Loading...
HomeMy WebLinkAboutContract 39704-A1 (2)AMENDMENT NO.1 TO COMMUNITY FACILITIES AGREEMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO.3 jc)4- A� COUNTY OF TARRANT § AUTHORIZING M&C NO. WHEREAS, the City of Fort Worth (City) and XTO Energy Inc. (Developer) entered into a Community Facilities Agreement, City Secretary Contract No. 39704 ("CFA"); and WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to allow City participation in an amount not to exceed $17,686.51 for the City's portion of costs associated with construction, inspection, and material testing of the 12-inch water main contemplated by the CFA; and WHEREAS, the City Council authorized execution of Amendment No. 1 to the CFA on the �s � day of l`'ll1 vc , 201.0(via M&C C L 763 . NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CFA: 1. Cost Summary Table is amended to be and read: A. Water and Sewer Construction 1. Water 2. Sewer Construction Cost Sub -Total Contingency 25% Total Water and Sewer Construction Construction Fees: B. Inspection Fee (2%) C. Material Testing Fee (2%) Construction Fees Sub -Total Developer's Cost $ 18,479.00 $ 18,479.00 $ 41619,75 $ 23,098.75 City's Cost $ 13,605,00 9 E� $ 923.96 $ 13,605.00 3,401.25 17,006425 340.13 340.13 680.26 Total Cost $ 32,084.00 $ 32,084.00 $ 81021,00 $ 403105,00 $ 802.11 $ 802.11 $ 1,604.22 Total Water and Sewer Project Cost $ 24,022.71 at 17,686.51 $ 41,709.22 The costs stated herein may be based upon construction estimates rather than actual cost. The City's portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Water Inspection and Material Testing Fees to the developer. The City's participation estimate shall be based upon unit prices contained in City of Fort Worth Ordinance No. 19192 (or by public bid). The City's cost participation shall be in an amount not to exceed $17,686.51 ("Participation"), but the reimbursement of the Participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above depending upon actual quantities from the Notice of Final Completion package (`Green sheet') and unit prices from the construction contract document and Green sheet but not to exceed the unit prices contained in the City of Fort Worth Ordinance No. 19192; j AMENDMENT NO. 1 Hemphill Heights, XTO Water Page 1 of 3 OFFICIAL RECORD CITY SECRETARY T. WORTF#, TX WATER COST SHARE (The City pays 50% and Developer pays 50% of the cost) Ite m No. Description Unit City Unit Price Part B Unit Price Lower Unit Price Total Price 50% city Participation 1 124ch water line LF -Qty 350 $38.00 $38.00 $38.00 $13,300.00 $6,650600 2 16"X12" tapping sleeve and valve EA 1 $3,185.00 $3,200,00 $3,185600 $3,185400 $1,592,50 3 10" ate valve EA 1 $1,306.00 $1,300000 $1,300,00 $1,300.00 $650.00 4 Fire hydrant EA 1 $2,360600 $2,200400 $2,200.00 $21200.00 $1,100000 5 1-inch water service EA 1 $300600 $300600 $300000 $300,00 $150000 6 Cast iron fittings TN 1.47 $3,600000 $3,000.00 $3,000400 $4,410,00 $2,205.00 7 Asphalt Pavement Repair LF 52 $48.00 $45.00 $45.00 $2,340.00 $1,170000 8 Trench Safety LF 350 $1.00 $0.50 $0.50 $175400 $87.50 Total $13,605900 Plus Contingency 25% $17,006425 Inspection $340413 Material testing $340613 Grand total $17,686.51 2. All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and effect. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) AMENDMENT NO. 1 Hemphill Heights, XTO Water Page 2 of 3 EXECUTED on this the C day of M_�_ , 2010, in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary Contract. Authorization CITY OF FORT WORTH: 11-- O�a °0 0ok�� Fernando Costa, A�a 0 Assistant City Manager 'OMMENDED: Director I)ate Water Department APPROVED AS TO FORM AND LEGALITY: s R Assistant City Attorney DEVELOPER FOR XTO ENERGY INC. Edwin S. Ryan, Jr. Sr. Vice President -Land Administration CORD pF�rlCi C NARY CITY St FT. WORTH, T AMENDMENT NO. 1 Hemphill Heights, XTO Water Page 3 of 3 FORT WORTH N Hemphill Heights, Blocks 1-R, 5-R and 7-R W E WATER S' � 3,500 7,000 10,500 14,000 NAD_1983_SlatePlane_Texas_North_Central_FIPS_4202_Feet 1 inchequals7000feet Feet M,�iC Review Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORT�O�TII COUNCIL ACTION: Approved on 3/1/2011 DATE: 3/1/2011 REFERENCE NO.: C-24763 LOG NAME: 60HEMPHILL HEIGHTS WATER CODE: C TYPE: CONSENT HEARING: NO SUBJECT: Authorize Amendment No. 1 to City Secretary Contract No. 39704, a Community Facilities Agreement with XTO Energy Inc., to Add City Participation in the Amount of $17,686.51 for Construction of Water Main to Serve the Hemphill Heights Neighborhood (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 39704, a Community Facilities Agreement with XTO Energy, Inc., to add City participation in the amount of $17,686.51 for the installation of the water main to serve the Hemphill Heights neighborhood. DISCUSSION: The developer XTO Energy, Inc., has executed a proposed contract for community facilities to serve a development located in Fort Worth (see attached map). Total construction cost for water improvements for this development is $41,709.22. There will be City participation for the 12-inch water main that will improve the service to the surrounding area. The Developer and the City estimated costs for water improvements are subject to construction inspection fees. A. Construction 1. Water 2. Sewer Construction Cost Sub -Total Contingency 25 percent Total Construction Construction Fees: B. Inspection Fee (two percent) C. Material Testing Fee (two percent) Construction Fees Sub -Total Total Project Cost Developer's cost City's Cost $ 18,479.00 $ 13,605.00 $0.00 $0.00 $ 18,479.00 $ 13,605.00 $ 4,619.75 $3,401.25 $ 23,098.75 $ 17,006.25 $461.98 $340.13 $461.98 $340.13 $923.96 $680.26 $ 24,022.71 $ 17,686.51 Total cost $ 32,084.00 $ 32,084.00 $8,021.00 $ 40,105.00 $802.11 $802.11 $1,604.22 $ 41,709.22 The developer's contractor, Conatser Construction TX, L.P., proposes to construct water facilities for $41,709.22. Upon Council's approval, City staff will execute an amended Community Facilities Agreement to include city participation between the City and the Developer. This project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: http://apps.cfwnet.org/council�acket/mc review.asp?ID=14611&councildate=3/1/2011 03/08/2011 !Vl&C Review Page 2 of 2 The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: ATTACHMENTS XTO Page Hemphill Hts CFA Exhibit water.pdf FROM Fund/Account/Centers P265 539140 609150141683 $17,006.25 P265 531350 609150141685 340.13 P265 531200 609150141684 340.13 Fernando Costa (6122) S. Frank Crumb (8207) Viesha Kaminska (8428) http://apps.cfwnet.org/council�acket/mc review.asp?ID=14611&councildate=3/1/2011 03/08/2011