HomeMy WebLinkAboutContract 40567-A1Amendment No. 1
STATE OF TEXAS § CITY SECRETARY NO, L+OS(0-j—Aj
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering
Corporation (Engineer) made and entered into City Secretary Contract No.
40567 (the Contract) which was authorized by the City Council by M&C &
24230 on the 19th of July, 20109 and
WHEREAS, the Contract involves engineering services for the following
project:
Shiver Road —From Stirrup Way to Meridian Lane
Project No. 01349
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised maximum
fees
NOW THEREFORE, City and Engineer, acting herein by and through
their duly -authorized representatives, enter into the following agreement
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services speced in a proposal letter dated March 14, 2011, a
copy of which is attached hereto and incorporated herein. The cost to City
for the additional services to be performed by Engineer total $1,045.00,
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $63,546.00
3.
OFFICIAL RECORD
CITY SECRETARY
Contract Amendment No. 1
Page 1 of 2
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Executed on this the �}� day of 2011, in
Fort Worth, Tarrant County, Texas. _�,��
ATTEST:
Marty Hendrix'
City Secretary
APPROVAL RECOMMENDED:
Dougl�s W. Wiersig, P.E. �
Director
Transportation and Public Works
Dannenbaum Engineering Corporation
ENGINEER
��
Mark C. Lorance, P.E.
North Texas Regional Manager
6421 Camp Bowie Blvd., Suite 400
Fort Worth, Texas 76116
APPR VED AS TO FORM AND LEGALITY:
Doug Black
Assistant City Attorney
FOR
»,
APPROVED:
�G�!t�tw�..+ro �iL_
Fernando Costa
Assistant City Manager
,.
1 '� ..� �
Contract Amendment No. 1
Page 2 of 2
DANNENBAUM ENGINEERING CORPORATION o
6421 CAMP BOWIE BLVD., SUITE 400 FORT WORTH, TEXAS 76116-5421 (817) 763-8883
fears
of
E.eccllcnce
March 14, 2011
Ms. Wilma Smith, P.E.
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
RE: 4473-01; Shiver Road —from Stirrup Way to Meridian Lane
Supplemental Agreement No. 1
City Project No. 01349
Ms. Smith:
Per your request, we have prepared and are submitting for your review the attachments to
Supplemental Agreement No.1, which includes the preparation and distribution of a
Public Meeting Notification.
The fees summary for this additional work is as follows:
Dannenbaum Engineering
$1,015.00
If you are in agreement with this Supplemental Agreement Number 1, our authorized
compensation will increase by $1,015.00, for a total of $63,516.00. A further summary of
contract amendments is shown below:
Original Contract Amount:
Amendment No. 1
Revised Contract Amount
$ 62,501.00
1,045.00
$ 633546*00
Please do not hesitate to call if you have any questions or require any additional
information.
Sincerely,
rtis Caldwell, P.E.
xc: Mr. Mark Lorance, P.E.
Mr. Bryan Sherrieb, P.E.
File
G:\1210\4473-01\AdminWgreement\SA #1\Letter Smith 2011-03-14.docs