Loading...
HomeMy WebLinkAboutIR 8734INFORMAL REPORT TO CITY COUNCIL MEMBERS ��1tF[p e "'), rars To the Mayor and Members of the City Council No. December 13, 2005 Page 1 of 1 SUBJECT: Transportation /Public Works Drainage Project List as of December 2005 In response to a recent Council request, we have attached a list of the currently identified major drainage projects. These projects will address known drainage problems located throughout the City. They have not been fully scoped so the cost estimates shown are conceptual. Each project will need to be studied to develop a detailed scope and budget. As the planned inventory and condition assessment is completed, we expect to identify additional projects that will be added to this project list. Also, every time we complete a watershed study, projects will be refined and new projects will likely be identified. Therefore, the attached list is very preliminary in nature, does not reflect priorities, and will be adjusted frequently. However, we are using this list and the data we have thus far (existing watershed studies, historical flooding data, completed design work, etc.) to develop the first few years of a potential capital program. The capital program would be adjusted based on data obtained from the watershed studies, inventory, and condition assessments. If you need additional information please contact Robert Goode, Transportation and Public Works Director, at 817 392 -7913. Yoswell C ar es City Manager Attachment ISSUED BY THE CITY MANAGER FORT WORTH. TEXAS N v �O L a m R L L m _ m _ a� L V a� 0 U to CD CD N L .�c G v m d N ,o 0 m M o n CO N U') "o D °o 0 co (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) Project No. 'Project Name Citywide Projects ��ditional High Water Warning System Undefined high-water culvert improvements M111 111 11UNTAIIIIIIINYA Citywide minor drainage projects ��Nmill 111 7777 777 7- 7 777777771 MM Council District 2 Projects 'Tony's Creek detention pond rehabilitation McKinley at NW 30th culvert improvements •` # f 19300 Harmon Road culvert improvements at BFC-2 3700 Keller Hicks culvert improvements east of Alta Vista Sansorn Park Drive culvert improvements in Sansom Park arsons Street drainage improvements A Millaim 35th Street NW culvert improvements @ Cement Creek •` i t[McCandless-25th storm drain improvements Cold Springs-Watauga drainage improvements 2400 Meacham Boulevard drainage improvements 11000 Old Denton Road culvert improvements at Big Bear Creek A 0 1 10900 Alta Vista culvert improvements at Big Bear Creek 0 INMTO- 111111114900 Golden Triangle culvert improvements east • North Beach 2200 Cantrell Sansorn bridge improvements @ Little Fossil Creek ��[Mercado C annei Improvements 'Ephriham storm drain improvements RTITITI I M11 -its Kearney-23rd storm drain improvements 'Dry Branch Creek Phase 2 improvements 'East Long-South Meacham storm drain improvements Little Fossil Creek channel improvements Circle Park storm drain improvements e hannel Waftersh ed lmprm,/ements Phase 2 December, 200 5 Page 1 of 6 MAJOR DRAINAGE Projects (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) Project No. Project Name Council District 3 Projects 14000 Lost Creek Blvd, drainage improvements at golf course pond ��[10500 Chapin Road culvert improvements Alemeda St culvert improvements @ MSC-1 ��[Mojave Trail drainage improvements Upper Willow Lake channel improvements Spurgeon-Staples storm drain improvements — ---------------- ---------- --- - -- - -- Luther Lake outfall channel improvements — - - --- ------------ •000 Old Granbury Road culvert improvements ii : Kellis Park Drainage Improvements-------- Pensacola-Royal drainage improvements {r iii iii 'Miscellaneous Overton Park storm drain improvements Overton-Foster Park drainage improvements-- Inwood channel improvements INUTY011111IM- Westland Drainage Improvements • • .Ridglea storm drain & channel improvements Council District 4 Projects • 10110110#11111111111114700 Lake Havasu Trail culvert improvements ••00 Randol Mill Road culvert improvements 11• 11 8100 Trinity Boulevard Culvert Improvements a 41� Boca Raton Blvd at Woodhaven bridge improvements La Valle Grande drainage improvements 11JWAU#;1Q= Fossil Drive Drainage Improvements !Fosdic Lake it rehabilitation ii Randol Mill Road Culvert Improvements North Beach bridge capacity improvements@Little Fossil Creek 'Kimbo Road drainage improvements 1111 Martha Lane Channel Improvements Phase 3 is Prewett Channel drainage improvements ii ii Lower Dry Branch Creek drainage improvements Eastern Hills Drainage Improvements December, 2005 Page 2 of 6 MAJOR DRAINAGE Projects (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) Project No. ..... .. Proi Project Name TMaPSGO Council District t Proba Probable Cost Council District 5 Projects Pending South Pipeline channel improvements 54T 5 $ 500,000 Pending Plant Avenue drainage improvements 79M 5 $ 500,000 Pending 4201 Cravens Road culvert improvements @ VC-1 93D 5 $ 800,000 Pending 11800 Mosier Valley Road culvert improvements 55W 5 $ 1,200,000 TPW-100162 Cottonwood Creek Channel Improvements 80D 5 $ 1,200,000 Pending 9100 Trinity Blvd. culvert improvements (Walker Branch) 67A 5 $ 1,500,000 Pending Quail Road at Elizabeth Road culvert improvements 80S 5 $ 1,500,000 Pending Prairie Dog Channel drainage improvements 92H-L 5 $ 3,500,000 Pending Sun Valley drainage improvements 93K-L 5 $ 3,500,000 Pending Tarrant-Glen Park storm drain improvements 92E-F 5 $ 4,000,000 Pending Wildcat Branch channel improvements 79S-Z 5 $ 5,000,000 Pending Pate watershed storm drain improvements 79W 5 $ 5,000,000 Pending Trinity Blvd/Greenbelt (Walker&W.Fork) bridge improvements 68AEJ 5 $ 6,000,000 Pending Dunbar channel drainage improvements 79Q/U 5 $ 6,000,000 Pending Englewood Heights storm drain improvements 78U 5 $ 7,000,000 Total CD 5 $ 47,200,000 Council District 6 Projects Pending Lower Krauss-Baker Channel improvements 90W 6 $ 250,000 Pending 6300 Vega Drive culvert improvements 89Z 6 $ 300,000 Pending 9600 Cleburne Road West culvert improvements 103X 6 $ 500,000 Pending Berkshire - Hallmark storm drain extension 105A 6 $ 500,000 Pending Rayburn channel improvements 90W 6 $ 1,000,000 Pending 1800 Risinger Road W.culvert improvements @ Sycamore Creek 1040 6 $ 1,200,000 Pending 2400-2500 Crowley-Cleburne Road North culvert improvements 104WX 6 $ 1,600,000 Pending Southgate-Walton drainage improvements 90S-T 6 $ 2,000,000 Pending Wedgwood storm drain improvements 89Q/U 6 $ 4,500,000 Pending South Hulen storm drain improvements 89W 6 $ 5,000,000 Total CD 6 $ 16,850,000 December, 2005 Page 3 of 6 MAJOR DRAINAGE Projects (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) I wi December, 2005 Page 4 of 6 Project Name Council District 7 Projects HAD Scoft-Sunset storm drain improvements =�! r-21gorlml 0 # . . [Quail Run drainage improvements Harmon Road culvert improvements at BFC-3 illi=tlltlkgfj Shore View and Bomber R . culvert improvements 101TOXOTITIR Academy Boulevard Culvert Improvements 12000 White Settlement culvert improvements at Live Oak Creek Crestwood Drainage Improvements M�1400 block Verna Trail North culvert improvements 111111111UNTAII[Ill Indian Creek Channel-Improvements 200 Bonds Ranch Road West culvert improvements 3900 Ohio Garden culvert improvements •- •�4700 WJ Boaz Road culvert improvements 7400 Comanche Trail culvert improvements MICRON 5400 W Boaz Road culvert improvements 0 Ito 200 Zuni Trail North culvert improvements at pond ••00 Wa• ley Robertson culvert improvements at Big Fossil Creek Miscellaneous Mo-nticello storm drain improvements Diaz-Hallo-ran storm drain improvements Me I I iii E Channel Improvements 000 too 2100 Silver Creek Road bridge capacity improvements 15100 Cromwell Marine Creek Road culvert improvements 111104 ovell-Bourine drainage improvements ���73200 Silver reek Road bridge capacity improvements Libbey-Goodman DrainageImprovements East Arlington Heights storm drain improvements I wi December, 2005 Page 4 of 6 MAJOR DRAINAGE Projects (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) Project No. Project Name ma Psco Council District Probable Cost 11 Council District 8 Projects Pending 700 Collard Street drainage improvements under UPRR 78K 8 $ 250,000 Pending 2709 Fairway storm drain extension 92A 8 $ 250,000 Pending Savage-Roma Highland Hills drainage improvements 91 U 8 $ 300,000 Pending Conner Ave.bridge improvemens at Ludelle Channel 78E 8 $ 400,000 Pending Linda Lane storm drain improvements 91 H 8 $ 400,000 TPW-100156 Oakridge Terrace Drainage Improvements 91 L 8 $ 400,000 Pending 2300 E. Berry St. culvert improvements @ SC-3 77Z 8 $ 500,000 Pending Briardale-Ridgeview drainage improvements 91 D 8 $ 500,000 Pending Rendon New Hope Road culvert improvements @ Elm Branch 107Y 8 $ 700,000 Pending 1600 Oak Grove Road East culvert improvements 120A 8 $ 800,000 Pending 10600 Oak Grove Road culvert improvements 105Y 8 $ 1,000,000 Pending 9700 Race Street South culvert improvements 1065 8 $ 1,000,000 Pending 7900 Anglin Drive at EKB Road culvert improvements 107E 8 $ 1,000,000 Pending Old Mansfield Road bridge improvements at Sycamore Creek 77Z 8 $ 1,400,000 TPW-100164 Mackenzie Channel Improvements 78N 8 $ 1,500,000 Pending 9800 Oak Grove Road culvert improvements 105U 8 $ 1,600,000 Pending Maddox Ave @ Sycamore Creek bridge capacity improvements 78N 8 $ 1,700,000 Pending 2400 East Vickery Blvd. bridge improvements @ Sycamore Creek 78J 8 $ 2,000,000 Pending Wesleyan Hills storm drain improvements 78S 8 $ 2,000,000 Pending Everman Parkway channel improvements 105R 8 $ 2,000,000 Pending 11600 Oak Grove Road South culvert improvements 120E 8 $ 2,000,000 Pending East Vickery-IM Terrell storm drain improvements 77B/F 8 $ 2,500,000 Pending Hallmark neighborhood drainage improvements 105E 8 $ 3,000,000 Pending Seminary-Beddell drainage improvements 91 K 8 $ 3,500,000 TPW-100158 Glen Garden Drainage Improvements 92A/E 8 $ 3,500,000 Pending Garden Acres drainage improvements 1190 -D 8 $ 3,500,000 Pending Ayers - Lancaster storm drain improvements 78L 8 $ 4,000,000 Pending Highlands Addition storm drain improvements 77M 8 $ 5,000,000 Pending Vickery's-Hyde Park storm drain improvements 77QIU 8 $ 7,000,000 Total CD 8 $ 53,700,000 December, 2005 Page 5 of 6 MAJOR DRAINAGE Projects (All Projects need to be studied to Develop Scope, Cost, and Priority Ranking) Project No. Project Name Mapsco Council Probable Cost District Council District 9 Projects TPW-100155 Drew Street Detention Pond 90G 9 $ 250,000 Pending Bellaire Drive North culvert improvements at TCU Stadium 75Z 9 $ 300,000 Pending 13th Avenue drainage improvements at FWWR 76G/L 9 $ 300,000 Pending 1700 Park Place culvert improvements at railroad 76Q 9 $ 300,000 Pending Upper Fair Park channel improvements 91 F 9 $ 400,000 Pending Worth Hts.-Echo Lake drainage improvements 91B 9 $ 500,000 TPW-100434 Daniel Meyer Coliseum Drainage Improvements 76W 9 $ 800,000 Pending College-Spurgeon drainage improvements 90M 9 $ 1,000,000 Pending Hubbard Heights storm drain improvements 90L-M 9 $ 1,200,000 Pending Butler-McClure culvert improvements 91 C 9 $ 1,400,000 TPW-100432 Hammond Street drainage improvements 911 9 $ 1,500,000 Pending University-Park Hill storm drain improvements 76N 9 $ 2,000,000 Pending South Ryan Place storm drain improvements 76U-V 9 $ 2,500,000 Pending McLean-Boyd Storm Drain Impovements 90A 9 $ 4,000,000 Pending Seminary Hill drainage improvements 90Q 9 $ 4,000,000 TPW-100161 Hemphill Heights-Devitt Drainage Improvements 77W 9 $ 4,500,000 Pending OLV-Worth Heights storm drain improvements 91A 9 $ 5,000,000 Pending Fairmont-West Magnolia storm drain improvements 76M-V 9 $ 8,000,000 Pending Ryan Place-Arlington Street storm drain improvements 76Q-R 9 $ 8,000,000 Pending Rosemont/Anthony drainage improvements 90H 9 $ 8,000,000 TPW-100182 Forest Park-Berry Drainage Improvements 76X 9 $ 12,000,000 PLN-100252 Bailey's Industrial storm drain improvements 62X 9 $ 20,000,000 Total CD 9 $ 85,950,000 Multi-District Projects Pending Ultimate Dry Branch Creek drainage improvements 63H/M 2,4 $ 20,000,000 TPW-100084 Big Fossil Creek Watershed Improvements 34F-G 2,4,7 $ 8,000,000 Pending 5600 Dirks Road drainage improvements under railroad 102D 3,6 $ 500,000 TPW-100184 Manderly-Suffolk Drainage Improvements 90E 3,9 $ 4,000,000 Pending Bluebonnet Hills storm drain improvements 90A 3,9 $ 5,000,000 TPW-100066 Milam-Robinhood Drainage Improvements 80F 4,5 $ 1,200,000 Pending Precinct Line bridge improvements @ West Fork 67E /1 4,5 $ 3,000,000 Pending Forty Oaks drainage improvements 79F-G 4,5 $ 12,000,000 Pending Miller-Howard- storm drain improvements 92D 5,8 $ 1,500,000 Pendmg Linwood-West Side drainage improvements 768 7,9 $ 8,000,000 TPW-100188 Central Arlington Heights Drainage Improve eats 75G-M 7,9 $ 10,000,000 Pending West Arlington Heights storm drain improvements 75KaQ 7, 9 10,000,000 Pending Samuels-Delga drainage improvements 83 /Ft' Q 8,9 4,000,000 Pending East CBD drainage improvements 63W/X 8,9 $ 8,000000 TPW-100189 Henderson Street Drainage Improvements 7 6661 D 3Y9 $ 1Z000,000 J00 Total Multi-Districl $ 107,200,000 E:]G:ran:d::TotaW111 $ =55qG,5o,0W01e1,x December, 2005 Page 6 of 6