Loading...
HomeMy WebLinkAboutContract 39643-A1 (2)AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO., %I(o4�j- Q� (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Brown & Gay Engineers, Inc., (Engineer) made and entered into City Secretary Contract No39643, (the Contract) which was executed administratively by the City Manager on the 23rd day of December, 2009; and WHEREAS, the Contract involves following project. Lake Arlington Drainage Master Plan, engineering services for the Project No. SWS-008 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 3, 2011 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $46,000. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $141,390. City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 10.01.2010 Page 1 of 2 CITY S CRETAWY FT WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the *Day of Month Here* day of *Month Here*, *Year Here*, in Fort Worth, Tarrant County, Texas. ATTEST: City Secretary ` •. I ohm � l t PPROVAL RECOMMENDED. 00 t Greg Sir Transpor �, PE, Acting Director on and Public Works Frown & Gay Engineers, Inc. ENG Ey: Name: Dorian French, PE, RPLS, DWRE Sr. Vice President 108 W. 8th St, Suite 200 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 6.18.2010 Page 2 of 2 NO M&C REQUIRED 4 APPROVED: Fernando Costa Assistant City Manager January 3, 2011 Mr. Steven Eubanks, PE, CFM City of Fort Worth Department of Transportation and Public Works Storm Water Management 1000 Throckrnorton Street Fort Worth, TX 76102 Re; Amendment No. 1 to Lake Arlington Drainage Master Plan City Study Number-SWS-008 Dear Mr. Eubanks: Per your regt[est, Browu and Gay Engineers, Inc. is pleased #o provide storm water quality design services requested by the City of Fort Worth. Those services will be conducted under Task 13 -Water Quality Study, of the Lake Arlington Drainage Master Plan. The fee for the proposed scope of services wi11 be on a time and ma#erials basis not to exceed a total fee of $46,000.00. If you have any questions or need additional information, please contact me at 817-887-6138 or at ckro ng ess(a�browngay.com. Sincerely, i• �— — Carl J. Krogness, PE Project Manager 108 West 8th Street •Suite 200 •Fort Worth, Texas 76102 • TEL: 817-887-6130 •FAX: 817-887-613b • EMAtL: bgeQbrowngay.00m