Loading...
HomeMy WebLinkAboutContract 40759COMMUNITY FACILITIES AGREEMENT TIIE STATE OF TEXAS § City Secretary COUNTY OF TAIiRANT § Contract No. �' WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, ahome-rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Carlyle/Cypress West 7`�', L.P. Authorized Titl e:C.F.O Brian Parro ect Name: West 7"' South East Bloclt Proiect Location: 2973 Crockett Street Additional Streets: Plat Case No.: FS-007-167 Plat Name: Van Zandt's Park Addition 76A-B To be completed Received staff Council District: 9 CFA: 2010-036 DOE:6474 No: 01511 Date: � / ` �' 09-01-10 PO 9 �I=1=f`ilt9� I�'E�iVR� CITY SECRETARY �Y W®RTHf TX :� 1 NOW, THEREFORE, KNOW ALL B V THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A� X Sewer 'j (A 1) X , Paving (B) _X Storm Drain: (B4) X Streetscape (B-2) X Street Lights & Signs (C) X9 E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed tinder this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Hart, btil the alle;red negliaence of the City of Combined CFA final Sept 11, 2008 4 Fort Worth, its officers, seryants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, ill whole or in part, by the alleked negliaenee of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storin drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. E Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and* accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: West 7South East Block CFA No.: 2010-036 DOE No.: 6474 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1, Water Construction 2, Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Streetscape -Landscaping, Irrigation & Hardscape 4. Street Lights - Installed by Developer 5, Street Signs - Installed by Developer TPW Construction Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. WaterlSewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Inspection Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial C,uarantee Onlions. choose one Developer's Cost $ 259,865.74 $ 316,855.74 $ 1,139.80 $ 1,139.80 $ 2,279.60 7129.00 $ 16,238.73 Choice Amount (ck one) Bond = 100% $ 316,855.74 Com letion A reement = 100% /Holds Plat $ 316,855.74 Cash Escrow Water/Sanitary Sewer= 125% $ 71,237.50 Cash Escrow Paving/Storm Drain r= 125% $ 324,832.18 Letter of Credit = 125% w/2 r expiration period $ 396,069.68 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Develo er has execute this instrument in quadruplicate, at Fort Worth, Texas this day of 20 10. CITY OF FORT WORTH -Recommended by: Water Department Transportation &Public Works Department Wendy C t abulal, EMBA, P.E. William A. VV4krkest, P.E Development Engineering Manager Approved Amy J. R Assistant ATTEST: to Form & Attorney Marty Hendrix City Secretary ATTEST Signature (Print) Name: Director Approved by City Manager's Office Fernando Costa Assistant City_ Manager Carlyle/Cypress West 7a`, L.P. wMhwL � Print Name: Title: Signature �FFICli�lRECORD CITX SECRETARX F r. WORTH, TX I Combined CFA final Sept 12, 2008 8 `-�-_ Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit 13-2: Streetscape ® Streetscape Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 0 VICINITY MAP N,T.s. WEST 7TH STREET SE BLOCK FORT WORTH, TEXAS 4 Huitt—Zolicrs, Inc. Engineering / Architecture 500 W. 7th St. Ste. 300 Phone (817)335-3000 Fort Worth, 7exos 76102 Fox (817)335-1025 '—.:plt7i7W ffv 'YOt%Roil N:Y)10Ni 18SWI.SHit .iSm"4AKkTS Ul "N,61t3fIimn*af)YRY}S(Y':1WAYJ�NUN SetU tiPJkJ.'Yi1HISNU:)iitil'#tlt472Y7d 5 � wourigig "evil P Y z < O Q r h �f i�r�E�l+�%�� �b ���� RBI's 5 r� �'•Y',� ��rr� ��' axx �v 4 4 a� ��7a' ��3�S:�a S,i:i�S.su ,9EEG;kJ4 3�4MLGC�36LpG��'Y�`�a�(u i � Ems-+ ^H` u ILI Fmf ti x 'l f ar w H U ( fl o(t Y%" 0 P4 N We N w w w w . �o p a W o 0 J N°zz d o o Lo w � o x x W a �r.-.c.z:zrn is {� AtR:r. r•s :�ctr �� mrsa U60CKgyA/Z!}dJTT3 PAItiSADS1i'fiGW e#,. � ./t71�4% cuLaocz�fnlu# _� __ �a�srrx�,�rr C{Z(}[:(i�T7' S�7'f.'E�T - -� _� �_ � _. #lfLYE I/ IF ' � yNIT r NTI+XfM#NY _ 1 ytj YKK L!�✓ Pe.+dl N' 1 t•{� tii l�N ^'d� r ��. I T / # _ 1 ! r e�. i . to i � �' -.—. - - _4..�,_.. ____�__-. -r . tar fT•R. ��. 'PtCJ4 ,v., }� 11 R w d w Yd.>�w rm� � t a x uT jjjj r,w a.,+wrr ...,. „ .<�t,�...,., Yl9+iM!?Y+tN>:FF'aC71ls# Mr ' f�wY✓M'N ^FAt+r<✓} Ml�+�w#'+rs�.5h+f�w+�L1+�1dr�N�� �rw..M1+S�+1w.rfNN +�.4#✓#M+eNr+.\e>Naf t.iM W++# W bwM� MNJw1 Wbyrdw#1M+1 wNWwhd L:x Nw+.+ie1w+I.YIYr.Je wrw#. ut4TYEdil4wlr. A+y).hil'✓9 M.#✓rdYd>3K! MecH.wa,�thx^e•ee�t4'n..//rltielwyiwJ ►.a M.rfMrr. T,+.wxa#n.e.�td�ddtW kFs✓a'V�*wla.Me+h+ls.r.v.#M1+tlnsYc rM'�h+'41fYw+f�,M4M1•xreN ✓NM�dewT V�bwMN/�I. Wit MiiMrt N�Mfx Yf.w Y)9I4r NM+✓rWadrr+roaNT�W ✓ Js,..r�hY� �Niwf4�.,IAHwtiW#t4�(Yb+wW YIMiYM�l+M 4^'rrwfN+.wM5�K Ywt✓aTnr4"li .,�.� ewK�Y. Rwr.«.H.i ��'o �wlw.N� ��irim+.ihN.ne MNT++PM !tlLNu7r++f lt#/1Y dsr#.yrleti,#Mwyu! Nan«.nvx+*41nw1+l4ew+twriKie�wt7-WM*diwn N r.+MY+aaAM xr>w Mx }M'haYkd+lYhiYiNMYaM r..eewy+� wM«w.avr. urMW�+++r�«,yf w+n.rwaa+rd,ew+auvn Nnr.+yn✓ ,w,.+ar.YhYanwr w�•t...«w rrrrr L+A +i�.wq�•ew� w+..wa�ai� tlr.ew+rYrwe+.++*igvfrM1 w-. AYaLN i+1+�Kh`Midi aMDY4iA41 NGp YAw)x.w✓d+x#h W�dwWY1.N✓dwYawlt!rw•ishrx4warrM.^sYiN+eaw*.MM'+fw�'�rW.M VwW✓wrµFwllwdweq L.VnN hJiisM4 MI✓4 hhl+wwewaYWyd,.w«.ww. hrridF w.�.nyi�+..nnM, �Mehdd+'+eNwr.x+�+l'iwaw.w.s.rwwvw�°+wr.w.+,�.q. nt Ma#wr+.e#w✓xdwh.F,axwt✓M#.IMh�*•.AM +Lf f+(+e>•'W wiiMw.haf��++✓J♦ 1ktiMMYeT/uM{p�yxww.e*erMtiuW erN W M+YML.h�fw hVAe'd+^i W d.d sahq++e!#kwb✓T+a.:M7M4MMM►'T�Ma.wrysuKww,wVlwrd krw+ fq1..+.�s.ra+NLa.✓rl+•KrrrArl.Ixdwww►i.L.wd.r4 rN..1n4•iw'Wr+w..�+ mwxleew rdo✓.no A+L L.+!++xn Msf�+wa#MR-e 1�+.� M F ,m�.+l e.� w.'u� r,r.el.� RrY Nd I Yy . M !.S w.�. rMe ugi.r�l Ka{Iwl.. Oi>�l�mw�'F#m+NwRW npRf'eMYG#nsr �#.p YiywrYd�MA h�•.w..rh dfnlodd.,. ra++edV,ldq YYxeryLngJ..wb w tfYwprrtla� M##{wY�Yrr< J nteW,IuaarwrNMaMeMMI#eN NW 1.Yr.r✓.e✓MhN•iriw YWtiar•Iri/V..,Iri P+d �yww�.v�.+YYMM kwrhwA 7Wc�: �� f.1TY PLAN CGiA.Nl3ap1 Cif( fF FtY(T 4JHiH, '.i,%AS ti Y 1 re.++aM af#+Y d{h h d #Y+^I 71 an.' �� ,,��'ff,� pPK4t ^�1��N�p Y�yj0 ���� +�,�,�,� s �, ,Dd�rscra ,. rd.aevr Dt♦,rM R.:Xge'W FNhtFd r'dew+rMs/w.estnlwi Nsw.+N+i7N*wM'!tY / MJ. W4! wr2aWtL!d+R APt+rt'w'..+a r>:w-Yl+<+.r/ND+iwM ti+rDkwMs)w.:-n.y►NekTw!•w„urdF'�i�.�Any.nnwn�..�rixT.+a G.r�bT+#++, .Me{M>9reheA w...dNht.�rq W+1# fY IXtl!fYNDI Pwfn++✓INH/tsq I+eeYNiervr.d#e✓y Prd.t✓4r+r gW�#y�wm ��aef�d eiY�~Im✓���idM4/)tA4�t awn M1wAv'TNYoa'LfYNtsdbMf T#� M9dY:.wr+e aud�nyls�re. aahM Ya4 9 WN' N5D1e44gAgL/Yi1✓eL•IY+IRMirr�/�ar✓ta LAw� uw,M dw�d�>ra��ar ryw... el�L.�s�� �Ro.d�tir�el�m �i rs�n �Mx� a�Mi nrmn :.wAMMeI�iY��1w N�Mw'W.#aw�aaF,�eid pntrwrxN rdir aleryawr.rdwrd l.{ I�IueA.'�bfhw/ �i.+N/»NyiMwl+ef4YYAt`PIT�DK.#.±}iti#1edhM.+�iMllnsYNwc+ve mford4+.v.vuh F Jt�t� LIIR'4,1r�wM�lvaLw��iK bY/�+�•NA.s#M HEwrvnDw�>•d+rN NlO�wrr Oad�w A✓•d r#hrdM�Yhlab^olxlbaMlr•, rlm li.1IN 10. M4L N'zAeLrTar.WCAOIXlIIX. nwlM1+vnrCgralafew/l Tnx1 ,y�Opt�1l,�el>w/w✓Yn�awdrr.�+rnl .�+ra�.YaiT.c� b""�'r1e.. as re.eyw.rr...w�.ha.nr�rR. �4.l�T.w� dw4 mDtd.. hfL{>YM h+i11 Yr3itf¢ei�w�✓t✓✓1'w''d M}�i(D.ww...drs,.ralan dN�ta]Q�4 NpkaYl+dn,4Yy�aM xawRHrlHd Wl4 MOITg1�#MbisaltlgN b. pdb3wur�a,hxNdln l# TMh PnL,d14a+RIM}111PY{�N.+n� NEi_, eelrwa-n � y.a�S».wxrt Hevw�a ea•wtd I6 W W 1)rYaRwMwL 111HKCYr1V ed u�Mrr<My W aMawrraMM W M d{M I{s,W L 54 t]PT YA #Fhp alnadwb. oeFl4egvle M1>ew elry•dry,l. ✓y.y,prld✓Naa.vr�alaY Nrf. sea l• irrsR_eFYwwM�fM✓dN:?�d@M KDf1Mls.rsl)n»>•arrT+�L+Yt�r�r+rloaayhsJ.r. ✓.aiv+rl..M f ai. �V.�+.ei+4w.a NihM M»�1Ws¢�s�Nii )NhM �� � �.w,'r°••t.«..ryi'r+H ofY r,rrVh+Gtfi�'KTs+wntsRt�*L.. .. ... Nei}E4 YYNlW MLIR _.j.l_dga .�ilT� YM ��"L • pY�#.MdYapl+wT � �lii JReYY M1 M✓J�' � a�iJn#iw Mw,Na'dwlr.Mrd,v.M ill p/e#yMrd)lq 4w ti R r r, Ni`• YJG� Nsneu arcrw.no TMN._[i_' �a'r/.,_e1kfEa, iry1 ,',.���Y,j,,�ro � �',{TA,.wdyaxp�iy'u?d,. -� ��l�X� AtliiRrDtlfl.0 Ns x'hw MaY1Lw ?J t✓w�t�ai scrurtrvn I O ±� s Q N z q� W w.ar.�, rm..ixh.. wa...+s)q .,. d..«xn.�fX t,x-Ixt'.—:ml �A!!L'tikiT�✓�ueau✓.-w..r.d:,rraq: , w,di.x•darwdKw pe e✓.✓aw>•d1v M,�i G- 11�/ L+tfdt_d�El� lt✓nhMril r++ �irYJ.-. M41A.. hn✓wwrN#NM�+MSM)5«.+tWt/Mx.rw. +�'nYnrn wlsi'+✓( mwM+�✓w,s.tlrN M'X?YfYj V45NEA btfARAtiiiAY.' "", r' y+ 4C�}}yyn�L}sff� �.tul 6r17th ktC _� ?� �<_, �h r�.f.+� f; tbriil fi#+i1 P�wy SN dp}. t� zj:•' a Aga!wtTi..sf �6ddi 1� Cip+PlanF�%No. FS-007.187 -�lL-� �1 r... ,, M. ,..a .�' . — — � �����•�- --� r A n� F{naC Pkct jor Lot 1—R �• Lot f7—R, BEoak 8 _-_� Il'l�niL1R �IAN ZANDT'S PARK ADDITION _..._.._..._.._.._.... N,�.rr>n,.,.tK, rigrxerciWArd,�ceunlsvwWg hMe/f>7'1hFdCL�Atlk.ew+�Jtdaltw7+idafT•A, BIxtB dYMT77.Wf'3 P/RRMIJr,»lolhe -- 500 V1.7CT$irzd„6uXe 30D,FM 1l4xIF1, TxTLc7el62 41pdMalWdAtera/Gu/r. tewfr,lhddrecwAd kV ?(Wy{181dYldK w/s7hrMGa.ly, fov+ --^--^—'�---- PI�wl61T1�3� fL%ieiTJJ561o2b CM t4.vq: 'iaDrnnl. GeUYIf V. Texas E J G x > UO m I W C�8 w OQ� I— w u � 0 w t— ILd I � I .. G ;lf 00ry z x z D IML-I 00 I-a.w M U W j z _ OUO fur)W � : I • — � LLJ �w wz 0 cv Q Y w x$� W W ass Q W II Z V) p - m mLLJ = m z t:.i = H N In W (n a w �y 3 0 mLAMl s DM(1'2131VM Y X3-VdD-L0£601\S118iHX3\Y3:)\ONIa33NION3\N9G tt otoar£t }((II b [J 0 CAL < lil --� w �O W 0iwmffl� I 1- say V)ww w Z {/} 0L ham- — CL 0( 0 z a• z Lil � W V) R- to u) d z Cpw mew - a—► 1 s Q � � 00 c z zZ n- > 10 Fes;; w �� t 1 Z ~ w w UJ ►�V) mom m # c`v w H d 3 ox V) � �# 0 r ce d Zo (< z VF �z oz 00 , _1 Nam. wZ t> O tY O � t=w aw aw 0 3 Q QvLn an 1 I W - -- - l c o g U 0 Q 11 , 114 Q ~' Lij 133�11� oil I I i �JMO'a3M3S l-VlC3-tl�0-LO£601\511f3tHX3\1flO\�JNIai . . . iI zi -.._ IV.�. .. _.,..._._.._.._ w W W z 0 uwj i{ ,� 0AM IS 188no L,0£60I' �NlN33NI�N3 t0�8ptC4 ('QfJd �N WdCt�tr Oi 1 1� 11 t; } ! 1 b ' n.. z co i OPP, I n c�3 z l��als aiaan� L Iu w to N cn 0 UNIT I • WATER Item No Approx. Qtr Unite _ Item Descdptlon —_—__ u Unit PriceVin YVords_ Unit Cost Total Cost 1 1 EA Relocate Existing 1" Irrigation Service, Meter and Vault $800.OD $800.00 Dollars and Cents 2 1 EA Relocate Existing 2" Domestic Service, Meter and Vault $900.00 $900,00 Dollars and Cents 3 1 EA 6" Gate Valve w(Cast Iron Box & Lid $700,00 $700A0 Dollars and Cents 4 1 FA 4" Domestic Meter and Vault $8,000.00 $81000A Dollars and Cents 5 100 LF Trench Safety $2,00 $200400 Dollars and Cents 6 1 LS Chlorinate & Pressure Test $500,00 $500.00 Dollars and Cents 7 0.03 ETONPipe Fitting - Install $33000,00 $90 00 Dollars and Cents TOTAL AMOUNT BID - WATER $11 190.00 UNIT I - SEWER Item No. _ J_ . ._._ -_ ..__- __ m-___ _ _ I.._.__ __ __ _ _______- -__- _-_ -__ Ap�rox Qty, Unit Item Description Unit Price in Words Unit Cost I Total Cost _ . _ _. _ ,-.._ _ , _., _ . _. _ _ _m_.. 8 1 EA Connect to Existing Manhole $3,500,00 $3,600,00 Dollars and Cents 9 1 EA Sewer-Service•8 inch-2 Way Clean Out - Install $900.00 $900.00 Dollars and Cents 10 1 EA Sewer-Service-8 Inch-SDR26 - Install $800,00 $800,00 Dollars and Cents 11 500 LF Inspection -Post Construction Cleaning & TV $2,00 $1,000,0o Dollars and Cents 12 7 EA Reconnect Existing 4" Sanitary Sewer Services $800.00 $5,600.00 Dollars and Cents 13 500 LF In"Situ Form or Approved Equal - Trenchless Pipe Repair and Lining $68,00 $341000.00 Dollars and Cents 14 1 EA Abandon & Plug Existing 6" Sanitary Sewer Service @ Property Line $O.OD $O:Op Dollars and Cents TOTAL AMOUNT BID - SEWER $45,800.00 TOTAL AMOUNT BID - UNIT I $56,990.00 Page 2 UNIT 11 = DRAINAGE Item No. Qty Unit Item Description _ i Unit Price in Words Unit Cost Total Cost I � 15 30 LF 18" HDPE Strom Drain $60.00 $1,800.00 Dollars and Cents 16 2 2 JEAConnect 18" HDPE to Back of16 Existing Inlet with Concrete Collar $1,500,00 $3,000.00 Dollars and Cents 17 5 LF 12" HDPE Strom Drain $50000 $250,00 Dollars and Cents 18 1 EA Connect 12" HDPE to Existing 60" RCP with Concrete Collar $2,500.00 $2,500,00 Dollars and Gents 19 35 LE Trench Safety System - Install $2.00 $70,00 Dollars and Cents 20 1 LS Erosion Control— Install and Maintain per SWPPP $500.00 $500.00 Dollars and Cents TOTAL AMOUNT BID - DRAINAGE $8 120.00 UNIT 11- PAVING Item N O�m 1Approx 4ty_Unft 1 f i i Item Description - ( Unit Price in Words m Unit Cost Total Cost I 21 1 LS Mobilization $1,000,00 $1,000,00 Dollars and Cents 22 1 LS Traffic Control $2,000,00 $2,000,00 Dollars and Cents 23 365 ;LFSaw Cut Remove Existing Curb and Gutter $10.00 $3,650000 Dollars and Cents 24 185 SY Remove Concrete Alley, Driveways, & Roadway Pavement (all depths) $8,00 $11480,0U Dollars and Cents 25 5 EA Install Street Signs $500,0 $2,500,00 Dollars and Cents 26 150 SY Pavement-8.5 Inch Reinforced Concrete w/ Joints and Sealant $52,00 $7,800.00 Dollars and Cents 27 227 SY Pavement-7 Inch Reinforced Concrete w/ Joints and Sealant $48,00 $10,896.00 Dollars and Cents 28 36 SY Pavement46 Inch Reinforced Concrete w/ Joints and Sealant $43,00 $1,546.00 Dollars and Cents 29 160 SF Walk-4 Ft - Install $6,00 $960,00 Dollars and Cents 30 1 EA Sidewalk Ramp $1,500000 $1,500,00 Dollars and Cents 31 367 LF 7 Inch Monolithic Curb and Gutter $22,00 $8,074.00 Dollars and Cents 32 20 LF Pavement Marking -Striping Install $15,00 $300.00 Dollars and Cents' TOTAL AMOUNT BID • PAVING $41 708.00 Page 4 GRAND TOTAL AMOUNT BID: UNITI - STREETSCAPE-LANDSCAPE Item No, Approx. Qq Unit Item Description Unit Price In Words Unit Cost Total Cost 1 8 EA 100 GAL. Canopy Trees - Install Dollars $728.00 $5,824.00 and Cents 2 2 EA 3" CAL. Canopy Trees - Install Dollas rs $280,00 $560.00 and 3 4 EA 65 GAL. Ornamental Trees - install Dollas $392,00 $1,568.00 and Cent 4 78 EA Lindheimer Muhly Grass - Install Dollas rs $20.16 $1,572.48 and 5 93 EA 5 GAL. Shrubs -Instali Dollars and Cents $20.16 $1,874.88 6 142 EA 2 GAL. Shrubs - Install and DollaCents rs $16.80 $21385.60 7 121 EA 1 GAL, Shrubs Install and Dollars $12.32 $1,490.72 8 680 EA 4" Pots (Groundcover) - Install and Dollas rs $1.40 $952.00 9 80 SY Bermuda Sod Grass - Install and Dollars s Cen10 $5.60 $448.00 12 EA Landscape Pots - Install Dollars and Cents $392.00 $4,704.00 11 160 CY Bed Preparation � Install and Dollas rs $56.00 $8,960,00 12 244 LF Steel Edging -Install Dollaand Cents $5.60 $1,366.40 TOTAL AMOUNT BID - LANDSCAPE $31,706.08 UNITI- STREETSCAPE -HARDSCAPE Item No. Approx. Qq Unit Item Description Unit Price In Words Unit Cost Total Cost 13 31403 SF Concrete Walks with Rock Sall Finish -Install Dollars $7.00 $23,821.00 and Cents 14 220 LF Concrete Steps -Install and Dollars $41.44 $9,116.80 15 38 CY Concrete Cheekwalis and Footings - Install and Dents $630,56 $23,646.00 16 40 CY 4" THK. Decomposed Granite - Install p Dollars and Cents $347.20 $13,888.00 17 14 EA Steel Saddles on Cheekwalls Dollars and Cents $72 80 $1,019.20 18 25 EA Metal Handrail - Install Dollars and Cents $560.00 $147000.00 TOTAL AMOUNT BID - HARDSCAPE $852491,00 TOTAL AMOUNT BID "UNIT 1 $117,197,08 UNIT 11 - STREETSCAPE - IRRIGATION Item No. Approx, QtV Unit Item Description Unit Price In Words Unit Cost Total Cost 19 5 EA Drip Zones including all Dripline, Valves, Quick Couplers Mainline, Controllers and Sleeves Dollars and Cents $2 240.00 $11,200.00 TOTAL AMOUNT BID - IRRIGATION $11,200,00 TOTAL AMOUNT BID - UNIT II $1111200.00 UNIT III LIGHTING Item No, Approx, Qty Unit Item Description Unit Price In Words Unit Cost Total Cost 20 8 EA KIM Light- Install Dollars $2$183.62 $17,468.96 and Cents 21 1 EA AcomLight- Install Dollas rs $4,124.96 $41124.96 and 22 7 EA LED Light - Install Dollars $536.00 $3,752.00 and Cents 23 16 EA Cheekwall Light - Install Dollars and Cents $220.49 $3$27.84 24 10 EA Up Lights - Install and DollaCents rs $702.54 $71025A0 25 1 LS Siring Lights -Instali Dollars and Cents $6,104.00 $61104.00 26 13 EA Electrical Ground Box - Install and Gents $896.00 $11,648.00 27 515 LF 2"Conduit -Install Dollars and Cents $8.00 $4,120.00 28 9 EA light Pole Foundations -Install and Dollars $1,200.00 $10,800.00 29 27085 LF #6 AWG ~ Install Dollars and Cents $1.50 $3,127.50 30 695 LF #10AWG(ground)-Install and Dollars Cents $2.00 $1,390.00 31 100 LF Bore(for 1" Conduit) under roadway and Dollas Cent $20.00 $2,000.00 TOTAL AMOUNT BID - LIGHTING $75,088,66 TOTAL AMOUNT BID - UNIT III $75,088,66 UNIT IV -SIGNAGE Item No, Approx. City Unit Item Description Unit Price In Words Unit Cost Total Cost 32 9 EA BreakawaySigns 9 Dollars and Cents $336.00 $3,024.00 33 9 EA Decorative Poles and Sign and Centsrs s $392.00 $30528,00 TOTAL AMOUNT BID - SIGNAGE $6,552.00 TOTAL AMOUNT BID - UNIT IV $60552.00 TOTAL AMOUNT BID - UNIT 1 $117,197.08 TOTAL AMOUNT BID - UNIT 11 $11,200,00 TOTAL AMOUNT BID - UNIT III $75,088.66 TOTAL AMOUNT BID - UNIT IV $6,552.00 GRAND TOTAL AMOUNT BID: $Z10.037.74