Loading...
HomeMy WebLinkAboutContract 39975-A1LMLJ1VM)MT NO. 1 WRACY NOof •�lll1111Lll.`dt111J9 the City of Fort Worth (CITY) and Kimley®Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 39975, (the CONTRACT) which was authorized by M&C C-24094 on the 2nd day of September, 2010 in the amount of $1,072,250.00; and WHEREAIS, the CONTRACT involves engineering services for the following project: Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements; and �'HEREA�Si, it has become necessary to execute Amendment No.l to the CONTRACT to include an increased scope of work and revised fee. 1\TOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the Following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 25, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $46,995.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,119,245.00. 36 Clyy SECRETARY C:FTe WnRT"q'Tx All other provisions of the Contract, wh cl ..are- not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: / APPR AL REC MN�Nll�I� : / S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ENGINEER I{imley-Horn and Associates, Inc. Glenn Gary, P.E. Senior Vice -President DATE : p� _ 4P P 0 l Date: N/A Secretary Nei: I I Page -2- • February 25, 2014 Mr. John Kasavich, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements Additional Services — Amendment No. 1 .HA No. 061018069 Dear John: Kimley-Horn and Associates, Inc. (Kimley-Horn or ENGINEER) is pleased to provide the City of Fort Worth (CITY) with Amendment No. 1 for the Cultural District/ Will Rogers Area Water and Sanitary Sewer Improvements contract. The CITY has asked Kimley-Horn to perform additional services ander this contract for the extension of a 24-inch water line. Part 3.5 — Watonga St. Construction Plans will be prepared fora 24=inch water improvements along Watonga St. This Part will be added to an existing TPW project for advertisement together as one project. As such, preparation of a project manual is not included, and bidding services have been limited to the answering of questions and preparation of conformance plans. The following relocations and extensions are anticipated: • Replacement of the existing 204rich water line with a 24-inch Water Line along Watonga St. from Montgomery St. to the West Side Pump Station at Camp Bowie Blvd. (1,000 LF) ENGINEER will perform the work described in the. items above for this Amendment in accordance with the Original Contract: Task 1 (Design Management) - $8,725 ENGINEER will complete Design Management task for Part 3.5 — Watonga St. for a period not to exceed four (4) months. TEL 81733565i1 FAX 817 335 5070 Sure 950 801 Cherry Street, Unit i t Fora Worth, Texas �sioz KiMIey-Horn Mr. John Kasavich, P.E., February 25, 2014, Page 3 and Associates, Inc. The following table summarizes our recommended budget revisions and shows the revised contract amount: Description nal Amend No. 1 ReviseContrad Contract act Task I —Design $102,500 $87 $111,225 Management Task 2—Conceptual $1255100 $63440 $131,54o Design Task 3 —Preliminary $178,900 $12,810 $191,710 Design Task 4 — Final Design $26900 $15,750 $285,350 Task 5 — Bid Phase $35,200 $3,270 $38,470 Services Task 6 — Construction $72,100 $725100 Phase Services Task 7 — ROW/Easement $30,300 $0 $30,300 Services Task 8 = Survey Services $202,250 $0 $2021250 Task 9 —Permitting $56,300 $0 $56,300 Total Project $1,0721250 $46,995 $1,119,245 The ENGINEER will subcontract a portion of these services to the following consultants: Non-SBE Subconsultant Service Fee Corrpro Companies Inc. Cathodic Protection $1,500 Total $1,500 The following table summarized the water and sewer design fees: Contract/Amendment Water Fee Sevver Fee Survey Fee Total Fee Original Contract $611,625 $262,125 $1983500 $1,0729250 Amendment No. 1 $46;995 $0 $0 $46,995 TOTAL $6S$,620 $2627125 1 $198,500 1 $1,119,245 Mr. Joltn KasavichI P.E., February 25, 2014,.Page 4 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, JMLEY-HORN AND ASSOCIATES, INC. Glenn A. Gary, P.E. Sr. Vice President GAG/JRT:srm Attachment: Amendment Level of Effort KTBV Utilities1061018069WPP\AmendmentlllDrnft4lAmendl•CD-Ltr.doc EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Cultural District/ Will Rogers Water and Sanitary Sewer Improvements - Amendment #1 Citv Project No. 01468 Task No. Task Description labor hours Total Labor Cost Ex Pease Total Expense Cost Task Sub Total Principal Project Manager Protect Engineer EIT CADD Administrative if Subconsultant Travel Reproduction Rate $250 $200 $135 $110 $801 $85 MWBE Non-MWBE 1.0 Protect Management 7 11 15 25 0 0 $%725 $0 $0 $0 $0 $0 $8,725 7.1 Managing the Team g0 $0 $0 lllll 1.1.2 OAf4C 5 $1,250 $0 $1,250 1.2 Communiptlons and Re rtin9 $0 g0 $o 1.2.1 Pre-Desgn Coordination Meeting 1 11 $q45 g0 $445 1.22 Design Submittal Review Meetings (4 Migs) 21 8 81 8 $4,060 g0 $4,060 1.2.3 Coordination with ANA 2 6 16 $2,970 $0 $2,970 1.2.4 Prepare Monthly Progress Reports Wth Schedule $0 g0 $0 1.2.5 Prepare Monthly MBE7SBE Reports $0 $0 $0 2.0 Conceptual Design 30-Percent 1 3 10llllllllllllllllllll� 34 0 0 $5,940 $0 $0 $100 $400 $500 $6,440 2.1 Data Collection 3 6 SUM $0 $1,065 2.2 Conceptual Design Package $0 $100 $400 $500 $500 2.2.1 Cover Sheet ANA $0 go $0 2.2.2 Site Visit 21 2 2 $890 $0 $890 2.23 Review Geolechnical Report 1 2 S355 $0 $355 2.2.4 2.2.5 Survey Clean up Exhibits and Summary 1 1 1 2 8 12 $1,015 $2,040 $0 g0 $1,015 $2,040 2.2.6 Phasing $0 $0 $0 2.2.7 OPCC 1 4 $575 $0 $575 3.0 Preliminary Design 60 Percent 0 9 20 56 0 0 $10,660 $0 $1,500 $0 $500 $2,000 $12,660 3.1 Preliminary Design Package $0 $500 $500 $500 3.1.1 Cover (ANA) $0 $0 $0 3.1.2 Overall La (ANA) $0 g0 $0 T 3 PlanfPsorde Sheets 41 5 18 $3,455 $0 $3,455 3.1.4 Water Details 1 2 6 0 $0 $1,130 3.1.5 Restraint Calculations 1 2 6 0 $0 $1,130 3.1.6 S hlcafions Coordination 2 4 0 $0 $710 3.1.7 Quantifies/Pdd OPCC 1 3 t0 5 $0 $1,705 3.1.8 Cathodic Protection 2 4 0 $1,500 $1,500 $2,210 3.2 Constmctabil' Review 2 2 4 0 $0 $1,110 3.3 UtilityClearance 2 4 0 $0 $710 4.0 Final Design 2 13 30 66 0 41$li4750 $0 $0 $0 $1 000 $1,000 $16,750 4.1 Final Draft (90%) Conshuction Plans and specifications I $0 $1,000 $1,000 $11000 4.1.1 Plan/Profile Sheets 1 3 5 12 $2,845 $0 $2,845 4.1.2 Restraint Calculations 1 2 5 12 $2,645 50 $2,645 4.1.3 Water Details t 2 6 $1,130 $0 $1,130 4.1.4 Sequencing Sheet and Meetings w/ Field O 4 e 10 $2,980 $0 $2,980 4.1.5 I ratio Control (ANA) $0 $0 $0 4.2 Final (100%) Plans and S ' gyrations 2 6 1fi 4 $3,310 $0 $3,310 City of Fart Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR O(8c1a1 Release Date: 8.09.2012 Task No. Task Description Labor hcurs Total Labor Cost Ex ense Total Expense Cost Task Sub Total Principal Project Manager Project Engineer EIT CADD Administrative Subconsultant Travel Reproduction Rate $256 $200 $135 $110 $80 $85 MWBE Non-MWBE 1.0 Project Management 7 11 15 25 0 0 $8,725 $0 $0 $0 $0 $0 $8,725 4.3 Quan00es1PrIcfmVOPCC 90%and 100% 1 4 10 $1,840 $0 $1,840 6.0 Bid Phase 2 3 8 9 0 0 $3,170 $0 $0 $0 $100 $100 $3,270 5.1 Bid Support $q $0 5.1.1 Upload Documents to Bua $0 $01 $0 5.1.2 Answer Bidders Questions/Addenda 2 21 6 2 $11930 $0 $1,930 5.1.3 Issue Addenda $0 $0 $0 5.1.4 Attend Bid Opening 1 1 $245 $0 $245 5.1.5 Prepare conformane documents 1 1 4 $775 $0 $775 5.2 Mylar Drawl s 2 $220 $100 $100 $320 6.0 Construction Phase Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 ;0 6.1 Construction Support $0 $0 6.1.1 Attend Preconstruction Cor6erer $0 $0 $0 6.1.2 Attend Public Meek $0 $0 $0 6.1.3 Construction Coordination Meetings 3) $0 $0 6AA Shot) DraMngs $0 $6 6,1.5 Site Visits 2 $0 $0 6.2 Record Drawings/As Built $0 $0 $0 7.0 ROW/Easement Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 7.1 Right -of -Entry Documents $0 $0 $0 8,a Surve 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 8.1 Des nSurvey 0 $0 $0 Totals 12 39 83 190 0 41 $43,245 $0 $1,500 $100 $21000 $3,600 $46,845.00 Water Line Footage 1,000 100% Sewer Line Foota e 0 0% 1,000 100% pup (A) Total Fee (B) Survey Fe a (C Total Fee - surve Fee Water Fee (60%ot C) Sewer Fee (40% of C) $46,995.00 $0.00 Descd Iron WP Water Sewer Conce Nal Design (30%) 31 $14,098.50 $0.00 Prelim(nary Desgn(60% 32 $28,197.00 $0.00 Final Design 10% 33 $4,699.50 1 $0,00 Survey 51 $0.00 1 $0.00 Subtotal 1 $46,995.00 $0.00 Total $46,995.00 City of FoA Wodh, Texas Attachment 8 - Level of EffoA Supplement Typipl Water and Sevrer Replacement FW WTR Officlai Release Date: 8.09.2012 Project Summa Total Hours 328 Total Labor $43,245 Total Expense $3,600 MBF/SBE Subconsultanl $0 Non-MBE/SBE Subconsultant $'1,500 10% Sub Mark $150 MBE/SBE Participation 0.0% Total Project Cost $46,995.00 Descd Iron WP Water Sewer Conce Nal Design (30%) 31 $14,098.50 $0.00 Prelim(nary Desgn(60% 32 $28,197.00 $0.00 Final Design 10% 33 $4,699.50 1 $0,00 Survey 51 $0.00 1 $0.00 Subtotal 1 $46,995.00 $0.00 Total $46,995.00 City of FoA Wodh, Texas Attachment 8 - Level of EffoA Supplement Typipl Water and Sevrer Replacement FW WTR Officlai Release Date: 8.09.2012 Project Summa Total Hours 328 Total Labor $43,245 Total Expense $3,600 MBF/SBE Subconsultanl $0 Non-MBE/SBE Subconsultant $'1,500 10% Sub Mark $150 MBE/SBE Participation 0.0% Total Project Cost $46,995.00 City of FoA Wodh, Texas Attachment 8 - Level of EffoA Supplement Typipl Water and Sevrer Replacement FW WTR Officlai Release Date: 8.09.2012 Project Summa Total Hours 328 Total Labor $43,245 Total Expense $3,600 MBF/SBE Subconsultanl $0 Non-MBE/SBE Subconsultant $'1,500 10% Sub Mark $150 MBE/SBE Participation 0.0% Total Project Cost $46,995.00