HomeMy WebLinkAboutContract 40718COMPLETION AGREEMENT
This Completion Agreement (tl
Jay of
COMPANY (th "Surety") and THE
"Obligee").
e "Agreement") is made and entered into this
2010 by and between CONTINENTAL CASUALTY
CITY OF FORT WORTH, TEXAS (the "Owner" or
RECITALS
WHEREAS, TEXAS UNITED EXCAVATORS, L.L.C. ("Former Contractor") and the
Owner entered into contracts to furnish all labor and materials and perform all work for the
project known as Paving, Drainage, Water and Sewer Replacement, 2004 CIP Contract #44,
DOE No. 5407 further identified as City Secretary Contract No. 38210 (the "Original
Contract") in accordance with the terms and provisions of the Original Contract, including all
contract documents forming a part of the Original Contract;
WHEREAS, as required by law and under the terms of the Original Contract, the
Former Contractor as principal and the Surety made, executed and delivered to the Owner
Performance Bond No. 929448647 (the "Bond");
WHEREAS, by letter dated April 26, 2010, Obligee formally declared Principal in
default of the Original Contract and the Obligee has called upon the Surety to fulfill its
obligations as Surety under the terms of the Performance Bond; and
WHEREAS, the Former Contractor disputes the propriety of the termination, and the
Surety reserves its rights to assert the Former Contractor's claims, to the extent permitted by law,
and to dispute the propriety of the termination and/or the performance bond demand, and the
Obligee reserves its rights and defenses with respects to the Surety's claims, the propriety of the
termination, and/or the propriety of the bond demand; and
WHEREAS, Surety agrees, subject to the penal sum of the Bond, to make financial
arranm geents for the completion of the Original Contract in accordance with its original terms
and conditions and Surety has arranged for the completion of the Original Contract in accordance
with those conditions and requirements set forth herein and agreed upon by the parties hereto;
NOW, THEREFORE, in consideration of the agreements and undertakings hereinafter
set forth, and for other good and valuable consideration, the receipt and adequacy therefore
being hereby acknowledged, the Owner and the Surety agree as follows:
AGREEMENT
1. Performance of the Work and Close-out.
The Surety hereby undertakes to make financial arrangements for the performance of the
work as set forth in Exhibit "A", attached hereto and incorporated herein, that has been
prepared by the Surety and agreed to by the Owner pursuant to the Original Contract and
Takeover Agreement
Principal: TUE
Page 1 of 8
all associated change orders, if any, and in so doing agrees to be bound by the Original
Contract.
The Owner acknowledges that the Surety, by its execution of this Agreement, is acting
in its capacity as the surety for the Former Contractor in making arrangements for the
performance and completion of the Original Contract, and not as a completing
contractor, and that the Surety is not assuming any obligations or liabilities beyond
those set forth in the Bonds. As to the performance and completion of the Original
Contract, except as otherwise provided in this Agreement, the Surety is entitled to all of
the rights, obligations, title and interest of the Former Contractor in and to the Original
Contract in all respects as if the Surety were the original party to the Original Contract,
2. Completion Contractor.
The Obligee acknowledges that the Surety will enter into a Completion Contract with a
Completion Contractor for the performance of the work under the Original Contract.
Obligee agrees that it will work directly with Completion Contractor as if Completion
Contractor was the original contractor. Surety shall include within its contract with
Completion Contractor provisions in the agreement requiring complete and faithful
performance and completion of the above referenced Project, a provision obligating
Completion Contractor to hold harmless and indemnify Obligee, which shall substantially
and materially conform to the obligations of Original Contractor pursuant to the Contract
Specifications, and shall provide performance and payment bonds for the benefit of the
Obligee and Surety as joint obligees which guaranty Completion Contractor's payment
and performance obligations undertaken in its Completion Construction Contract, and in
addition shall cause Obligee to be named as an additional insured on all public liability
insurance policies presently in force or subsequently obtained covering personal injuries
and/or property damages arising out of the performance and completion of the work on
the above referenced Project, and shall furnish Obligee with evidence thereof.
3. Contract Balances.
The Obligee and the Surety agree that as of the date of this Agreement:
(a) The authorized amount of the Original Contract, including all approved
change orders, is the sum of $2,522,738.95;
(b) The Principal and/or the Surety have been paid the sum of $1,777,270.89;
(c) The Obligee is holding the sum of $93,540.57 as retainage pursuant to the
terms of the Original Contract;
(d) The Obligee was required to pay for traffic control barricades for May
2010 through August 2010 for an estimated amount of $14,545.90 and
water supply service repairs in the amount of $457.77 while this
Agreement and selection of the Completion Contractor was finalized.
Takeover Agreement
Principal: TUE
Page 2 of 8
(d) The "Contract Balance" shall be hereinafter defined as the sum of
$730,464.39. The Contract Balance shall be increased or decreased, as
appropriate, as a result of invoicing for traffic control barricades and water
supply service repairs through August 2010 as well as certain pending
change orders to the Original Contracts submitted by the Principal and/or
the Obligee, and as a result of any change orders for extra work (work that
is different from, in excess of, or beyond the scope of the work required by
the Original Contract) requested or required by the Obligee after the date
of the execution of this Agreement. The Obligee agrees that adequate
funding will be available for the Contract Price plus the negotiated amount
of any pending and any future modifications; and
(e) As of the date of the execution of this Agreement, the Obligee represents
and warrants that, according to the records available to it, the Contract
Balance as defined herein is accurate. The Surety reserves the right to
verify the accuracy of the Contract Balance. The Surety's sole remedy
against the Obligee for breach of this representation and warranty is
reformation of the Contract Balance to the proper amount.
The Owner acknowledges that the Contract Balance is available to complete the Project
and is not subject to back charges, set -offs, liquidated damages or other withholdings as
of the date of this Agreement.
The Owner agrees that the Contract Balance is dedicated to and will be applied to the
completion of the Original Contract. The Owner shall pay to the Surety the Contract
Balance, plus or minus any additional amounts of money on account of any Change
Orders requested and authorized by the Owner, as the work progresses. The payment
of the Contract Balance, and approved Change Orders, shall be made to the Surety in
accordance with the terms of the Original Contract. The Surety agrees to spend its
own funds as may be necessary from time to time to pay for the performance of the
work contemplated by this agreement in the event that the Contract Balance is
insufficient, with any such payments being credited against the penal sum of the
Performance Bond. In no event shall the Owner withhold any of the Contract Balance
from the Surety by asserting a future offset or setoff or because of or on account of
any claims, liens, suits or demands by any persons or entities furnishing or alleging to
have furnished labor and/or materials to the project Owner will not offset against or
otherwise withhold payment of any amount of the Contract Balance as a result of, or
charge to Surety, any alleged liquidated and/or actual delay damages caused by any
action or inaction of the Former Contractor, completion contractor or Surety prior to the
Completion Deadline set forth below. Owner further agrees that, except as provided by
order of a court of competent jurisdiction or to the extent otherwise provided by law, it
will not acknowledge or honor any claim or charges against the Contract Balances by any
alleged assignee, successor, creditor, trustee, receiver, or transferee of Contractor or by
any other party or governmental entity making claim to the Contract Balance or any
portion thereof without the written consent of Surety.
Takeover Agreement
Principal: TUE
Page 3 of 8
OFFICIAL RECCR�
CITY SECRETARY
�T. WORTH, TX
Payments from the Owner shall be made payable to Continental Casualty Company
and transmitted to the Surety at the following address, unless and until the Surety
notifies the Owner in writing of a change of address:
333 S. Wabash Avenue
41 st Floor
Chicago, IL 60604
Attn: J. Trey Felty
4. Insurance.
The Surety may satisfy the required insurance obligations under the Original Contract
by providing evidence of the required insurance coverage carried by the Completion
Contractor, with the Owner and the Surety being named as insureds under the policy
or policies.
9. The Surety's Bonds Liability.
The Bonds shall remain in full force and effect in accordance with their terms and
provisions. Nothing in this agreement shall be deemed to enlarge or reduce the
Surety's obligation under the Bonds or the Statutes under which they are written. The
total liability of the Surety under this Agreement and Bonds for the performance of
the work, after the expenditure of the Contract Balance, is limited to and shall not
exceed the penal sum of the Bonds. Surety agrees that it will be responsible for the
payment of any perfected, legitimate payment bond claims made by persons and or
entities that provide labor and or materials under the Original Contract, for
improvement of the real property upon which the project is located, provided that its
liability for such payment will extend only to the penal sum of the payment bond.
Any and all payments made by the Surety for performance and/or payment shall be
credited dollar for dollar against the penal sum of the respective bond. Nothing in this
Agreement constitutes a waiver of such penal sum or an increase in the liability of the
Surety under the bonds. In the event Surety should expend funds equal to the Penal
Sum in discharge of its performance bond obligation, Owner agrees that Surety shall
have no further liability or obligation, if any, under the Performance Bonds, this
Agreement, the Original Contract or otherwise to complete the work, if any. Nothing
contained herein shall limit Surety's obligations under the Maintenance Bonds for the
project.
10. Reservation of Surety's Rights.
Surety expressly reserves all prior rights, equitable liens and rights to subrogation that
would be the laborers', materialmen's, or the Former Contractor's under the Original
Contract (except as specifically modified by this Agreement) celln righ s
dating back to the execution of the Bonds, including but not limited to those'righ4s
IL
Cl: SECRE` ARY
Takeover Agreement �o WORTH: X�
Principal: TUE --_
Page 4 of 8
and remedies that may accrue during the completion of the Original Contract. No
waiver of such rights is agreed to or intended regardless of any provisions of this
Agreement.
11. Time for Completion, Cooperation and Best Efforts.
Owner and Surety agree that the Completion Deadline and the time to complete the work
for each Project will be 40 working days from a written notice to proceed to be issued by
Owner to the completion contractor. Any request for extension of time will be governed
by the terms of the Original Contract.
The Owner and the Surety agree to use their best efforts to cooperate under the terms
of this Agreement for the prompt completion of the performance of the work. Owner
further agrees that, in the event it believes that an event of default has occurred under the
terms of the Original Contract as a result of completion contractor's actions or inactions
on the Project, Owner will provide written notice of such suspected default to Surety five
(5) days in advance of issuing any cure or default notice accordance with the terms of the
Original Contract so that Surety can investigate. Owner will also furnish a copy of said
written notice to the project manager and to completion contractor.
12. No Third Party Rights.
This Agreement is solely for the benefit of the Owner and the Surety. The Owner and
the Surety do not intend by any provision of this Agreement to create any third -party
beneficiaries of this Agreement, nor to confer any benefit upon or enforceable rights
under this Agreement or otherwise upon anyone other than the Owner and the Surety.
Specifically, the Owner and the Surety acknowledge that nothing in this Agreement
shall extend or increase the rights of any third -party claimants or the liabilities or
obligations of the Surety under the Bonds.
13. Whole Agreement.
This Agreement, along with the Bonds, Original Contract and any duly authorized
change orders, constitute the whole %J the understanding, discussions, and agreements
by and between the Owner and the Surety. The terms and provisions of this
Agreement are contractual and not mere recitals. The Owner and the Surety
acknowledge that there have been no oral, written or other agreements of any kind as
a condition precedent to or to induce the execution and delivery of this Agreement.
Any written or oral discussions conducted prior to the effective date of this
Agreement shall not in any way vary or alter the terms of this Agreement.
14. Changes.
This Agreement shall not be changed, amended or altered in any way except in
writing and executed by both the Owner and the Surety.
Takeover Agreement
Principal: TLTE
Page 5 of 8
15
16.
17
19.
20.
Execution.
This Agreement may be executed in one or more counterparts, each of which shall be
deemed to be an original but all of which together shall constitute one and the same
instrument. Facsimile copies will have the same force and effect as originals.
Recitals.
The Recitals contained in this Agreement are incorporated herein by reference and
made a part hereof.
Governing Law and Jurisdiction.
This Agreement shall be governed by and controlled by the laws of the State of Texas
and the parties to this Agreement, in the event of any dispute involving this
Agreement, agree that venue shall lie exclusively in Tarrant County, Texas.
Notices.
Any notices, which are required to be given by the terms of this Agreement or the
Bonds, shall be made as follows:
As to the Owner: Department of Transportation &Public Worlcs
Attn: William A. Verkest, P.E., Director
1000 Throckmorton Street
Fort Worth, Texas 76102
As to the Surety:
Effective Date.
City Attorneys Office
Attn: Amy J. Ramsey, Assistant City Attorney
1000 Throckmorton Street
Fort Worth, Texas 76102
J. Trey Felty
Continental Casualty Company
333 S. Wabash Avenue
Chicago, IL 60604
This Agreement is effective as of the date first written above.
Successors and Assigns.
This Agreement shall be binding upon the parties and their respective
assigns.
Takeover Agreement
Principal: TUE
Page 6 of 8
®FFICIAL RECOR®
CITY SECRETARY
,T. WORTH, TX
21. Invalidity, Illegality or Unenforceability.
In the event that one or more provisions of this Agreement shall be declared to be
invalid, illegal or unenforceable in any respect, unless such invalidity, illegality or
unenforceability shall be tantamount to a failure of consideration, the validity, legality
and enforceability of the remaining provisions contained in this Agreement shall not in
any way be affected or impaired thereby.
22. Construction of Agreement.
The Parties agree that each Party and each Party's counsel have reviewed and approved
this Agreement, and that each Party has fully understood and voluntarily accepted each
and every provision contained in this Agreement. As such, it is understood and agreed
by the Owner and the Surety that this Agreement shall be construed without regard to
any presumption or other rule requiring construction against the party causing this
Agreement to be drafted.
(Remainder of Page Intentionally Left Blank)
���It�iA�. RECCR®
CITY SECREiAR
Takeover Agreement
Principal: TLTE
Page 7 of 8
IN WITNESS WHEREOF, the parties have executed this Agreement on the date
indicated above, and each of the undersigned personally represent and warrant that they have
the full right, power and authority to execute this Agreement on behalf of the respective
parties.
CITY OF FORT WORTH
�� L�
Fernando Costa
Assistant City Manager
Recommended:
CONTINENTAL CASUALTY COMPANY
:I. Trey'Felty/
Senior Clairti
William A. Verlcest, P.E., Director
Transportation &Public Works Department
Approved as to Form and Legality:
��
Amy J. Ramsey
Assistant City Attorney
ATTEST:
Marty Hends'i:
City Secretary
Date: � \1� Z"'�� �
s Counsel
pq'��o ������
,a � oo °o �,a4
F�y� p o oa'�,
�d a�
��,,
��� oo°o ooQyo �F
�G4�00400� T !J'
����C,p�S �c,.o,
��.e.,
No M&C Required —
Authorized by contract executed per
M&C
Takeover Agreement
Principal: TUE
Page 8 of 8
'i
�-
ti !�
EXHIBIT "A"
DID PROPOSAL
2004 CIP CONTRACT 44 — PAVEMENT RECONSTRUCTION, DRAINAGE
NWROVEMENTS AND WATER AND SANITARY SEWER REPLACEMENT ON
WESTCREEK DRIVE
Fort Worth, Texas
June 16, 2010 (REVISED)
CONTINENTAL CASUALTY COMPANY
c/o Mr. G. Keith Roberts
Roberts, Taylor & Sensabaugh, Inc.
4001 Gateway Drive, Suite 100
Colleyville, Texas 76034
Gentlemen:
The following proposal is being made an behalf of
for
the completion of the scope of work defined in the Standard Form of Agreement between the City of
Fort Worth, Texas and Texas United Excavators, LLC for the project known as 2004 CIP Contract
44 - Pavetnent Reconstruction, Drainage Improvements and Water and Sanitary Sewer Replacement
on WestcreekDrive .
The Contract Documents are composed of the following:
The "CONTRACT" between the City of Fort Worth, Texas and Texas United Excavators,
LLC made and entered into on or about December 16, 2008.
The Specifications identified as Specifications and Contract Documents for Paving,
Dt ainage, Water and Sewer Replacement 2004 CIP Contract #44 Westct eekDrive prepared
by ANA Consultants, 1701 River Run, Suite 610, Fort Worth, Texas 76107.
The Contract Drawings, prepared by ANA Consultants, 1701 River Rum, Suite 610, Fort
Worth, Texas 76107.
INVITATION &INSTRUCTIONS TO BIDDERS prepared by Roberts, Taylor, and
Sensabaugh, Inc., dated June 10, 2010.
BID PROPOSAL FORM prepared by Roberts, Taylor &Sensabaugh, Inc., dated June 16,
2010 {Revised}.
The undersigned certifies that (he, she) is authorized to act on behalf of -tha- (Partnership,
Proprietorship, Corporation) to execute and submit this Bid Proposal. Th�it�1��d�T� ���i� Y,
r
certifies that this proposal is made without collusion on the part of any perso; fi%o
N
t'! �''!;Ci .qf d
EXHT I "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 2 of 18
We certify that we have carefully examined the INVITATION &INSTRUCTIONS TO BIDDERS
prepared by Roberts, Taylor & Sensabaugh, Inc., including all Schedules and Exhibits, the drawings,
specifications, and the CONTRACT complete as identified above. We further certify we have
carefully examined the in -place work, the site conditions and local conditions affecting the work of
the Contract Documents.
On the basis of our examination of the project site and all the Contract Documents cited above, we
propose to famish all work necessary including, but not limited to, supervision, labor, materials,
tools, equipment, fees, permits, assessments, applicable taxes, insurance, overhead, profit, bonds,
warranties, as -built drawings and incidentals necessary to complete the work in strict accordance
with the plans and specifications for the lump sum price shown below.
BASE BID:
The undersigned bidder having thoroughly examined the contract documents, including plans,
specifications, the site of the project and understanding the amount of work to be done and the
prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment, and material,
except as specified to be furnished by the City, which is necessary to fully complete all of the work
as provided in the plans and contract documents and subject to the inspection and approval of the
City of Fart Worth, Texas, and binds himself upon acceptance of this Proposal to execute a contract
and furnish an approved Performance Bond, Payment Bond and such other bonds, if any, as may be
required by the contract documents for the performing and completing of said work. Contractor
proposes to do the work within the time stated and for the following sums:
ITEM
NO.
QUANTITY
AND UNIT
DESCRIPTION & PRICE IN WORDS
PRICE FIGURES
UNTT/TOTAI,
] . UNIT II
— Paving;.J::Dollars
&Drainage
1 L.S,
�1Y)d ity Adjustmen�lt 1 Repair
$9,268 $9,268
N D Cents
per lump sum.
2.
4 EA
Sign -Project Designation Install
71)pry e U, fj-& Dollars
NJO Cents
each.
3.
553 L.F.
Curb & Gutter... Remove
se& IlJ Dollars
$ bo $ 9 7/0 OD
nl D Cents
per linear foot.
4.
84 S.Y.
Pavement -Valley Gutter Remove
_ Dollarsi,
o _ 11�Ii�iL RE ' 44) i
00
$ D b$
per swareard.
P 9 Y ETARY
ITT. WOR��s 3„ '! ��
L' XMIT "All
1t
BID PROPOSAL
June 15, 2010 (Revised).
Page 3 of 18
wtl
5.
1 S.F.
Driveway • Remove
Si )(
Dollars
$ ob $
n o
0.
N n Cents
per square foot.
6.
I S.F.
Walk � Remove
U r
Dollars
d D D D
$ _ $
ND Cents
per square foot.
7.
I S.F.
Walk-ADA Wheelchair Ramp Remove
(F)
Dollars
� D
$ $ $
O p
M Cents
per square foot.
8.
1 S.Y.
Pavement.Concrete � Remove
�We17 j-•�
Dollars
$ a D. ° b $
a�. a
Cents
per square yard.
9.
1 EA
Inlet Remove, Remove Existing Curb inlets, All
Sizes
TQ�I Dollars
$ 10006 $
f a01)
�)
D Cents
per square yard.
l 0.
76 L.F.
Pipe n Remove; Remove Existing Storm
All Sizes
-rr%)Pni 4
Drain Pipe,
Dollars
07) S
i t �aD•�a
NO Cents
per linear foot.
I1.
1 L.S.
Headwall • Remove, Remove Existing Storm Drian
Headwall, All Sizes
r� P. �tlmc ri n Dollars
S-31 ODD bD $ 3 060, 0 a
1 j D Cents
per lump sum.
12.
300 C.Y.
Pavement -Unclassified Street Excavation
S ) j ep 1d
� Remove
Dollars
$ bb S
OD
•x
n Cents
ors)
per cubic yard.
13.
4194.71 S.Y.
Spbgrade-6" Lime Stabilized Install; 6"
@ 35#SY
Dollars
�'ob
$ 7 g
7��
Cents
per square yard.
Na
82.94 TO
Subgrade-Lime for Stabilization _.. Install;
0 Tj JLyP3 Aed Si X� •(
(35#SY)
Dollars
Cents
per ton.
15.
3242.09 L.F.
Curb-7" Install; 7" Attached Concrete Curb
T_ {e Dollars
%a �7
N n Cents
per linear foot.It,
cL6T� WORTH, TX
EXHIBIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 4 of 18
M.
17878 L.F•
Pavement -Silicone Joint Sealant � Install
T 7p
Dollars
D o
Am Cents
per linear foot.357.5�,
17.
150 L.F.
Curb & Gutter-7" w/18" Gutter � Install; 7"
Reinforced Concrete Curb and 18" Gutter
eh'f' F JDollars
$
aj� a� $
3 '75Z)
N 7 Cents
per linear foot.
18.
1492.5 S.F.
Driveway-6" � Install; Construct 6" Reinforced
Concrete Driveways
S e o-e n Dollars
$
b o
7' $1
b of .5°
NO Cents
per square foot.
19.
267 S.F.
Wa1k-4 Ft � Install; Construct Reinforced
Walks
Fou r
Concrete
Dollars
N 0 Cents
per square foot.
20.
133 S.F.
Walk-ADA Wheelchair Ramp � Install; Construct
Reinforced Concrete Wheel Chair Ramps
7F ) e )0 Op,
Dollars
$
1 a � � $
1 x 5W O
NO Cents
per square foot.
21.
64 TO
P vement-Transition- Min 6 Inch I MAC
11 g f:O�:J { i �) Q
- Install
Dollars
$
q OD
l $
bD
1\1 D Cents
per ton.
22.
6 EA
Manhole -Adjustment - Services; Adjust existing
sewer Manholes to Grade
lEl Dollars
$
. Ob$
LA go p a
Cents
each.
23•
7 EA
Valve Box -Adjustment- Services; Adjust
Water Valve Boxes to Grade
+(QeLmLdL6�
Existing
Dollars�ne
$e3g
s
a
/A j O Cents
each.
24.
11 EA
Meter Box_Adjustment � Services; Adjust
Water Meters to Grad r
1w0 N u t d A9 CL
Existing
Dollars
$
b�$
%5D �r7
Cents
each.
25.
497 C.Y.
Too soil � Install; as Directed by Engineer
Dollars
$
$
y
CTnts
per cubic yard.
EXHIBIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 5 of 18
Pipe -Sub Drain-b Inch Subdrain w/Grave l and Filter
Fabric � Install
1" D r+i � j Dollars
0&) a Cents IM 00 Ua
per linear foot. 9 ? $
27. 1 EA Inlet -Top of 10 Ft Drainage Inlet � Replace; Adjust
To Existing 10' Curb Inlet to New Grade
1 tor) 7nDU& Vr4, Dollars
j,I lo) Cents
each. $ ba $ D
28, 1 L.F. ALust Existing Storm Drain Pipe to New Inlet
.� Dollars
�its) �— Cents J/
Pei, linear foot. $ D•aD $ azvoa )
LFTa
29.
1 L.S.
Storm Water Pollution Prevention Plan > Than l Ac
SWPPP -- Install
W 0 :nDu Sa r C Dollars
oa $ 000•°a
tJ l7 Cents
per lump sum.
30.
1.5 EA
Inlet-Inline 10 Ft - Install; Construct Sid. ] 0' Curb
Inlet
711irR e oLigo V1 C, Dollars
rr��
$J Q�� $
A) p Cents
each.
31.
1 EA
11*1 Inline-20Ft ...Install; Construct Std 20' Curb
Inlet ,
'7b►'IL*j t' r V%Q Uhl (CP� Dollars
,/
$ ' $ q'6 Oa
7
N 0.__ Cents
each.
32.
I.1 EA
Inlet-Recessed4OR Install; Construct Std, 10'
Recessed Curb Inlet
l f �/ f" 1y� HClt�Sj n0c� Dollars
.OD $oD
KIn Cents
each.
33.
4 EA
Inlet-Recessed-20 Ft � Install; Construct Std, 20'
F,=ssed Curb Inletr(
Ft7 r ��,5) X �I U pj f�q d Dollars
N� Ir D
$ �j lOw'�D $ of yQ�` D
OND
.1
Cents
each. '
34,
1 EA
Inlet -Recessed- >Than 20 Ft � Install; Constrvct 30'
Recessed —Cz}�' b Inlet
tr11Q. ,►1D1Asarid Dollars
$ 5,CjD 0"$ XV,0v
Cents
Itsin
each.
35.
l EA
Inlet -Recessed- >Than 20 Ft � Install; Construct 2-
Double 20' Recessed Curb Inlet
fliT}a I- I )IOU pald. r
$ g °d $ 6 d�
Nty en,
each.'OLR��
WORM Ti
EAjJLLBIT "A"'
BID PROPOSAL
June 15, 2010 (Revised).
Page 6 of 18
Pipe-I8 Inch -Class III (Non -Standard) � Replace;
Complete in Place
S j6 >(7'v Dollars
J E) Cents
per linear fool.
37. 1 L.F. Pipe-2l Inch -Class III � Izzstall; Complete in Place
6 J%%o r}� Dollars
W D Cents
per linear foot.
38. I L.F. P241nc1z-Class III � Install; Complete in Place
rf4hl Dollars
Cents
per linear foot.
39.
CuT
I L.F.
Pipe-241nch-Class III � Itzstall (Equalizer per
Detail, Slit.64) Complete in Place
Dollars
DD
Cents
per linear foot.
40.
1 L.F.
Pipe-30 Inch -Class III Install,• Complete in Place
DO&Q Dollars
$ 00• 00 $ 100,0V
` M 0 Cents
per linear foot.
41.
1 L.F.
Pipe-361nch-Class III Install; Complete in Place
Dollars
$ 1 t 0 • Iw $ 110.0 a
IN Q Cents
per linear foot.
42.
1 L.F.
Pipe-54Inc r-Class Ill �Izstall,• Complete in Place
`�M)D u ��il�> Dollars
$ C\)wt $ c4a
()(p Cents
per linear foot.
43.
I L.F.
Box Culvert-5 Ft X 5 Ft � Install,• Complete in Place
p L�J�9L Dollars
$ �'�1�D• �a$ ,�� •� v
Cents
per linear foot.
44.
12 L.F,
Box Culvert-12 Ft x 4 Ft ti Install; 2 Barrel Complete
in,Place
1C Dollars
G�
Cents
per linear foot.
45.
1.62 C.Y.
Headwall-24 Inch Pipe � Insall; 24" Concrete
He?dwall, Complete in Place
411 :1 !Ad ,,� Dollars
%o •6D $ 1, IS54
(i Cents
per cubic yard.
46.
1 C.Y.
Headwall-30Inch Pipe � Install; 30" Concrete
Headwall, Coin I to irr Place —.
$ %DO' D�$
G`,
per czrbic yard CI
e WARTli, TR I
EXHIBIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 7 of 18
47.
I C.Y.
Headwall-36Inch Pipe � Instal 36" Concrete
Headwall, Coin ete in Place
S?. Xo n t t Ud nO C Dollars
$ $ 700,0 D
0 Cents
�A
per cubic yard.
48.
40.42 C.Y.
Headwall � Install (TxDOT Type PW) Concrete
Headwall Complete in Place
CGS E Put dhork )�71 + 4 Dollars
a�
NO I —Cents
per cubic yard.
49.
1 LeF. Trench Safety System 5 Foot Depth � Install; Trench
Safety System for Storm Drain Pipe Over 5' Deep
Fi �q 'ee"..l Dollars
b? D Cents
per Iinear foot.
$ /5 011 $ j5 b 0
50.
ICY
Unclassified Trench FYcavation & Backfill Install
r1 Wen4.l Dollars
$ oZO po $ a�D0 00
N 0 Cents
per cubic yard
51.
227.5 C.Y.
Channel -Unclassified Excavation Remove
FIo;4 -ee j Dollars
$ 1 �J 0 b $ /'156
N'D Cents
per cubic yard.
52.
273.68 C.Y.
RipRap-18 Inch Rock (Grouted) Install; Grouted
Rock Rip Rap 24" Deep, Type A
Dollars
$ 1D 00
Cents
per cubic yard.
53.
203 C.Y.
Erosion Control-Gabion Basket Install; (Mattress)
a f� 4L4e.0Sjd'(eC Dollars
$ 0D $ (od19D0 as
10 0 Cents
per cubic yard.
54.
36 L.F.
Pavement-2 Inch Min HMAC on 2I27 Concrete Base
(2000AA) � Install; Permanent Asphalt Pavement
Repair
-i- ; Imo; Dollars
$ '50.00 $ j Zoo* 0 D
ND Cents
per linear foot.
55,
1 L.S.
Traffic Control Install;
1 t)2 1 r1QUSg►1 cL Dollars
$ MD oo$ 5 WDS0�
�} j) Cents
per lump sum.
56.
36 L.F.
Pavement-2 Inch HMAC on 6 Inch Flex Base -
Temporary - Install; Temp. Asphalt Pavement
Repair, Minimum 2" Hot Mix on Min. 6" Compacted
Flexible Base, per Fig. 2000-1 C
1 (4L ,Dollars
0
$ c3D60 $ 11 0 6y�
OFFICIAL kEGORP
Cents
per linear foot.
n WORTH, TX
EXIIff3IT nArr
BID PROPOSAL
June ] 5, 2010 (Revised).
Page 8 Of 18
57.
2265 S.Y.
Grass-Hydromulch Seeding � Install; {Charmel Work)
� f�J �. Dollars
5� �
$ 1. $ ��
-�1 �-,,t .l cents
per squareyard. -_Y_
58.
11 EA
Sign -Address on Curb � Install
f � C- •{-�L(,�1� r`P �
Dollars
$
p.00 $ 3 �, o D
Iy D Cents
each.
S9.
IS G.Y.
Retaining Wa11 (Concrete} � Install
'7 � f e •� %� f�/ n1d Y�C� �� i �.i
Dollars
$ ��
�
ppa $ 5� 0
1�1-� Cents
per cubic yard.
60. UNIT
II -
Green
Cement
4901.09 S.Y.
Pavement � InstaU; 7.5" Reinforced Concrete
Pavement � Green Concrete
�n�•�. � Dollars
$
Q �� $ ��1� d���
�C7 Cents
per square yard.
PAVEMENT &DRAINAGE
SUBTOTAL AMOUNT BID
$
$ �?1 y�gl
Water Improvement
ITEM
QUANTITY
DESCRIPTION & PRICE IN WORDS
PRICE FIGURES
NO.
AND UNIT
UNIT/TOTAL
1.
1 L.F.
Pipe-Pressure-I2 Inch � Install (Includes Removal or
�Ibandozzing of Existing Water Pipe)
}- i � � �-� Dollars
.1�1 D Cents
$ rjp. � O $ rjQ, 0 O
per linear foot.
2.
1 L.F.
Pipe-Presszn•e-I D Inch �--Install IO"PVC Water Line
(Includes Removal ortl bandonirzg ofFxisting Water
Pipe)
_
_ �(Z�,E. �! %' 1y�, , Dollars
/� p—� Cents
$ ��0�$ �5 ��
per linear foot.
3.
?4.32 L.F.
Pipe-Pressure-Blnch �- hzstal7 8"PVC GYater Line
(Includes Removal orrlbondonizzg offixistizzg Water
P' e
(�-� Dollars
____
�J
� Cents
L/
$ T�• � � $ �7�, 8D
per Ilnear foot.
9.
3.85 L.F,
Pipe-Presszo•e-6lzch � Install 6" PYC Water Line
(lry rant lines);
1 %rr��/C�,���•�._ Dollars
Q' /�/
$ �U' O� $ � / (�7, �D
i� j�T �..J Cents
per linearfoot.
i , _�, '�:
EXHIBIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 9 of 18
5.
20 L.F
Pipe-Pressure-8 Inch � Install 8" (DIP) Water Line
(Includes Removal or Abandoning of Existing Water
Pipe)
6) Xi J Dollars
$ oo $ l aoD. o0
0�) (2 Cents
per linear foot.
6.
I EA
Valve-6 Inch -,Gate Valve w/Box Install; 6-Inch
Gate Valve w' h Cast Iron Box & Lid
E I 1hj: 4YAc)reAr Dollars
v
$
Cents
each.
7.
I EA Valve-8 Inch -Gate Valve w/Box � Install; 8 Inch
Gate Valve with Cast Iron Box & Lid;
D AIp 7ho w : o n Dollars
Cents
each.
$ 0 o. $ tano.
8.
1 EA
Valve401nch-Gate-Valve w/BoxInstall; 104nch
Gate Valve with Cast Iron Box & Lid
�1 �+. e P1W3 14 L( jk ✓ a Dollars
$ a.�� od. ��
D
461 _Cents
each.
9.
1 EA
Valve-121nch-Gate Valve w/Box � Install; 124nch
Gate Valve with ast Iron Box & Lid
SiX' CP&I ff4ldCPt1: _ Dollars
l o Cents
each.
10.
1 EA
Valve-6lnch-Blow Off—w/Sump Manhole Install
�' A 7P Ea d lm IMF Dollars
$ J�6D.d0 f�a
NJ() Cents
each.
II.
I EA
Fire Hydrant Install; Standard Fire Hydrant; 3 '6"
Bu
Dollars
$a 50c),00$ 0
A) Cents
each.
12.
L5 VF
Fire Hydrant -Barrel & Stem Extension Install;
Barrel Exte Sion for Fire Hydrant over 3'6" Bury
DU 1 h1d 1^ Dollars
b1 Cents
per vertical foot.
13.
1 EA
Fire Hydrant � Remove; Remove & Salvage Existing
Fire Hydran
7" J_ ���`y(�Qd Dollars
CC
$'$
n Cents
each.
14.
I TO
Pipe Fittings -<Than 16Inch DI Pipe � Install; Cast
Iron Fittings; 12" orsmaller
s----
$ ( $ 00
` EU
Per ton. bm
FT. WORTH, TX
EXHIBIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 10 of 18
I S.
1 Est
Water Service4 Inch -Tap to Main - J nstall; 14nch
Water Service Tap to Main
JP _ j3) YY-}--� Dollars
$
Cents
each.
16.
1 L.F.
Water Service4 Inch Install,• Install 14nch Copper
Service from tVarn to Meter
F NQ� Dollars
$ 4K U $ 4 �a
}� l C7 Cents
per linearfoot.
17.
5 EA Meter Box -Class A Install; Class "A" Plastic Meter
Box Complete in Place
I r 1 f'J-4 uN Dollars
Cents
each.
$
18.
3 EA
Wter Service-1 Inch Relocate
f'tiu r w�'O et�1 Dollars
$ OD.01) $ 1 Up . o o
"n Cents
each.
19.
1 L.S.
Water Service-2 Inch -Temporary Install; Furnish
and Lay 2 Inch Pipe and Fittings for• Temporary
Water Service Connection
14 re Dollars
$
�J D Cents
per luinp sum.
20.
578 L.F.
Pavement-2 Inch Min HMAC on 2/27 Concrete Base
(2000-I A) � Install; Permanent Asphalt Pavement
R pair, per Fig. 2000-1A
t/t Dollars
$ L7)10D L7)8 0 a
►`1 (7 Cents
per linear foot.
21.
378 L.F.
Pavement-2 Inch HMAC on 6 Inch Flex Base -
Temporary � Install; Temporary Asphalt Pavement
Repair, minimum 2" Hot Mix on minimum 6"
Compacted Flexible Base
Te Dollars
1� Cents
per linear foot.
22,
1 L.F.
Trench Safety System S Foot Depth � Install
Dollars
$ LD. 50
Cents
per linear foot.
23.
40 L.F
Concrete -Encasement Install; per Fig. 20
!-1 VP— Dollars
D6
$ $ o�(X9• o
I�
Cents
per linear foot.
OFFICIAL RECORD
CITY SECRETARY
FT WORTH! TX
EXHIBIT "A"
31D PROPOSAL
June 15, 2010 (Revised).
Page 11 of 18
24.
400 C.Y.
.Fill Material -Type B Backfill � Install; Type `B"
Backfill
:(,)(7 Dollars
$ �OD
T,(D Cents
per cubic yard.
25.
10 C.Y
Concrete -Type B � Install (2500#PSI) Concrete for
Muse ]laneous Placement
! 11 I �f� Dollars
js)D Cents
$ �� Ott $ 0
b
per cubic yard.
26.
10 C.Y.
Concrete -Type E --Install (1500#PSI) Concrete for
�Miisgellaneous Placement
! ► }'1 (�: �l Dollars
$ $SO 2oe D
�C7 Cents
per cubic yard.
27.
10 C.Y.
Fill Material -Ballast Stone Install
-Q V e. Dollars
$ r,. bD $ 50 v
�j 7 Cents
per cubic yard.
28.
1 L.F.
Curb & Gutter � Remove
R 4 -i r_e tiJ Dollars
tN1 0 Cents
per linear foot.
29.
40 S.F.
Walk � Remove; Remove Existing Concrete Walk
�ThE'�� Dollars
1\ 1 O Cents
per square foot.
30.
1 L.S.
Storm Water Pollution Prevention Plan > Than J A
SWPPP � Jnstall
�A 1 t Qt\k tr§d Dollars
o Cents
-M
per lump sum.
31.
4 L.F.
Curb & Gutter-7 Inch pw/18 Inch Gutter � Install
1�Dollars
AD
$ $ �(�•��
�) (� Cents
per linear foot.
32.
10 L.F.
Pavement -Concrete on 2/27 Concrete Base (2000-2)
Install �-^
�G �•L,.l t" I V"� Dollars
D
1J D Cents
per linear foot.
33.
10 C.Y.
Subgrade-Crushed Limestone for Misc. Placement
111still
71 Dollars
1) o Cents
per cubic yard.
WATER IMPROVEMENT
SUBTOTAL AMOUNT BIll'
$
OFFIC iA
CITY SECRETARY
FT. WORTH, TX
EXMBIT "A►'
BID PROPOSAL
June 15, 2010 (Revised).
Page 12 of 18
newer lmprovemenc
ITEM
NO.
QUANTITY
AND UNIT
DESCRIPTION & PRICE IN WORDS
PRICE FIGURES
UNIT/TOTAL
1•
101.35 L.F.
Pipe-Sewer4 Inch-SDR35 (All Depths) - Install; 8-
Inch PVC Pipe for Sanitary Sewer Line by Open Cut
Dollars
$ �� $ 125
h) n __ Cents
per linear feet.
2.
153.04 L.F.
Pipe-Sewer-8 Inch-SDR26 (All Depths) � Install; 8-
Inch PVC Pipe for Sanitary Sewer Line by Open Cut
1Z,0 r 1�, •/ ` V P Dollars
$ Jr' b $ g8(p• SD
l�l o r Cents
per linear feet.
3.
56 L.F.
Pipe-EnlargementmHDPE-Sizes Specified by Engineer
-- Install; 6" to 6" Service by pipe bursting, All
De the
?+' h Dollars
I
$
jJ
Cents
per linear foot.
4.
72 L.F.
Sewer Service-4 Inch-SDR26 � Install; Sanitary
Sewer Service with Cement Stabilized Bacl¢ll by
Open Cut, All Depths (In Public ROW or Permanent
Easement)
4c) Dollars
$ `�J DD $
�In Cents
per linear foot.
5.
491 L. F.
Sewer Service4 Inch � Install; 44nch PVC Sanitary
Sewer Service Line by Open Cut, All Depths (In
Public ROW or Permanent Easement)
f ►1 I +� .! I— i' Dollars
$ DD $ ) Da
ND Cents
per linear foot.
6.
19 EA
Sewer Service4 Inch Service Tap Install; 44nch
PVC Sanitary Sewer Service Tap
` 7k-ceP_ �ia�d rid I .1 Dollars
$ 35D@0D$
n Cents
each.
7.
19 EA
SSee{wer Servilc�-4 Inch-2 way Clean Out � Install
l�lMOE, Nu1,[10a Dollars
b
$D 5 D a
0 Cents
each.
8.
1 EA
Manhole-Std 4 Ft Diam (to 6 Ft Depth) � Install
1 Dollars
$ ADD $ nqD
7 Cents
each.
3E11ULIBl l "All
1l
31D PROPOSAL
June 15, 2010 (Revised),
Page 13 of 18
9.
l .89 VF
Manhole-Std 4 Ft DiarnAdded Depth (over 6 Ft
Depth)I- Install
r) h10 ri VLt - AD6 j I -� .j Dollars
NO Cents
per vertical foot,
10.
1 EA
Manhole Drop-Std 4 Ft Diam (to 6 Ft Depth)
Install T f-1 , /
jflue. U1J j ALI Dollars
<� Cents
per linear foot.
PLp 605z
5C0.06
II.
I V.F.
Manhole-Drop-Std 4 F1 Diam-Added
Ft Depth) Install
f o 4U N )A its C
Depth (over 6
Dollars
$ $
dn2pD
7)_ Cents
per vertical foot.
129
110 V.F.
Manhole -Paint & Coating -Interior Protective Coating
- Install
..Dollars
S 1ip(� D� S
Q, ioX P
N C7 Cents
per vertical foot.
139
1 EA
Manhole - Remove
7:n r P P 14 u& d, (to
Dollars
r) Cents
-w
each.
14.
1 EA
Manhole � Abandon
rCi ,I p H u hj rL mod.
Dollars
$.°i7
Cents
WND
each.
ISO
1 L.F.
Trench Safety System S Foot Depth Install
1 Ike n J D )K . Dollars
$ C; 0, $
cZ p�
jy 0 Cents
per linear foot.
1&
4 Ea
Manhole -Watertight Insert � Install
E(� �j
Dollars
S
Iy o Cents
each.
IT
28 EA
Collar -Manhole � Instal
C t1 KY4Gl Lip4 �
Dollars
$
_DU
j\j D T Cents
each.
1 &
3151.7 L.F.
Inspection -Post Construction Cleaning
o e—
& TV � Study
Dollars
�S•j D $
0 Cents
per linear foot.
190
405.8 L.F.
lns ection-Preconstruction Cleaning &
mi �
TV � Study
Dollars
OFFICIAL
CITY SECRETARY
��. �1� ' fj'k/t�a� �,a
b Cents
a)
per linear foot.
EXMIT "An
BID PROPOSAL
3une 15, 2010 (Revised).
Page 14 of 18
20.
713 L.F.
Pavement-2 Inch Min HMAC on 2/27 Concrete Base
(2000-1 A) � Install; Permanent Asphalt Pavement
Repair
E; q'j Dollars
N) ��
1J t7 I� Cents
per linear foot.
21.
1600 L.F.
Pavement-2 Inch HMAC on 6 Inch Flex Base -
Temporary � Install; Temporary Asphalt Pavement
Repair, minimum 2" Hot Mix on minimum 6"
Compacted Flexible Base, per Fig. 2000-1 C
N Dollars
$ p bd $ p
W) Cents
per linear foot.
22.
I .L.F.
Concrete -Encasement Install; per Fig. 20
j "+ , Dollars
Sb O
C7 Cents
per linear foot.
23.
1 L.F.
Curb & Gutter � Remove
D4 4 nP� Dollars
00
$ D
A) 0 Cents
per linear foot.
24.
48 S.F.
Walk � Remove; Existing Concrete Walk
4751,1 }-- Dollars
$ 7 IL
A D Cents
per square foot.
25.
8 S.Y.
Pavement -Valley Gutter n Remove
7 In i Dollars
$ .06 $ ';10,00
/J 0 Cents
per square yard.
26.
206 S.F.
Driveway � Remove
Q V e_ Dollars
D Cents
010
per square foot.
27.
600 C.Y.
Fill Material -Type B Backfill -- Install
1 p Dollars
$ 246 d $
per cubic yard.
28.
10 C.Y.
Concrete -Type B � Install; (2500#PSI) Concrete for
M' 11 neous Placement
/� Dollars
D�
$ b$ SOD'
_
Cents
per cubic yard.
29.
10 C.Y.
Concrete -Type E � Install; (1500#PSI) Concrete for
M' llaneous Placement
1J Dollars
)
$ 10,d0 $
[7 Cents
per cubic yard.
l�t `�-old
EXHMIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 15 of 18
30,
36 EA
Manhole -Vacuum Test � Services; Vacuum Test for
�S-ar-nlitary Sewer Manholes
! 11ice F nod YLP.A Dollars
$
�,Db $
�b Cents
each.
31.
1 EA
Sewer-Service-6 Inch-2 Way Clean Out � Install
Dollars
$
"rap
6
Nr} Cents
each.
32.
1 C.Y,
/F--ii�ll1111aterial Flowable Fill (8Inch Sewer) Install
>rl4 Dollars
$
bb
Aa D. S
�y 0 Cents
per cubic yard.
33.
2066 C.Y.
Fill Material -Cement Stabilized Backfill � Install
Dollars
Q
JJ 0 Cents
per cubic yard.
34.
8 L.F.
Curb & Gutter4 Inch w/18 Inch Gutter � Install
Dollars
D
D D
n Cents
,K1
per linear foot,
35.
80 S.F.
Dn�'vay-6 Inch � Install
�] (f )%�A Dollars
�� Cents
per square foot.
36.
1 EA
Dehole-& ploratory Excavation - Study
1 X U t�C� f t� Dollars
$
by�
��'
� U0
Cents
each.
37.
10 C.Y.
Subgrade=Crushed Limestone for Misc. Placement
In� 11
t" 1J Q Dollars
$
N O Cents
per cubic yard.
SEWER IMPROVEMENT
SUBTOTAL AMOUNT BID
Additional Items
ll) O �-I U jJC�i��. Do}lars
$ c Qo $,�,2M
Np Cents
per lump sum.
2.
1 L.S.
Grout Rip Rap Already in Place
o 1, c�o rH Dollars
k l�r
Cents
per lump sum. a
EXHIBIT ►►A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 16 of 18
3.
10 EA
I Crape MyTtlesNegetation � Replace/Install
it U CPNJ ror -}- r' J 4 Dollars
$150 $1.500
ND I Cents
each.
4.
100 L.F.
Replace Damaged Curb
��
_ Cents
per linear foot.
5.
1 L.S.
As Built Drawings
Dtja�0L 0a Dollars
$(no' $
N 0 Cents
Per lump sum.
6.
1 EA
Demo & Replace Inlet Top & Rings/Covers +/- 5012
Westcreelc West
O= % Ir ::nq 0LkCCt,!2C1 Dollars
$'Cow$
IJU
Cents
each.
7.
150 S.Y.
Asphalt Repair @ Intersection of Westfield &
Westcreek ast Side)
c5) Dollars
/ a
n Cents
IN
per square yard.
8.
1 L.S.
1t
Miscellaneous
D totSq elglo Dollars
0 Cents
WOO 301000
$ $
per lump sum. cj
ADDITIONAL ITEMS
SUBTOTAL AMOUNT BID
$
TOTALS
No fig
PAVEMENT &DRAINAGE
SUBTOTAL AMOUNT BID
�`
$ $
WATER IMPROVEMENT
SUBTOTAL AMOUNT BID
$ $ �V6'I.1D
SEWER IMPROVEMENT
SUBTOTAL AMOUNT BID
$ $ 10 7 79,
ADDITIONAL ITEMS
SUBTOTAL AMOUNT BID
o
w
$ $
TOTAL AMOUNT BID
We acknowledge receipt of and have added to and made a part of the
Documents the following addendum (addenda):
PxoPua,s�;� (�f?�l'act4
EAltWIT ''A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 17 of 18
Addendum No.1
Addendum No. a ��
Addendum No.
Dated: (D(V 1 Dl Q
Dated: bCe / O) D
Dated:
We propose to execute a contract with Continental Casualty Company or the City of Fort Woz•th,
Texas, at Continental Casualty Company's option, upon award, and to complete the work of the
Contract within -d working days.
We have included a Bid Bond in the amount of 2% ofthe amount of our bid underwritten by
+ Y-t�,J M �a
We propose to furnish a performance bond and payment bond acceptable to Continental Casualty
Company for 100% of the total amount bid and such other bonds as may be required by the contract
documents.
In submitting this bid, it is understood Continental Casualty Company reserves the right to acceptor
reject any and all bids, to waive any informalities and to open the bids privately. In addition, it is
understood and agreed this bid proposal shall remain open to acceptance for a period of 60 calendar
days from the date thereof.
The undersigned certifies that the bid prices contained in this proposal have been carefully checked,
and are submitted as correct and final.
Name
By:
Title:
(A Partnership�Proprietorship or Corporation)
OFFICIAL REC®R®
CITY SECRETARY
FT. WORTH, TX
EX MIT "A"
BID PROPOSAL
June 15, 2010 (Revised).
Page 18 of 18
(Seal if Corporation)
Interchange Corporate Center
450 Plymouth Road, Suite 400
Plymouth Meeting, PA. 19462-1644
Ph, (610) 832-8240
BID BOND
Bond Number: Bid Bond
KNOW ALL MEN BY THESE PRESENTS, that we Conatser Construction TX, LP
P. Q. Box 15448, Fort Worth TX 76119 as principal (the "Principal"),
and LIBERTY MUTUAL INSURANCE COMPANY, a Massachusetts stock insurance company, as surety (the
"Surety"), are held and firmly bound unto Continental Casualty Company
, as obligee (the "Obligee"), in
the penal sum of Two Percent of the Total Sid Amount
Dollars ($ 2% of Total Bid ),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our
heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for: 2004 CIP Contract 44 - Westcreek Drive
Pavement Reconstruction, Drainage Improvements, Water & Sanitary Sewer Replacement
in the City of Fort Worth, TX
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal within the period specified therein, or, if no
period be specified, within sixty (ti0) days after opening, and the Principal shall enter into a contract with the Obligee
in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
contract documents, or in the event of the failure of the Principal to enter into such contract and give such bond or
bonds, if the Principal shall pay to the Obligee the difference in money not to exceed the penal sum hereof between
the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with
another party to perform the work covered by said bid, then this obligation shall be null and void; otherwise to remain
in full force and effect. In no event shall the liability hereunder exceed the penal sum thereof.
PROVIDED AND SUBJECT TO THE CONDITION PRECEDENT, that any claim by Obligee under this bond must
be submitted in writing by registered mail, to the attention of the Surety Law Department at the address above,
within 120 days of the date of this bond. Any suit under this bond must be instituted before the expiration of one
(1) year from the date of this bond. If the provisions of this paragraph are void or prohibited by law, the minimum
period of limitation available to sureties as a defense in the jurisdiction of the suit shall apply.
DATED as of this 25th
WITNESS/ATTEST
LMIC-5000
day of June
20 10
Conatser Cons
By:
LP
�`` N�nie: Jerry R. Conatser, Pres. Conatser
%'�l title: Management Group, Inc, GP
LIBERTY MUTUAL INSURANCE COMPANY
ey:
S. Davis
(Seal)
(Seal)
®FFICIAL RECG►R®
CITY SECRETARY
FT. WORTH, TX
Rev. 03104
2590050
;THIS POWER OF:ATTORNEY.IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power:of Attorney "limits -the ,acts -.of those named herein, and they have no authority to bind the Company except In the manner and to .
the extent herein stated.. ` ':.: ' :' ::.: u'.....' ." - ...
.LIBERTY MUT AL INSURANCE COMPANY
F30STON, MASSACHUSETTS. '
.. POWER �
" WERQF.ATTORNEY,:.". •:"-: �.. ..' " ..
KNOW ALL PERSONS.BY -THESE PRESENTS: -That Liberty Mutual Insurance. "Company "(the :'Company" j, a Massachusetts stock insurance
company, pursuant to and by authority of.the By-law and Authorization hereinafter set forth, does hereby name, constitute and appolnt
GREG A.'WILKERSON; :GLENNA S.".DAVIS, CATHY :VINSON, CAROLYN MAP-11 % JOHN..R. WILSON, ALL "OF THE CITY
"OF.FORT-WORTH, STATE:OF TEXAS: ::....:.::.:::::.::::..; :.:,:::::.:..... a 868 6014'aam man seendoa kn6ma paps map wevv0popm of*8189al eager
................................................... ..............• .......a....,....a.... .....
each individually If. there be. more:fhan.one .named, its true "lawful• attorney -in -fact to -.make, execute, seal, acknowledge and deliver, for and on Its
:behalf as surety and as Its act and deed, anti an undertakings, bonds,. recognlzances:."and other suret�yy obliggations inAhe.penal sum not exceeding
TWENTY FIVE MILLION AND 00/100** ***************'"' DOLL,4RS"($ "25 000 000.00***'* >: a each, and the
:execution of such undertakings, bonds;:.recognizances :end:.ether .surety :obligations,.16 pursuance bt:these presents, :shah be as binding upon the
Company as €f.they had been duly sig'ned:6 the presidenfaibd::attestecl. by the,segretary of tfie;Compahy:in their own proper -persons.
ItThat this power is made: and executed -pursuant to and by.auihorfty of the. following By -law -and Authorization:. . 7.
It
ARTICLE-XIII -"Execution of Contracts: Section 5. Surety Bonds and Undertakings:
Any officer of the Company authorized for that purpose in writing by the chairman or-ths president, and subject to such limitations as the
.chairman or the president may prescribe, shall appoint such attorneys -In -fact, as may be.necassary to act in -behalf -of the Company to make,
execute, seal, acknowledge and deliver as surety any and all mundertakings,. bonds," recognizances and other surety obligations. . Such
legal .attorneys -in -fact, subject to the (imitations set forth in their respective powers of attorney, shall have full power to bind the Company by their rn
0. ";signature and execution of any such instruments and to attach thereto the seal of the Company.. When so executed. such instruments shall be c
s :binding as If signed by the president and attested.by the..secretary.. �
b ..
8y the following instrument the chairman or the president has. authorized the afficer.or other official named therein to appoint attorneys-in-fact:4MIN.
Pursuant to Article XIII, Sectlon"5 of.the $y-Laws, GIt 0arnet W. "Elliott, Assistant Secretary of Liberty Mutual, Insurance Company, is hereby
dar � ...-authorized to appoint such attorneys -in -fact as maybe necessary to act in behalf of the Company to make, execute, seal, acknowledge and r
II deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.
y.:
:. .
That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. 0 WOMEN c w
j IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of C E
Liberty Mutual Insurance -Company has been affixed thereto In Plymouth, Meeting, Pennsylvania this 12th day of June . M
..
�rI ItO . Re
'y
LIBERTY MUTUAL INSURANCE COMPA
oNY:
I It
ai
�, O
: Garnet W, Elliott, Assistant Secretary N a
Elk�, "COMMONWEALTH OF PENNSYLVANIA ss _
y COUNTY OF MONTGOMERY
C +� On this 12th day "of June 2009 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged +� N
t3 that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above
ai Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation.02 "
IN TESTIMONY WHET F i� "e:h unto subscribed "my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year a N
v first above written. ;�.`' CNu{
�.i,
:COMMONWEALTH OFkNNSYIVANiA' :': 1= N
i �..• rJ :'.Notniai5enl'•. - : - - `+� C7
' .r..: Tamsa Pactetia, Nclaiy PtNkx .Y. CO
0 . • ."" _ 'PlYmnulfti. Monl eryCOUnry : -:By "
G1 •� MYConIS1104n.F�punsidmsh2J,_0,3 Ter sa Pasteila, Notary €Public: Ll r
Mem cv, Pumsyrvnni�lue7WdaL,n o1 Katat O.. : 0CERTIFICATE r
I, the undersigned, Assistant ecretary pf Liberty Mutual Insurance Company,, do -hereby certify that the "original power of attorney of which the foregoing
Is a full, true and correct copy, is in full. force and effect on the:date-of this cert€ficate; and 1. do further aertlfythat"the officer or official who executed the
said power of attorney is an Assistant Secretary specially authorized o :the chairman ar. the president to.appoint attorneys -in -fact as provided in Article
XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company.:
This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the
following vote of the board of directors of Liberty Mutual Insurance Company ate meeting duly called and.held on the 12th•day of March,1.980.
:.VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a
csrtif€ed copy of any power of attorney issued by the company in connection with surety bonds, shall be Valid and binding upon the company
: with the same force and effect as though manually affixed. " .. ' . - " .
1.
IN"TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, of
June 2010
OFFICIAL.RECORD.
tByZ4 1 1TY SECRETARY
'' Davi M. Carey, Ass nt SecretaryNO
TX
ROBERTS, TAYLOR & SENSABAUGH
a Corporation
PROFESSIONAL CONSULTANTS
June 15, 2010
TO ALL PROSPECTIVE BIDDERS
Re: Principal
Obligee:
Project:
Surety:
B and No.:
RT&S File:
Gentlemen:
DALLAS/
FT. WORTH OFFICE:
4001 Gateway Drive
Suite 100
(Sly 28We 2-1 Texas
76034
Fax {817) 282 7598
HOUSTON OFFICE:
s 0 Rd.
H0I 9�88 77mo
ax (281) 97MM
REPLY TO:
Dallas(FL Worth
Texas United Excavators, LLC
City of Fort Worth
2004 CIP Contract 44 - Pavement Reconstruction, Drainage Improvements and
Water and Sanitary Sewer Replacement on Westcreek Drive,
Continental Casualty Company
929448633
10-31166 (33)
ADDENDUM NO. 1
Please note the following change to the Invitation &instructions To Bidders dated June 10, 2010.
1. Delivery of Bids. Bids will be received in the offices of Roberts, Taylor & Sensabaugh, Inc.,
4001 Gateway Drive, Suite 100, Colleyville (DFW), TX 76034 by Mr. Keith Roberts,
Consultant to Westenz Surety Company, until 5 P.M., Friday, June 25`b, 2010. Proposals
may be sent by facsimile to the offices of Roberts, Taylor & Sensabaugh, Inc. provided such
proposals are followed by one day overnight delivery of fully executed originals. The phone
number for facsimile transmissions is (817) 282-7598. Each Bidder is instructed to complete
the Bid Proposal Form, attached and identified as "Exhibit A", in submitting a bid for this
completion work.
2. Exhibit "A" � June 15, 2010 (Revised) attached herewith.
If you have any questions or comments regarding this Addendum or the Invitation & Instruction To
Bidders matter, please contact me at 817-282-7597.
ddVIdu rVi Cj(LV)DJ4Cq
G. Keith Roberts ✓�/
GIOZ/com
cc: ("lie
is e r,
CITY SECRETARY
�T. W®RTH, TX
ROBERTS, TAYL"OR & SENSABAUGH
a Corporation
PROFESSIONAL CONSULTANTS
June 16, 2010
TO ALL PROSPECTIVE BIDDERS
DALLAS/
FT. WORTH OFFICE:
400I Gateway Drive
Sate 100
Colle rvUe Texas 76034
`817) 282-1597
Fax (817) 282-7598
HOUSTON OFFICE:
12345 Jones Rd,
Site 2A0
Hgol n0-69T &ex g 77070
Fax (281) 970-6977
REPLY TO:
Da[las�Ft worth
Re: Principal: Texas United Excavators, LLC
Obligee: City of Fort Worth
Project: 2004 CIP Contract 44 - Pavement Reconstruction, Drainage Improvements and
Water and Sanitary Sewer Replacement on Westcreek Drive,
Surety: Continental Casualty Company
Bond No.: 929448633
RT&S File: 10-31166 (33)
ADDENDUM N0.2
Gentlemen:
Please note the following changes to the invitation &Instructions To Bidders dated June 10, 2010.
1. Exhibit "A" -June 16, 2010 (Revised) attached herewith.
• Item 44 (Paving) -Revised quantity to read
• ltem 3 (Additional Items) -Line item budget for replacement of crape myrtle bushes
• Item 7 (Additional Items) - Revised quantity to read 150 S.Y.
• Item 8 (Additional Items) - Added "Miscellaneous" L.S.
Ifyou have any questions or comments regarding this Addendum or the Invitatian &Instruction Ta
Bidders matter, please contact me at 817-282-7597.
GKRJcom
cc: file