HomeMy WebLinkAboutContract 40653-CO1 (2)Fa}S- 003& - CITY Fc> P,-r Wo RT H 6 s� City of Fort Worth CONTRACT NO, SECRETARY Change Order Request Project Name: Hicks industrial Park Sanitary Sewer Extension CitySec No.: 40653 Project No.(s): P275-707170036783 DOE No. 5580 City Proj. No.: 00367 Project Description: Sanitary Sewer Extension to Serve Hicks Industrial Park Contractor: Wright Construction Co., Inc. City Project Mgr. Liam Conlon ' JAN 20 2012 Phone Number: 817-392-6824 Dept. I Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) 1 hange Order# 0 Date: I 12/8/2011 City Inspector: Michael Collier Phone Number: 817-223-2273 000.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) ASONS) FOR CHA were necessary to ORDER plete the Totals Contract Time $32,000. $1,329,593.25 Increased pay item quantities of 8-inch sewer pipe, 4-foot diameter manhole and 32-inch frame and cover. Additional pay item quantity of ductile iron pipe services. The change order will also allow for the � project. OFFICIAL RECOR® C19T SECRET TX FT. VIORTM, of pay item quantities that are no City rrr rt:Iil It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Wright Construction Co., Inc. Matthew S. Bartos I actor Date Project Ma a er Date Assi tanj DIT4qtf±Later Npt Date Construction Supervisor TPWDept) Date Assi Date 'Manager I Date - Council Action If Required) M&C Number A/ M&C Date Approved Fria-r WORT" City of Fort Worth Change Order Additions Project Name Hicks Industrial Park Sanitary Sewer Extension Project No.(s): P275-707170036783 DOE No. 5580 Project Description Sanitary Sewer Extension to Serve Hicks Industrial Park City Sec No.: City Proj, No. Contractor Wright Construction Co., Inc. Change Order: Date: 1218/2011 City Project Mgr. Liam Conlon City Inspector Michael Collier ADDITIONS 40653 00367 13 Manhole STD 4- ft. Diameter SEWER 2.00 EA $1,435.00 $2,870,00 14 Manhole STD 4- ft. Diameter SEWER 2,00 LF $130,00 $260.00 20 Collar Manhole 32-Inch Frame and Cover Install SEWER 2.00 EA $930.00 $1,860400 21 Manhole Vacuum Test Services SEWER 2,00 EA $110,00 $220,00 22 Inspection Post Construction Cleaning and TV Study SEWER 182,00 LF $1.50 $273400 23 Trench Safety SEWER 182.00 LF $1.50 $273100 36 Core Existing Manhole 64ch SEWER 1.00 EA $8000001 $800,00 37 1 DIP to Cross the Existing W/L ditch SEWER 7.00 EA 1 $15800,001 $12,600400 Page 2 of 4 Additions Sub Total $25,662.50 FCo R T WO RT H City of Fort Worth Change Order Deletions Project Name Hicks Industrial Park Sanitary Sewer Extension Project No.(s): P275-707170036783 DOE No. 5580 Project Description Contractor Sanitary Sewer Extension to Serve Hicks Industrial Park Wright Construction Co., Inc. City Sec No.: City Proj. No.: Change OrderL. Date 1 12/8/2011 City Project Mgr. I Liam Conlon City Inspector: Michael Collier DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 24 Concrete Type E Install SEWER 10.00 CY $85.00 $850400 25 Driveways 6-Inch Exposed Aggerate Install SEWER $8,622,00 SF $1,40 $120070,80 26 Drives 6-Inch Install SEWER 420,00 SF $8.00 $3,360000 27 Pavement 2-inch HMAC on 2/27 Concrete Base Material SEWER 819.00 LF $65.00 $53,235,00 29 Rip Rap Grouted Than 18-inch Rock Install SEWER 42.00 CY $120.00 $5,040000 33 6-Inch Top Soil Install SEWER 75.00 CY $8.00 $600100 34 Filll Material SEWER 10.00 CY $20.00 $200,00 35 Dehole Exploratory Excavation Study SEWER 6.00 EA $40,001 $240,00 40653 00367 Page 3 of 4 Deletions Sub Total $75, M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0200 Page 4 of 4