HomeMy WebLinkAboutContract 40440-A4 (2)AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and AECOM Technical Services, Inc. (Engineer) made and entered into City Secretary Contract No. 40440, (the Contract) which was authorized by the City Council by M&C C-24201 on the 4th day of May 2010 and amended by City Secretary Contract No. 40440-A1 on the 12th day of August, 2010; and WHEREAS, the Contract involves engineering services for the following project: Alliance Airport Phase 7 Pavement Rehabilitation, Project No. 1588 WHEREAS, it has become necessary to execute Amendment No. 4 to said contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 11, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13,504.38. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City of all work and services shall not exceed the sum of $205,382.53. OFFICIAL RECORD CITY �I�CRETAR`� Ft WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this day of 20�, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: Kenneth L. Penney, Jr., A.A.E. Airport Systems Director AECOM Technica Services, I c. Enginee By: Name: Uei B�ratan, P.E. Title:or Vice President 1700 Market Street Suite 1700 Philadelphia, PA 19103 APPROVED AS �O FORM AND LEGALITY: Assistant City Attorney Date: Assistant City Manager Co,ntract authorization `+ <<�� moo x Port Worth Alliance Airport Runway Guard Light Rehabilitation Fee Estimate and Man-hour Summary Base Contract Date: January 17, 2011 AECOM TECFINICAL SERVICES, INC. Summa o os s Total 1. Direct Labor: Civil Design $1,845.00 2. Labor and General Administration Overhead ((150%) x Item 1 - Direct Labor Cost) $2,767.50 3, Subtotal of Direct Labor and Overhead (Total of Items 1 & 2) $4,612,50 4. Profit (Item 3 - Direct Labor and Overhead x.15) $691488 Labor Total (Items 3 & 4) $6y304.38 5. Expenses: DMJM (See Attached) _ $200.00 6. Subconsultants (All Subconsultants are MWBE Qualified) Electrical Design (Ferguson Consulting) Guard Lights $5,000.00 Construction QA Testing) (Mas-Tek Engineering) $3,000600 7. Lump Sum Fee Estimate (Items 3, 41 5, and 6) Total (Design and CPS)j $13,504.38 DBE Participation Total $8,000.00 DBE Percentage 59.2% Fort Worth Alliance Airport Runway Guard Light Rehabilitation Fee Estimate and Manhour Summary Civil Design Date: January 17I 2011 AEGDM TECHNICAL SERVICES, INC. Labor Classifications Hours Rate GOSt Project Principal 0,001 $71.75 ( $0.00 Project anage, I30.00 $61.50 $10845.00 Senior Engineer 0.00 $43.30 $0.00 Engineer 0.00 � $27.70_ ____ $0.00 CADD Technician 0.00 $31.8Q $0.00 Administrative 0.00 $19.50 $0.00 Labor Total 30.Q0 $1,845.00 Expenses Unit Quantity Unit F�rice Cost Plotting (drawings) EA 0 $5.00 $0.00 Printing (blue line drawings) EA 0 $0.60 $0.00 Printing (Specifications & Reports) EA 0 $0.05 $0.00 Overnight Mail\Courier EA 0 $25.00 $0.00 Mylars EA 0 $8.00 $0.00 Transportation Miles 400 $0.50 $200.00 Expense Total $200.00 Fort Worth AIt(ance Airport Runway Guard Light Rehabilitation Fee Estimate and Man•hour Summary Date: January 175 2011 AECOM TECHNICAL SERVICES, INC. Project Project Senior Total Ho0rs ID ACTIVITY NAME Principal Manager Engineer En ineer Technician Clerical per task 1,0 Project Management 1.1 Design Coordination Meetings —� — 0 1,2 Review As-Builts 0 -P.' 1.3 Project Coordination 0 M' 1.4 QAReview 1D 10 2.0 Miscellaneous M' 2.1 Cover Sheet 0 1 2.2 Project Layout 0 2.3 Quanilies and General Notes _ 0 2A Phasing Plans 2.5 Specifications 0 _ C 3,0 Construction Phase Services p' 3.1 Periodic Site Visits/Meetings 20 — —__20 3 TOTAL HOURS 0 30 0 0 0 0 30 M&C Review Page 1 of 2 COUNCIL ACTION: Approved on 4/5/2011 fts iai site d the ity of r of V%loaL i, Texas FORT �rVOR 11 DATE: 4/5/2011 REFERENCE NO.: **C-24819 LOG NAME: 55AFW - PVMNT REHAB P7 AMD4 CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: Authorize Execution of Amendment No. 4 to City Secretary Contract No. 40440 in the Amount of $13,504.38 with AECOM Technical Services, Inc., to Include Electrical Design, Civil Design and Materials Testing for the Phase Seven Airfield Pavement Rehabilitation, Runway Guard Light Rehabilitation and Precision Approach Path Indicator Rehabilitation at Fort Worth Alliance Airport (COUNCIL DISTRICT 2) It is recommended that the City Council authorize the City Manager to execute amendment No. 4 to City Secretary Contract No. 40440 in the amount of $13,504.38 with AECOM Technical Services, Inc., to include electrical design, civil design and materials testing for the phase seven airfield pavement rehabilitation, runway guard light rehabilitation and precision approach path indicator rehabilitation at Fort Worth Alliance Airport. DISCUSSION: On May 4, 2010, (M&C C-24201) the City Council approved City Secretary Contract No. 40440, an engineering services agreement in the amount of $144,865.84 with AECOM USA Group, Inc., for phase seven airfield pavement rehabilitation, runway guard light rehabilitation and precision approach path indicator at Fort Worth Alliance Airport. On August 12, 2010, Administrative Amendment 1 in the amount of $36,843.31 was executed to expand the scope of the contract to include the rehabilitation of existing Precision Approach Path Indicator (PAPI) system on runway 16R/34L at Alliance Airport. Equipment failure and continued maintenance necessitated the replacement of the existing PAPI system. This amendment increased the total fee to be paid by the City for work and services to $181,709.15. On October 26, 2010, per the request of Mr. Frank R. Wengler, P.E., of AECOM USA, Inc., d/b/a AECOM USA Group, Inc., Amendment 2 was approved by Council to assign the contract to AECOM Technical Services, Inc. On November 29, 2010, Administrative Amendment 3 in the amount of $10,169.00 was executed to expand the scope of the contract to incorporate the replacement of the air conditioning system in the electrical vault. This amendment increased the total fee to be paid by the City for work and services to $191,878.15. Amendment 4 in the amount of $13,504.38 is proposed in this M&C to increase the scope of the contract to include replacing the In -Pavement lights at Taxiway -A north and south, Taxiway-B west of main runway, and Taxiway-H west of main runway for a total of 68 fixtures. This amendment increases the total fee to be paid by the City for work and services to $205,382.53. FAA funds from Runway Rehab and ARFF Grant 348-029641-2010 will be used for this project. Existing land credits that remain from the original land donation for Alliance Airport will be used for the City's five percent in -kind match. http://apps.cfwnet.org/council�acket/mc review.asp?ID=14811&councildate=4/5/2011 4/6/2011