Loading...
HomeMy WebLinkAboutContract 39623COMMUNITY FACILITIES AGREEMENT THE.STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Tarrant County, hereinafter called "Developer", desires to make certain improvements to the Proposed Tarrant County Jail Facility located at Belknap between Cherry Street and Burnett Street in the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Wise, and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Honorable B. Glen Whitley with Tarrant County and the City, acting herein by and through Fernando Costa, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed b its contractor and Consent of Surety signed by its surety to ensure rlliovat Proposed "Tarrant County Jail Page 1 of 10 CITY SECRETARY FT.1AtORTH, TX has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water and Sewer (A) E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: a. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. b. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (1 OOn/o) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Proposed Tarrant County Jail Page 2 of t0 Chapter 2253, Texas Government Code. c. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. d. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. e. To require its contractor to have frilly executed contract documents submitted to the City to schedule aPre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. f. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. Proposed'I'arrantCounty Jail Page 3 of l0 H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, frilly indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort I✓Vorth, ift officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated lierein, whether or not such iniuries, death or damages are caused, in whole or in part, by the Proposed "rarrantCoturiy Jail Page 4 of 10 alleged neelluence of rite ON of Fort Worth, its officers, servants, or etnployees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infi•astructtu•e and improvements, Developer will assign to the City anon -exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: a. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. b. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing Fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. c. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. d. Developer shall pay in cash the total cost of street signs. Proposed l'arrrnt County Jail Page 5 of }0 P. COMPLETION WITHIN 2 YEARS a. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. b. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. c. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. d. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Proposed "rarrantCounty Jail Page 6 of t0 II. Water and Sewer Facilities A. Developer shall install a 12-inch water line and related pavement repair in Weatherford Street from east ROW line of Cherry Street to Florence Street's water main; cut and plug the existing 84nch water main in Burnett after the tee of the most northern existing water service, and any proposed domestic, irrigation and fire line services for the new jail facility. The improvement is shown on Exhibit A. The estimated cost of which is $243,050.00. Additionally, the developer agrees to pay for any remaining engineering and survey cost related to the water and sewer improvement. The City agrees to pay for $8,000 of engineering and survey cost and items listed below. The City also agrees to record the location of each said service line in respect to the corner of the lot served, and to retain said records in its possession. The Developer and the City shall share in the cost of the water improvements as follows: WATER FACILITIES: Estimated Develo r Cost Estimated City Cost Estimated Total Cost Mains within Development $ 1069710.00 $ 87,730.00 $ 194,440.00 25% Contingency $ 26 677.50 $ 21 932.50 $ 48 610.00 Sub -Total Water Construction $ 1333387950 $ 10%662.50 $ 243,050.00 Engineering/Survey �T�sI55,887.501 $ 22 500.00 $ 8 000.00 $ 30 500.00 Sub -Total Water $ 117,662.501 $ 273 550.00 *To be dedicated by the developer The costs stated herein may be based upon engineer's construction estimates rather than actual cost. The final cost to Developer and City shall be based upon public bid unit prices: WATER COST SHARE (The City pays for 12-inch water pipe in Weatherford Street from east ROW line of Cherry Street to Florence water connection point.) 12" water pipe ($280/t_F) Proposed'rarrantCounry Jail Page 7 of l0 8" water pipe ($60/LF) 100 L.F. x $60 = $ 6,000.00 6" water pipe ($50/LF) 15 L.F. x $50 = $ 750.00 Trench Safety ($1) 280 L.F. x $1 = $ 280.00 Fittings ($5,000/TN) 1.5 TN x $5,000 = $ 7,500.00 12" Gate valve ($1,500/EA) 1 EA x $1,500 = $ 11500400 8" Gate valve ($11000/EA) 2 EA x $1, 000 = $ 2,000.00 6" Gate valve ($800/EA) 1 EA x $800 = $ 800.00 Fire Hydrant Removal ($500/EA) 1 EA x $500 = $ 500.00 Fire Hydrant (New) ($2,500/EA) 1 EA x $2,500 = $ 2,500.00 Pavement-2 Inch Min. HMAC on 2/27 Concrete Base ($75/L.F.) 390 L.F. x $75 = $ 29,250.00 Curb & Gutter (Match Existing) ($30/LF) 5 L.F. x $30 = $ 150.00 Walk (Match Existing) ($10/SF) 50 SF. x $10 = $ 500.00 Dehole 5 to 10 ft Depth ($1,500/EA) 1 EA x $1,500 = $ 1,500.00 Storm Water Pollution Prevention Plan ($3,000 LS) 0.5 x $3,000 = $ 1,500600 Traffic Control ($10,000 LS) 0.5 x $10, 000 = $ 5,000.00 $ 87,730,00 B. Developer shall install new sewer connection to the sanitary main in Belknap; and in -situ lining the existing 8-inch sewer main in Burnett from Belknap manhole to a manhole located at the mid -block of Burnett Street between Belknap and Weatherford as shown on Exhibit A-L The estimated cost of which is $20,745.00. The City agrees to record the location of each said service line in respect to the corner of the lot served, and to retain said records in its possession. Portion of the sewer improvement is related to a proposed sky bridge/tunnel encroachment. The developer agrees to design the suspended underground tunnel to span between pier foundations over the existing 14-inch sewer main in Burnett Proposed Tarrant County Jail Page 8 of l0 Street to achieve no load onto the existing sewer main. The Developer's cost for the sewer improvements is as follows: SANITARY SEWER FACILITIES: Estimated Developer Cost Estimated City Cost Estimated Total Cost Mains within Development 16,380.00 - 16,380.00 25% Contingency 4095600 - 4 095.00 Sub -Total Sewer 1 205475.001 20 475.00 *To be dedicated by the developer. The costs stated herein may be based upon construction estimates rather than actual cost. The final cost to Developer shall be based upon public bid unit prices. TOTAL WATER AND SANITARY SEWER FACILITIES: Estimated Developer Cost Estimated City Cost Estimated Total Cost Sub -Total Water Construction $ 133,387.50 $ 10%662.50 $ 2433050.00 Sub -Total Sewer Construction $ 20 475.00 $ - $ 20 475.00 Sub -Total Water and Sewer Construction $ 1535862050 $ 10%,662.50 $ 263,525.00 En ineerin Suave $ 22 500.00 $ 8 000.00 $ 30 500.00 Sub -Total Water and Sewer Engineering and Constriction Construction Materials Testing $ $ 1765362.50 3 077.25 $ $ 1175662050 2 193.25 $ $ 2943025600 55270050 Construction Inspection $ 3 077.25 $ 25193825 $ 5270850 Total $ 182 517.00 $ 122 049.00 $ 304 566.00 Proposed Tarrant County Jait Page 9 of 10 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this the ay of 2009. Approval Recommended: Water Department :L4"44 ) S. Frank Crumb Director ATTEST: z ka% City SecretaryMarty Hendrix Q` Anaroved as to Form: Attorney ATTEST: Corporate Secretary Ca�tract puthoxiza�io>s� Date City Of Fort Worth Assistant City Manager Fernando Costa DEVELOPER: By: Tarrant County Honorable B. Glen Wl Tarrant County Judge OFFICIAL RECORD CITY SECRETARY Proposed Tarrant County Jail FT. WORTH, TX Page 10 of 10 0 O d d z C a` ( /0 V z 0 U d' z 0 U Ui a m 0 a LL. 0 z 0 z a 0 UN W W _z z W O O O O O O O 0 O O O O O O O pp O 0 O O 0 O O O O O O O O 0 O O O O O O O O O O O co) O 0 O O O O O O O O O O O O O O 0 O o 0 0 o p O o o p pp O o O o 0 0 0 O 0 0 0 0 0 0 pp Q o 0 0 g W h O 0 O 0 W O to W N O co O O O N W O to O to W W W W to N 0 O N O to W fA fA W W W IA W W W O to O W W W� W� W W F_ W N W 6 fA V! o I0 ' O Q W 0 M N Co 0) to Q r N W '- N O O 3� r N �' N M V O C! LL O O O Q O O O V O O Q O O O O O O O O Q O O O O O O O O O O O O O O O O O O O O V Q O U O Q V O fJ O O O O O O O O O O O O O O ' o to 0 0 0 0 0 0 0 0 0 0 Q 0 0 0 0 to 0 0 a to g 0 g o g o 0 0 0 0 0 to 00 0 0 o iA W 0 0 0 to o W W o o 0 o Q to 0 o y '7 to 0 0 O J n .- O O N W 0 w WW M O �f O 0 N M to t0 N 0 n w to 0 W O N N W W N W (A (A N to N W W N W W m W N W W W N W W W W � W W W W W W W 015 C H Cto to O to o W 0 W 0 co co V co 0 W to N .- N r r N r, N .- r W r r r W 0 0 c> � O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q O 0 0 0 0 0 .- 0 0 0 0 0 0 0 Cl 0 o 6 o 0 0 N t7 o 6 0 0 0 0 to 0 0 0 N W O O O W O 0 0 to 0 0 0 0 to 0 r M to O W W 0 0 to 0 0 W h M 0 0 W W 0 0 co O w N to to co M W O W V) to to N N W W W 0 0 W O to W W W N W W N N W W W 60 to 0 z NW W w iA W to W W rW w HQQ J J J J QQ¢¢ QQ Q Q Q 6 QQ c[ ¢ J J Q U. J QQ ¢¢ Q J J 1 J J L1J FZ W W W W lyj W Uj J W to tjJ W> W {.IJ .N.1 W m m O N W m� � W n N M W M M W O N M V' h W tp 'V' M 0 O. (n 0)) CO) N h a V' N 14` V t(f V t0 h n N O 0 C\I O a0 z O O O O O O O O q O O R O O O O O O O O O 00 4 4 4 g g O g o o o o o o o 9 Q O p p Y$ 4 9 �� dd ❑❑❑�����d❑ddaod❑addd r3dd❑❑od m m m m m m m m m m m m m m m CO m CO m m m m m m m m m m m m m 0 v ig to EL C Im c c a s N t W N N N (� C N .«� o CL cc a s °� E? to Q j �+ C c 0 to Z U j U (� C C C y N^C E y m> T Q O c $' v w w w o• c ro at c o m v v ❑ m aci c cN 3 E E o W a ^) U. p~, OOOX t - 0� N 1 W N N m A ,tC�1 V x= N t C W C Q: a G U U m E- C _ X N 1 a 6. t1 M �i y�� Q C m m m M y U C c iK .0 h C C ro 0 V U; C cn ! y d C •� lT C t1 N .p 0. 3: D >> Ut m x m C O N N N .0 ❑ n' N (�` N C a s CL � c? a� p❑ o m0 o o u'S o %J c� 0 ty -0 cc a o� � m 5 c 20 m y to �? U= rn m c U W °' Z UU{ d LL>? C .. m N ro N nZ� III M 3 ro fCp f1 H F _u)jaP�U' 9 O 8 Q E 7❑ C L g CL O c_ y ny 3 c tri c 5 o. C 2 E c- cri ti J3J O PL 0 E t9 ❑❑ I"' t V ^2 Ti j h E B C m C C ol CO CO 0 >. ate- m m N a C N � Njj W t G u. U l% li C p C 4) (� dl d) C �, CL� CI tY t O 0 W 1 V 7 d) O C a O pY (b) t�S. y ^ UCO ro r G � H 7 C m w01.. U- c c �l C �° C T .. N Y,. t� a a` a 4 J N m C E m aLmi to N m y U� c u�� Z o o b d�>i d7 r1 d C7 �aaat fi `� d� tm� d�x�i t� to > Ew _m 0 0 0 0 ° Ems+ tg o b m a3 i {i Y oC c c c c U } n E IE n n m>>>> ro v ro N ro m ro g l o o m m ro m f� ro 0 3aa:a.a.ar>>>>i�.ii����(L6 In cn55����a rELU U) M N M V' to W r, co m 0 N M V' tf) W t. W m 0 N M V' to W f. m �i M .- N N c(VV N N N N N N Exhibit .� *APPROVED AS TO kORM: By: arrant 's Office By law, the District Attorneys Office may only advise or approve contracts or legal documents on behalf of its clients. It may not advise or approve a contract or legal document on behalf of other parties. Our review of this document was conducted solely from the legal perspective of our client. Our approval of this document was offered solely for the benefit of our client. Other parties should not rely on this approval, and should seek review and approval by their own respective attorney(s). ZCL; xeview Page 1 of 2 Official site of the City of Fort Worth, Texas DATE: 1 1 • • • • CODE: C -I-ypE; NON- PUBLIC NO CONSENT HEARING. SUBJECT: Authorize a Community Facilities Agreement with Tarrant County with City Participation in the Amount of $122,049.00 for Water and Sewer Improvements to the Proposed Tarrant County Jail Facility Located at Belknap Street between Cherry Street and Burnett Street It is recommended that the City Council authorize the City Manager to execute a Community Facilities Agreement with Tarrant County with City participation in the amount of $122,049.00 for water and sewer improvements to serve the proposed Tarrant County Jail Facility located in Downtown Fort Worth. i1SCUSSION: The 12 inch water main improvement on Weatherford Street and the sewer improvement on Burnett Street will benefit both Tarrant County (the County} facilities and the City of Fort Worth. A portion of the sewer improvement is related to a proposed sky bridge/tunnel encroachment. The County agrees to Design the suspended underground tunnel to span between pier foundations over the existing 14 inch sewer main in Burnett Street to achieve no load onto the existing sewer main. The County will design, bid and construct the water and sewer improvements according to City's design criteria and standards. The City and the County will participate in the cost of construction as follows. The County's water improvement cost consists of a 12 inch water main improvement and pavement epair on Weatherford Street from the eas# right-of-way line of Cherry Street to Burnett Street, cut and )lug the existing eight inch water main in Burnett Street after the tee of the most northern existing water service and install any proposed domestic, irrigation and fire line services for the new jail facility. Any emaining engineering and survey cost related to the water and sewer improvement will be paid by the county. the County's sewer improvement cost consists of new sewer connection to the sewer main in Belknap street and in -situ lining the existing eight inch sewer main in Burnett Street from the Belknap Street nanhoie to a, manhole located at the mid -block of Burnett Street between Belknap Street and Neatherford Street. additionally, the County will pay to the City the Community Facilities Agreement (CFA) fee, two percent nspection fee and two percent material test fee on the County's portion of the water and sewer. mprovements. ('he City will participate in the construction cost for the 12 inch water main and pavement repair on Nea#herford Street from east right-of-way line of Cheny Street to Florence Street water connection Joint. The City will also reimburse the County $8,000.00 on the engineering and survey for the 12 inch vater main and pay for the two percent inspection and two percent material testing cost on City's ►ortion of the water improvement. �://apps.cfwnet.org/council�acket/mc review.asp?ID=12644&counciIdate=ll/17/2009 11/20/2009 L&u xvview Estimated Estimated Developer Cost Cily Cost Sub -Total Water Construction $133,387050 $109,662.50 Sub -Total Sewer Construction $20*475600 0.00 Sub -Total Water and Sewer $153,862050 $109,662050 Construction Engineering/Survey $22,500600 82000000 Sub=Totall Water and Sewer n ine rin $176,362.50 $117,662050 Construction Construction Materials Testing $3,077.25 $27193.25 Construction Inspection 3 077.25 2 193.25 TOTAL $182,517.00 $1229049000 Estimated Total Cost $2431050000 $20,475.00 $263,525.00 $30,500.00 $5,270.50 5 270.50 $3041566.00 Upon Council's approval. City staff will execute a Community Facilities Agreement to include City participation between the City and the Developer. This project is located in COUNCIL DISTRICT 9. �ICAL INFO TION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/AccounUCenters Additional Information Contact: IiACHMENTS ►OTARRANT COUNTY JAIL CFA Exhibit.pdf iailFacilityLocation.pdf FRAM Fund/Account/Centers P265 539140 609150142583 $117.662.50 P265 531350 609150142585 P265 531200 609150142584 Fernando Costa (6122) S. Frank Crumb (8207) Wendy Chi-Babulal (8242) 2 193.25 2 193.25 r//apps.cfvcmet.org/council�ackedmc review.asp?ID=12644&councildate=ll/17/2009 11/20/2009 1 1 1 11.. �. December 1, 2009 Wendy Chi-Babula i Planning and Development Engineering Manage i Fort Worth Water Department 1000 Throckmorton Street fort Worth, Texas 76102 Reference: Tarrant County Jail Project Subject: Requested Financia{ Guarantee.lnformation Dear Ms. Chi-Babula Pursuant to your request, Tarrant County Facilities Management offers the following information concerning the financial guarantee of the new Tarrant County Jail project: Tarrant County voters approved a $233,000,000 Capital Improvement Program in May of 2005 that included a new Jail Facility, Medical Examiner's Facility Expansion, Juvenile Services Expansion and a Courts Building. Contained In the Capital Improvement Program is the capital budget for the new Jail Facility located in downtown Fort Worth. The amount of the capital budget is $108,000,000. Please let me know if you need any other information concerning the Jail project.) can be reached at: Office: (817) 8843708 • Email: �ressieyC�tarranteounty.co�r 100 W. WEATHERFORD FORT WORTH, TEXAS 76146 (817) 884-2878 Sincerely; Tarrant County Facilities Management f I zwtA Clarence Pressley Assistant Director of Facilities Management Copy: Tarrant County Jail Project Files