Loading...
HomeMy WebLinkAboutContract 40567-A1Amendment No. 1 STATE OF TEXAS § CITY SECRETARY NO, L+OS(0-j—Aj (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation (Engineer) made and entered into City Secretary Contract No. 40567 (the Contract) which was authorized by the City Council by M&C & 24230 on the 19th of July, 20109 and WHEREAS, the Contract involves engineering services for the following project: Shiver Road —From Stirrup Way to Meridian Lane Project No. 01349 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fees NOW THEREFORE, City and Engineer, acting herein by and through their duly -authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services speced in a proposal letter dated March 14, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $1,045.00, 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $63,546.00 3. OFFICIAL RECORD CITY SECRETARY Contract Amendment No. 1 Page 1 of 2 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the �}� day of 2011, in Fort Worth, Tarrant County, Texas. _�,�� ATTEST: Marty Hendrix' City Secretary APPROVAL RECOMMENDED: Dougl�s W. Wiersig, P.E. � Director Transportation and Public Works Dannenbaum Engineering Corporation ENGINEER �� Mark C. Lorance, P.E. North Texas Regional Manager 6421 Camp Bowie Blvd., Suite 400 Fort Worth, Texas 76116 APPR VED AS TO FORM AND LEGALITY: Doug Black Assistant City Attorney FOR », APPROVED: �G�!t�tw�..+ro �iL_ Fernando Costa Assistant City Manager ,. 1 '� ..� � Contract Amendment No. 1 Page 2 of 2 DANNENBAUM ENGINEERING CORPORATION o 6421 CAMP BOWIE BLVD., SUITE 400 FORT WORTH, TEXAS 76116-5421 (817) 763-8883 fears of E.eccllcnce March 14, 2011 Ms. Wilma Smith, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 4473-01; Shiver Road —from Stirrup Way to Meridian Lane Supplemental Agreement No. 1 City Project No. 01349 Ms. Smith: Per your request, we have prepared and are submitting for your review the attachments to Supplemental Agreement No.1, which includes the preparation and distribution of a Public Meeting Notification. The fees summary for this additional work is as follows: Dannenbaum Engineering $1,015.00 If you are in agreement with this Supplemental Agreement Number 1, our authorized compensation will increase by $1,015.00, for a total of $63,516.00. A further summary of contract amendments is shown below: Original Contract Amount: Amendment No. 1 Revised Contract Amount $ 62,501.00 1,045.00 $ 633546*00 Please do not hesitate to call if you have any questions or require any additional information. Sincerely, rtis Caldwell, P.E. xc: Mr. Mark Lorance, P.E. Mr. Bryan Sherrieb, P.E. File G:\1210\4473-01\AdminWgreement\SA #1\Letter Smith 2011-03-14.docs