Loading...
HomeMy WebLinkAboutContract 39578COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. �� U WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, ahome-rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: CVS Pharmacy, Inc. a Rhode Island Corporation Authorized Signatory: Michael B. Nulman Title: Assistant Secretary, Senior Legal Counsel Project Name: CVS #2167 ect Location: SEC Timberland Blvd. & IH-35W Additional Streets: N/A Plat Case No.: FP-009-026 Plat Name: Moriah at Timberland Addition Mapsco: 21G Council District: 2 City Project No: 01420 To be completed by Received by: CFA: 2009-049 DOE:6308 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX i NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Faces ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (AIA., Sewer (A4) X, Paving (B) X Storm Drain (B4) `X , Street Lights & Signs (C) 'X E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Hart, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: CVS Pharmacy Q167 CFA No.: 2009-049 DOE No.: 6308 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2, Sewer Construction Water and Sewer Construction Cost Sub -Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Developer's Cost $ 23,200.00 $ 60,231.25 $ 83,431,25 $ 57,164.86 $ 123356.50 $ 17,700,50 $ 87,221,86 $ 170,653.11 $ 1,668.63 $ 1,668.63 $ 3,337.25 $ 2,780.85 $ 1,390.43 $ 708.00 $ 4,879.28 $ 8,216.53 Choice Amount (ck onel � Bond = 100% $ 170,653.11 Com letion A reement = 100% /Holds Plat $ 170,653.11 Cash Escrow Water/Sanitary Sewer= 125% $ 104,289,06 Cash Escrow Paving/Storm Drain r= 125% $ 109,027.33 Letter of Credit = 125% w/2 r expiration period $ 2131316,39 7 IN TESTIMONY WHEREOF, the City of Fort or has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said DeCv�eloper has executed this instrument in quadruplicate, at Fort Worth, Texas this f of ��� 200a CITY OF FORT WORTH - Recontf�aei:ded by: Water Department Wendy Chi-)�abulal, EMBA, P.E. Development Engineering Manager Approved asnto Form &Legality.• Amy J. Rams�y� Assistant City Attorney ATTEST: City Secretary Transportation &Public Works Department William A: erkest, P Director Approved by City Manager's Office Fernando Costa Assistant City Manager CVS Pharmacy, Inc. a Rhode Island Corporation Signature Print Name: Michael B. Nulman Title: Assistant Secretary, Senior Legal Co nseI OFFICIAL RECORD CITY SECRETARY FT:WORTH, TX Combined CFA final Sept 12, 2008 n Check items associated With the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A4: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-I: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 0 MAPSCO 21-G N.T.S. CAA VICINITY MAP FORT WORTH, TEXAS N SCALE: 1 "=60' LOWER EXISTING 16" WATER 6" FIRE HYDRANT CONNECTON 20' SANITARY SEWER, WATERLINE & GASUNE E VOL. 15680, PG i6— TSN FIRE LINE dNECTION VICE NECTIONID PROPOSED CLASS BOXES TSN 0 sN p lvl E Pnst°' FUTURE SIGNAL 0 mium r1d VAULT k PROPOSED FIRE E8f3 HYDRANT n a / TRIANGLE 1-35 REALTY, LTD, CC# 0086268 CS/pharmacy / 12,900 SF 69 PARKING SPACES a 1,391 AC, 60,611 SF / 6 FFE= 793,00 a / �g W - DUMPSTER 10' BLDG. SETBACK — — — — — — — — — — — — 20' SAN. SEWER BY SEP. INST. ®®® Winkelmann EXHIBIT A WATER & Associates, Inc. MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS CONSULTING CIVIL ENGINEERS ■ SURVEYORS D LLASTEXAS P 75230NE, SURE 325 (972) 490-7099 FAX W. MCCOWEN SURVEY, ABSTRACT NO. 999 Texas Engineers Registration No. 89 Expires 05/31/2010 CITY OF FORT WORTH Texas Surveyors No. 100866-00 Expires 12/31/2009 TARRANT COUNTY, TEXAS COPYRIGHT v 2009, Winkelmann & Associates, Inc. Scale : 1 = 60 Dote : 11 06 09 TRIANGLE 1-35 REALTY LTD. Dwg. File : 43832CFAWtr.dwg 303 W. WALL STREET, SUITE 1500 Project No.: 43832.01 20 MIDLAND, TEXAS 79704 n N SCALE: 1 "=60' Winkelmann & Associates, Inc. CONSULTING CIVIL ENGINEERS III SURVEYORS 6750 MILLCREST PLAZA DRIVE, SUITE 325 (972) 490-7090 DALUS, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration Na. 89 Expires 05/31/2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT 0 2009, Vlinkelmann & Associates, Inc. Scale : 1 = 60 Date : 10 15 09 Dwg. File : 43832CFASwr.dwg Project No. : 43832.01 20 1 MATCH LINE 1,517 L.F. PROP. 8" WASTEWATER PIPE 20' SANITARY SEWER, WATERLINE & GASLINE ESMT. VOL. 15680, PG 16 TRIANGLE I-35 REALTY, LTD. cc$ oosszsa PROP. 4' DIA. WASTEWATER MANHOLE w/8" STUBOUT & PLUG CONNECT TO EXISTING WASTEWATER LOT 1, BLOCK 1 LAWSON ADDITION CAB. A, SL. 5579 EXHIBIT A-1 WASTEWATER MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT N0. 999 CITY OF FORT WORTH TARRANT COUNTY, TEXAS TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 MIDLAND, TEXAS 79704 SHEET 1 OF 3 Winkelmann & Associates, Inc. CONSULTING CIVIL ENGINEERS ■ SURVEYORS 6760 NILLCRE6T PUZA DRIVE, SURE 325 (972) 490-7090 DALU6, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No. 89 Expires OS/31 /2070 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT 0 2009, Winkelmann & Associates, Inc. Scale : 1 — 601 Date : 10 15 09 Dwg. File : 43832CFASwr.dwg Project No.: 43832.01(20) 1I FAMUNIMEN101 �3 / / / / PRC TRIANGLE I-35 REALTY, LTD. CCU' 0086268 2D' SANITARY SEWER, VdATERLINE & GASLINE ESMT. VOL. 156803 PG 16 MATCH LINE EXHIBIT A-1 WASTEWATER MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT NO, 999 CITY OF FORT WORTH SHEET TARRANT COUNTY, TEXAS Z TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 OF MIDLAND, TEXAS 79704 3 20' SANITARY SEI�R, WATERLINE & GASLINE ESMT. VOL. 75680, PG 76 `�® Winkelmann & Associates, Inc. CONSULTING CIVIL ENGINEERS IIISURVEYORS 6750 HILLCREST PLAZA DRIVE, SURE 325 (972) 490.7090 DALLAS, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No, 89 Expires 05/31/2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT o 2009, Winkelmann & Associates, Inc. scale : 1 = 60 Date : 10 15 09 Dwg. File : 43832CFASwr.dwg Project No. : 43832.01(20) MATCH LINE TRIANGLE 1-35 REALTY, LTD. CC# 0086268 EXHIBIT A-1 WASTEWATER MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT NO, 999 CITY OF FORT WORTH TARRANT COUNTY, TEXAS TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 MIDLAND, TEXAS 79704 20' SAN. SEWER ESMT. �9.I�i�UY 3 OF 3 %' jft"'2 TIMBERLAND BLVD, triaraz nm sort-ar-wp ®`� Winkelmann & Associates, Inc. CONSULTING CIVIL ENGINEERS ■ SURVEYORS 6750 HILLCREST PLAZA DRIVE, SUITE 325 (972) 420-7090 DALLAS, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No. 89 Expires 05/31/2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT O 2009, Plnkelmann & Associates, Inc. Scale : 1 '= 120 Date : 11120109 Dwg. File : 43832CFAPay.dwg Project No.: 43832.01(20) EXHIBIT B PAVING MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT N0, 999 CITY OF FORT WORTH TARRANT COUNTY, TEXAS TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 MIDLAND, TEXAS 79704 N SCALE: 1 "=120' cw Winkelmann & Associates, Inc. CONSULTING CIVIL ENGINEERS III SURVEYORS 6750 HILLCREST PU2A DRIVE, SUITE 325 (972) 490-7090 DALUS, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No. 89 Expires 05/31 /2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT Oo 2009, Winkelmonn & Associates, Inc. Scale : 1 = 60 Date : 11/20/09 Dwg. File : 43832CFAPay.dwg Protect No. : 43832.01(20) EXHIBIT B PAVING MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT NO. 999 CITY OF FORT WORTH TARRANT COUNTY, TEXAS TRIANGLE I-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 MIDLAND, TEXAS 79704 WOODPARK PARTNERS LTD. VOL 012577, PG. 1712 N SCALE: 1 "=60' SHEET OF 2 �r N SCALE: 1 "=60' 20' SANITARY WATERLINE & VOL 15680, F INSTALL 84 L.F. 30" RCP STORM PIPE INSTALL 30" TYPE 'B' HEADWALL HDWL� TSN CONST. 2' CONC. PILOT CHANNEL iSN / / / / / Winkelma,nn & Associates, Inc. CONSULTING CIVIL ENGINEERS ■ SURVEYORS 6750 HILLCRE6T PUZA DRIVE, SUITE 325 (972) 490-7090 DALU6, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No. 89 Expires 05/37 /2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT © 2009, wnkelmann & Associates, Inc. Scale : 1 11= 602 Date : 10 15 09 Dwg. File : 43832CFAStm.dwg Project No. : 43832.01 20 v2o / PP GWL TIMBERLAND BLVD. — — (VARIABLE WIDTH RIGHT—OF—WAY) oTSN / s I caararaa o o o _ Ex. Conc. P mt. o40 Ex. Striped Y Median '4 TRIANGLE I-35 REALTY, LTD. CCU 0086268 ��$/pharmacy 12,900 SF 69 PARKING SPACES 1,391 AC, 60,611 SF FFE= 793,00 CONSTRUCT 5'x5' DROP INLET ALL 14 L.F. 36" RCP STORM PIPE :TRIG LINE ESM 12826, PG. 4: 1 3 �o 0 � o �. to EXHIBIT B-1 STORM MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT NO. 999 CITY OF FORT WORTH SHEET TARRANT COUNTY, TEXAS 1 TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 OF MIDLAND, TEXAS 79704 1 9 I TIMBERLAND BLVD. Ire W� m„ -w» INSTALL 2" SCH. 40 PVC FOR STREET LIGHTS 2' BEHIND BACK OF CURB TRI-COUNTY ELECTRIC TO INSTALL POLE TRANSFORMER ON PROP. POWER POLE w/ 2" RIGID RISER k�l N SCALE: 1 "=120' � i INSTALL 2 D-40 STREET LIGHTS w/ 200w HPF COBRA HEAD w/ PHOTO CELL I I liiill■��■ A - • � : • I INSTALL 2" SCH. 40 kkk PVC FOR ELEC. CONDUIT PRIOR TO PAVING ;�. M V12 WL I I II INSTALL GROUND BOX FOR I FUTURE CONNECTION I ( i I I � I I I I i I I � ®®, Winkelma.nn & Associates, Inc. CONSULTING CIVIL ENGINEERS ■ SURVEYORS 6750 HILLCREST PLAZA DRIVE, SUITE 325 (972) 490-7090 DALLAS, TEXAS 75230 (972) 490-7099 FAX Texas Engineers Registration No. 89 Expires 05/31/2010 Texas Surveyors No. 100866-00 Expires 12/31/2009 COPYRIGHT © 2009, Wiinkelmann & Associates, Inc. Score : 1 = 120 Date : 11106109 Dwg. File : 43832CFALight.dwg Project No.: 43832.01 20 II X X X EXHIBIT C LIGHTING MORIAH AT TIMBERLAND ADDITION FORT WORTH, TEXAS W. MCCOWEN SURVEY, ABSTRACT NO. 999 CITY OF FORT WORTH SHEET TARRANT COUNTY, TEXAS 1 TRIANGLE 1-35 REALTY LTD. 303 W. WALL STREET, SUITE 1500 of MIDLAND, TEXAS 79704 1 PART B - PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: CVO PHARMACY, INC., A RHODE ISLAND CORPORATION PROPOSAL FOR: PROJECT NAME: CVS Pharznacy #2167 (Moriah at Timberland Add'n� WATER PROJECT NO, P265-602150142083 SEWER PROJECT NO, 1`275-702130142083 FILE NO, W-2110 X NO. X-21128 CITY PROJECT NO, 01420 DOE # 6308 Includes the furnishing of all materials, except materials specified to be fiux�ished by the City, equipment and labor for the installation of WATER SEWER STORM DRAIN PAVING & STREET LIGHT IMPROVEMENTS and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: CVS PHARMACY #2i 67 (MUR1Ali AT TIMBERLAND AgDITION) Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having tharoughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Updated: 10l7/2009 UNIT I: WATER 1MPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UN11 NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE TOTAL AMOUNT {Fuxnish and install, including all appurtenant work, complete in place, the following items) {D-No, refers to related items in the Part D Special Conditions) Item Approx. Unit Item Description Unit Price Total No. Quantity Measurement "D" Item reference Amount 1. 2 Ea. Connect to Ex. 16" Water $2,750 $5,500 See Sheet C-3 Five Thousand Five Hundred Dollars 2. 22 L.F. 6" PVC Water Line $17.50 $385 Three Hundred Eight Five Dollars 3. 2 Ea. 6" Gate Valve $875 $15750 One Thousand Seven Hundred Fifty Dollars 4. 1 Ea. Fire Hydrant $25200 $2,200 Two Thousand Two Hundred Dollars 5. 0.5 Tons Fittings $5,000 $2,500 Two Thousand Five Hundred Dollars 6. 1 Ea. 2" Domestic Service $1,600 $100 Connections (including 2" tap & 2" copper line) One Thousand Six Hundred Dollars 7. 1 Ea. Class "B" Meter Boxes $300 $300 Three Hundred Dollars 8. 1 Ea. 1" Irrigation Service $1,500 $1,500 Connections (including 1" tap & 1" copper line) One Thousand Five Hundred Dollars 9. 1 Ea. Class "A" Meter Box $200 $200 Two Hundred Dollars 10. 1 L.S. Lower Existing 16" Water $6,600 $65600 See Sheet C-3 Six Thousand Six Hundred Dollars 11. 44 L.F. Trench Safety $10 $440 Four Hundred Forty Dollars 12. 1 L.S. Testing $225 $225 Two Hundred Twenty Five Dollars _ $23,2ao Twenty Three Thousand Two Hundred Dollars Updated: 10/7/2009 UNIT II: SEWER IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS TOTAL AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions) Item Approx. Unit Item Description Unit Price Total No. Quantity Measurement "D" Item reference Amount 1. 1 L.S. Connect to Ex. Main $650 $650 See Sheet C 4 Six Hundred Fifty Dollars 2. 1,517 L.F. 8" SDR 26 PVC Pipe $20 $30,340 (at different depth) Thirty Thousand Three Hundred Forty Dollars 3. 20 L.F. Concrete Encasement $20 $400 See Sheet C-6 Four Hundred Dollars 4. 9 Ea. Standard 4' Manhole $25100 $183900 (up to 6' depth) Eighteen Thousand Nine Hundred Dollars 5. 42 L.F. Additional vertical $59.52 $2,500 manhole depth over 6' Two Thousand Five Hundred Dollars 6. 8 Ea, Clay Dam $200 $100 One Thousand Six Hundred Dollars 7. 1 Ea. Double Sewer Cleanout $607625 $607425 See Sheet C-5 Six Hundred Seven Dollars and Twenty Five Cents 8. 6 Ea. 8" Plug $50 $300 Three Hundred Dollars 9. 1,517 L.F. Trench Safety $1 $1,517 One Thousand Five Hundred Seventeen Dollars 10. 1 L.S. Erosion Control $11000 $1 NO See Sheet C-10 One Thousand Dollars Vacuum Testing $900 $900 Nine Hundred Dollars 12. 12517 L.F. Post TV Inspection $1 $1,517 One Thousand Five Hundred Seventeen Dollars TOTAL AMOUNT BID SEWER $b0,231.25 Sixty Thousand Two Hundred Thiz�.y One Dollars and Twenty Five Cents Updated; I0J7/2009 UNIT III: STORM DRAIN IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UN11 NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE TOTAL AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions) Item Approx. Unit Item Desexiption Un t Price Totai No. Quantity Measurement "D" Item reference Amount 1. 1 Ea. 5'x5' Drop Inlet $2,800 $2,800 See Sheet C-23 Two Thousand Eight Hundred Dollars 2. 84 L.F. 30" Reini Conc. Pipe $56.50 $4,746 Four Thousand Seven Hundred Forty Six Dollars 3. 14 L.F. 36" Reinf. Conc. Pipe $65.50 $917 Nine Hundred Seventeen Dollars 4. 1 Ea. 30" Type `B' Headwall $15500 $13500 See Detail on Sheet C-33 One Thousand Five Hundred Dollars 5. 36 S.F. 2' Concrete Pilot Channel $12.50 $450 See Sheet C-23 Four Hundred Fifty Dollars 6. 1 L.S. Erosion Control $700 $700 See Sheet C40 Seven Hundred Dollars 7. 98 L.F. Trench Safety $0.50 $49 Forty Nine Dollars 8. 1 L.S. Traffic Control $1,194.50 $1,194.50 See Sheet C-35 One Thousand One Hundred Ninety Four Dollars and Fifty Cents TOTAL AMOUNT B1D STORM DRA1N $ 12 356.50 Twelve Thousand Three Hundred Fifty Six Dollars and Fifty Cents Updated: 10/7/2009 UNIT IV: PAVING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE TOTAL AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No: refers to related items in the Part D Special Conditions) Item Approx. Unit Item Description Unit Price Totai No. Quantity Measurement "D" Item reference Amount 1. 400 L.F. Sawcut Ex. Asphalt Pvmt. $3 $1,200 See Sheet C-43 One Thousand Two Hundred Dollars 2. 508 C.Y. Unclassified Excavation $8 $45064 Four Thousand Sixty Four Dollars 3. 762 S.Y. 9" 3,500 psi Cone. Pvmt. $32.24 $242569 Per Geotech. Report Twenty Four Thousand Five Hundred Sixty Nine Dollars 4. 762 S.Y. 6" Lime Stabilized $6.48 $4,945 Subgrade Four Thousand Nine Hundred Forty Five Dollars 5. 11.5 Tons Hydrated Lime $150 $1,725 (6% - 28 lbs./S.Y.) One Thousand Seven Hundred Twenty Five Dollars 6. 10 S.Y. Asphalt Transition $100 $11000 One Thousand Dollars 7. 1 L.S. Pavement Markings $25500 $2,500 See Sheet C-20 Two Thousand Five Hundred Dollars 8. 2,395 S.F. 4' wide sidewalk $3A7 $8,310.65 Eight Thousand Three Hundred Ten Dollars and Sixty Five Cents 9. 1 Ea. Barrier Free Ramp $350 $350 See Sheet C-20 Three Hundred Fifty Dollars 10. 1 L.S. Erosion Control $1,500 $1,500 See Sheet C40 One Thousand Five Hundred Dollars 11. 1 L.S. Traffic Control $701.21 $7,001.21 See Sheets C-37 & C-37A Seven Thousand One Dollars and Twenty One Cents TOTAL AMOUNT BID PAVING $57 164.86 Fifty Seven Thousand One Hundred Sixty Four Dollars and Eighty Six Cents Updated: 10/7/2009 UNIT V: STREET LIGHT IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS UNIT TOTAL PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items} (D-No. refers to related items in the Part D Special Conditions) Item Approx. Unit Item Desci7ption Unit Price Total No. Quantity Measurement "D" Item reference Amount 1. 2 Ea. Canc. Piers for Light Poles $775 $1,550 One Thousand Five Hundred Fifty Dollars 2. 2 Ea. D-40 Street Light Poles $2,500 $5,000 Five Thousand Dollars 3. 2 Ea. Single Arm $1,000 $2,000 Two Thousand Dollars 4. 2 Ea. Lights $50 $100 One Hundred Dollars 5. 3 Ea. Electrical Ground Boxes $550 $1,650 One Thousand Six Hundred Fifty Dollars 6. i Ea. 2" Rigid Riser Assembly $4,150 $4,150 Four Thousand One Hundred Fifty Dollars 7. 330 L.F. 2" PVC Sch. 40 Conduit $4 $1,320 One Thousand Three Hundred Twenty Dollars 8. 990 L.F. Conductor #4 Wire $0.88 $874.50 Eight Hundred Seventy Four Dollars and Fifty Cents 9. 330 L.F. Conductor #8 Wire $3.20 $1,056 One Thousand Fifty Six Dollars TOTAL AMOUNT BID STREET LIGHTS $17,700.50 Seventeen Thousand Seven Hundred Dollars and Fifty Cents Updated: 10/7/2009 BID SUIVIMARY TOTAL AMOUNT BID WATER TOTAL AMOUNT BID SEWER TOTAL AMOUNT BID STORM DRAIN TOTAL AMOUNT BID PAVING TOTAL AMOUNT BID STREET LIGHTS 11 11 ------------ $ 60,23 i .25 $12,356.50 $57 i 64.86 $17,700.50 GRAND TOTAL AMOUNT BID $ i 70 653.11 One Hundred Seventy Thousand Six Hundred Fifty Three Dollars and Eleven Cents Updated: 10/7/2009 PART B - PROPOSAL (font.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department, 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within Nine (90) calendar days after issue of the work oxdex, and to complete the contract within nety(90I calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or DU 1 as applicable:} ❑ A. The principal place of business of our company is in the State of Nonresident bidders in the State of ,our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. on resident bidders in the State of ,our principal place of business, are not required to underbid resident bidders. ® B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Updated: I0/7/2009 I {we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 {Initials} Addendum No. 2 {Initials} Addendum Na. 3 {Initials) Addendum W. 4 {Initials) Respectfully submitted, By.xW Title �G� Ji uL Vii Address 701 D r Telephone: Updated: t0/7/2009