Loading...
HomeMy WebLinkAboutContract 39968-A1AMENDMENT No. 1 THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 3991�$ (No M&C Needed) COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and RJN Group Inc., (Consultant) made and entered into City Secretary Contract No. 39968, (the Contract) which was executed by the City Manager on the 17th day of March, 2010; and WHEREAS, the Contract involves professional services for the following project: Temporary Wastewater Flow Metering for Wholesale Customer Meter Validation WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an amended scope of work and revised maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include additional temporary metering for validation of the Benbrook Thomas Crossing and Saginaw East meter station, and additional follow up metering for the Hurst Valley View Meter Station. Article II of the contract is amended to provide for an increase in the maximum fee to be paid to the Consultant for all work and services performed under the Contract, as amended, so that the total fee paid by the city for all work and services shall not exceed the sum of $14,282.00, All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL REC®R® CITY SECRETARY FT WORTH, TX 06-23-1 0 Al 1 c 1 6 I N EXECUTED on this 4 k� day of 2010, in Fort Worth, Tarrant County, Texas. ATTEST: OR Secretary APPROVAL RECOMMENDED: 4&V v or lcoe S. Frank Crumb, P.E. Director, Water Department RJN Group, Inc. ENGINEER By: APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney Fernando Costa Assistant City Manager CI`I•Y SECRETARY F`Yz WORTH, T r i n group June 11, 2010 Chris Harder, P.E. Engineering Manager Fort Worth Water Department 1511 11th Avenue Fort Worth, Texas 76102 RE: Amendment 1 —Wholesale Wastewater Meter Station Validation Testing Dear Mr. Harder: Thank you for the opportunity to continue work. Please find the scope and amendment cost for the installation and calibration of three (3) temporary flow meters for a two week period. We understand the purpose is to validate the existing permanent meter stations. The scope of services is as follows: Site evaluation —Based on initial location information provided by the City, RJN will recommend to the City which manhole sites to install the temporary flow meters. The equipment will be activated to record the depth and velocity at 5 minute intervals. Installation —Site installation documents will be prepared for each (3) of the selected monitoring manholes. The document will include the street location, map/sketch, pipe dimensions, manhole depth, meter configuration and hydraulic conditions. The equipment will undergo a series of diagnostic tests and calibrations to validate and confirm the meter data. Data Collection— It is anticipated that each flow meter will be installed for a period of two weeks. Two (2) site visits will be performed during the two week monitoring period. A velocity profile will also be obtained during each calibration by measuring the instantaneous velocity at pre -defined depths, and then integrated to derive an average for comparison to the meters calculated average velocity. ringrouD Letter Report The engineers will use various analytical tools, such as hydrographs and scattergraphs to verify the accuracy and precision of the equipment. A letter report will be provided including a summary of the average flows for each site. Attached to the letter will include the site installation documents, 1-hour hydrographs and the average daily flow rates. Compensation —Compensation for providing these services will be based upon the following rate table. Description Units otal Site Selection and Installation 3 Sites 3ea $ 3,162.00 Meter Maintenance and Calibration 3 Sites 3ea $ 4,008.00 Data Review/Letter Report LS $ 11479000 $ 8,649000 We thank you again for the opportunity and look forward to working with you on this project. Should you have any questions, please do not hesitate to contact me. Best Regards, RJN Group, Inc. bKt Kevin Chumbley, P.E. Project Manager