Loading...
HomeMy WebLinkAboutContract 40079-A2TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 40079, (the CONTRACT) which was authorized by M&C C-24151 on the 6th day of April, 2010 in the amount of $121,823.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $23,800.00 which was administratively authorized on June 24, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Scott -Sunset Drainage Improvements, Project no. 00628; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated. October 17, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $4,025.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $149,648.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- OF�ICI�L RECORD CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: INEER T�aau;e, Nall M�.�Yiael A. President s,l P.E ns, Inc. DATE : APPROVAL RECOMMENDED: (/� • W Dougla W. Wiersig, P Direct r, Transportati n and Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: �onzale� Assistant City Secretary 0o t090 d moc 000 000000 ,# b4�a rFTN CIAL RECORD SECRETARY Page -2- WORTH, TX �iM TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning October 17, 2011 Mr. Michael Owen, P.E. City of Fort Worth Transportation and Public Works Dept. 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Scott Sunset Drainage Improvements City Project No. 00628 Amendment No. 2 TNP Project No. FTW10133 Dear Mr. Owen: Teague Nall and Perkins (TNP) is submitting this fee amendment for the above referenced contract based on additional services requested by the City of Fort Worth. The following is a brief description and cost for the additional services TNP will provide: Additional Services for Switching to New Specifications Previously, TNP had submitted contract document specifications (old format) with the 90% plan submittal. This work involves additional effort to prepare new contract documents that conform to the specifications recently adopted by the City of Fort Worth. Using the new specifications will require us to revise the proposal bid form to match the new bid item descriptions and specification numbers associated with each bid item. Also, because some bid items are now paid by a different unit of measure, we will need to revise the plan notes and the quantities. Total Contract Amendment No. 2: $4,025 Summary of Contract Fee: Original Contract Amount: $ 121,823 Amendment No. 1: $ 23,800 Amendment No. 2: $ 44025 Revised Contract Amount $ 1497648 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Rll�� Tom Dayton, P.E. Copy: Mr. Michael Jones, PE - TNP 1100 Macon Street •Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-online. com Task No. 4.0 4.3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for SWU PROJECT - SCOTT SUNSET DRAINAGE IMPROVEMENTS - CONTRACT AMENDMENT #2 Task Description Rate Final Design & Final Construction Documents Additional Services for switching to new specifications/construction documents City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Totals City Project No. 00628 Project I Project I EIT/ Manager Engineer Designer $)40 �125 $95 Total Labor Cost Expense Subconsultant Travel Reproduction MWBE Non-MWBE Total Expense Cost Task Sub Total 8 5 24 $4,025 $0 $0 $0 $0 $0 $4,025 8 5 24 I 81 51 24 $4,0251 01 01 0 0 $4,025 Project Summary Total Hours 37 Total Labor $4,025 Total Expense $0 MWBE Subconsultanf $0 Non-MWBE Subconsultani $0 5% Sub Markup $0 MWBE Participation 0.0% Total Project Cost $4,025 1 of A