STATE OF TEXAS S CITY SECRETARY CONTRACT N0.39646-A1
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (CITY) and LANDTEC Engineers, LLC.,
(CONSULTANT) made and entered into City Secretary Contract No. 39646, (the
CONTRACT) which was authorized on the 23rd day of December, 2009;
WHEREAS, the Contract involves engineering services for the following
project.
Revisions to the City of Fort Worth, Transportation and Public Pn�er��s
Department Pavement Design Standards Manual
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the Contract.
1.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated February 11,
2010, a copy of which is attached hereto and incorporated herein. The
cost to City for the additional services to be performed by CONSULTANT
total $4,000.00,
2.
Article II of the Contract is amended to provide for an increase in the
fee to be paid to CONSULTANT for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work
and services shall be the sum of $24,000.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Page -1-
CITE ���RET�IRY
FT. WORTH, TX
EXECUTED on this
Fort Worth, Tarrant
the _
County,
Texas.
day ofC�'z-r--� 2010 in
� R
ATTESTe
.I • R. /
III � • _ I •
_ I
APPROVAL RECOMt�NDED:
r � 1
Fernando Costa
Assistant City Manager
William A! Verkes�, P.E.
Director, Transportation and Public Works Department
Thomas D. Baker, P.E., R.P.L.S.
LANDTEC Engineers, LLC
ENGINEER
APPROVED AS TO FORM AND LEGALITY:
Amy Ramsey
Assistant City Attorney
Page -2-
OFIFiClAL t���itt�t3
ETARY
Geotechnical & Environmental Engineering
Construction Materials Testing
Laboratory Testing
February 11, 2010
Proposal 2959
Mr. Patrick J. Buckley, P.E.
Senior Professional Engineer
Transportation and Public Works
City of Fort Worth
1000 Throckmorton Street, 2"d Floor
Fort Worth, Texas 76102
Re: Pavement Design Manual
Dear Patrick:
Submitted herein is our proposal for professional geotechnical engineering services for the
Pavement Design Manual project in Fort Worth, Texas.
The scope of work includes soil borings, concrete cores, Dynamic Cone Penetrometer
(DCP) field tests to determine the California Bearing Ratio (CBR) of subgrade and
underlying soils, laboratory tests and preparation of a report. The purpose is to evaluate the
condition of the concrete, evaluate the underlying lime treated subgrade and underlying soil
conditions, evaluate the cause and affect of the two transverse cracks within the concrete
pavement and provide recommendations.
SCOPE OF BASIC SERVICES
LANDTEC proposes the following Basic Services:
Field Exploration
• Drill borings to depths of approximately 5 to 10 feet.
• Obtain soil samples and perform DCP tests as appropriate for the soils encountered.
• Observe for groundwater seepage during drilling and record level.
• Backfill boreholes and replace concrete.
LANDTEC ENGINEERS, LLC 1700 Robert Road Suite 101 Mansfield, Texas 76063 817.572.2818 Fax 817.561.5485
2959 Pavement Design Manual
Laboratory Testing
Laboratory testing will be conducted on samples that are considered to be reasonably
representative of the materials obtained from the field exploration. The tests will evaluate
and classify the soils, identify subsurface site characteristics, and provide data for analysis.
The tests include
• Atterberg limits (liquid and plastic limits) tests
• Unit dry weight and moisture content tests
• Unconfined Compressive strength
• Swell Tests
Engineering Analysis and Report
An engineering analysis and evaluation of the field and laboratory data will be performed for
the project. Information to be provided is as follows:
• Plan of borings illustrating the approximate location of each boring and scale to
which the drawing is made
• A log of each boring indicating the boring number, location (northing, easting and
elevation if provided by Graham Associates), depth of each strata, soil description,
field penetration tests including Standard Penetration tests (SPT's) and/or Texas
Cone Penetrometer (TCP) , laboratory tests, and groundwater information
• Description of the field exploration and laboratory testing program
• Laboratory test results
• Discussion of subgrade and subsurface soil conditions
• Analysis of results and recommendations
• Four (4) copies of the geotechnical report
2959 Pavement Design Manual 2 LANDTEC
ADDITIONAL SERVICES
The following services are not included in the Basic Services and will be considered as
Additional Services, if and when required or requested:
• Additional copies of the report; additional submittals of draft reports other than those
described in Basic Services; revisions to the report after final submission to Client;
revisions to the report required as a result of changed regulations or design
• The services of specialty subconsultants or other special outside services other than
those described in Basic Services
• Coordination with regulatory agencies other than that described in Basic Services
• Any other services not specifically included in Basic Services
COMPENSATION
LandTec proposes to perform the Basic Services outlined herein on the basis of our
standard Schedule of Charges dated January 1, 2009. The cost for Basic Services is not to
exceed $4,000.
ANTICIPATED SCHEDULE
The field exploration will begin approximately one week from the time authorization is
received. The field work will require approximately one or two days, depending on weather
conditions and site accessibility.
Laboratory testing will start after the borings are made and should be completed within one
to two weeks after completion of the field exploration. The geotechnical engineering report
will be completed within one week of completion of the laboratory testing. A total turnaround
time of three weeks is anticipated.
Sincerely,
IANDTEC ENGINEERS, LlC
Thomas D. Baker, P.E., R.P.L.S.
Sr. Geotechnical Engineer /Principal
TBPE Firm No. F-000329
2959 Pavement Design Manual 3 IANDTEC ENGINEERS