Loading...
HomeMy WebLinkAboutContract 40079-A3AMENDMENT TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 40079, (the CONTRACT) which was authorized by M&C C-24151 on the 6th day of April, 2010 in the amount of $121,823.00, and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $23,800.00 which was administratively authorized on June 24, 2011 and Amendment Number 2 in the amount of $4,025.00 which was administratively authorized on January 9, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project. Scott -Sunset Drainage Improvements, Project No. 00628; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 15, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $4,910.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $154,558.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFIOIAL REGOR® CITY SECRETARY FT. WORTH, TX Page -1- ATTEST: EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE* APP RECOMMENDED: j. v Douglas /Vq. Wiersig, P.E. Director, Transportation ENGINEER "qe Nall and Perkins, President DATE : �5�2 Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney �.po^c�Ziq� Id•o° / 1 04 Mary J. Ka�'is�r I „�'2i�2 City Secretary V' M&C Date: OFFICIAL RECORD CITY SECRETARY T. WORTH, TX Inc . Page -2- Civil Engineering Surveying Landscape Architecture Planning May 15, 2012 Mr. Michael Owen, P.E. City of Fort Worth Transportation and Public Works Dept, 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Scott Sunset Drainage Improvements City Project No. 00628 Amendment No. 3 TNP Project No. FTW10133 Dear Mr. Owen: Teague Nall and Perkins (TNP) is submitting this fee amendment for the above referenced contract based on additional services requested by the City of Fort Worth. The following is a brief description and cost for the additional services TNP will provide: Additional Services forGeotechnical Services Geotechnical services will be utilized to get2 soil bores at depths of 50' and 25'to help determine the depth of rock at the Trinity River outfall. A soil bore log and short geotechnical report will be included with this work. This information is particularly critical in determining the type of installation that will be necessary for the Sheet Piling coffer dam. Total ContractAmendment No.3: $4,910 Summary of Contract Fee: Original ContractAmount: $ 121,823 Amendment No. 1: $ 23,800 Amendment No. 2: $ 41025 Amendment No. 3: $ 4,900 Revised ContractAmount $ 1541548 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALLAND PERKINS, INC. Tom Dayton, P.E. Copy: Mr. Michael Jones, PE - TNP 1100 Macon Street •Fort Worth, Texas 76102.817.336.5773 phone • 817.336.2813 fax www. tnp-online. com �z .� � �o �� 'LA vy` M in W W..fi�rr i d J 1a- ark F- Z 0 a v z 0 `� a v00000�o h N� N N� W V!� � NO A � Y �o c_� �a� & ;.; �F-f-;? aka .. a ~ww w� ����~ �� 0 Z �o my �� C ui ��W �m� o LL O U�a w