Loading...
HomeMy WebLinkAboutContract 40860-A3 (2)_UPINLI, 101M_Do STATE OF TEXAS cS CITY SECRETARY CONTRACT NO.Lk17y�j 0 " r (No M&C Needed) COUNTY OF TARRANT b WHEREAS, the City of Fort Worth (City) and Eurgess & Niple, Inc., (Engineer) made and entered into City Secretary Contract No. 40860, (the Contract) which was executed by the City Manager on the Thirtieth day of September 2010; and WHEREAS, the Contract involves engineering servi�;es for the following project: Crooked Lane Drainage Improvements, City Project No. 01335 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include a change in scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the Following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 11, 2011 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $8,000.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $130,909.00 City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 10.01.2010 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 08-11-11 P02:21 IN 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the I� day of , Worth, Tarrant County, Texas. ATTEST: Marty Hendrixv - Q �o $ S City Secretary 60 0 ua0 ayye� APPROVAL RECOMMENDED : ``�ti„°��!�"0..=�'�'- APPROVED : Douglas Wiersig, P.g. Director, Transportation/Public Works Department Bur ENG r�ss & Niple, Inc. Fernando Costa Assistant City Manager Name: David R. Washington, P.E., R.P.L.S. Vice President 3950 Fossil Creek Blvd., Suite #210 Fort Worth, TX 76137-2745 APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 6.18.2010 Page 2 of 2 in Fort 395o Fossil Creek Blvd., Suite 210 1 Fort Worth, TX 70137 1 017.300A444 July 11, 2011 Dr. Vibhuti Pandey, P.E., CFM Project Manager Stormwater - Transportation & Public Works Integrated Program Management (IPM) 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: 01335 -Crooked Lane Drainage Improvements Additional Services Request #3 for Additional Engineering Services Dr. Pandey, This letter is our formal request for Authorization for additional services on this project. At our meeting on June 22, 2011 with Steve Eubanks and Linda Young, we discussed making changes to the alignment of the project. We agreed to shorten the tie-in point, add a "bubbler" drop inlet at our new connection point and revise the cross -connection with the existing storm drain at the intersection of Crooked Lane and Brentwood Stair Road. These revisions require additional effort on our part and I have attached Attachments A-E for this additional effort. Please let me know if you have any questions or need additional information concerning this request. burgessniple.com July 11, 2011 01335 - Crooked Lane Drainage Improvements Additional Services Request #3 for Additional Engineering Services Page 2 PROJECT FEE DETAILS Contract Item Original Contract City Sec'y Contract # 40860 Approved Amendment No. 1 City Sec'y Contract # 40860-A1 Approved Amendment No. 2 City Sec'y Contract #40860-A1 Current Contract Total Proposed Amendment No. 3 REVISED TOTAL PROJECT FEE Respectfully submitted, Burgess & Niple, Inc. TBPE FIRM REGISTRATION NO. F-10834 6)4;uw L • William D. Wendland, P.E. Associate Director, Fort Worth Public Sector Enclosure Description Crooked Lane Drainage Improvements Additional Survey Aditional Survey, Add Bid Phase and Construction Phase Services Additional Engineering Services P:\PR49573\PM\CONTRACT\CO\CO-3\Amendment 3-Pandey-Additional Services Request_20110711.docx Fee $88,961.00 $6,650.00 $27,298.00 $122,909.00 8 000.00 $130�909.00