Future Com Ltd. Confidential Change Control
Change Request # 2
Reference SOW: CoFW —SOW ID # Request
B C Config. & Imp. 100121EDWNJMXCEXv14 Date: 03/09/2010
Request Title: Change Request #1 Status: In Process
Originator's Name: Alan Girton Phone/Email/ 817.392.8484
Mailstop: Alan.girton(fortworthgov.
orq
Sponsor's Name: Alan Girton Priority: High
Assigned To: Chris Edwards Response To be determined
Date:
Request Description
The original SOW had as its purpose for a Future Com engineer to help decrease the
logging to Blue Coat Reporter via configuration, knowledge transfer of report configuration,
and best practices recommendations. Blue Coat Director was also to be implemented and
configured.
Since the original SOW was submitted, two of the Blue Coat devices have been replaced
due to hardware failure.
Justification
Due to hardware failure of the existing proxies, new hardware has been purchased and
three additional days of professional services added to the scope of the engagement for the
purpose of installation and configuration of the replacement hardware. The Blue Coat
Director portion of the SOW will be performed at the beginning of the implementation to
simplify the deployment process.
City of Fort Worth_Blare Coat Config_CR #2
1 of 3 03/09/10
®FFICfA� RECt�IIF11 WORTH Ty
CITY SECRETAR A�
Future Coin Ltd. Confidential Change Control
Future C®m PI WJV%0 Tasks
1. Conduct pre -implementation meeting:
1.1. Confirm pre -engagement activities have been completed by the City of Fort
Worth.
1.2. Clarify project objectives.
1.3. Review project procedures.
1.4. Discuss technical details.
2. Upgrade the SGs to latest SGOS version
3. Apply necessary licenses to the boxes
4. Apply configurations that are matched to existing ProxySG appliances.
CITY SECRETARY
FT WORTH, TX
City of Fort Worth Bhre Coat Confrg_CR #2 2 of 3 03/09/10
Future Com Ltd. Confidential Change Control
Impact Assessment
Impacts
Description
Functional
Scope
Functional scope for the overall project has increased.
Schedule
This change will delay the complete project delivery by three (3) days.
Effort
This change will extend the effort by approximately three (3) days.
Cost
Three (3) additional days @ $1,869.60 = $5,608.80 Total Cost
To schedule this consulting engagement, Future Com requires a signed copy of this Change
Request:
&mailed to Jan.AllmanCabfcltd.net or faxed to (817) 510-1159.
Recommendation
Authorization
Authorized by:
City of Fort Worth
Authorized Signature
Karen L. Mont;gomery
Title (printed)
Date
FOR
'! ...City of Fora Worth_.B
FTa WORTH, RTH, TX
C
Authorized by:
Future Com Ltd.
Authorized Signature
(Above name printed)
Title (printed)
'��aALITY: Attested byo
NT ClTY ATTORNEY
/ � rv; yes