HomeMy WebLinkAboutContract 39968-A1AMENDMENT No. 1
THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 3991�$
(No M&C Needed)
COUNTY OF TARRANT
WHEREAS, the City of Fort Worth (City) and RJN Group Inc., (Consultant) made and
entered into City Secretary Contract No. 39968, (the Contract) which was executed by the City
Manager on the 17th day of March, 2010; and
WHEREAS, the Contract involves professional services for the following project:
Temporary Wastewater Flow Metering for Wholesale Customer Meter Validation
WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to
include an amended scope of work and revised maximum fee.
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the Contract:
1.
Article I of the Contract is amended to include additional temporary metering for
validation of the Benbrook Thomas Crossing and Saginaw East meter station, and
additional follow up metering for the Hurst Valley View Meter Station.
Article II of the contract is amended to provide for an increase in the maximum
fee to be paid to the Consultant for all work and services performed under the Contract,
as amended, so that the total fee paid by the city for all work and services shall not exceed
the sum of $14,282.00,
All other provisions of the Contract which are not expressly amended herein shall remain
in full force and effect.
OFFICIAL REC®R®
CITY SECRETARY
FT WORTH, TX
06-23-1 0 Al 1 c 1 6 I N
EXECUTED on this 4 k� day of
2010, in Fort Worth, Tarrant County, Texas.
ATTEST:
OR
Secretary
APPROVAL RECOMMENDED:
4&V v
or lcoe
S. Frank Crumb, P.E.
Director, Water Department
RJN Group, Inc.
ENGINEER
By:
APPROVED AS TO FORM AND LEGALITY:
Assistant City Attorney
Fernando Costa
Assistant City Manager
CI`I•Y SECRETARY
F`Yz WORTH, T
r i n group
June 11, 2010
Chris Harder, P.E.
Engineering Manager
Fort Worth Water Department
1511 11th Avenue
Fort Worth, Texas 76102
RE: Amendment 1 —Wholesale Wastewater Meter Station Validation Testing
Dear Mr. Harder:
Thank you for the opportunity to continue work. Please find the scope and amendment
cost for the installation and calibration of three (3) temporary flow meters for a two week
period. We understand the purpose is to validate the existing permanent meter stations.
The scope of services is as follows:
Site evaluation —Based on initial location information provided by the City, RJN will
recommend to the City which manhole sites to install the temporary flow meters. The
equipment will be activated to record the depth and velocity at 5 minute intervals.
Installation —Site installation documents will be prepared for each (3) of the selected
monitoring manholes. The document will include the street location, map/sketch, pipe
dimensions, manhole depth, meter configuration and hydraulic conditions. The equipment
will undergo a series of diagnostic tests and calibrations to validate and confirm the meter
data.
Data Collection— It is anticipated that each flow meter will be installed for a period of two
weeks. Two (2) site visits will be performed during the two week monitoring period. A
velocity profile will also be obtained during each calibration by measuring the instantaneous
velocity at pre -defined depths, and then integrated to derive an average for comparison to
the meters calculated average velocity.
ringrouD
Letter Report The engineers will use various analytical tools, such as hydrographs and
scattergraphs to verify the accuracy and precision of the equipment. A letter report will be
provided including a summary of the average flows for each site. Attached to the letter will
include the site installation documents, 1-hour hydrographs and the average daily flow
rates.
Compensation —Compensation for providing these services will be based upon the
following rate table.
Description
Units
otal
Site Selection and Installation 3 Sites
3ea
$ 3,162.00
Meter Maintenance and Calibration 3 Sites
3ea
$ 4,008.00
Data Review/Letter Report
LS
$ 11479000
$ 8,649000
We thank you again for the opportunity and look forward to working with you on this project.
Should you have any questions, please do not hesitate to contact me.
Best Regards,
RJN Group, Inc.
bKt
Kevin Chumbley, P.E.