Loading...
HomeMy WebLinkAboutContract 39753-CO2CITY SECRETARY CONTRACT NO Cps. Future Com Ltd. Confidential Change Control Change Request # 2 Reference SOW: CoFW —SOW ID # Request B C Config. & Imp. 100121EDWNJMXCEXv14 Date: 03/09/2010 Request Title: Change Request #1 Status: In Process Originator's Name: Alan Girton Phone/Email/ 817.392.8484 Mailstop: Alan.girton(fortworthgov. orq Sponsor's Name: Alan Girton Priority: High Assigned To: Chris Edwards Response To be determined Date: Request Description The original SOW had as its purpose for a Future Com engineer to help decrease the logging to Blue Coat Reporter via configuration, knowledge transfer of report configuration, and best practices recommendations. Blue Coat Director was also to be implemented and configured. Since the original SOW was submitted, two of the Blue Coat devices have been replaced due to hardware failure. Justification Due to hardware failure of the existing proxies, new hardware has been purchased and three additional days of professional services added to the scope of the engagement for the purpose of installation and configuration of the replacement hardware. The Blue Coat Director portion of the SOW will be performed at the beginning of the implementation to simplify the deployment process. City of Fort Worth_Blare Coat Config_CR #2 1 of 3 03/09/10 ®FFICfA� RECt�IIF11 WORTH Ty CITY SECRETAR A� Future Coin Ltd. Confidential Change Control Future C®m PI WJV%0 Tasks 1. Conduct pre -implementation meeting: 1.1. Confirm pre -engagement activities have been completed by the City of Fort Worth. 1.2. Clarify project objectives. 1.3. Review project procedures. 1.4. Discuss technical details. 2. Upgrade the SGs to latest SGOS version 3. Apply necessary licenses to the boxes 4. Apply configurations that are matched to existing ProxySG appliances. CITY SECRETARY FT WORTH, TX City of Fort Worth Bhre Coat Confrg_CR #2 2 of 3 03/09/10 Future Com Ltd. Confidential Change Control Impact Assessment Impacts Description Functional Scope Functional scope for the overall project has increased. Schedule This change will delay the complete project delivery by three (3) days. Effort This change will extend the effort by approximately three (3) days. Cost Three (3) additional days @ $1,869.60 = $5,608.80 Total Cost To schedule this consulting engagement, Future Com requires a signed copy of this Change Request: &mailed to Jan.AllmanCabfcltd.net or faxed to (817) 510-1159. Recommendation Authorization Authorized by: City of Fort Worth Authorized Signature Karen L. Mont;gomery Title (printed) Date FOR '! ...City of Fora Worth_.B FTa WORTH, RTH, TX C Authorized by: Future Com Ltd. Authorized Signature (Above name printed) Title (printed) '��aALITY: Attested byo NT ClTY ATTORNEY / � rv; yes