Loading...
HomeMy WebLinkAboutContract 40860-A1STATE OF TEXAS s CITY SECRETARY CONTRACT NO.p�l�p-� (No M&C Needed) COUNTY OF TARRANT s WHEREAS, the City of Fort Worth (City) and Burgess & Niple, Inc., (Engineer) made and entered into City Secretary Contract No. C-24395, (the Contract) which was executed by the City Manager on the Sixth day of August 2010; and WHEREAS, the Contract involves engineering services for the following project: Crooked Lane Drainage Improvements, City Project No. 01335 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I of the Contract is mended to include the additional engineering services specified in a proposal letter dated November 22, 2010 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $6,650.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $95,611.00 City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 10.01.2010 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY T. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. E)MCUTED on this the im )c,\,` day of � C �� , in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary William A: Verke�s�E, P Transportation/Public Department less & Niple, Inc. ENG By: Director, Works oppO°coo�<_. Y o- 0 v f: e° . psi APPROVED: Fernando Costa Assistant City Manager Name: David R. Washington, P.E., R.P.L.S. Vice President 3950 Fossil Creek Dr., Suite #210 Fort Worth, TX 76137 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 6.18.2010 Page 2 of 2 7. WORTH, TX 3950 Fossil Creek Blvd., Suite 210 1 Fort Worth, TX 76137 1 017.300.1444 November 22, 2010 Dr. Vibhuti Pandey, P.E., CFM Project Manager Stormwater - Transportation & Public Works Integrated Program Management (IPM) 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: 01335 -Crooked Lane Drainage Improvements Additional Services Request for Surveying Dr. Pandey, This letter is our formal request for Authorization for additional surveying services on this project. Justification In the Preliminary Drainage Report, we determined that two additional areas need to be surveyed outside of the original scope of work. The two areas are circled in red on Figure 1(enclosed1. The driveway between the two lots at the low point on Crooked Lane is an existing 20' Drainage and Utility Easement. We need survey data of the entire easement as well as survey along Crooked Lane where the existing driveway ties into the road. Additionally, an additional inlet will likely be required on the upstream side of High Vista Court, so additional survey data will be needed along Brentwood Stair from Rock View Court to 20' West of Druid Lane/Druid Ct. I have also enclosed the Surveyor's proposal letter to me for this additional effort. PROJECT FEE DETAILS Contract Item Description Fee Original Contract Crooked Lane Drainage Improvements $88,961.00 City Sec'y Contract # 40860 Proposed Amendment No. 1 Additional Survey REVISED TOTAL PROJECT FEE 6 650.00 95 611.00 burgessniple.com November 22, 2010 01335 - Crooked Lane Drainage Improvements Additional Services Request for Surveying PROJECT FEES Prime Consultant Burgess & Niple M/WBE Consultant Gorrondona & Assoc./ Trevino Reproduction Non- M/WBE CMJ Engineering Base Contract $881961.00 $63,404000 $211557.00 $4,000000 Amendment 1 $ 6,650.00 $0.00 $61650.00 $0.00 Total Contract 95 611.00 563,404900 28 207.00 4 000.00 Percent of Total 1 66.32% 29.50% 4.18% The updated estimated M/WBE percentage of the overall project fee (29.50%) exceeds the original Contract percentage, which was 24.23%. The M/WBE goal of the original contract was 24%. Please let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess & Niple, Inc. TBBPE FIRM REGISTRATION NO, FF�-110834 o z;uw r/ • fiako4t4 William D. Wendland, P.E. Associate Director, Fort Worth Public Sector Enclosures P:1PR495731doc1Pandey-Additional Services Request_20101122.docx =17.: 1i Ad _ u •,add }� � � 8 is itar � r r �♦ Wqh Meadow Cl.e+- 5. - 4 J a �.� -^' � � rye' �'-�` 4 �r • ti — — — — - - ..y Arm "W% Mail jr 1. !a t 2010 Eu.opa Technolo2CJ9GooSle tiL D 2010Geoplee - — neaeiv Dale Dec 27, 2006 72'4512 WN 97'11'07 66' W elov 55611 Eye all .`:011 �. ) Gorrondona & Associates, Inc. November 17, 2010 GSWW 3950 Fossil Creek Blvd., Suite 210 Fort Worth, Texas 76137-2745 Attn: Mr. James Mullins, EIT Re: CITY OF FORT WORTH —CROOKED LANE DRAINAGE IMPROVEMENTS ADDITIONAL SURVEY & SUE Dear Mr. Mullins: Gorrondona &Associates, Inc. (G&AI) is pleased to submit this proposal for professional land surveying services for the above referenced project. The following itemized surveying services are to be provided by Gorrondona & Associates, Inc.: 1.) Research property owners and obtain copies of subdivision plats and ownership deeds. 2.) Locate property corners and establish property lines and existing right -of --way lines. Prepare a property map of the existing right -of --way showing lots numbers, ownership with recording information and all of the parcels of land affected by the project. Deliverables include a property map to overlay onto the topographic survey prepared in an AutoCad 2009 file format, along with copies of deeds, subdivision plats and tax ownership information. 3.) Extend existing horizontal and vertical project control. Establish at least two benchmarks or every 500' for each project. The horizontal control shall be NAD83, north central zone with a detailed description being given for each control point. 4.) Provide a topographic survey of the proposed drainage improvements as show in an exhibit provided by engineer dated 11/08/2010, with the limits being down Brentwood Stair Road from Rockview Court to the west approximately 570 linear feet and from the existing storm drainage system in Crooked Lane east between the house to the rear lot lines approximately 130 linear feet. The survey along Brentwood Stair Road shall include 50-foot cross -sections extending from right -of --way to right -of --way, and at all grade breaks along the existing centerline. The survey between the houses shall include 50' cross-section and extend from house to house. The topographic survey shall include, but not limited to, locating all existing features such as water valves, water meters, curb & gutter, asphalt, sidewalks, medians, fences, driveways, storm & sewer manholes, tree lines or 7524 Jack Newell Blvd. So. •Fort Worth, Texas 76118 •817.496.1424 •Fax 817.496.1768 9 www.ga-inc.net Gorrondona & Associates, Inc. trees 6" and larger, tops and toes of slope, power poles, mailboxes, signs, telephone risers and other visible features. 6.) Deliverables shall include an AutoCad 2009 drawing file showing all %J the features located, ground elevations, a TIN and TIN file, along with one -foot interval contours. Provide copies of the survey field notes, a hardcopy of the coordinates and an ASCII file of the coordinates for the points located. �.) SUBSURFACE UTILITY ENGINEERING QL"B" — G&AI will perform this work in general accordance with the recommended practices and procedures described in ASCE Publication CUASCE 38-02 (Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data). G&AI will utilize geophysical prospecting equipment to designate the horizontal position of existing underground utilities that are within the existing ROW. This level of work includes acquiring "as -built" documentation from utility companies and making the initial contact with their representatives. Based on our site visit and information already obtained, we anticipate encountering buried electric, cable television, telephone and storm drains behind the houses and buried electric and sanitary sewer along the south side of Brentwood Stair Road. The length of project is 700 linear feet and utilities will be mapped to the same limits as defined in the Topographic Survey section at a rate of $4.50 per linear foot or $3,150.00. Gorrondona &Associates, Inc. can provide the above professional land surveying services for a Lump Sum fee of $3,500.00 and a lump sum fee of $3,150.00 for SUE services. The total amount of this proposal is for $6,650.00. If you have any questions or require additional information please contact me at (817) 4964424. Sincerely, GORRONDONA &ASSOCIATES, INC. lam._ W. Truett Wilson, R.P.L.S. Survey Director 7524 Jack Newell Blvd. So. •Fort Worth, Texas 76118.817.496.1424 •Fax 817.496.1768 • www.ga-inc.net