning Study, Phase 11, by Halff Associates a. Review of the footage of approximately 2,915 linear feet of existing storm drain identified in fair condition as a part of the Study and identify sections for repair/rehabilitation: 1. S-1107 — 345 linear feet of 96"x84" Concrete Arch Pipe 2. S-787 —185 linear feet of 72" concrete -lined Corrugated Metal Pipe 3. C1 C — 305 linear feet of 102"x84" Concrete Arch Pipe 4. Cl C — 75 linear feet of 144"x102" Concrete Arch Pipe 5. C1 C —130 linear feet of 60"x84" Reinforced Concrete Box Rev 04/17/09 linear feet of 96"x72" Stone Arch Pipe 7. C1 M —1,160 linear feet of 48" Reinforced Concrete Pipe b. Perform site inspection including coordinating with the CITY for confined space inspection of sections identified for repair/rehabilitation. c. Develop scope of work for sections identified for repair/rehabilitation. xiv. Conceptual Engineering Plan Submittal a. Conceptual plans shall be submitted to City 90 days after Notice to Proceed Letter is issued. b. The ENGINEER shall furnish nine (9) copies of the concept engineering plans (11 "x17") which include layouts, drainage computations, preliminary right-of-way needs and cost estimates for the ENGINEER's recommended plan. An executed Project Certification and Decision Log shall be provided with the submittal. The ENGINEER shall also evaluate the phasing of the water, sanitary sewer, street and drainage work, and shall submit such evaluation in writing to the City as a part of the concept phase of the project. 2. Preliminary Engineering Upon approval of the Concept plans, ENGINEER will prepare construction plans as follows: a. Drainage area maps with drainage calculations and hydraulic computations. b. Preliminary project plans and profile sheets set up to be on 22" x 34" sheets and/or c. Proposed roadway profile grades and elevations along each curb line; elevations at all p.v.i.'s; p.i's half stations; high and low points; vertical curve information; and pertinent AASHTO calculations. Profiles for existing curbs (if any) and existing ground at the left and right-of-way lines shall be shown. Existing found property corners (e.g. Iron pins), along the existing right-of-way shall be shown on the plans. Profiles for existing and proposed storm drain mains and leads shall be provided. Rav 04/17/09 d. Existing utilities and utility easements will be shown on the roadway plan and profile sheets. ENGINEER will coordinate with utility companies and the City of Fort Worth to ascertain what, if any, future improvements are planned that may impact the project. e. Preliminary roadway and/or channel cross -sections will be developed, from the survey notes, at intervals not -to -exceed 50 foot along the project length and will extend 10' past the right of way line on both sides of the street. Additional cross - sections at important features including driveways, p.i.'s of intersecting streets, (minimum distance of 100' along cross -street at each P.I.) walks, retaining walls, etc., will also be provided. Profiles of centerline of driveways will also be provided where necessary. Scale will be 1" = 10' horizontal and 1" = 2' vertical. f. Street and intersection layouts. g. Proposed plan/profile sheets will conform to City of Fort Worth construction legend. Adequate horizontal and vertical control shall be provided on the plan sheets to locate all proposed and existing facilities. Legal descriptions (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. h. Geotechnical Investigation/Pavement Design The ENGINEER shall prepare a detailed geotechnical engineering study and pavement design in conformance with the City of Fort Worth Pavement Design Standards Manual, 2005. The study shall include recommendations regarding utility trenching and identifying existing groundwater elevation at each boring. j. Right-of-way/Easement Preparation and Submittal The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. The documentation shall be provided in conformance with the checklists and templates available on the City's Buzzsaw site. k. ONCOR Coordination EA2-9 Rev 04/17/09 m. Rev 04/17/09 Coordinate with ONCOR to develop scope of impact to existing gas lines within project limits. TXU Coordination Coordinate with TXU to develop Scope of Impact (Underground &Overhead lines within project limits) Preliminary Construction Plan Submittal Preliminary construction plans and specifications shall be submitted to CITY 70 days after approval of Part B, Paragraph IV. ii. The ENGINEER shall deliver two (2) sets of full size (22"x34") and nine (9) sets of 1/2 size (11 "x17") preliminary construction plans, two (2) sets of specifications, and an updated and executed Project Certification and Decision Log to CITY for review. Generally, plan sheets shall be organized as follows: Cover Sheet General Layout and Legend Sheet Drainage Area Map and Computations Plan & Profile Sheets Preliminary Cross Sections Standard Construction Details Special Details (If applicable) iii. The ENGINEER shall submit a preliminary estimate of probable construction cost with the preliminary plans submitted. This estimate shall use ONLY standard City bid items. If items need to be added as new standard bid items, the ENGINEER shall provide the appropriate information to the City for review and approval. Engineer shall assist City in selecting the feasible and or economical solutions to be pursued. Constructability Review ENGINEER shall schedule and attend a project site visit with the City project manager and Construction personnel to walk the project. The ENGINEER shall Ep,2-i o summarize the City's comments from the field visit and submit this information to the City in writing. o. Review Meetings with City The ENGINEER shall meet with CITY to discuss review comments for preliminary submittal, including comments from the field visit. The ENGINEER shall prepare/distribute meeting "minutes" documenting the discussions/decisions from the meeting. The CITY shall direct the ENGINEER in writing to proceed with Final Design for Final Review. p. Utility Clearance Phase The ENGINEER will consult with the City's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities that have an impact or influence on the project. ENGINEER will design City facilities to avoid or minimize conflicts with existing utilities. The ENGINEER shall deliver a minimum of 13 full size (22"x34") sets of approved preliminary construction plans to the Citys Utility Coordinator for forwarding to all utility companies, which have facilities within the limits of the project. q. Public Meeting After the preliminary plans have been reviewed and approved by the City, the ENGINEER shall prepare project exhibits, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. r. Storm Water Pollution Prevention Plan (SWPPP) For projects that disturb an area greater than one (1) acre, ENGINEER will prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the project for use by the Contractor during construction. Engineer will prepare drawings and details for proposed SWPPP improvement that the Contractor must use during construction. EA2-11 Rev 04/17/09 3. Contractor will be regulatory agencies. s. Traffic Control Plan responsible for filing the SWPPP with appropriate The ENGINEER may utilize standard traffic reroute configurations posted as "Typicals" on the City's Buzzsaw website. The typicals need not be sealed individually, if included in the sealed contract documents. Typical details, City of Fort Worth Standard details available on Buzzsaw at date of execution of this contract, are included in the scope of work for traffic control along Lipscomb Street (Pennsylvania Ave to Broadway Ave). In the event that the "typicals"(as described above) cannot be utilized on the project, the ENGINEER shall prepare a signed and sealed Traffic Control Plan for review and approval by the Traffic Division of the Transportation and Public Works Department . Detailed traffic control and construction phasing for 10th Street (Cherry Street to Lexington Street) is included in the scope of the contract. Final Engineering Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: i. Final construction plans and specifications shall be submitted to CITY 80 days after approval of Preliminary plans. The ENGINEER shall deliver two (2) sets of full size (22"x34") and nine (9) sets of '/2 size (11 "x17") preliminary construction plans, nine (9) sets of contract documents, and an updated and executed Project Certification and Decision Log to CITY for review. The ENGINEER shall submit a final design estimate of probable construction cost with the final design plans submitted. This estimate shall use ONLY standard City bid items. EA2-12 Rev 04/17/09 The ENGINEER shall meet with CITY to discuss review comments for final design submittal. The ENGINEER shall prepare/distribute meeting "minutes" documenting the discussions/decisions from the meeting. The CITY shall direct the ENGINEER regarding acceptance of the final design plans. 4. Final Construction Plan Submittal a. Final Construction Documents shall be submitted to CITY 15 days after approval of the Final plans. Following CITY approval of the recommended improvements, the ENGINEER shall submit final construction plans and contract documents to CITY (each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas) and submit two (2) sets of plans and construction contract documents b. ENGINEER's Estimate of Probable Construction Cost The ENGINEER shall submit a final estimate of probable construction cost with the final plans submitted. The estimate shall use ONLY standard City bid items. c. Mvlar Submittals The ENGINEER shall submit a final set of mylar drawings for record storage as follows: 1. Street and storm drain plans shall be submitted as one set of plans. Street and storm drain plans shall be separate from water and sanitary sewer plans. All sheets shall be standard size (22" x 34") with all project numbers (TPW and water/sanitary sewer) prominently displayed. 2. For projects where water/sanitary sewer improvements occur on a TPW Department funded project with no Water funding involved, a separate set of mylars with cover sheet shall be submitted for Water Department. Rev 04/17/09 3. Signed plans sets shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file. There shall be one (1) PDF file for the TPW plan set and a separate PDF file for the Water plan set. Each PDF file shall contain all associated sheets of the particular plan set. Singular PDF files for each sheet of a plan set will not be accepted. PDF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the City of Fort Worth, org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X- 35667_org36.pdf" where "X-35667" is the assigned file number obtained from the City of Fort Worth, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_orgl8.pdf Both PDF files shall be submitted on one (1) Compact Disk, which will become property of and remain with the City of Fort Worth. Floppy disks, zip disks, e-mail flash media will not be accepted. 4. For information on the proper manner to submit PDF files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. Rev 04/17/09 PART C -CONSTRUCTION ASSISTANCE 1. Bid Documents The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. Contract documents shall be uploaded in pdf files and the plans in pdf or dwf files. The ENGINEER will make available for bidding, upon request by the CITY, up to thirty (30) sets of the final approved and dated plans and specifications and contract documents for the projects to the CITY for distribution to potential bidders. Proposal will be provided in electronic format. 2. Bidding Assistance The ENGINEER shall assist the CITY during this phase including preparation and delivery of any additional addenda prior to bid opening to plan holders and respond to questions submitted to CITY by prospective bidders. The ENGINEER shall upload all addenda onto Buzzsaw. The ENGINEER shall attend the scheduled pre -bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening, develop bid tabulations in hard copy and electronic format and return four (4) copies of the bid tabulation, along with the contract documents to the City within three (3) working days after bid openings. 3. Construction Documents The ENGINEER will make available for construction, upon request by the CITY, up to twenty (20) sets of the final approved and dated plans and specifications and contract documents for the projects to the CITY for distribution to the contractor and City personnel. 4. Assistance During Construction The ENGINEER shall attend the pre -construction conference for the project. EAZ-15 Rev 04/17/09 After the pre -construction conference, the ENGINEER shall provide project exhibits, and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall also consult with and advise the CITY on design and/or construction changes, if necessary. The ENGINEER shall make periodic site visits during construction and provide documentation of the observations made, as requested by CITY. The ENGINEER shall attend the "Final' project inspection and assist with preparation of final punch list, as requested by CITY. EA2-16 Rev 04/17/09 ATTACHMENT "0 COMPENSATION AND SCHEDULE Design Services for West Downtown Storm Drain Structural Rehabilitation City Project No. 01364 (.Compensation A.The ENGINEER shall be compensated a total lump sum fee of $241,287 as summarized in Exhibit "134' Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment A for all labor materials, supplies, and equipment necessary to complete the project. B.The ENGINEER shall be paid monthly payments as described in Exhibit "B-1" Section 1 - Method of Payment. Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER. ((.Schedule Final Plans and Contract Documents for bid advertisement shall be submitted within 255 calendar days after the "Notice to Proceed" letter is issued (excluding City review time). A.Conceptual Engineering Plans - 90 calendar days. B. Preliminary Engineering Plans and Contract Documents - 70 calendar days. ,Final Engineering Plans and Contract Documents - 80 calendar days. .Final Plans and Contract Documents for Bid Advertisement - 15 calendar days. Rev 02-10-09 EXHIBIT "10" I METHOD OF PAYMENT (Supplement to Attachment B) Design Services for West Downtown Storm Drain Structural Rehabilitation City Project No. 01364 I.Method of Payment Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice from the ENGINEER outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Uritil satisfactory completion of Conceptual Engineering plan submittal and approval by the City, a sum not to exceed 30 percent of the total lump sum fee less surveying and construction services. Until satisfactory completion of Preliminary Construction Plan submittal and approval by the City, a sum not to exceed 60 percent of the total lump sum fee, less previous payments and less surveying and construction services. Until satisfactory completion of Final Construction plan submittal and approval by the City, a sum not to exceed 90 percent of the total lump sum fee, less previous payments and less surveying and construction services. The balance of the earnings, less previous payments and less surveying and construction services, shall be payable after Bid opening for the Project has been conducted. Surveying and construction services shall be paid after services are rendered. II. Progress Reports A.The ENGINEER shall submit to the designated representative of the Director of the Department of Transportation and Public Works monthly progress reports covering all phases of design in the format required by the City. B.If ENGINEER determines in the course of making design drawings and specifications that the opinion of probable construction cost of $2,161,768.00 (as estimated in Exhibit B-4) will be exceeded, whether by change in the scope of the project, increased cost or other conditions, the ENGINEER shall immediately report such fact to the City's Director of the Department of Transportation and Public Works and, if so instructed by the Director of the Department of Transportation and Public Works shall suspend all work hereunder. Rev 02-10-09 Design Services for West Downtown Storm Drain Structural Rehabilitation City Project No. 01364 2009 Standard Hourly Rate Schedule Employee Classification Rate/Hour (Rance) Principal Engineer $185-$210 /hour Project Manager /Planner $160 /hour R.P.L.S. $105 /hour R.P.L.S. (Principal) $180/ hour Design Engineer $100-$140 /hour Designer /CAD Operator $70-$100 /hour Survey Technician $70/ hour Clerical $60/ hour Survey Crew $155/ hour Reproduction work will be at current commercial rate. Subcontractors will be paid for at actual invoice cost plus 10%. Rev 02-10-09 B2- 1 EXHIBIT "B-3A" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 013ti4 Consulting Firm Prime Consultant Brown & Gay Engineers, Inc. M/WBE Consultants Gorrondona & Assoc. Inc. Lamb -Star Engineering, L.P. Urban Engineers Groups, Inc. EST, Inc. LA Blueline GM Enterprises, Inc. Non M/WBE Consultants CMJ Engineering, Inc. Total for Professional Services Project Description Professional Services Prime Responsibility Engineering &Project Management Surveying/SUE Traffic Control/SWPPP Water/Sanitary Sewer Design TV Inspection Printing and Reproduction Geotechnical - Drilling Services Amount $ 179,037.00 Geotechnical -Engineering Services $ Scope of Services Water, Sewer, Paving &Drainage 22,950.00 21,000000 9,000.00 2,000000 2,500.00 2,700800 60.150.00 Percent 74% 2,100.00 1% $ 241,287.00 Total Fee $ 241,287.00 M/WBE Fee Percent $ 60,150 25% EB3A-1 EXHIBIT "B-3B" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 01364 PROFESSIONAL SERVICES FEE SUMMARY Transportation &Public Works: Paving &Drainage $122,121 Water Department: Water Improvements $6,423 Sanitary Sewer Improvements $29,151 $35,574 T&PW and Water Basic Services Total $157,695 Special Services: Transportation &Public Works: Level B SUE $ 11,475 Study & Engr. Recommend. for In -situ Structural Rehab of Storm Drain $ 15,945 TV Inspection - CN1 - Cherry to Lamar (EST Provide Services) $ 21000 Review TV Inspection - CN1 - Cherry to Lamar/Develop Scope Recommendation $ 21940 Review TV Inspection for Lines in Fair Condition/Develop Improv. Scope $ 10,100 Coordinate Utility Impacts with ONCOR/TXU $ 5,120 GeotechnicalInvestigation/Report $ 41800 Printing & Reproduction Subtotal $ 71235 Construction Assistance $ 3,392 Administrative (10%) Fee on M/WBE Firms $ 41658 Additional Services Subtotal $ 67,665 Water Department: Printing &Reproduction Subtotal $ 2,107 Construction Assistance $ 988 Administrative (10%) Fee on M/WBE Firms $ 1,357 Additional Services Subtotal $ 41452 T&PW and Water: Additional Services Total $ 72,117 EB3B-1 EXHIBIT "12-312" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 01364 SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE) A. SUMMARY OF TOTAL FEE Service Descri tion Water Sewer Pavin Total Engineering Services $6,423 $29,151 $122,121 $ 157,695.00 Special Services $ 626.00 $ 2,838.00 $ 64,273600 $ 67,737.00 Surveying Services $ - $ - $ 11,475.00 $ 11,475.00 Construciton Services $ 178.00 $ 810.00 $ 39392000 $ 4,380.00 $ 79227.00 $ 32,799.00 $ 201,261.00 $ 241,287.00 B. BREAKDOWN OF WATER, SEWER AND PAVING FEES (LESS SURVEY 0EES1 1. Total Water Fee (less surveying &construction services) _ $ 7,049 Concept (300/) $ 2,115 Preliminary (60%) $ 4,230 Final (10%) $ 704 2. Total Sewer Fees (less surveying & construction services) _ $ 31,989 Concept (30%) $ 91597 Preliminary (60%) $ 19,194 Final (10%) $ 31198 3. Paving Fees (less surveying & construction services) _ $ 186,394 Concept (30%) $ 555919 Preliminary (60%) $ 111,837 Final (10%) $ 18,638 ��a EXHIBIT "B-3C" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 01364 FEES FOR SURVEYING SERVICES Surveying Services (Gorrondona &Assoc. Inc. ) Paving Topographic Surveys Water Topographic Surveys Sanitary Sewer Topographic Surveys T&PW and Water Department Total for Surveying Services: 2,295 LF @ $5.00/LF $ 0 11,475 EB3C-1 EXHIBIT "B-3D" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION loth Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 01364 FEE FOR REPRODUCTION SERVICES Printing &Reproduction Conceptual Design Report 9 Sets of Report $0.20/Pg X 100 Pg/Report X 9 = $ 180 Preliminary & Utility Clearance Plans 15 Sets of Constr. Plans (Full Size) $2.00/Sheet X 35 Sht/Plan X 15 = $ 1,050 9 Sets of Constr. Plans (11X17- Half Size\) $1.00/Sheet X 35 Sht/Plan X 9 = $ 315 2 Sets of Specifications $0.20/Sheet X 250 Pg/Spec X 2 = $ 100 Final Plans 4 Sets of Constr. Plans (Full Size) $2.00/Sheet X 35 Sht/Plan X 4 = $ 280 9 Sets of Constr. Plans (11X17- Half Size\) $1.00/Sheet X 35 Sht/Plan X 9 = $ 315 9 Sets of Specifications $0.20/Sheet X 250 Pg/Spec X 9 = $ 450 Construction Documents 50 Sets of Constr. Plans $2.00/Sheet X 35 Sht/Plan X 50 = $ 3,500 50 Sets of Specifications $0.20/Sheet X 250 Pg/Spec X 50 = $ 2,500 Mounted Exhibits for Public Meetings 1 Drawing $30.00/Board X 4 Each = $ 120 Final Mylars for Record Purposes 1 Set of Plans $10.00/Sheet X 35 Sht/Plan X 1 = $ 350 PDF - Water and Sewer Files Scanning/PDF Creation $4.00/Sheet X 11 Sheets = $ 44 CD Creation 1 - CD = $ 15 PDF -TPW Scanning/PDF Creation $4.00/Sheet X 27 Sheets = $ 108 CD Creation 1 - CD = $ 15 Printing &Reproduction Subtotal Transportation &Public Works Water Department (Water &Sanitary Sewer): 9,342 $ 7,235 $ 2,107 E83D-1 N O N O O 0 0 O N O O O N ai aD N N N N c7 n n m N O t7 O M 6 O F N N N N N N N N N N N N N N N N ~m aa}} mm CY 6 Y O O i N N O N N O _ Q t 0 H 6 O O yy L 0 m CaC W N po pN _� S y+ CC`3 FN- � 0 F N N y F W hh W N ul FF% W y to as d O. W w W W 2 N y y h y N= y N �=/1 q y= ¢ f mE cc Z 0 7 N N N �- N N^^ 1� N N yy� W N m a i E m c O 0 Ul m . m m a 2 r = c U m o m m N In c > 4 g _ N a Pi A fp m y ro o o — C c =¢ C 9 U $ 0 U m p O O m E_ r a a m CL w =_US E v 5 t a U E o a om� ul m Zt ¢ U p p ro e V a 0O oo E U `o vl =+.`9 m.Y m Oval `m ¢a c J € E m a c c " m m m o 0 o m> Z W c qO m i! c m 19 '" m j y Li 3 m xa c o m m m v� [t Jcoomm3m ` c 4 cm w w 24 � . N c oo mro mam o N n m a o m C 0 U2 N ZN N (/i m C U m 3 N W V F.c N m m °m m m v m m �' m 2 m m .0 9 m w E v£ E U 1{c1 y� L 'm `0 c d� d� m o p 0 o d .G O.� oUUo a 0. g2 0a`a a aaoino�a W N U y m pl M m m W a ap 00 O N m m �O yy mm N m^ �y �O m pp t°�i m O d N VI aD t7 d m O t7 O) N N (h .- .- N w n < V `mq LO CD 6 Of w H H N N N N H N N N H H H N H N N N (p am0 N M �O toIWIMININI cl t N uP) Cg 1111101 t m i C O e N N d O v ap pp ��pp O 1C in b m N ^' m N d 0 N N y$ 01 C .... N w H too 0 L m ? m m N N N b J (to D 0 O N °E =w===ww==www to w Z www' a _ h y y y y y y y y y( y N N y N A O' E oc � t 0 o m c A o y y m m Y a c m F c CO O (7 Cot m U n u a s eNi m o y L? m a o a u� E o a m E ry m ~ O c o 0 c2 m o m O m N m ELm¢ c U y 3 y N 2 0 l° 0£ c m U m m o f c 0 0 ^D L Q m a O 0 0 C m J 0 .� m O O .o y N O �' C t U m' 0 m G 5 m m¢ m `= E m O N t __ m m N 9 x ;� q W c m v a o ro m. y > m m ro to m �1 m m z ,� cc E o c �a m z m a e$ .-t c u�y a a> -� m m -m 3 m � C ad n. c 2 c p m o m m O x N O - E = m m U a 3 y m N N E `o e N o� .: ' o ci an d 3 c ?:`o V h m^ N Y N N a a a co (j m� O N c '� a X m 9 9 w °- m m ami o m m m m m m m m .o m U o m m w A m 3 c t r z c i) L t c c c a 1° m n'Y '�u O U m c we cc o a m U o C �L t C c y� y vy a) g y y h h m u a c c c c o m p F ILL IL 11 a IL U Q U tl C 10 mQO J a r � � o O Q J � Q 61 � Cl) 410 iHCw x N c J Q _UNY C zz�> �ac,�. rn G �. c ®era OV U) Z Z W 3in.o OF m Z O N O o 0 J N W F Y] N O N N 1A N O^ c 2 � F1 V3 N N N fA N N � Y o j Ic r N N N pp V t� pp pO C] O C C m W O co O O v � H N O O a0 O f0 N N U 001 a7 N � O O o m C y N w N N N N N N ov co to N ao m r W L O ^ v W p., N u m Q e d W O m `O v �D �O N M O W 0 yN S c v N C IN ma o C of m a a n o r. o t A et N C a y H z Z W Z p > Z Z a y �a 47 4) z N N � s N 411,1 E o 0 0 0• N v a c All O CU 0 3 o `o c 0 o E m cc o f c_ m n o a m y 3 c D c m Eo 8 a d c m a m a s E m .y 'o 'w 4J S •m fC o aLi o 'C ,$� m� M O O. h N N O V _ o c n U) ro •y y y 0 3 m E$ a `m o y E e m ? a c c > C - 'o •c o c a a m E m° c° E v y pm c m ` o o o oE E $ oo a5 ' ` Z• y cm ¢ WAC o o_ W o a -. a)¢ ao '`m o To aNi 'U.�d a'Sy� n as > 93 o mm m E m o R fo m aE eE Z : N Y m ac> C C nm Oo m C 0p ° O aCl 0 fo 9 E W m m a o o m ffi m m Q �C 5 o a c° o c Im m'c rL a m o a w 3 3 W x dE ° E m Q m U 2 5 c $ h L` rn o� W e° � .; y o_ c y m o` a w N U i m y 3` o m m m W m ?� 3 3 m m e c p� U > c W m m `d g m c m m 'v m m W E E E E v o a' m �+ m o o 3 3 a s� m�oxa¢wiE u'ac�'na o o m 6. a (0 p ¢ ¢ a a` 0 U E a` t- t- � O¢ J Q Q �! 4 R H 7/29/2009 EXHIBIT "B-3E" (Supplement to Attachment B) Design Services for WEST DOWNTOWN STORM DRAIN STRUCTURAL REHABILITATION 10th Street (Cherry Street to Lexington Street) Lipscomb Street (Pennsylvania Ave to Broadway Ave) City Project No. 01364 Budgeted Sheet Count 1 COVER SHEET 2 LEGEND, SHEET INDEX & GENERAL NOTES 3 GENERAL NOTES 4 PROJECT CONTROL SHEET - (1 OF 1) 5 WATER LAYOUT MAP - (1 OF 1) 6 SANITARY SEWER LAYOUT MAP - (1 OF 1) 7 8" WATER PLAN - 10th STREET 8 8" WATER PLAN - LIPSCOMB 9 L-116 - 8" SANITARY SEWER PLAN & PROFILE -STA 0+00 TO STA 6+00 10 L-116 - 8" SANITARY SEWER PLAN & PROFILE -STA 6+00 TO STA 12+00 11 DRAINAGE AREA MAP 12 HYDRAULIC COMPUTATIONS 13 STORM DRAIN PLAN & PROFILE - 10th STREET - STA 10+00 TO STA 13+00 14 STORM DRAIN PLAN & PROFILE - 10th STREET - STA 13+00 TO STA 16+00 15 STORM DRAIN PLAN & PROFILE - 10th STREET - STA 16+00 TO STA 19+00 16 STORM DRAIN PLAN & PROFILE - 10th STREET - STA 19+00 TO STA 22+00 17 STORM DRAIN PLAN & PROFILE - LIPSCOMB STREET - STA 30+00 TO STA 33+00 18 STORM DRAIN PLAN & PROFILE - LIPSCOMB STREET - STA 33+00 TO STA 36+00 19 STORM DRAIN PLAN & PROFILE - LIPSCOMB STREET - STA 36+00 TO STA 39+50 20 STORM DRAIN DETAIL SHEETS (1 of 3) 21 STORM DRAIN DETAIL SHEETS (2 of 3) 22 STORM DRAIN DETAIL SHEETS (3 of 3) 23 WATER DETAIL SHEET 24 SANITARY SEWER DETAIL SHEET 25 TRAFFIC CONTROL PLAN 26 TRAFFIC CONTROL PLAN 27 TRAFFIC CONTROL PLAN 28 TRAFFIC CONTROL PLAN 29 TRAFFIC CONTROL PLAN 30 TRAFFIC CONTROL PLAN 32 TRAFFIC CONTROL PLAN 33 EROSION CONTROL PLAN (1 of 3) 34 EROSION CONTROL PLAN (2 of 3) 35 EROSION CONTROL PLAN (3 of 3) EB3E-4 m i C E E E� t� N m � F- d m E x a W Q- cn O CD CD CD O O O O O to (M co O 1� 0) (D O O L CD O I� r co C lLO (0 O N 0 r U r N 03 O fA ff.), (f? O O O o O O O In CO T d' a0 O O CO 1� (0 T (� 0cow m i i M co a) � O U W W 69 c 0 O O o 0 N cm mtd' V O :3 r O C d d' 00 O N cis ° 00 ov 0 0 0 � r co LP) r 1� Z c 00 N r 00 00 G 0 0 O U H N !Y a o c m i m (D (L a) �. U) E O 0 J r J 1 a W Date: June 17, 2009 BGE Job Number: COF05-05 Exhibit B-4a ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Drainage Improvements PROJECT NAME: West Downtown Storm Drain Structural Rehabilitation -City No. 01364 Project Manager: Michael Owen, PE CPMS RECORD NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL AMOUNT Draina a Im rovements 00054 Box Culvert - Remove LF 950 $ 10.00 $ 91500.00 00057 Box Culvert -Cast in Place-34 to 66 inches ~ Install LF 950 $ 450.00 $ 427,500.00 00080 Pipe _ Remove LF 11185 $ 5.00 $ 5,925.00 00082 Pi a-24 Inch-CL III ~ Install LF 200 $ 75.00 $ 15,000600 00083 Pi a-30 Inch-CL III � Install LF 60 $ 90.00 $ 5/400900 00086 Pi a-42 Inch-CL III ~ Install LF 310 $ 145.00 $ 447950.00 00087 Pi e-48 Inch-CL III � Install LF 260 $ 175.00 $ 45,500.00 00088 Pi a-54 Inch-Cl. III � Install LF 525 $ 200.00 $ 105,000.00 00100 Storm Water Pollution Prevention Plan > than 1 Ac SWPPP � Install LS 1 $ 10,000000 $ 10,000.00 00101 Unclassified Trench Excavation & Backfill � Install CY 81730 $ 2.00 $ 17,460.00 00102 Inlet � Remove EACH 10 $ 750.00 $ 7,500.00 00106 Inletdnline-10 Ft Install EACH 10 $ 3,000.00 $ 301000.00 00116 Manhole � Remove EACH 9 $ 11000000 $ 91000000 00117 Storm Drain Manhole- > Than 4 Ft Install EACH 9 $ 89000.00 $ 72,000.00 00181 Traffic Control Install LS 1 $ 259000.00 $ 25,000.00 00372 Trench Safety System 5 Foot Depth Install LF 29135 $ 1.00 $ 21135400 00414 Utility Adjustment � Repair (Includes adjustment to existing underground electric and gas lines) LS 1 $ 175,000.00 $ 1759000.00 00424 Curb & Gutter ~ Remove LF 19050 $ 2.00 $ 2,100.00 00443 Pavement-2 Inch Min Overlay - Replace (Additional Asphalt Pavement Repair Beyond the Trench Width) SY 61390 $ 15.00 $ 959850.00 00443 Pavement-2 Inch Min HMAC on 2/27 Concrete Base (2000-1A) ~ Install LF 29420 $ 55.00 $ 133,100.00 00494 Subgrade - Crushed Stone ~ Install CY 20 $ 20.00 $ 400.00 00529 Walk Remove SF 400 $ 1.00 $ 400.00 00530 Walk-4 Ft ~ Install Concrete SF 400 $ 4.50 $ 11800.00 00532 Walk-ADA Wheelchair Ramp Install SF 600 $ 10.00 $ 67000.00 00542 Dehole-Exploratory Excavation - Study EACH 12 $ 11000600 $ 129000.00 00544 Fill Material-Flowable Fill � Install CY 21190 $ 100.00 $ 219,000.00 00837 Concrete- Type B Install CY 20 $ 250.00 $ 51000.00 00839 Concrete -Type E - Install CY 20 $ 275.00 $ 5,500.00 00844 Curb -Curb & Gutter as directed by Inspector ~ Replace LF 11050 $ 30.00 $ 31,500.00 00847 Valve Box -Adjustment � Services EACH 8 $ 300.00 $ 21400.00 Paving Improvement Subtotal $ 1,521,920 Contingencies (10%) $ 152,190 Paving Improvements Total $ 1,674,110 EB4a-1 Date: June I , 2009 BGE Job Number: COF05-50 Exhibit B-4b ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Water Improvements PROJECT NAME: West Downtown Storm Drain Structural Rehabilitation -City No. 01364 Project Manager: Michael Owen, PE CPMS RECORD DESCRIPTION UNIT QUANTITY UNIT TOTAL NO. PRICE AMOUNT 00618 Pi e-Pressure-8 Inch � Install PVC LF 480 $ 45.00 $ 21,600.00 00616 Pipe-Pressure-6 Inch Install PVC LF 60 $ 40.00 $ 21400,00 00568 Pipe Fittings- < Than 16 Inch DI Pipe Install TON 1 $ 41000.0O $ 41800,00 00749 Valve-8 Inch -Gate- wNalve Box � Install EACH 7 $ 900,00 $ 61300,00 00745 Valve-6 Inch -Gate- wNalve Box - Install EACH 6 $ 700.00 $ 4,200.00 00546 Fire Hydrant Install EACH 6 $ 2,000.00 $ 12,000.00 00548 Fire Hydrant -Barrel & Stem Extension Install VF 6 $ 100.00 $ 600.00 00553 Meter Box Class "A"� Install (Polyethylene) EACH 4 $ 200.00 $ 800,00 00763 Water Service-2 Inch � Install LF 240 $ 25.00 $ 61000.0O 00767 Water Service-2 Inch -Tap to Main - Install EACH 4 T 600.00 $ 2,400.00 00751 Valve -Gate � Remove & Salvage EACH 13 $ 300.00 $ 3,900,00 00547 Fire Hydrant ~ Remove EACH 6 $ 300.00 $ 1,800.00 00372 Trench SafetyS stem 5 Foot Depth - Install LF 240 $ 1.00 $ 240.00 00443 Pavement-2 Inch Min HMAC on 2/27 Concrete Base 2000-1A Install LF 280 $ 40.00 $ 11,200400 00844 Curb -Curb & Gutter as directed by Inspector Replace LF 60 $ 30.00 $ 11800000 Sewer Improvements Subtotal $ 80,040 Contingencies (100/6) $ 81004 Sewer Improvements Total $ 88,044 E64b-1 Date: June 17, 2009 BGE Job Number: COF05-50 Exhibit B-4c ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST Sanitary Sewer Improvements PROJECT NAME: West Downtown Storm Drain Structural Rehabilitation -City No. 01364 Project Manager: Michael Owen, PE DESCRIPTION I UNIT I QUANTITY I UNIT I PRICE TOTAL I AMOUNT CPMS RECORD NO Sewer Improvements 00196 Collar -Manhole � Install EACH 12 $ 350.00 $ 4,200.00 00201 Inspection -Post Construction Cleaning & TV � Study LF 11350 $ 2.00 $ 20700.00 00202 Ins ection-Preconstruction Cleaning & TV ~ Study LF 11350 $ 3.00 $ 4,050.00 00206 Manhole Remove EACH 12 $ 250.00 $ 31000.00 00213 Manhole-Std 4 Ft Diam to 6 Ft Depth) Install EACH 12 $ 21500.00 $ 301000.00 00214 Manhole-Std 4 Ft Diam-Added Depth (over 6 Ft Depth) _ Install VF 24 $ 180.00 $ 41320.00 00217 Manhole -Vacuum Test � Services EACH 12 $ 150.00 1 $ 13800.00 00218 Manhole -Watertight Insert Install EACH 12 $ 80.00 $ 960.00 00228 Pi e-Sewer-10 Inch- SDR26 All Depths) Install LF 11260 $ 60.00 $ 759600.00 00260 Pi e-Sewer-15 Inch Ail Depths) - Install LF 150 $ 90.00 $ 131500.00 00350 Pipe-Sewer-8 Inch-SDR26 All Depths) Install LF 450 $ 45.00 $ 201250.00 00319 Pipe-Sewer-6 Inch Ail Depths) Install LF 20 $ 35.00 $ 700.00 00354 Sewer Service-4 Inch Install LF 280 $ 20.00 $ 51600.00 00355 Sewer Service-4 Inch Service Tap Install EACH 14 $ 450.00 1 $ 69300.00 00356 Sewer Service4 lnch-2 Way Clean Out Install EACH 14 $ 200.00 $ 2,800.00 00372 Trench Safety System 5 Foot Depth Install LF 11470 $ 1.50 $ 2,205400 00402 Driveway ~ Remove SF 300 $ 1.50 $ 450.00 00404 Driveway-6 Inch Install Concrete SF 300 $ 6.00 $ 13800.00 00443 Pavement-2 Inch Min HMAC on 2/27 Concrete Base 2000-1A ~ Install LF 11770 $ 55.00 $ 97,350.00 00493 Subgrade-Crushed Limestone For Misc. Placement Install CY 20 $ 20.00 $ 400.00 00544 lFill Material-Fiowable Fill ~ Install CY 1 900 $ 85.00 $ 761500.00 00839 jConcrete-Type E ~ Install CY 20 $ 275.00 $ 51500.00 00844 lReplace Curb -Curb & Gutter as directed by Inspector LF 110 $ 30.00 $ 31300400 Sewer Improvements Subtotal $ 3633285 Contingencies (10%) $ 36,329 Sewer Improvements Total $ 39%614 EB4c-1 Consulting Contract Schedule Speciflcatlons City of Fort Worth Capital Improvement Program FORT WORTH Dept.: PMO Subject: Schedule Specifications Version:1 *0 Effective Date: June 30, 2009 Attachment D —Project Schedule This PROTECT requires a Tier 3 schedule as defined herein and in the Citt!'s Schedule Guidance Document. D1. CONSULTING SERVICES SCHEDULE DEVELOPMENT: The CONSULTANT shall prepare schedules for consulting services that meet the requirements described in this specification, showing by Critical Path Method (CPM) the planned sequence and timing of the Work associated with the Agreement. All submittals shall be submitted in PDF format, and schedule files shall also be submitted in native file format (i.e. file formats associated with the scheduling software). The approved scheduling software systems for creating the schedule files are: — Primavera (Version 6.1 or later or approved by CITY) Primavera Contractor (Version 6.1 or later or approved by CITY) Primavera Sure I rak (Version 3.x or later or approved by CITY) — Microsoft Project (Version 2003/2007 or later or approved by CITY) D2. BASELINE CONSULTING SERVICES SCHEDULE: Following notice -to -proceed, the CONSULTANT shall develop, submit and review the draft detailed baseline consulting services schedule with the CITY to demonstrate the CONSULTANT's understanding of the Agreement requirements and approach for performing the work. The CONSULTANT will prepare the final detailed baseline consulting services schedule based on CITY comments, if any, and submit to the CITY no later than the submittal of the first project invoice. The following guidelines shall be adhered to in preparing the baseline schedule, and as described in further detail in the CITY's Schedule Guidance Document. a. The scope shall be subdivided by work breakdown structure (WBS) representing the tasksI subtasks, and activities associated with delivering the work. b. The schedule shall accurately describe the major work activities, key milestones, and dependencies/relationships as appropriate to the work. c. The schedule should include appropriate meetings, review periods, critical decision points, including third party utility dependencies and reviewing agencies. D3. PROGRESS CONSULTING SERVICES SCHEDULE: The CONSULTANT shall prepare and submit monthly to the CITY for approval the updated schedule in accordance with Dl and D2 and the CITY's Schedule Guidance Document inclusive. As the Work progresses, the CONSULTANT shall enter into the schedule and record actual progress as described in the CITY's Schedule Guidance Document. The updated schedule submittal shall also include a concise schedule narrative that highlights the following, if appropriate and applicable: • Changes in the critical path, • Expected schedule changes, • Potential delays, CITY OF FORT WORTH, TEXAS PROGRAM MANAGEMENT OFFICE • Opportunities to expedite the schedule, • Coordination issues the CITY should be aware of or can assist with, • Other schedule -related issues that the CONSULTANT wishes to communicate to the CITY. D4. PERFORMANCE AND CONSULTING SERVICES SCHEDULE: If the work accomplished falls behind that scheduled due to factors within the CONSULTANT's control, the CONSULTANT shall take such action as necessary to improve the progress of the Work. In addition, the CITY may require the CONSULTANT to submit a revised schedule demonstrating the proposed plan to make up the delay in schedule progress and to ensure completion of the Work within the allotted Agreement time. D5. SCHEDULE TIERS SPECIAL INSTRUCTIONS: The requirements for the schedule are determined based on the nature and needs of the project. The schedule tier for this project is stated at the top of this document. CONSULTANT shall submit each schedule relying on the CITY's current Schedule Guidance Document. D6. SCHEDULE SUBMITTAL AND PAYMENT: As stated in III.A.(1). of the Agreement, CONSULTANT shall provide the information required by Attachment D. CONSULTANT's monthly invoices will not be accepted and processed for payment without monthly schedule updates that are submitted in the time and manner required by Attachment D and the CITY's current Schedule Guidance Document. CITY OF FORT WORTH, TEXAS PROGRAM MANAGEMENT OFFICE 20F2 11TH- It1111111111D u■ wu _. � ��� ���. -% %� p Kim it 11■' �, M if fill [fill 111 �r•+ r--PEl:ER.SMITH-E= L18 - Lipscomb Street (Broadway St to Pennsylvani C u[ elm PR ITT ST W o� �P_RUITT ST < m— � o PER_STJ Z I Ifimmffl COOPER ST IS ATTACHMENT "E" (COUNCIL DISTRICT 9) CITY PROJECT NO. 01364 CITY MAP: 2048-388 & 2048-292 MAPSCO: 76D & 76H IJ/ BROWN SAY £t? S*tEEM St{C, WEST Brown 8 Gay Engineers, Inc. 108 Well Bih Streal, Suita 200, Forl Wonh, TX 78102 Td: 817-88T-0730 Fac: e17-887.8135 -Civil engineers end xneyara- IN C1 N - 10TH STREET & LIPSCOMB STREET PROJECT LOCATION MAP CNYPROJECTNO DATE: D(HIBI 00' 01364 JUNE 2009 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, October 20, 2009 LOG NAME: 20WESTDOWNTOWN REFERENC .. - SUBJECT: Authorize an Engineering Agreement in the Amount of $241,287.00 with Brown &Gay Engineers, Inc., for Design of the West Downtown Storm Drain Structural Rehabilitation Project RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an Engineering Agreement with Brown &Gay Engineers, Inc., in the amount of $241,287.00 for design of the West Downtown Storm Drain Structural Rehabilitation project. DISCUSSION: The Storm Water Management Program was established to reduce flooding in Fort Worth, presence streams, minimize water pollution and to operate the storm water system in a more effective manner to fully comply with state and federal regulatory requirements. This will be accomplished by infrastructure reconstruction and system maintenance, master planning, enhanced development review and increased public education and outreach. (Project No. 01364) On October 16, 2007, (Ordinance No. 17840-10-2007) City Council authorized the issuance and sale of $25,000,000.00 in Storm Water (Drainage) Revenue Bonds, Series 2007, to fund a two year Storm Water Capital Project program. Due to aging infrastructure and localized flooding complaints, the need for a study of the existing drainage infrastructure in the west downtown area was identified. The Henderson Street Storm Drain Watershed Planning Study —Phase II (City Project No. 00078) was completed by Halff Associates for the City of Fort Worth in June 2007. The planning study developed three recommended improvement alternatives including the replacement of the trunk lines located underneath 10th Street and Lipscomb Street. A request for qualifications to provide drainage design was issued by the City in August 2007, and 26 design consultants submitted statements of qualifications, including Brown &Gay Engineers, Inc. Brown &Gay Engineers, Inc., was selected to provide design services for the replacement of the trunk lines underneath 10th Street and Lipscomb Street identified in the Henderson Street Storm Drain Watershed Planning Study. The design services for the subject engineering agreement will include the following: performance of television inspection of existing storm drain along 10th Street from Cherry Street to Lamar Street; review of existing television inspection reports and evaluation of engineering recommendations included in the Henderson Street Storm Drain Watershed Planning Study; evaluation of multiple alternative in -situ structural rehabilitation methods with recommendations; storm drain and pavement design for improvements on 10th Street from Cherry Street to Lexington Street and on Lipscomb Street from Pennsylvania Avenue to Broadway Avenue; and preparation of engineering plans and contract documents Logname: 20WESTDOWNTOWN Page 1 of 2 for the bidding and construction of the recommended improvements. Brown &Gay Engineers, Inc., proposes to perform the design services for a lump sum fee of $241,287.00. City staff considers the fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $86,470.00 is required for project management by the Transportation/Public Works Department. Brown &Gay Engineers, Inc., is in compliance with the City's M/WBE Ordinance by committing to 25 percent M/WBE participation. The City's goal on the project is 25 percent. This project is located in COUNCIL DISTRICT 9, Mapsco 76D and 76H. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Storm Water Capital Projects 2007 Revenue Bond Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P229 531200 209280136431 ATTACHMENTS 1. FAR West Downtown(3).pdf (CFW Internal) 2. FUNDS_AVAI.LABLE.doc (CFW Internal) 3. MAP 20WESTDOWNTOWN.pdf (Public) 4. MWBE 20WestDovyntown _�3�,.pdf (CFW Internal) P229 531200 209280136432 P229 531200 209280136433 P229 531200 209280136451 P229 531200 209280136485 Fernando Costa (8476) William Verkest (7801) Michael Owen (8079) $67,631.00 $135,261.00 $22,540.00 $11.475.00 4 380.00 Logname: 20WESTDOWNTOWN Page 2 of 2