HomeMy WebLinkAboutContract 40079-A3AMENDMENT
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 40079,
(the CONTRACT) which was authorized by M&C C-24151 on the 6th day of
April, 2010 in the amount of $121,823.00, and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $23,800.00 which was administratively authorized on
June 24, 2011 and Amendment Number 2 in the amount of $4,025.00 which was
administratively authorized on January 9, 2012; and
WHEREAS, the CONTRACT involves engineering services for the
following project. Scott -Sunset Drainage Improvements, Project No. 00628;
and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated May 15, 2012, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$4,910.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $154,558.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFIOIAL REGOR®
CITY SECRETARY
FT. WORTH, TX
Page -1-
ATTEST:
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE*
APP RECOMMENDED:
j. v
Douglas /Vq. Wiersig, P.E.
Director, Transportation
ENGINEER
"qe Nall and Perkins,
President
DATE : �5�2
Public Works Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
�.po^c�Ziq�
Id•o° / 1 04
Mary J. Ka�'is�r I „�'2i�2
City Secretary V'
M&C
Date:
OFFICIAL RECORD
CITY SECRETARY
T. WORTH, TX
Inc
.
Page -2-
Civil Engineering Surveying Landscape Architecture Planning
May 15, 2012
Mr. Michael Owen, P.E.
City of Fort Worth
Transportation and Public Works Dept,
1000 Throckmorton Street
Fort Worth, Texas 76102
Re: Scott Sunset Drainage Improvements
City Project No. 00628
Amendment No. 3
TNP Project No. FTW10133
Dear Mr. Owen:
Teague Nall and Perkins (TNP) is submitting this fee amendment for the above referenced contract
based on additional services requested by the City of Fort Worth. The following is a brief description
and cost for the additional services TNP will provide:
Additional Services forGeotechnical Services
Geotechnical services will be utilized to get2 soil bores at depths of 50' and 25'to help
determine the depth of rock at the Trinity River outfall. A soil bore log and short geotechnical
report will be included with this work. This information is particularly critical in determining the
type of installation that will be necessary for the Sheet Piling coffer dam.
Total ContractAmendment No.3: $4,910
Summary of Contract Fee:
Original ContractAmount: $ 121,823
Amendment No. 1: $ 23,800
Amendment No. 2: $ 41025
Amendment No. 3: $ 4,900
Revised ContractAmount $ 1541548
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALLAND PERKINS, INC.
Tom Dayton, P.E.
Copy: Mr. Michael Jones, PE - TNP
1100 Macon Street •Fort Worth, Texas 76102.817.336.5773 phone • 817.336.2813 fax
www. tnp-online. com
�z
.� �
�o
��
'LA
vy` M
in W
W..fi�rr
i
d
J 1a-
ark
F-
Z
0
a
v
z
0
`�
a
v00000�o
h
N�
N
N�
W
V!�
�
NO
A
�
Y
�o
c_�
�a�
&
;.;
�F-f-;?
aka
..
a
~ww
w�
����~
��
0
Z
�o
my
��
C ui
��W
�m�
o
LL
O
U�a
w