Loading...
HomeMy WebLinkAboutContract 39647Tariff for Retail Delivery Service Oncor Electric Delivery Company 6.3.1 Facilities Extension Agreement Fy �=ON RACT ETNO V S�0 D WR Numbers: 2951134I 3021696, 3021699 & 3023149 Region/District: Fort Worth This Agreement is made between The City of Fort Worth, hereinafter called "Customer" and Oncor Electric Delivery Company, LLC, a Delaware Limited Liability Company, hereinafter called "Company" for the extension of Company Delivery System facilities, as hereinafter described, to the Customer's Westside Water Treatment Plant located at 12200 Old Weatherford, Fort Worth, Texas. The Company has received a request for the extension of: STANDARD DELIVERY SYSTEM FACILITIES TO NON-RESIDENTIAL DEVELOPMENT Company shall extend standard Delivery System facilities necessary to serve Customer's estimated maximum demand requirement of 4,500 kW ("Contract kW"). The Delivery System facilities installed hereunder will be of the character commonly described as 2400/4160 volt, 3 phase, at 60 hertz, with reasonable variation to be allowed NON-STANDARD DELIVERY SYSTEM FACILITIES TO NON-RESIDENTIAL DEVELOPMENT Company agrees to provide service to Customer with four 2500 kVA pad mounted transformers. The point of service between the Customer and the Company will be the load side bushings of Company's pad mounted metering units. Customer's facilities shall be installed in such a manner as to provide a split bus configuration, which will not permit the parallel connection of Company's transformers at any time under any condition. Customer shall control the use of electric power so that under normal conditions the Customer's electrical load is reasonably balanced between the transformers. Should Company determine that the Customer's facilities are operating in a manner other than that permitted herein, Customer agrees to take corrective action necessary to meet aforesaid conditions of service. Company agrees to provide service to Customer with an alternate feed using a Company owned and operated automatic throwover switch for a load not to exceed 4,500 kW. Should Customer request an alternate feed for a load in excess of 4,500 kW or if Customer's load on the alternate feed exceeds 4,500 kIV, Customer agrees to pay Company for the costs associated with providing such service in accordance with Company's Tariff for Electric Service, ARTICLE I -PAYMENT BY CUSTOMER At the time of acceptance of this Agreement by Customer, Customer will pay to Company $802,912.81 as payment for the Customer's portion of the cost of the extension of Company facilities, in accordance with Company's Facilities Extension Policy, such payment to be and remain the property of the Company. Should Company not receive payment of $802,912.81 by December 21, 2009, a new payment amount will be determined by Company. ARTICLE II -NON-UTILIZATION CLAUSE FOR STANDARD DELIVERY SYSTEM FACILITIES This Article II applies only to the installation of standard Delivery System facilities. The amount of Contribution in Aid of Construction ("CIAC") to be paid by Customer under Article I above is calculated based on the estimated data supplied by Customer or Customer's representative and specified above. Company will conduct a review of the actual load at the designated location to determine the accuracy of the estimated data supplied by Customer or Customer's representative. If, within two (2) years after Company completes the extension of Delivery System facilities, the estimated load as measured by actual maximum kW billing demand at said location has not materialized, Company will re -calculate the CIAC based on actual maximum kW billing demand realized. The installation of a Company meter in connection with Temporary Delivery Service does not constitute substantial completion. Customer will pay to Company a "non -utilization charge" in an amount equal to the difference between the recalculated CIAC amount and the amount paid by Customer under Article I, above. Company's invoice to Customer for such "non -utilization charge" is due and payable within fifteen (15) days after the date of the invoice. OF�,�$�ECORD CITY SECRETARY FT WORTH, TX Tariff for Retail Delivery Service Oncor Electric Delivery Company ARTICLE III -TITLE AND OWNERSHIP Company at all times shall have title to and complete ownership and control over the Delivery System facilities extended under this Agreement. Delivery service is not provided under this Agreement. However, Customer understands that, as a result of the installation provided for in this Agreement, the Delivery of Electric Power and Energy by Company to the specified location will be provided in accordance with Rate Schedule 6.1.1.3 — Secondary Service Greater Than 10 kW, which may from time to time be amended or succeeded. This Agreement supersedes all previous agreements or representations, either written or oral, between Company and Customer made with respect to the matters herein contained, and when duly executed constitutes the agreement between the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives. ARTICLE V -OTHER SPECIAL CONDITIONS Customer agrees to install the required on site electrical conduits and equipment pads according to Company design standards and specifications. Customer has disclosed to Company all underground facilities owned by Customer or any other party that is not a public utility or governmental entity, that are located within real property owned by Customer. In the event that Customer has failed to do so, or in the event of the existence of such facilities of which Customer has no knowledge, Company, its agents and contractors, shall have no liability, of any nature whatsoever, to Customer for any actual or consequential damages resulting from damage to such undisclosed or unknown facilities. )X� � EP�ED�� CUSTOI ERI AI LtUALI I Yam Contract Authorizatioa Ils PTED BY CO nature Title !&V ' /n! Date Signed Attested boo OFF'ICIA� RECORD CITY��TARY T. WORTH, TX M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas COUNCIL ACTION: Approved on 12/15/2009 t r DATE: 12/15/2009 REFERENCE NO.: **G-16797 LOG NAME: 600NCOR WESTSIDE WTP PUBLIC CODE: G TYPE: CONSENT HEARING: NO SUBJECT: Authorize Payment in the Amount of $802,912.81 to Oncor Electric Delivery Company, LLC, for Electrical Service to the Westside Water Treatment Plant RECOMMENDATION: It is recommended that the City Council authorize the City Manager to approve payment in the amount of $802,912.81 to Oncor Electric Delivery Company, LLC, for the extension of Company Delivery System facilities to provide dual feed electrical service to the Westside Water Treatment Plant. DISCUSSION: The construction of the 12 million gallon per day Westside Water Treatment plant began in August 2009, and is scheduled to be completed in 2012. This plant is designed to improve water system reliability for existing customers and meet water demands of future customers in west Fort Worth. As part of the work under this Agreement, Oncor Electric Delivery Company, LLC, will be required to provide electrical service with backup reserve capacity for the Westside Water Treatment Plant. This service agreement is for the extension of Company Delivery System facilities and is based on total connected load and will include the installation of four 2500 KVA pad mounted transformers, metering units, service conductors and automatic switchover capabilities between primary and backup feeders. This project is located in the City's Extra Territorial Jurisdiction, one quarter mile west of the intersection of Old Weatherford and Chapin Road in unincorporated Tarrant County, Mapsco 71 F. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P253 539120 607540045680 $802,912.81 Fernando Costa (6122) S. Frank Crumb (8207) Chris Harder (8293) http://apps. cfwnet.org/council�acket/mc_review. asp?ID=12805&councildate=l2/15/2009 12/16/2009 M&C Review Page 2 of 2 ATTACHMENTS 604NC_O__R WESTSIDE WTP__MAP_REVfSE__D_._pdf http://apps.cfwnet.org/council�acket/mc review.asp?ID=12805&councildate=l2/15/2009 12/16/2009